Objectives Expro have a long-standing relationship with Shell and were approached to provide a suite of services to the Corrib Project, offshore North-West Ireland (Atlantic Ocean), to achieve the successful completion of the gas well to allow production to the Irish grid via a new gas facility To complete within challenging conditions (particularly weather), in a tight timeframe, whilst in a remote location Expro Excellence Expro’s ‘first time right’ approach ensured compliance with tight timeframe Approximately 737 operational hours with zero Expro NPT Subsea, slickline, well test and sampling teams all involved – seamless transition between phases with all product lines working in unison Flexible approach by Expro overcame logistical issues caused by the remote location Successful cutting trials completed with SSTT on 2” coil tubing and wireline 16 wireline runs Well test with maximum gas rate of 116 MMscf/day On-site fluid sampling Value to client Expro’s excellent performance allowed Shell to complete the Corrib Project as required by the Irish Government – late completion may have delayed the project significantly When operational, the facility contributes up to 60% of Ireland’s gas requirement Contact For further information, please contact: [email protected] www.exprogroup.com/welltesting From reservoir to disposal, Expro provides safe, efficient and accurate well testing services to meet the needs of our customers in any well, anywhere in the world. Expro has more than 40 years’ experience of providing well testing services to the global oil and gas industry. As one of the largest well test companies in the world, we provide mobile process equipment that accurately measures the performance of our customers’ wells. The data that we provide allows our customers to plan the optimal exploration of their reservoirs. Well Testing / Expro Excellence Expro’s ‘first time right’ approach key to overcoming challenging conditions of Corrib Project delivery Well Testing Expro Excellence exprogroup.com Project highlights Positive feedback from Shell regarding value added sessions and crew briefings Expro project manager provided support to client representative during stack up/SIT trials Project manager supported other vendor operations within Shell remit Second round of crew engagements well received by offshore teams Recognition of well test crew safety interventions Expro regional management facilitated key vendor/team engagement sessions during the planning phase to ensure a 'one team approach to right first time' principles were at the core of delivery
Transcript
Page 1: Expro Excellence Well Testing…with Shell and were approached to provide a suite of services to the Corrib Project, offshore North-West Ireland (Atlantic Ocean), to achieve the

Objectives

• Expro have a long-standing relationshipwith Shell and were approached toprovide a suite of services to the CorribProject, offshore North-West Ireland(Atlantic Ocean), to achieve thesuccessful completion of the gas well toallow production to the Irish grid via anew gas facility

• To complete within challenging conditions(particularly weather), in a tight timeframe,whilst in a remote location

Expro Excellence

• Expro’s ‘first time right’ approach ensuredcompliance with tight timeframe

• Approximately 737 operational hours withzero Expro NPT

• Subsea, slickline, well test and samplingteams all involved – seamless transitionbetween phases with all product linesworking in unison

• Flexible approach by Expro overcamelogistical issues caused by the remotelocation

• Successful cutting trials completed withSSTT on 2” coil tubing and wireline

• 16 wireline runs

• Well test with maximum gas rate of 116MMscf/day

• On-site fluid sampling

Value to client

• Expro’s excellent performance allowedShell to complete the Corrib Project asrequired by the Irish Government – latecompletion may have delayed the projectsignificantly

• When operational, the facility contributesup to 60% of Ireland’s gas requirement

ContactFor further information, pleasecontact:

[email protected]/welltesting

From reservoir to disposal, Expro provides safe, efficient and accurate well testingservices to meet the needs of our customers in any well, anywhere in the world.

Expro has more than 40 years’ experience of providing well testing services to the globaloil and gas industry. As one of the largest well test companies in the world, we providemobile process equipment that accurately measures the performance of our customers’wells. The data that we provide allows our customers to plan the optimal exploration oftheir reservoirs.

Well Testing

/ Expro Excellence

Expro’s ‘first time right’ approach key toovercoming challenging conditions ofCorrib Project delivery

Well Testing

Expro Exce l lence exprogroup.com

Project highlights

• Positive feedback from Shellregarding value added sessionsand crew briefings

• Expro project manager providedsupport to client representativeduring stack up/SIT trials

• Project manager supported othervendor operations within Shellremit

• Second round of crewengagements well received byoffshore teams

• Recognition of well test crewsafety interventions

• Expro regional managementfacilitated key vendor/teamengagement sessions during theplanning phase to ensure a 'oneteam approach to right first time'principles were at the core ofdelivery