© ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008
Transcript
Page 1: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

© ITC-AICE, 2007

E! 3792 ENIWEP TRIBOSTAND

Kick-off meeting

Castellón, 21st January 2008

Page 2: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Meeting agenda

8:30 - 9:00 Registration

9:00 - 9:15 Welcome and introductory remarks, agenda presentation

9:15 - 10:00 Project overview. Presentation of the project program, review of technical objectives, activities, Gantt

10:00 - 11:00 Organisation and communication within the consortium and work groups, review of management structure

11:00 - 11:15 Coffee break

11:15 - 12:00 Current situation of the administrative and technical work carried out

12:00 - 12:30 Workpackages timetable, spacially for the first year. Meetings schedule

12:30 - 13:30 General conclusions

Page 3: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Project overview

PROBLEM:

Same property measured in different laboratories with different means gives: DIFFERENT RESULTS

OBJECTIVES:• To yield a group of common test protocols, which will allow for

obtaining the same results, under the same conditions, at any laboratory that has the required means.

• Once these protocols have been obtained and their validity and traceability verified, a tribological analysis and test service will be established and will enable companies from different sectors to solve their problems at any member centre of the service.

Page 4: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Partners

Instituto de Tecnología Cerámica (ITC-AICE) (Spain)

Tekniker (Spain)

Asociación de las Industrias Navarras (AIN) (Spain)

Fritta S.A. (Spain)

Falex (Belgium)

Katholieke Universiteit Leuven (Belgium)

Centrale Recherche SA - Ecole Centrale Paris (CRSA-ECP) (France)

Tribotechnic (France)

Departamento de Ingeniería Mecánica - Universidad de Coimbra (Portugal)

Instituto Pedro Nunes - Associaçao para a inovaçao e desenvolvimento en ciência e tecnologia (Portugal)

Laboratorie Dubois, S.A (*) (Switzerland)

National Physical Laboratory (**) (England)

Page 5: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Project diagram

1 Bibliographic search

2 Selection of tests

5 Start-up of service 6.1 Submission of protocols

6.2 Dissemination of results

7 Project management

4 Study of the tests

3 Selection of equipment and samples

Page 6: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 1. Bibliographic search

Compilation of standards and regulations related to the methods under study

Page 7: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 2. Selection of tests

Each partner to supply a list of its own non-standardised tests to be included in the project.

Result of activities 1 and 2:

Join list of tests to be studied

Page 8: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 3. Selection of equipment and samples for performance of the tests

Task 3.1 List of equipment available in each Research Centre

Task 3.2 Round-robin intercomparison of standard materials to validate the results of all the available equipment

Task 3.3 Selection of samples of different types and properties to be tested by the protocols listed in activity 2 (bulk materials, coatings, different roughness, different properties, etc.)

Page 9: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activities 4. Study of the tests (one per test)

Task 4.1 Study of the different variables affecting the results. Selection of the best values of these variables by the responsible of the test

Task 4.2 Testing of samples with the conditions established in 4.1

Task 4.3 Round-robin intercomparison among the centres which have the technique available

Task 4.4 Results analysis and uncertainty calculation where applicable

Task 4.5 Drawing up of a common definitive protocol

Page 10: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 5. Start-up of a test service

Launching of a external tribological test service

Creation of a Website through which the requests for tests by clients can be channelled.

Creation of a catalogue detailing the tests capabilities of each member of the consortium

Page 11: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 6. Dissemination of results

Task 6.1 Submission of protocols to standardisation committees:

The relevant protocols of the tests included in the service will be submitted to the corresponding standardization committees

Page 12: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 6. Dissemination of results

Task 6.2 Dissemination of the project results:

The results obtained will be disseminated by different channels (scientific publications, conferences, fairs, ENIWEP website, etc.)

Page 13: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 7. Project management

Facilitate administrative tasks and notifying the consortium of due dates

Preparation of technical and cost justification reports

Acting as a permanent contact point for all partners and maintaining a high level of communication in the consortium

Coordination of meetings

Operation of a project website with a restricted area for the consortium members. At the end of the project, it will be the tool for the tests service

Page 14: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Gantt diagram

TASK

QUARTERS OF THE YEAR

First year Second year Third year Fourth year

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1

2 H1

3.1 H1

3.2 H2 H3

4.1

4.2

4.3

4.4

4.5 H4

5 H5

6.1

6.2

7

H1: Tests and equipment listH2: Standards for verification of equipment.H3: Testing materialsH4: Test protocolsH5: Tribological analysis and test service

Page 15: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Organization and communication among the consortium

Page 16: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activity 4 Organization

Test 1sub-consortium

Test 2sub-consortium

Test 3sub-consortium

Test “n”sub-consortium

Coordinator of test 1 (tasks 4.1 to 4.5)

Coordinator of test 2 (tasks 4.1 to 4.5)

Coordinator of test 3 (tasks 4.1 to 4.5)

Coordinator of test “n” (tasks n.1 to n.5)

Coordinator of activity 4

Page 17: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activities distribution suggestion

1 Bibliographic search

Instituto Pedro Nunes

2 Selection of tests

Department of Metallurgy and Materials Engineering –KUL

3 Selection of equipment and samples

Asociación de las Industrias Navarras (AIN)

4 Study of the tests

Facultade de Ciencias e Tecnologia – UC

Page 18: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Activities distribution suggestion

5 Start-up of a tests service (website launche)

ITC

6.1 Submission of protocols to standardisation comitees

TEKNIKER

6.2 Dissemination of the project results

Central Recherche S.A. – ACP

7 Project management

ITC

Page 19: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

E!3792 – ENIWEP TRIBOSTAND

Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007

Next meeting

Coinciding with next ENIWEP general meeting?

Page 20: © ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

DISEÑO Y ARQUITECTURA

Thanks for your attention