© ITC-AICE, 2007
E! 3792 ENIWEP TRIBOSTAND
Kick-off meeting
Castellón, 21st January 2008
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Meeting agenda
8:30 - 9:00 Registration
9:00 - 9:15 Welcome and introductory remarks, agenda presentation
9:15 - 10:00 Project overview. Presentation of the project program, review of technical objectives, activities, Gantt
10:00 - 11:00 Organisation and communication within the consortium and work groups, review of management structure
11:00 - 11:15 Coffee break
11:15 - 12:00 Current situation of the administrative and technical work carried out
12:00 - 12:30 Workpackages timetable, spacially for the first year. Meetings schedule
12:30 - 13:30 General conclusions
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Project overview
PROBLEM:
Same property measured in different laboratories with different means gives: DIFFERENT RESULTS
OBJECTIVES:• To yield a group of common test protocols, which will allow for
obtaining the same results, under the same conditions, at any laboratory that has the required means.
• Once these protocols have been obtained and their validity and traceability verified, a tribological analysis and test service will be established and will enable companies from different sectors to solve their problems at any member centre of the service.
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Partners
Instituto de Tecnología Cerámica (ITC-AICE) (Spain)
Tekniker (Spain)
Asociación de las Industrias Navarras (AIN) (Spain)
Fritta S.A. (Spain)
Falex (Belgium)
Katholieke Universiteit Leuven (Belgium)
Centrale Recherche SA - Ecole Centrale Paris (CRSA-ECP) (France)
Tribotechnic (France)
Departamento de Ingeniería Mecánica - Universidad de Coimbra (Portugal)
Instituto Pedro Nunes - Associaçao para a inovaçao e desenvolvimento en ciência e tecnologia (Portugal)
Laboratorie Dubois, S.A (*) (Switzerland)
National Physical Laboratory (**) (England)
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Project diagram
1 Bibliographic search
2 Selection of tests
5 Start-up of service 6.1 Submission of protocols
6.2 Dissemination of results
7 Project management
4 Study of the tests
3 Selection of equipment and samples
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 1. Bibliographic search
Compilation of standards and regulations related to the methods under study
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 2. Selection of tests
Each partner to supply a list of its own non-standardised tests to be included in the project.
Result of activities 1 and 2:
Join list of tests to be studied
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 3. Selection of equipment and samples for performance of the tests
Task 3.1 List of equipment available in each Research Centre
Task 3.2 Round-robin intercomparison of standard materials to validate the results of all the available equipment
Task 3.3 Selection of samples of different types and properties to be tested by the protocols listed in activity 2 (bulk materials, coatings, different roughness, different properties, etc.)
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activities 4. Study of the tests (one per test)
Task 4.1 Study of the different variables affecting the results. Selection of the best values of these variables by the responsible of the test
Task 4.2 Testing of samples with the conditions established in 4.1
Task 4.3 Round-robin intercomparison among the centres which have the technique available
Task 4.4 Results analysis and uncertainty calculation where applicable
Task 4.5 Drawing up of a common definitive protocol
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 5. Start-up of a test service
Launching of a external tribological test service
Creation of a Website through which the requests for tests by clients can be channelled.
Creation of a catalogue detailing the tests capabilities of each member of the consortium
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 6. Dissemination of results
Task 6.1 Submission of protocols to standardisation committees:
The relevant protocols of the tests included in the service will be submitted to the corresponding standardization committees
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 6. Dissemination of results
Task 6.2 Dissemination of the project results:
The results obtained will be disseminated by different channels (scientific publications, conferences, fairs, ENIWEP website, etc.)
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 7. Project management
Facilitate administrative tasks and notifying the consortium of due dates
Preparation of technical and cost justification reports
Acting as a permanent contact point for all partners and maintaining a high level of communication in the consortium
Coordination of meetings
Operation of a project website with a restricted area for the consortium members. At the end of the project, it will be the tool for the tests service
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Gantt diagram
TASK
QUARTERS OF THE YEAR
First year Second year Third year Fourth year
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1
2 H1
3.1 H1
3.2 H2 H3
4.1
4.2
4.3
4.4
4.5 H4
5 H5
6.1
6.2
7
H1: Tests and equipment listH2: Standards for verification of equipment.H3: Testing materialsH4: Test protocolsH5: Tribological analysis and test service
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Organization and communication among the consortium
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activity 4 Organization
Test 1sub-consortium
Test 2sub-consortium
Test 3sub-consortium
Test “n”sub-consortium
Coordinator of test 1 (tasks 4.1 to 4.5)
Coordinator of test 2 (tasks 4.1 to 4.5)
Coordinator of test 3 (tasks 4.1 to 4.5)
Coordinator of test “n” (tasks n.1 to n.5)
Coordinator of activity 4
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activities distribution suggestion
1 Bibliographic search
Instituto Pedro Nunes
2 Selection of tests
Department of Metallurgy and Materials Engineering –KUL
3 Selection of equipment and samples
Asociación de las Industrias Navarras (AIN)
4 Study of the tests
Facultade de Ciencias e Tecnologia – UC
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Activities distribution suggestion
5 Start-up of a tests service (website launche)
ITC
6.1 Submission of protocols to standardisation comitees
TEKNIKER
6.2 Dissemination of the project results
Central Recherche S.A. – ACP
7 Project management
ITC
E!3792 – ENIWEP TRIBOSTAND
Kick-off meeting Castellón, 21st January 2008 | © ITC-AICE, 2007
Next meeting
Coinciding with next ENIWEP general meeting?
DISEÑO Y ARQUITECTURA
Thanks for your attention