COLOR KEY
Continuing intosecond year ofconstruction Already bid;in construction2020Will bid in timefor 2020construction,included incurrent fundingprogram
Not included incurrent fundingprogram; willbe ready to bidif funds areavailable
VALDEZ
NULATO
Dalto
n High
way
Denali Hwy
Glenn Hwy
Parks Hwy
Richardson Hwy
Alaska Hwy
NORTHERN REGION
TOK
CORDOVA
NOME
KOTLIK
ANCHORAGE
DEADHORSE
UTQIAĠVIK
GLENNALLEN
FAIRBANKS
KIVALINA
SELAWIKKOTZEBUE
HOLY CROSS
CONT
INUI
NG IN
TO 2N
D YE
ARAL
READ
Y BID WI
LL B
ID IN
TIM
E FOR
2020
CON
STRU
CTIO
N
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
2020CONSTRUCTION
NORTHERN REGION
NULATO AIRPORT ACCESS ROAD IMPROVEMENTS
NORTHERN REGION GUARDRAIL (ALASKA HIGHWAY)
RICHARDSON HIGHWAY MP 18-24 RESURFACING
RICHARDSON HIGHWAY MP 159-167 RECONSTRUCTION
PARKS HIGHWAY MP 163-168.5 & 169.5-174 REHABILITATION
DALTON HIGHWAY MP 362-414 PAVING
NORTHERN REGION DEEP CULVERTS STAGE III - ORCA ROAD
NOME BERING STREET REHABILITATION
Construct a new two-lane gravel road from Kotzebue to a beach access ramp at Cape Blossom on the Baldwin Peninsula to provide all-season access.
KOTZEBUE TO CAPE BLOSSOM ROAD
Construct a new M&O facility at the airport that will house snow removal equipment, aircraft rescue and �re�ghting equipment, and sand and deicing chemicals.
UTQIAĠVIK (BARROW) AIRPORT COMBINED M&O FACILITY - STAGE II
Rehabilitate the Kotlik Airport by applying dust palliative, removing existing obstructions, upgrading airport lighting, and replacing the segmented circle.
KOTLIK AIRPORT REHABILITATION
Rehabilitate the Holy Cross Airport by installing surfacing, dust palliative, lighting systems, and FAA Navaids.
HOLY CROSS AIRPORT RESURFACING & LIGHTING REHABILITATION
Rehabilitate the Tok Cuto� Highway between MP 38-50, including bridge rehabilita-tion, roadside hardware, drainage, and utility relocations.
TOK CUT-OFF MP 38-50 REHABILITATION
Rehabilitate the East Fork and West Fork Selawik Footbridges. Work includes bridge work, redecking rails, utilities, and ADA improvements.
SELAWIK FOOTBRIDGE REHABILITATION
Resurface the Richardson Highway between MP 51-65, including roadside hardware, drainage improvements, and utility relocations.
RICHARDSON HIGHWAY MP 51-65 RESURFACING
Construct embankment for Kivalina evacuation road from the mainland side of Kivalina Lagoon to Kisimigiuqtuq Hill (K Hill), including drainage improvements.
KIVALINA EVACUATION & SCHOOL SITE ACCESS ROAD
Repave the runway, taxiways, and taxi lane. Repair airport lighting and replace signs and pavement markings.
UTQIAĠVIK (BARROW) AIRPORT PAVEMENT OVERLAY
Rehabilitate Bering Street in Nome from the intersection of Front Street to the intersection of Greg Kruschek Avenue, including ADA improvements and utilities.
Replace the existing culverts that provide hydrologic connectivity between the Fleming Creek estuary and Orca Inlet with new �sh-passage culverts.
Rehabilitate the Dalton Highway between MP 362-414, including widening, spot repair, and resurfacing 52 miles of the highway near Deadhorse.
Rehabilitate the Parks Highway between MP 163-168.5 and 169.5-174, including constructing passing lanes and improving drainage.
Reconstruct the Richardson Highway between MP 159-167, including replacing the existing culvert at Haggard Creek with a new bridge.
Preserve the pavement on the Richardson Highway and provide bridge rehabilitation, roadside hardware, and utility improvements.
Reconstruct guardrail on the Alaska Highway to meet current design standards, including improvements to roadside hardware.
Rehabilitate the Nulato Airport Access Road, including bridge work, drainage improvements, and roadside hardware.
17
16
10
15
11
14
12
13
9
8
7
5
4
3
2
1
6
Chena Hot Springs Road
Richardson Hwy
College Road
Farmers Loop Road
Goldstream Road
Parks Hwy
Badger Road
Johansen Expy
Airport Way
Chen
a Pum
p Roa
d
Steese
Highway
Sheep Creek Road
COLOR KEY
Continuing intosecond year ofconstruction Already bid;in construction2020Will bid in timefor 2020construction,included incurrent fundingprogram
Not included incurrent fundingprogram; willbe ready to bidif funds areavailable
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18 FAIRBANKS AREA SIGNAL UPGRADES - STAGE II
RICHARDSON HIGHWAY MP 353-357 ACCESS IMPROVEMENTS
COLLEGE ROAD MEDIAN EXTENSION
FAIRBANKS RAMP SIGHT DISTANCE IMPROVEMENTS
CHENA HOT SPRINGS MP 0-6 REHABILITATION
CHENA PUMP BIKE & PEDESTRIAN FACILITY REHABILITATION
JOHANSEN EXPY & DANBY ROAD BIKE PATH RESURFACING
FAI LIGHTED AIRFIELD SIGNS
FAIRBANKS AREA CONCRETE BARRIERS
FAST PLANNING SURFACE UPGRADES 2020
MCGRATH ROAD UPGRADE
TANANA LOOP & SOUTH CHANDALAR DRIVE INTERSECTIONS
UNIVERSITY AVENUE - SEGMENT 2
WENDELL AVENUE BRIDGE REPLACEMENT
ILLINOIS STREET & COLLEGE ROAD SIGNAL INTERCONNECT
STEESE EXPY CHENA HOT SPRINGS ROAD ROUNDABOUTS
STEESE EXPY CHENA HOT SPRINGS ROAD BYPASS LANE
Perform signal modi�cations at multiple locations throughout the Fairbanks area, including roadside hardware.
Reconstruct Richardson Highway and adjacent frontage roads, including construction of new frontage roads and elimination of highway access points.
Construct new median on College Road from Costco driveway to Illinois Street, including roadside hardware, drainage, and intersection improvements.
Reconstruct right turn ramps at multiple locations in Fairbanks to improve sight distance, including roadside hardware, utilities, and other improvements.
Replace the lighted air�eld signs at Fairbanks International Airport for runway 2L/20R.
Resurface the bike and pedestrian path along the Johansen Expressway and the path along Danby Street between Wembley Avenue and College Road.
Rehabilitate Chena Hot Springs Road from MP 0-6, including drainage, embankment stabilization, roadside hardware, utilities, and intersection improvements.
Rehabilitate the Chena Pump Road path between Riverstone Way on Geist and Grebe Drive on Chena Pump, including widening shoulders, bridge work, and drainage.
Upgrade the concrete barriers on the Johansen Expressway, Mitchell Expressway, Steese Expressway, and Richardson Highway to current design standards.
Resurface pavement, replace pavement markings, install ADA-compliant curb ramps, and install cross culverts on various streets and sidewalks in Fairbanks and North Pole.
Reconstruct McGrath Road and adjacent bike path, between Farmers Loop and the Old Steese Highway, including roadside hardware, drainage improvements, and utilities.
Construct a bypass lane and retaining wall at the Steese Highway northbound ramp at Chena Hot Springs Road.
Construct roundabouts at the Steese Highway and Chena Hot Springs Road Interchange, including drainage and ADA improvements and utilities.
Reconstruct Tanana Loop and portions of South Chandalar Drive, including intersection improvements and pedestrian facility construction and improvements.
Rehabilitate and widen University Avenue at Airport Way from the DNR and BLM entrance to Rewak Drive, including Geraghty Avenue.
Replace the Wendell Avenue Bridge and rehabilitate Wendell Ave/Old Steese between Clay Street and 3rd Street, including pedestrian and bicycle access improvements.
Construct a �ber optic signal interconnection along Illinois Street from Terminal Street to College Road and College Road from University Avenue to the Steese Expressway.
DAVIS ROAD RESURFACINGResurface Davis Road from University Avenue to Lathrop Street, including ADA improvements and sidewalk repairs.
34
33
32
3031
29
23
2827
22
26
25
24
21
20
19
18 35
CONT
INUI
NG IN
TO 2N
D YE
ARWI
LL B
ID IN
TIM
E FOR
2020
ALRE
ADY B
ID
WILL
BID
IN TI
ME F
OR 20
20 C
ONST
RUCT
ION
2020CONSTRUCTION
FAIRBANKS AREAAREA-WIDE PROJECTS