.. J-11 011/195/ 2015-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (I.A. Division) To , Shri N. Rajeshwar Reddy Joint Managing Director M/s Balaji Amines Ltd. Plot no. E-7 & E-8, MIDC Chincholi, Taluka Mohol, District Solapur, Maharashtra Email.: [email protected] ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan Aliganj, Jorbagh Road New Delhi - 110 003 E-mail : lk.bokolia@nic.in Telefax: 011-24695313 Dated: 13 th October, 2015 Subject: Expansion of Specialty Chemicals Manufacturing Unit at Plot No.E-7 & E-8, MIDC Chincholi, Taluka Mohol, District Solapur, Maharashtra by M/s Balaji Amines Ltd. - reg TOR Ref. No.: Your proposal no. IA/MH/29191/2015 dated 17th July, 2015 Sir , Kindly refer your letter no. IA/MH/29191/2015 dated 1 ih July, 2015 along · with project documents including Form-1 , Pre-feasibility Report and draft · rerms of Reference' as per the EIA Notification, 2006 . It is noted that the proposal is for expansion of specialty chemicals manufacturing unit at Plot No .E-7 & E-8, MIDC Chincholi, Taluka Mohol, District Solapur, Maharashtra by M/s Bala ji Amines Ltd. Following products and by products are now proposed: Sr. No. Product Existing· Products Proposed Total after Capacity (MT I Products expansion ( Month) Capacity MT I MT/ Month) Month 1 Mono Methyl Amine MMA 928.8 -- 928.8 2 Di Methyl Amine DMA 2066.4 -- 2066.4 3 Tri MethylAmine TMA 144 432 576 4 Di Methyl Am ine Hydrochloride (DMA 1092 1092 2184 HCI 5 N-Methyi-2-Pyrrolidone NMP 1005 1008 2013 . 6 2-Pyrrolidone 2P ) 1005 - 1005 7 N-Ethyl Pyrrolidone NEP 1005 - 1005 8 Oi Methyl Formi de DMF 2160 840 3000 9 Gama Butyro Lactone GBA 1005 1008 2013 10 Methyl Di Ethanol amine MDEA 1035 -- 1035 11 Poly Vinyl Pyrrolidone/ PVP Iodine 201 -- 201 {PVP/PVP Iodine) -- ...- 12 Mono Ethyl Amine MEA 100.8 -- 100.8 13 Di Ethyl Am ine DEA 298.8 -- 298.8 14 Tri Ethyl Amine 1 TEA 601 .2 -- 601.2 15 Morpholine MOR - 1080 1080 16 Aceto Nitrile ACN - 1440 1440 17 Di Methyl Carbonate DMC -- 1660 1660 1 .
Transcript
Page 1: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

..

J-11 011/195/2015-IA II (I) Government of India

Ministry of Environment, Forest and Climate Change (I.A. Division)

To,

• Shri N. Rajeshwar Reddy Joint Managing Director M/s Balaji Amines Ltd. Plot no. E-7 & E-8, MIDC Chincholi , Taluka Mohol, District Solapur, Maharashtra

Email.: [email protected] ; Fax.: 0091-217-2451521

Indira Paryavaran Bhawan Aliganj, Jorbagh Road

New Delhi - 110 003

E-mail : [email protected] Telefax: 011-24695313

Dated: 13th October, 2015

Subject: Expansion of Specialty Chemicals Manufacturing Unit at Plot No.E-7 & E-8, MIDC Chincholi, Taluka Mohol, District Solapur, Maharashtra by M/s Balaji Amines Ltd. - reg TOR

Ref. No.: Your proposal no. IA/MH/29191/2015 dated 17th July, 2015

Sir, Kindly refer your letter no. IA/MH/29191/2015 dated 1 i h July, 2015 along · with project

documents including Form-1, Pre-feasibility Report and draft ·rerms of Reference' as per the EIA Notification, 2006. It is noted that the proposal is for expansion of specialty chemicals manufacturing unit at Plot No.E-7 & E-8, MIDC Chincholi , Taluka Mohol, District Solapur, Maharashtra by M/s Balaji Amines Ltd. Following products and by products are now proposed:

Sr. No. Product Existing· Products Proposed Total after Capacity (MT I Products expansion ( Month) Capacity MT I MT/ Month)

Month 1 Mono Methyl Amine MMA 928.8 -- 928.8 2 Di Methyl Amine DMA 2066.4 -- 2066.4 3 Tri MethylAmine TMA 144 432 576 4 Di Methyl Amine Hydrochloride (DMA 1092 1092 2184

HCI 5 N-Methyi-2-Pyrrolidone NMP 1005 1008 2013 . 6 2-Pyrrolidone 2P ) 1005 - 1005 7 N-Ethyl Pyrrolidone NEP 1005 - 1005 8 Oi Methyl Formide DMF 2160 840 3000 9 Gama Butyro Lactone GBA 1005 1008 2013 10 • Methyl Di Ethanol amine MDEA 1035 -- 1035 11 Poly Vinyl Pyrrolidone/ PVP Iodine 201 -- 201

~ {PVP/PVP Iodine) -- ...- ~ ~

12 Mono Ethyl Amine MEA 100.8 -- 100.8 13 Di Ethyl Amine DEA 298.8 -- 298.8 14 Tri Ethyl Amine 1 TEA 601 .2 -- 601.2 15 Morpholine MOR - 1080 1080 16 Aceto Nitrile ACN - 1440 1440 17 Di Methyl Carbonate DMC -- 1660 1660

1 )A~

.

Page 2: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

18 Budesonide ( BD -- 1.5 1.5 19 Betamethasone & Its Salts BM) - 1.5 1.5 20 Ciclesonide c CN - 1.5 1.5 21 Flumethasone &Its Salts FM - 0.525 0.525 22 Fluticasone & Its Salts 1 FC - 0.5 0.5 23 Beclamethasone Dipropionate BMD - 0.5 0.5 24 16-Aipha Hydroxy Prednesolone (16- - 0.5 0.5

AHP 25 Mometasone Furuote MF - 0.5 0.5 26 Propylene Glycol PG -- 1656 1656 27 Mono IsoPropyl Amine MIPA -- 504 504 28 - Propylene Carbonate PC - 432 432 By- Products - - -

1 Higher Amines 111 .9 117.12 229.02 2 Methyl Tri Ethanol Amine 57.6 ·- 57.6 3 Calcium Hydroxide 262.8 262.8 4 Tetra Hydro Furan - 86.4 86.4 5 Hydrogen - 51.84 51.84 6 Spent Caustic Solution 20% - 576 576 7 Sulphur -- 5.76 5.76 •

2.0 Draft Terms of Reference (TOR) have been discussed and finalized during 46th Reconstituted Expert Appraisal Committee (lndustry-2) meeting held during 20-21 5

t August, 2015 for preparation of EIA/EMP report. The Committee prescribed the following Specific and Additional TOR in addition to Generic TOR provided at Annexure-! for preparation of EIA-EMP report:

A. Specific TOR

1 Details on solvents to be used ,measures for solvent recovery and for emissions control. 2 Work zone monitoring arrangements for hazardous chemicals. 3 Detailed effluent treatment scheme including segregation of effluent streams for units

adopting 'Zero' liquid discharge. -

4 Action plan for odour control to be submitted . 5 A copy of the Memorandum of Understanding signed with cement manufacturers indicating

clearly that they co-process organic solid/hazardous waste generated. 6 Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous

waste in TSDF, if any. 7 Action plan for utilization of MEE/dryers salts. 8 Material Safety Data Sheet for all the Chemicals are being used/will be used. 9 Authorization/Membership for the disposal of solid/hazardous waste in TSDF are being

used/will be used. 1 0 Authorization/Membership for the disposal of solid/hazardous waste in TSDF. 11 Risk assessment for storage and handling of hazardous chemicals/solvents. Action plan for

handling & safety system to be incorporated. 12 Arrangements for ensuring health and safety of workers engaged in handling of toxic

Details of process emissions from the proposed unit and its arrangement to control. · 13 Ambient air quality data should include VOC, etc.,

B. Additional TOR

i The Committee exempted the public hearing as per Section 7 (i), Ill Stage (3), Para (i) (b) of EIA Notification 2006 as project is located in the notified industrial area.

ii A separate chapter on status of compliance of Environmental Conditions granted by State/Centre to be provided. As per circular dated 30th May, 2012 issued by MoEF, a

2

• I

..

Page 3: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

-

-

certified report by RO, MoEF on status of compliance of conditions on existing unit to be

provided in EIA-EMP report.

iii Copy of application submitted to obtain clearance from National Wild Life Board . •

3.0 These 'TORs' should be considered for the preparation of EIA I EMP for expansion of specialty chemicals manufacturing unit at Plot No.E-7 & E-8, MIDC Chincholi , Taluka Mohol, District Solapur, Maharashtra by M/s Balaji Amines Ltd. in addition to all the relevant information as per the 'General Structure of EIA' given in Appendix Ill and lilA in the EIA Notification, 2006.

I

4.0 . Public hearing is exempted as per Section 7 (i), Ill Stage (3), Para (i) (b) of EIA Notification · 2006. You are requested to kindly submit the final EIA/EMP prepared as per TORs to the Ministry for considering the proposal for environmental clearance within 3 years as per the MoEF O.M. No. J-1101314112006-/A./1 (/)dated tfh October, 2014

5.0 The consultants involved in the preparation of EIAIEMP report after accreditation with Quality Council of India/ National Accreditation Board of Education and Training (QCI/NABET) would need to include a certificate in this regard in the EIA/EMP reports prepared by them and data provided by other Organization(s)/Laboratories including their status of approvals etc. It is mention that an automatic TOR has been issued through e-mail on 07.09.2015 which stands cancelled with issue of this TOR.

Copy to:

(Lalit Bokolia) Additional Director

1. The Chairman, Maharashtra State Pollution Control Board, Shri Chatrapati Shivaji Maharaj Municipal Market-Building, 4th Floor, Mata Rambai Ambedkar Road, Mumbai - 400 001 , Maharashtra.

2. Regional Office 0/VCZ), Ministry of Environment, Forest and Climate Change, Nagpur.

3

(Lalit Bokolia) Additional Director

Page 4: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

• ....

'

1. 2.

3.

. . ••

4.

• • •

. • •

• •

· Annexure-I GENE~IC TERMS pF REFERENCE {TO~) IN RESPECT OF INDUSTRY SECTOR

Executive Summary Introduction •

i. Details of the EIA Consultant incl~ding NABET accreditation ii. Information about the project prop~nent iii. Importance and benefits of the project

'Project Description i. Cost of project and time of completion. ii. Products with capacities for the proposed project. iii. If expansion project, details of existing products with capacities and whether

• lV.

v. •

Vl. .. Vll.

adequate land is available for expansion, reference of earlier EC if any. List of raw materials required and their source along with mode of transportation .

• Other chemicals and materials required with quantities and storage capacities Details of Emission, effluents, hazardous waste generation and their management. Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and .contract)

viii. Process description along with major equipments and machineries, process flow sheet

• lX.

X •

(quantities) from raw material 'to products to be provided Hazard identification and details of proposed safety systems. · •

Expansion/modernization proposals: a. Copy of all the Environmental Clearance(s) including Amendments

thereto obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment and Fqrests as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in illl the existing environmental clearances including Amendments shall be provided. In addition, status of compliance of

b.

Consent to Operate for the ongoing /existing operation of the project from SPCB sh~l be attached with the EIA-EMP repprt . . In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the ElA Notitication 1994 and/or EIA Notification 2006 .shall be provided. Copies of Consent to Establish/No Objection Certificate and 1Copsen~ to Operate (in case of units operating prior to EIA Notification r2006, CTE and CTO of FY 2005-2006) obtained from ·the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted .

Site Details •

• I. ~

iL

iiI. • IV.

v.

Location of the project site covering village, Taluka/Tehsil, District and State, Justification for selecting the site, whether other sites were considered. A ·toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scale on an A3/ A2 sheet. (including all eco-sensitive ire as and environmentally sensitive places) Details w.r.t. option analysis for selection of site Co-ordinates (lat-long) of all four corners of the site . Google map-Earth downloaded of the project site.

.. •

• . . .

• • •• •

Page 5: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

. ... . . •

.. •

•• . .. •

• •

..

• Vl .

•• VII.

viii.

• IX.

X . •

Xl.

• •

Layout maps indicating existing unit as well as proposed unit indicating •

storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate. Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/greenbelt, in particular. Landuse break-up of total land of the project site (identified and acquired), government/private - agricultural, forest, wasteland, water bodies, settlements, etc shall be Included. (not required for industrial area) A list of major industries with nam~ and type wit~in study area (lOkm radius) shall

' be incorporated. land use details of the study area Geological features and Geo-hydrological status of the study area shall b~ included. Details of Drainage of the projeet upto Skm radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood

qc.currence frequency based on peak rainfall data of the past 30 years. Details of · FibQq Level of the project site and maximum Flood Level of the river shall also be

. J

pro video. (mega green field projects) xii. __ , Status of acquisition of land. If acquisition is not complete, stage of the acquisition

process and expected time of complete possession of the land. . xiii. R&R details in respect of land in line with state Government policy

• 5. · Forest, and wildlife related issues {if applicable):

• 1.

.. 11.

... 111.

• lV.

v.

• Vl.

6.

Permission and approval for the use of forest lanp (forestry clearance), if any, and recommendations of the State Forest Department. (if applicable) . Landuse map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha) Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted. The projects t<> be located within ~0 km of the National P&ics, Sanctuaries, Biosphere Reserves, Migratory C~rridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments ofthe Chief Wildlife Warden-thereon . Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife

Environmental Status · . i. Determination of atmospheric .inversion level at the project site and site-specific

micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall. ..

11 •

... 111.

AAQ data (except monsoon) at 8 locations for PMIO, PM2.5, S02, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved fore~ . Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification ofNov. 2009 along with- min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA Report .

• •

• •

• •

~-----"---- " ~·

• I

-

Page 6: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

\

'

7.

• • I

• IV.

v.

• Vl. .. Vll . ... Vlll. • IX.

. X •

• XI.

Surface water quality of nearby River (1OOm upstream and downstream of discharge point) and other surface drains at eight locations as per CPCB/MoEF&CC guidelines. Whether the site falls near to polluted stretch of river, identified by the CPCB/MoEF&CC, if yes give details. Ground water monitoring at minimum at 8 locations shall be included . Noise levels monitoring at 8 locations within the stvdy area. · Soil Characteristic as per CPCB guidelines . Traffic study of the area, type of vehicles, frequency of vehicl.es for transportation of materials, additional traffic due to proposed project, parking arrangement etc. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule-! fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and furnished. Socio-economic status of the stuqy area .

Impact and Environment Management Plan

• 1.

.. 11 • ... 111.

• lV.

v .

• VI. .. VII •

.. . Vlll .

• lX.

X.

Assessment of ground level concentration of pollutants from the stack emission based on site·specific meteorological features . In case the project is located on a. hilly terrain, the AQIP Modelling shall be done using inputs of the specific terrain characteristics for detennining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any. Water Quality modelling - in case of discharge in water bcdy Impact of the transport of the raw materials and end products on the surrounding environment shall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor-cum-rail transport shall be examined. • A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E(P) Rules. , Details of stack emission and action plan for control of emissions to meet .. standards.

, I \ •

Measures for fugitive emission control · .(' · .: Details of hazardous waste generation and their storage, utilization,.imd management. Copies of MOU regarding utilization of solid and hazardous waste in cement plant shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques~ Energy conservation, and natural resource conservation.

~

Proper utilization· of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided. · Action plan for the green belt development plan in 33 % area i.e. land with not less than I ,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated. Action plan for rainwater harvesting measures. at plant site shall be su~itted to harvest rainwater from the roof tops and storm water drains to recharge tile ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources. ..

. .

Page 7: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

• •• • •

• ..

\

• ),

8.

• 9 .

10.

11. .. . . . ..

• •

. xi. Total capital cost and recurring cost/annum for environmental pollution control

measures shall be included. . xii. Action plan for post-project environmental monitoring shall be submitted. xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency

Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.

Occupational health • • I

• 1.

•• 11.

••• 111.

• IV. •

• 1.

.. 11.

••• 111.

• lV •

• •

Plan and fund allocation to ensure the occupational health & safety of all contract and casual workers · Details of exposure specific health status evaluation of worker. If the workers, health is being evaluated by pre designed fonnat, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other o~ular defect) ECG, during pre placement and periodical examinations give • •

· tlie 'dpt~ls of the same. Details regarding last month analyzed data of above me~tioned parameters as per age, sex, duration of exposure and department

• -~ · Mse. · ..... .

Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards and whether they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopteq to keep them within PEL so that health of the workers can be preserved, Annual report of heath status of workers with special reference to Occupational Health and Safety .

Corporate Environment Policy • • •

'

Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. Does the Environment Policy prescribe for standard operating process I procedures to bring into focus any infringement I deviation I violation of the environmental or forest norms I conditions? If so, it may be detailed in the EIA. What is the hierarchical system or Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given. Does the company have system of reporting of non compliances I violations of environmental norms to the Boru-d of Directors of the company and I or

shareholders or stakeholders at large? This reporting mechanism shall . be '

detailed in the EIA report •

Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase. Enterprise Social Commitment (ESC) •

~ •

i. Adequate funds (at least 2.5 % of the project cost) shall be eannarked towards the Enterprise Social Commitment based on Public Hearing issues and item-wise details

' •

·--

I

..

I

Page 8: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

• ..

f

. ),

·' .. -: •• •

• • • • . . .

along with time bound · actio~ plan shall be included. Socio:-economic development · · activities need to be elaborated upon . . .

12. Any litigation pending against the project and/or any direction/order passed by any Court of . Law against the project, if so, details thereqf shall also be included. Has the unit received any

notice under the Section 5 of Environment '(Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and C9mpliance/ATR to the notice{s) and present status of the case. ·

13. '.A~tabular chart with index for point \Vise compliance of above TORs.

14. The TORs prescribed shall be valid for a period of three years for submission of the EIA-EMP reports.

The following general points shall be noted: I

· i. All documents shall be properly indexeg, page numbered. Period/date of data collection shall be clearly indicated . • •

11. •

Authenticated English translation of all material in Regional languages shall be ... Ill.

provided. iv. The letter/application for environmental clearance shall quote the MOEF file No. and

also attach a copy of the letter. · v. The copy of the letter received from the Ministry shall be also attached as an annexure

to the fmal EIA-EMP Report. vi. The index of the final EIA-EMP report must indicate the specific chapter and page no.

of the EIA-EMP Report vii. While preparing the EIA report, the instructions for the proponents and. instructions

for the consultants issued by MOEF vide O.M. No. J-11013i4112006-IA.II (I) dated 4th August, 2009, which are available on the website of this Ministry shall also be followed.

viii. The consultants involved in the preparation of EIA-E:MP report after accreditation with Quality Council of India (QCl) /National Accreditation Board of Education and. Training (NABET) would need to include a certificate in this regard in the EIA-EMP reports prepared

• by them and data provided by other organization/Laboratories including" !heir status of approvals etc. Nanie of the Consultant and the Accreditation details shall be posted on the EIA-E.MP Report as well as on the cover of the Hard Copy of the Presentation material for

• • • EC presentation. ,:. ·

TORs' prescribed by the Expert Appraisal Committee (Industry) shall be considered for preparation ofEIA-ElvfP report for the project in addition to all the relevant infonnation as per the 'Generic Structure ofEIA' given in Appendix III and IliA in the EIA Notification, 2006. Where the documents provided are in a language other than English, an English translation shall be provided. The draft EIA­EMP report shall be submitted to the State Pollution Control Board of the concerned State for conduct of Public Hearing. The SPCB shall condu9t the Public Hearing/public consultatioq, district-wise, as per the provisions of EIA notification, 2006. The Public Hearing shall be chaired by an Officer not below the rank of Additional District Magistrate. The issues raised in the Public Hearing and during the consultation process and the commitments made by the project proponent on the same shall b~ included separately in EIA-EMP Report in a separate ch~pter and s~Imrnarised in a tabular chart with financial budget (capital and revenue) along with time-schedule of implementation for complying with the commitments made. The final EIA report shall be submitted to the Ministry for obt$ing environmental clearance. ·

• .. ,.

• • •••

Page 9: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

General DetailsA.

Project DetailsA-1.

(i). Forest Clearance Required?: No

(ii). Proposal No. : FP/MH/IND/638/2016

(iii). Name of Project: Balaji Amines Limited

(iv). Short narrative of the Project : The company has taken into consideration the need to meet the

demands of the national & international market, the proponents of the industry planed to go for expansion

of Aliphatic Amines, Derivatives & Chemical Manufacturing Unit at Solapur.

(v). State : Maharashtra

(vi). Category of the Project : Industry

(vii). Shape of project land : Non Linear

(viii). Distance of the project from the boundary of the Protected Area (in km.): 1.84

(ix). Estimated cost of the Project(Rupees in lacs) : 0

(x). Total period for which clearance is required (in year): 5

(xi). Total Project Area(in ha.): 16

(xii). Project Area under Protected Area (in ha.): 0

(xiii). Project Area under Non-Protected Area (in ha.): 16

Wild Life Report

Form for seeking recommendation of Standing Committee of NBWL/SBWL.

PART - I(To be filled up by User Agency)

Page 10: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

Details of User AgencyA-2.

(i). Name : BALAJI AMINES LTD

(ii). Address1 : Plot No. E-7 & E-8, Chincholi MIDC, Tal.: Mohol,Dist.: Solapur.

(iii). Address2 : NIL

(iv). State : Haryana

(v). District : Solapur

(vi). Pin : 413255

(vii). Landmark : NIL

(viii). Email address : [email protected]

(ix). Landline Telephone No. : 2357050

(x). Fax No. : NIL

(xi). Mobile No. : 9822750414

(xii). Website (if any) : NIL

(xiii). Legal status of User Agency : Private

Details of Person Making ApplicationA-3.

(i). First Name: N

(ii). Middle Name: Rajeshwar

(iii). Last Name: Reddy

(iv). Gender: Male

Page 11: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

(v). Designation: Joint Managing Director

(vi). Address 1: Plot No. E-7 & E-8, Chincholi MIDC, Tal.: Mohol,Dist.: Solapur.

(vii). Address 2: NIL

(viii). State: Haryana

(ix). District: Solapur

(x). Pin: 413224

(xi). Landmark: Hotgi road

(xii). Email Address: [email protected]

(xiii). Landline Telephone No.: 2310824

(xiv). Fax No.: 2172451521

(xv). Mobile No.: 9822750414

(xvi). Upload a copy of documents in support of the competence/authority of the person making this

application to make application on behalf of the User Agency: Annexure copy of documents in

support of the competence

Details of Land required for the ProjectB.

Details of Protected AreaB-1.

No. of Divisions involved in Protected AreaB-1.1

Division wise details of land

S.no Division NameProtected Area

Name

Project Areaunder Protected

Area

1. Solapur Great IndianBustard Sanctuary,Nannaj

0

Details of Districts involvedB-1.2

Page 12: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

District wise breakup

S.no District NameProject Area

under ProtectedArea(ha.)

Project Areaunder Non-ProtectedArea(ha.)

1. Solapur 0 16

Component wise breakupB-1.3

Component wise breakup

S.no ComponentProject Area

under ProtectedArea(ha.)

Project Areaunder Non-ProtectedArea(ha.)

1 Balaji Amines Ltd 0 16

Maps of protected areaC.

Division 1. : Solapur

(i). Project Area under Protected Area (in ha.) : NIL

(ii). Nature of the Project : Non Linear

(a). No. of patches : One

Patch wise details

PatchNo.

Area of Patch(in ha.) Kml File of Patches

1. 0 No Data

(iv). copy of Survey of India Toposheet indicating boundary of protected area:

Annexure Survey of India Toposheet

(v). scanned copy of the Geo-referenced map of the protected area prepared by

using DGPS or Total Station: Annexure scanned copy of the Geo-referenced map

Justification for locating the Project in protected area and details of alternatesexamined :

D.

(i). copy of note containing justification for locating the Project in protected area: Annexure

Justification

Employment likely to be generatedE.

Page 13: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/06062016S0QXMY... · Email.: info@balajiamines.com ; Fax.: 0091-217-2451521 Indira Paryavaran Bhawan

(i). Whether project is likely to generate employment ?: Yes

(a). Permanent/Regular Employment(Number of persons): 100

(b). Temporary Employment(Number of person-days): 10

Displacement of People due to the project, if anyF.

(i). Whether project involve displacement?: No

Status of Environmental clearanceG.

(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes

(a). Status of the Environmental Clearance to the Project : EC under process

(ii).Environmental Clearance File No.: J-11011/195/2015-IA II (I)

Whether proposal is for investigation/surveyH.

Details of the Bio diversity Impact Assessment report in case the proposal involves use ofmore than 50 ha. NP/WLS.

(H-

2).

(a).Copy of the Bio diversity Impact Assessment report: Annexure Copy of Bio diversity Impact

Assessment report

Information on the projects undertaken by the proponent agency in the past in ProtectedAreas

(H-

3).

(a).Upload file: Annexure Information on the projects undertaken by the proponent agency in the past in

Protected Areas

Details regarding compliance of the conditions on each proposal(H-

4).

(a).Upload file: Annexure Details regarding compliance of the conditions on each proposal

(H-5).Whether any matter related to the project is sub judice in any court of law?: No

Documents

S.No Uploaded Additional Info. FilesRemarks


Recommended