PASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM ., f ".. TO: DeWa ~ . b a m ~ e t t i DATE: 1017111 FILE: ZN12-017 ZhingICode Compliance Administrator SUBJECT: Class I, Commercial Development Review - Elfers Senior Center Historic School Renovation and Annex Addi- tion PreliminaryIConstruction Site Plan and Stormwater Management Plan and Report (Project No. 1PRI 1-029) ~~0~:)amela S. Shaw ?j Development Review \ Technician II REFERENCES: Land Development Code, Section 306, Development Review Procedures; Comm. Dist. 3 It is recommended that the data herein presented be given formal consideration by the ZoningICode Compliance Administrator. Commission District: Project Name: Developer's Name: Location: Parcel ID No.: Land Use Classification: Zoning District: Acreage: Uselsquare Feet: WaterlSewage: Transportation Analysis Zone: Roads: Certificate of Capacity: Mobility Fee Assessment District: Mobility Fee CollectionIBenefit District: The Honorable Ann Hildebrand Elfers Senior Center Historic School Reno- vation and Annex Addition Pasco County Facilities Management 4120 Barker Drive; lot is the entire block between Grey Street, Mont Vista Lane, Barker Drive, and Olympia Street. Section 17, Township 26 South, Range 16 East. 17-26-1 6-0170-00300-0010 RES-9 (Residential - 9 dulga) R-1MH Single-FamilyIMobile Home District 2.25 Acres, m.o.1. Senior Center/7,912 Square Feet Pasco/Pasco 148 Public Initial A 1 DEVELOPER'S REQUEST: The developer of Elfers Senior Center Historic School Renovation Annex Addition is requesting approval for a preliminarylconstruction site plan and Stormwater Management Plan and Report for renovation of the historic Elfers School and the construction of an annex for use as a senior center. BACKGROUND: The site retains its original R-1MH Single-FamilyIMobile Home Zoning District. FINDINGS OF FACT: 1. Presently, the subject site contains the historic school building, a one-story block building, a one-story frame building, a one-story wooden building, two mobile homes, a carport, and two sheds. Except for the historic school, all of the listed structures will be demolished in two phases. 2. The subject property is located in Flood Zone "X." (ZN12-01 7) Page 1 of 10
Transcript
Page 1: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

PASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM

., f ".. TO: DeWa ~ . b a m ~ e t t i DATE: 1017111 FILE: ZN12-017

ZhingICode Compliance Administrator

SUBJECT: Class I, Commercial Development Review - Elfers Senior Center Historic School Renovation and Annex Addi- tion PreliminaryIConstruction Site Plan and Stormwater Management Plan and Report (Project No. 1 PRI 1-029)

~ ~ 0 ~ : ) a m e l a S. Shaw ?j Development Review \ Technician II

REFERENCES: Land Development Code, Section 306, Development Review Procedures; Comm. Dist. 3

It is recommended that the data herein presented be given formal consideration by the ZoningICode Compliance Administrator.

Commission District: Project Name:

Developer's Name: Location:

Parcel ID No.: Land Use Classification: Zoning District: Acreage: Uselsquare Feet: WaterlSewage: Transportation Analysis Zone: Roads: Certificate of Capacity: Mobility Fee Assessment District: Mobility Fee CollectionIBenefit District:

The Honorable Ann Hildebrand Elfers Senior Center Historic School Reno- vation and Annex Addition Pasco County Facilities Management 4120 Barker Drive; lot is the entire block between Grey Street, Mont Vista Lane, Barker Drive, and Olympia Street. Section 17, Township 26 South, Range 16 East. 17-26-1 6-01 70-00300-001 0 RES-9 (Residential - 9 dulga) R-1 MH Single-FamilyIMobile Home District 2.25 Acres, m.o.1. Senior Center/7,912 Square Feet Pasco/Pasco 148 Public Initial A 1

DEVELOPER'S REQUEST:

The developer of Elfers Senior Center Historic School Renovation Annex Addition is requesting approval for a preliminarylconstruction site plan and Stormwater Management Plan and Report for renovation of the historic Elfers School and the construction of an annex for use as a senior center.

BACKGROUND:

The site retains its original R-1 MH Single-FamilyIMobile Home Zoning District.

FINDINGS OF FACT:

1. Presently, the subject site contains the historic school building, a one-story block building, a one-story frame building, a one-story wooden building, two mobile homes, a carport, and two sheds. Except for the historic school, all of the listed structures will be demolished in two phases.

2. The subject property is located in Flood Zone "X."

(ZN 12-01 7) Page 1 of 10

Page 2: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

3. The surrounding zoning is as follows and, for reference purposes, the buffer requirements for the abutting properties are also provided:

Zoning Districts

North: R-1 MH Single-FamilyIMobile Type B Buffer 15 Feet Home Zoning District

South: A-R Agricultural-Residential Type B Buffer 15 Feet Zoning District

East: R-1 MH Single-FamilyIMobile Type B Buffer 15 Feet Home Zoning District

West: R-1 MH Single-FamilyIMobile Type B Buffer 15 Feet Home Zoning District

* Buffers are based upon the use of the site as a commercial (nonresidential) type.

4. The preliminarylconstruction site plan has been reviewed by the Zoning and Site Development Department, and it has been determined that the proposed use is consistent with the above-referenced zoning district's permitted uses.

5. The preliminary/construction site plan for the above-subject project was prepared for Pasco County Facilities Management Department by Northside Engineering Services, Inc., and consists of 16 sheets dated February 11, 201 1 ; the sheets were last revised on October 2, 201 1. The plans were originally received by the Zoning and Site Development Department on April 26, 201 1, and the latest revisions were received on October 4, 201 1.

6. Access to the property is from Grey Street, a County-maintained road, which has 50 feet of right-of-way with 20 feet of pavement; and from Barker Drive, a County-maintained road, which has 40 feet of right-of-way with 20 feet of pavement.

7. A Traffic Impact Study application was submitted and found to be exempt from the requirement to provide a traffic study and a Substandard Roadway Analysis.

8. The proposed request is consistent with the Pasco County applicable provisions of the Comprehensive Plan as conditioned.

CONCURRENCY ANALYSIS:

An Initial Certificate of Capacity is being issued for an 8,402-square-foot senior center. Any conditions required pursuant to the issuance of the certificate are attached to the Initial Certificate of Capacity.

RECOMMENDATION:

The Zoning and Site Development Department recommends approval of the preliminary/construction site plan and Stormwater Management Plan and Report with the following conditions:

Hard-Copy Site Development Permit

1. The applicantldeveloper or project contractor shall obtain a hard-copy Site Development Permit from the Zoning and Site Development Department prior to commencing any construction. To obtain this permit, the following must be submitted to the Zoning and Site Development Department:

a. The completed notarized acknowledgment portion of the attached agenda memorandum.

b. All necessary State and Federal permits including, but not limited to, dredge and fill, surface water, water distribution, wastewater collection, and reclaimed water from the appropriate agencies. The permit shall include the copies of the actual permit itself and all drawings that are approved by the respective regulatory

(ZN12-017) Page 2 of 10

Page 3: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

agency. Any annual reports required by such agencies shall be submitted to the biologist and the stormwater engineer.

No construction shall commence until the permit has been properly posted on the site.

Installation of Utilities Infrastructure

Prior to the start of any activities to construct waterlwastewater andlor facilities, the applicant shall provide a copy of the Letter of Commitment to serve this project issued by Pasco County Utilities, the utility provider.

The developer acknowledges that any provisions of Pasco County ordinances and any rezoning conditions of approval not specifically waived shall be in full force and effect, including all impact fee ordinances.

In the event ordinances/resolutions are adopted by the Board of County Commissioners including, but not limited to, solid waste, public safety, or wildlife, the developer shall be required to comply with such ordinanceslresolutions.

The developer acknowledges that approval of this preliminary planlpreliminary site plan and/or construction planlconstruction site plan does not establish vested rights with respect to construction of the project. Further, the developer acknowledges that no permit shall be issued or plat approved without the issuance of a Final Certificate of Capacity.

The developer acknowledges that in accordance with the Land Development Code (LDC), Section 402, Concurrency Management System, the Initial Certificate of Capacity shall expire as approved on the attached Concurrency Certificate.

All construction work, including roads, drainage, and utilities, shall be constructed in accordance with Pasco County design standards and tested in compliance with the Engineering Services Department's Testing Specifications for Construction of Roads, Storm Drainage, and Utilities.

The applicantldeveloper shall acknowledge that should Pasco County collect funds under a guarantee document, the developer shall authorize the County, or its designee, access to the property in question to complete the required work.

The applicanVdeveloper shall acknowledge that should Pasco County be required to institute legal proceedings in order to collect any funds under a guarantee document, the developer shall be responsible for attorney's fees and court costs incurred by the County in such action.

The developer acknowledges that an appeal may be filed against the decision of the Zoning and Code Compliance Administrator within 30 days of the date of this approval. Any development that takes place within the 30-day-appeal deadline shall not establish vested rights with respect to construction of the project.

Site plans approved by the Zoning and Site Development Department are the final approved documents. Changes/additions/deletions to approved site plans; i.e., building size, location, loading zones, etc., require revised site plan submittal, review fee, and approval in accordance with the LDC, Section 306.

The applicantldeveloper or project contractor shall notify the Engineering Services Department, Project Management Division, at least two working days prior to commencing any activity on the site.

Where underground water mains and hydrants are to be provided, they shall be installed, completed, and in service prior to combustibles being brought on-site (National Fire Protection Association, NFPA-1, 16.4.3.1.3).

The developer is hereby notified that the effective date of this development approval shall be the date of the final County action; however, no activity shall commence on site until such time as the acknowledgment portion of this document is completed (including notarization) and received by the Zoning and Site Development Department.

(ZN 1 2-01 7) Page3of 10

Page 4: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

15. The applicanffdeveloper acknowledges that except where project development schedules are established for Developments of Regional Impact (DRI) and Florida- quality development, the preliminary planlpreliminary site plan and all associated varianceslalternative standards requests shall expire within four years of the original approval date of the preliminary planlpreliminary site plan if Building Permits for the entire development have not been issued.

In the event a preliminary planlpreliminary site plan is voided, all subsequent submittals shall comply with regulations in effect at the time of the said resubmittals.

Construction Plan

16. Driveway, road, and intersection improvements requiring roadway widening andlor left- turn, storage lane construction shall also include an asphaltic concrete overlay of the entire limits of intersection improvement area to Pasco County specifications as approved by the County.

17. All construction within Pasco County right-of-way will require a Right-of-way Use Permit. The review and issuance of the Right-of-way Use Permit shall be conducted in accordance with the LDC, Section 31 1, Right-of-way Use Permit, and must be obtained prior to commencement of construction. The developer shall ensure that any improvements installed in rights-of-way are constructed to County standards.

18. The developer shall provide fire protection in compliance with the Pasco County Code of Ordinances, Chapter 46, Article Ill, and any subsequent amendments.

19. Prior to any construction activity, the developer shall ensure that proper erosion and sediment control measures are in place. The applicanffdeveloper or project contractor shall notify the Stormwater Management Division at least two working days prior to commencing any site preparation, including clearing and grubbing work, for a preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating from the project site and shall indicate on the construction drawings the manner in which fugitive dust is to be controlled. Further, all retention pond side slopes and associated swales shall be sodded to prevent soil erosion.

20. If, during construction activities, any evidence of historic resources including, but not limited to, aboriginal or historic pottery, prehistoric stone tools, bone or shell tools, historic trash pits, or historic building foundation, are discovered, work shall come to an immediate stop, and the Florida Department of Historic Resources (State Historic Preservation Officer) and Pasco County shall be notified within two working days of the resources found on the site.

21. If, during construction activities, any evidence of the presence of State and Federally protected plant andlor animal species is discovered, work shall come to an immediate stop, and Pasco County shall be notified within two working days of the plant andlor animal species found on the site.

Development Standards

22. The residential design standards are as follows:

a. Minimum Front-Yard Setback of 30 Feet

b. Minimum Side-Yard Setback of 15 Feet

c. Minimum Rear-Yard Setback of 30 Feet

d. Maximum Lot Coverage of 35 Percent

e. Maximum Height of 35 Feet

(ZNI 2-01 7) Page 4 of 10

Page 5: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

Building PermitlRecord PlatlCertificate of Occupancy

23. Prior to issuance of the first Certificate of Occupancy (CO) or Certificate of Completion, revised site plans must be approved. Revised plans that satisfactorily address the following shall be submitted:

a. Revised plans that address the following:

(1) Soil erosion and sediment controls plan must be expanded to include all disturbed areas including within the rights-of-way.

(2) Provide a soil erosion and sediment controls plan showing all of the necessary placement locations, notes, and details including, but not inclusive of, silt screen, construction/tracking pad Florida Department of Transportation (FDOT) Index 106's or the Florida Department of Environmental Protection National Pollutant Discharge Elimination System Best Management Practices), dewatering, inlets and swale protection, revegetation as necessary.

(3) Please add or modify the following notes:

(a) On the east side of the property runs a six-foot chain link fence. The fence must be maintained as not to block drainage coming from the east. Add a note which requires that as part of the maintenance duties.

(b) All work within the right-of-way will require a Right-of-way Use Permit.

(c) Add a note to the plans that the sight triangles are to be unobstructed and are to remain unobstructed.

(4) The plans shall certify that the roadway system is in substantial conformance with the Manual of Uniform Minimum Standards for Design, Construction, and Maintenance of Streets and Highways, State of Florida, in effect at the time the plans were prepared.

(5) Address the placement of fill including the compaction and lifts on the plans.

(6) Add the rough pond dimensions to the plans.

(7) Within the site plan, locate the various borings and DRI tests (to scalelto a scale).

(8) Provide a cross section through Grey Street (sheet C4.1).

(9) See sheets '(23.1 and C3.3. In the south pond is the word "spillway" which appears to be erroneous or mislocated; revise as necessary.

(1 0) See sheets C2.1, C4.1, and C4.2 section C-C. A new swale appears to be shown to be constructed in the Olympia Street right-of-way. The section does not appear to reflect it. On the plans, revise as necessary.

(11) Provide a Geotechnical Report signed and sealed by a professional geologist and/or a geotechnical professional engineer. See Section 704(.4) for the scope of work.

(12) Provide a soil boring below the proposed structure.

(13) The geotechnical engineer is to address the known or found geological hazards such as potential for stormwater discharging into the aquifer and sinkhole activity; include remediation measures.

(a) Provide any earthwork recommendations.

(b) Document on the plans the name of the geotechnical engineer and the respective report that the plans are based on.

(ZNI 2-01 7) Page 5 of 10

Page 6: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

(c) Provide two DRI tests; one in the existing pond and one in the new pond at the proposed pond bottom.

(d) Provide the DRI test location(s) as part of the amendedlrevised Geotechnical Report.

(e) The geotechnical engineer shall provide a certification per Section 704.5.

Show on sheet C4.2, Section A-A, six inches of freeboard must be maintained.

Provide a cross section (pond two [South]) showing the following information (some shown); Bottom of Pond elevation, Seasonal High Water Level, Design High Water Level (based on the seasonal high water level), the six inches of freeboard, and the Top of Pond elevation (minimum height).

On sheet C4.1: The system must contain the design event with six inches of freeboard (minimum top of grate elevation). In addition, per the Pasco County Stormwater Management Practices Manual (PCSWPM) the commercial parking lot inlets shall be designed and constructed to have the hydraulic gradient at or below the inlet elevation.

Provide stormwater tabulations complying with the PCSWPM; min tc to the first inlet is 15 minutes and must accommodate a 24-hourIl0-year storm event.

On sheets C4.1 and C6.1. The plan view indicates a 5' x 8' x 6 pad on both sides of the weir. However, on the weir detail, the weir opening is 10+ feet wide. The pad cannot prevent erosion if it is only one-half of the weir width; revise as necessary.

On sheet Ll.1, south property line eastern side, the proposed con- struction cannot cause, aggravate, nor have an adverse effect on the neighboring properties. The proposed swale passes through the proposed landscaping buffer. It appears that the landscaping plantings may function like a dam. If necessary, provide a space where the bottom of the swale is proposed.

On sheet C4.1, there are two locations to check:

(a) The.western one next to the right-of-way line appears to drain across the sidewalk. The sidewalk needs to remain slip resistant.

(b) The eastern one is at the east access to the phase two building. In lieu of draining down the sidewalk, there should be a cross slope to drain away from the building and off of the sidewalk.

CNISoils: The derivation of the curve numbers indicate only two basins, on and off site. The calculations indicated that there are two offsite basins. If the CN values are to be different, show the breakdown(s).

Where perc is to be used in the design of the stormwater facility, a DRI test is required to be done within the proposed stormwater at the bottom of pond elevation. Provide DRI test for both ponds. A factor of safety of two on the perc rate is required to be used. Provide the support calculations, i.e., MODRET or other.

Wherever the concrete sidewalk crosses a vehicular use area, add WWF, fibermesh, or approved equivalent.

Provide terminus or detectable warnings at sidewalk ends for the visually impaired.

Add the detectable warning detail (2008 FDOT, Index 304). Domes to be aligned in the direction of travel.

(ZNI 2-01 7) Page 6 of 10

Page 7: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

(26) The following maximums for roadways must be adhered to. Please add to the cross section.

(a) The cross-slope of the shoulders shall not be steeper than 0.06 feet per foot.

(b) The slope of the area within the roadside clear zone shall not be steeper than six feet horizontal to one foot vertical (6:l).

(c) Outside clear zone, all slopes within the County rights-of-way shall be a maximum of 4:l.

(d) Ditch bottoms should be at least two-feet wide and can be flat or gently rounded.

(27) Provide an Agent of Record for engineer and also for the developer if they are not the property owner.

(28) On the cover sheet, change the title of the "allowed" column to "minimum1maximum" and correctly fill it, or remove altogether.

(29) As it appears that all new improvements will not be constructed for occupancy at the same time, clearly indicate phase lines. Please take into consideration that the phase will need to be completely built for final engineering inspections, and the infrastructure must be adequate to support that phase.

(30) The minimum radii for entrances are 25 feet. Please correct the driveways as needed.

(31) On the north drive, where it is one-way, restrict the southern radius to preclude entrance from the south (right out only).

(32) Minimum stall depth for 60 degree spaces is 21 feet. Minimum stall width is 10.5 feet. Minimum aisle width is 18 feet. Correct the spaces along the southern portion of the one-way drive. Remove or correct the northern Americans with Disabilities Act (ADA) parking space so that it conforms.

(33) Loadinglunloading area of 12 x 50 is required for all commercial sites. If this can be accomplished using a standard parking space, place a note stating such on the plans. Show the arc-turn of the truck to and from the loading zone.

(34) Explain the note "grass parkinglgrass drivelno walk as an alternative". Any off-street parking area shall be graded for proper drainage and shall be surfaced so as to provide a durable and dustless surface including, but not limited to, a gravel, concrete, or bituminous concrete surface, and shall be so arranged as to provide for orderly and safe parking and storage of vehicles. All drive aisles must support a fire truck. If the drivelparking aisle is proposed to not be asphalted, provide a detail of the alternative. Simply leaving dirtisand is not an alternative.

(35) Please add a note that there will be no light spillage or glare beyond the project site.

(36) Clearly list the square footage for each phase, on each floor, and the totals.

(37) The pine or palm proposed to be removed on the north side of the property must be shown as replaced. The proposed landscaping will be fine, but please add the attached chart.

(38) Show the tree protection locations for the trees to be retained and provide a note that nothing can be dumped or placed under the dripline during construction.

(ZNI 2-017) Page 7 of 10

Page 8: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

All punk, ear, camphor, chinaberry, and mimosa trees are required to be removed because they are invasive. They do not have to be replaced.

Use the approved landscape chart which shows common and botanical names, height, caliper, drought tolerance, and whether a species is native.

Provide calculations to show the percentage of native plants and drought tolerant plants.

Show the detail for heating, ventilating, and air conditioning units' six-feet tall masonry wall screen.

A minimum of one species per five trees proposed is required. When forty or more trees are required, the minimum number of species is eight.

Palm trees may be substituted for up to 30 percent of the required shade trees at a rate of three palms for one shade tree, clustered eight feet on center, and display ten feet clear trunk.

No one plant species of shrubs or groundcover plants shall be more than 25 percent coverage of overall landscape area. Do not count the Bahia grass with groundcover; it is considered sod. Provide square footage for the shrubs also so that an equivalent comparison can be made. More species of shrubs and groundcover probably will be needed so that the maximum is not exceeded.

No more than 30 percent of landscaped areas may be grass; the balance must be shrubs or groundcover.

The areas to be covered in Bahia grass appear to exceed the maximum coverage; please correct and provide calculations.

A minimum.of 30 percent of the plant materials, other than trees and turf grass, used to fulfill the landscape requirements shall be native Floridian species. None of the species proposed are native; please correct.

All rows of parking shall have a terminal landscaped island (8' x 20') at each end, measured from the interior curb edges of the island. Some of the islands do not meet the measurements; please correct.

Each single, island shall have one shade tree, supplemented by shrubs, dwarf shrubs, and/or groundcover. All plants must be appropriate for the planting space; the Quercus virginiana will likely grow too large for the islands; please choose a different species.

The building perimeter shall be landscaped with an area, equal to ten percent of each building ground level floor area; the area will be a minimum of five-feet wide and shall include shade trees and/or palms, shrubs, and groundcover. Each building requires a minimum of two trees in its perimeter area. Fifty percent of the building perimeter is required to be landscaped with trees, shrubs, and groundcover. Correct the plantings around the addition(s).

Please indicate each buffer type on the plans, e.g., Type B with a typical cross section for each buffer type.

What will be used to provide the screening? If the continuous row of shrubs will be used, amend the plant table to show the height at planting as six feet; unless a variance to allow shorter shrubs is granted.

On the east and west sides, there are areas where the tree spacing is too great; please correct.

Water Management Systems are permitted within a required buffer provided that it does not exceed 50 percent of the square footage of any required side, rear, or front yard landscape buffer and does not exceed, at any location within the buffer, 70 percent of the buffer width. A minimum

(ZNI 2-01 7) Page 8 of 10

Page 9: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

five-foot wide level planting area shall be maintained between the retentionldetention pond or swale and the public right-of-way or adjacent parcel. The swale on the east exceeds the maximum. Staff would support a variance to allow it to do so.

(56) Trees must be planted at the rate of one tree per 50 linear feet of pond bank, but may be clustered or grouped to soften the visual edge. These trees are in addition to those required for the buffer. Water tolerant species are suggested.

(57) Provide a 1" = 200' drawing. Map is needed of the property boundary with lots, tracts, roadways, lift stations, buildings (with suites, units), and parking area only. The labeling should consist of lotlblock numbers, tract designation, and reserved street names, no geometry or additional labeling please.

(58) Provide a CAD file(s) set to Florida State Plane Coordinates - NAD 1983 Harn Florida West (Feet) with buildings and building numbers (apartment, condo, suite, etc); road centerlines with reserved names; lift stations, fire hydrants, lots and lot numbers, tracts and tract names (if applicable).

(59) The applicant shall provide a copy of the Environmental Resource Permit or permit exemption from the Southwest Florida Water Management District for the file of record prior to issuance of the Site Development Permit.

(60) DDCVA and fire hydrant supply line must be a minimum of eight inches in diameter.

(61) Sheet C3.2: the installation of sidewalk should be continued north on Barker Drive and then east on Grey Street. All sidewalk ramps shall be per FDOT standards for ADA compliance.

(62) Sheet C3.2: the crosswalk on Barker Drive should be ladder type per FDOT standards. W l l - 2 with W16-7P signs are required at the crosswalk.

(63) Sheet C3.2: the north driveway on Barker Drive; remove the R5-1 Do Not Enter sign from the back of the stop sign. Such posting is not permitted per the manual on Uniform Traffic Control Devices.

(64) Sheet C3.2: the north driveway on Barker Drive, add R6-I RIL sign on top of the R5-1 Do Not Enter sign on the south side.

24. Prior to issuance of the first CO or Certificate of Completion, provide, proof of public notice (affidavit of publication and affidavit of mailings, pursuant to the LDC, Section 306.3.E.2.e) to Zoning and Site Development.

25. Unless otherwise approved by the Emergency Services Director, when the development is record platted, or where a plat is not required, prior to the issuance of the first Building Permit, the development shall be included into a Pasco County Municipal Fire Service Taxing Unit to provide fire protection. The developer shall submit a petition for inclusion into the Pasco County Municipal Fire Service Taxing Unit at the time of record plat submission, or when no plat is required, prior to the issuance of the first Building Permit. In no case shall a Building Permit be issued until such a petition has been received by the Emergency Services Director.

26. If a Pasco County Global Positioning System (GPS) network point is located within the boundary of the site or within 50 feet of the same, the point shall be re-established using GPS methods and "Blue Booked" prior to the issuance of any Building Permits or the recording of any plat. Proof of the said Blue Booking shall be submitted to the County Surveyor prior to the issuance of the said permit or the recording of the said plat. If it is discovered that the said point has been destroyed by construction, then the applicantldeveloper of the land will be responsible for payment to Pasco County in the amount of $5,000.00 each.

27. The ownerldeveloper shall arrange for a final site inspection approval by the Engineering Services Department prior to the issuance of the Certificate of Occupancy (CO).

(ZN12-017) Page 9 of 10

Page 10: ., fegov.pascocountyfl.net/Content/ECM/Consolidated... · 11/3/2011  · preinspection of the sediment and erosion-control devices. The developer shall control all fugitive dust originating

28. The applicantldeveloper acknowledges that a Building Permit shall be obtained for all structures that have a footer, regardless of size, through the Central Permitting Division; i.e., including, but not inclusive of, buildings, accessories, and retaining walls.

The Zoning and Site Development Department's approval of this preliminarylconstruction site plan constitutes a finding by the Zoning and Site Development Department that the preliminarylconstruction site plan, as conditioned, is consistent with those Goals, Objectives, and Policies of the Comprehensive Plan and those provisions of the LDC that are applicable to preliminarylconstruction site plan approvals. This action is based on the office review of the plans, supporting documentation, and certifications of the Engineer of Record.

DEVELOPER'S ACKNOWLEDGMENT:

Date Signature

Print Name

STATE OF FLORIDA COUNTY OF

The foregoing instrument was acknowledged before me this

(date), by (name

of corporation acknowledging) a

(State or place of incorporation) corporation, on behalf of the corporation. Helshe is personally

known to me or who has produced (type of

identification) as identification.

Seal: NOTARY

ATACHMENT:

1. Initial Certificate of Capacity

Land ~eveloprnent Reguiations And Their Intent (ZNl2-017)

Page 10 of 10