2
VALDEZ NULATO Dalton Highway Denali Hwy Glenn Hwy Parks Hwy Richardson Hwy Alaska Hwy NORTHERN REGION TOK CORDOVA NOME KOTLIK ANCHORAGE DEADHORSE UTQIAĠVIK GLENNALLEN FAIRBANKS KIVALINA SELAWIK KOTZEBUE HOLY CROSS CONTINUING INTO 2ND YEAR ALREADY BID WILL BID IN TIME FOR 2020 CONSTRUCTION 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 2020 CONSTRUCTION NORTHERN REGION NULATO AIRPORT ACCESS ROAD IMPROVEMENTS NORTHERN REGION GUARDRAIL (ALASKA HIGHWAY) RICHARDSON HIGHWAY MP 18-24 RESURFACING RICHARDSON HIGHWAY MP 159-167 RECONSTRUCTION PARKS HIGHWAY MP 163-168.5 & 169.5-174 REHABILITATION DALTON HIGHWAY MP 362-414 PAVING NORTHERN REGION DEEP CULVERTS STAGE III - ORCA ROAD NOME BERING STREET REHABILITATION Construct a new two-lane gravel road from Kotzebue to a beach access ramp at Cape Blossom on the Baldwin Peninsula to provide all-season access. KOTZEBUE TO CAPE BLOSSOM ROAD Construct a new M&O facility at the airport that will house snow removal equipment, aircraft rescue and firefighting equipment, and sand and deicing chemicals. UTQIAĠVIK (BARROW) AIRPORT COMBINED M&O FACILITY - STAGE II Rehabilitate the Kotlik Airport by applying dust palliative, removing existing obstructions, upgrading airport lighting, and replacing the segmented circle. KOTLIK AIRPORT REHABILITATION Rehabilitate the Holy Cross Airport by installing surfacing, dust palliative, lighting systems, and FAA Navaids. HOLY CROSS AIRPORT RESURFACING & LIGHTING REHABILITATION Rehabilitate the Tok Cutoff Highway between MP 38-50, including bridge rehabilita- tion, roadside hardware, drainage, and utility relocations. TOK CUT-OFF MP 38-50 REHABILITATION Rehabilitate the East Fork and West Fork Selawik Footbridges. Work includes bridge work, redecking rails, utilities, and ADA improvements. SELAWIK FOOTBRIDGE REHABILITATION Resurface the Richardson Highway between MP 51-65, including roadside hardware, drainage improvements, and utility relocations. RICHARDSON HIGHWAY MP 51-65 RESURFACING Construct embankment for Kivalina evacuation road from the mainland side of Kivalina Lagoon to Kisimigiuqtuq Hill (K Hill), including drainage improvements. KIVALINA EVACUATION & SCHOOL SITE ACCESS ROAD Repave the runway, taxiways, and taxi lane. Repair airport lighting and replace signs and pavement markings. UTQIAĠVIK (BARROW) AIRPORT PAVEMENT OVERLAY Rehabilitate Bering Street in Nome from the intersection of Front Street to the intersection of Greg Kruschek Avenue, including ADA improvements and utilities. Replace the existing culverts that provide hydrologic connectivity between the Fleming Creek estuary and Orca Inlet with new fish-passage culverts. Rehabilitate the Dalton Highway between MP 362-414, including widening, spot repair, and resurfacing 52 miles of the highway near Deadhorse. Rehabilitate the Parks Highway between MP 163-168.5 and 169.5-174, including constructing passing lanes and improving drainage. Reconstruct the Richardson Highway between MP 159-167, including replacing the existing culvert at Haggard Creek with a new bridge. Preserve the pavement on the Richardson Highway and provide bridge rehabilitation, roadside hardware, and utility improvements. Reconstruct guardrail on the Alaska Highway to meet current design standards, including improvements to roadside hardware. Rehabilitate the Nulato Airport Access Road, including bridge work, drainage improvements, and roadside hardware. 17 16 10 15 11 14 12 13 9 8 7 5 4 3 2 1 6
Transcript
Page 1: Ġ NORTHERN REGION 2020 CONSTRUCTIONdot.alaska.gov/2020/docs/NR-construction-2020.pdf · Repave the runway, taxiways, and taxi lane. Repair airport lighting and replace signs and

COLOR KEY

Continuing intosecond year ofconstruction Already bid;in construction2020Will bid in timefor 2020construction,included incurrent fundingprogram

Not included incurrent fundingprogram; willbe ready to bidif funds areavailable

VALDEZ

NULATO

Dalto

n High

way

Denali Hwy

Glenn Hwy

Parks Hwy

Richardson Hwy

Alaska Hwy

NORTHERN REGION

TOK

CORDOVA

NOME

KOTLIK

ANCHORAGE

DEADHORSE

UTQIAĠVIK

GLENNALLEN

FAIRBANKS

KIVALINA

SELAWIKKOTZEBUE

HOLY CROSS

CONT

INUI

NG IN

TO 2N

D YE

ARAL

READ

Y BID WI

LL B

ID IN

TIM

E FOR

2020

CON

STRU

CTIO

N

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

2020CONSTRUCTION

NORTHERN REGION

NULATO AIRPORT ACCESS ROAD IMPROVEMENTS

NORTHERN REGION GUARDRAIL (ALASKA HIGHWAY)

RICHARDSON HIGHWAY MP 18-24 RESURFACING

RICHARDSON HIGHWAY MP 159-167 RECONSTRUCTION

PARKS HIGHWAY MP 163-168.5 & 169.5-174 REHABILITATION

DALTON HIGHWAY MP 362-414 PAVING

NORTHERN REGION DEEP CULVERTS STAGE III - ORCA ROAD

NOME BERING STREET REHABILITATION

Construct a new two-lane gravel road from Kotzebue to a beach access ramp at Cape Blossom on the Baldwin Peninsula to provide all-season access.

KOTZEBUE TO CAPE BLOSSOM ROAD

Construct a new M&O facility at the airport that will house snow removal equipment, aircraft rescue and �re�ghting equipment, and sand and deicing chemicals.

UTQIAĠVIK (BARROW) AIRPORT COMBINED M&O FACILITY - STAGE II

Rehabilitate the Kotlik Airport by applying dust palliative, removing existing obstructions, upgrading airport lighting, and replacing the segmented circle.

KOTLIK AIRPORT REHABILITATION

Rehabilitate the Holy Cross Airport by installing surfacing, dust palliative, lighting systems, and FAA Navaids.

HOLY CROSS AIRPORT RESURFACING & LIGHTING REHABILITATION

Rehabilitate the Tok Cuto� Highway between MP 38-50, including bridge rehabilita-tion, roadside hardware, drainage, and utility relocations.

TOK CUT-OFF MP 38-50 REHABILITATION

Rehabilitate the East Fork and West Fork Selawik Footbridges. Work includes bridge work, redecking rails, utilities, and ADA improvements.

SELAWIK FOOTBRIDGE REHABILITATION

Resurface the Richardson Highway between MP 51-65, including roadside hardware, drainage improvements, and utility relocations.

RICHARDSON HIGHWAY MP 51-65 RESURFACING

Construct embankment for Kivalina evacuation road from the mainland side of Kivalina Lagoon to Kisimigiuqtuq Hill (K Hill), including drainage improvements.

KIVALINA EVACUATION & SCHOOL SITE ACCESS ROAD

Repave the runway, taxiways, and taxi lane. Repair airport lighting and replace signs and pavement markings.

UTQIAĠVIK (BARROW) AIRPORT PAVEMENT OVERLAY

Rehabilitate Bering Street in Nome from the intersection of Front Street to the intersection of Greg Kruschek Avenue, including ADA improvements and utilities.

Replace the existing culverts that provide hydrologic connectivity between the Fleming Creek estuary and Orca Inlet with new �sh-passage culverts.

Rehabilitate the Dalton Highway between MP 362-414, including widening, spot repair, and resurfacing 52 miles of the highway near Deadhorse.

Rehabilitate the Parks Highway between MP 163-168.5 and 169.5-174, including constructing passing lanes and improving drainage.

Reconstruct the Richardson Highway between MP 159-167, including replacing the existing culvert at Haggard Creek with a new bridge.

Preserve the pavement on the Richardson Highway and provide bridge rehabilitation, roadside hardware, and utility improvements.

Reconstruct guardrail on the Alaska Highway to meet current design standards, including improvements to roadside hardware.

Rehabilitate the Nulato Airport Access Road, including bridge work, drainage improvements, and roadside hardware.

17

16

10

15

11

14

12

13

9

8

7

5

4

3

2

1

6

Page 2: Ġ NORTHERN REGION 2020 CONSTRUCTIONdot.alaska.gov/2020/docs/NR-construction-2020.pdf · Repave the runway, taxiways, and taxi lane. Repair airport lighting and replace signs and

Chena Hot Springs Road

Richardson Hwy

College Road

Farmers Loop Road

Goldstream Road

Parks Hwy

Badger Road

Johansen Expy

Airport Way

Chen

a Pum

p Roa

d

Steese

Highway

Sheep Creek Road

COLOR KEY

Continuing intosecond year ofconstruction Already bid;in construction2020Will bid in timefor 2020construction,included incurrent fundingprogram

Not included incurrent fundingprogram; willbe ready to bidif funds areavailable

35

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

19

18 FAIRBANKS AREA SIGNAL UPGRADES - STAGE II

RICHARDSON HIGHWAY MP 353-357 ACCESS IMPROVEMENTS

COLLEGE ROAD MEDIAN EXTENSION

FAIRBANKS RAMP SIGHT DISTANCE IMPROVEMENTS

CHENA HOT SPRINGS MP 0-6 REHABILITATION

CHENA PUMP BIKE & PEDESTRIAN FACILITY REHABILITATION

JOHANSEN EXPY & DANBY ROAD BIKE PATH RESURFACING

FAI LIGHTED AIRFIELD SIGNS

FAIRBANKS AREA CONCRETE BARRIERS

FAST PLANNING SURFACE UPGRADES 2020

MCGRATH ROAD UPGRADE

TANANA LOOP & SOUTH CHANDALAR DRIVE INTERSECTIONS

UNIVERSITY AVENUE - SEGMENT 2

WENDELL AVENUE BRIDGE REPLACEMENT

ILLINOIS STREET & COLLEGE ROAD SIGNAL INTERCONNECT

STEESE EXPY CHENA HOT SPRINGS ROAD ROUNDABOUTS

STEESE EXPY CHENA HOT SPRINGS ROAD BYPASS LANE

Perform signal modi�cations at multiple locations throughout the Fairbanks area, including roadside hardware.

Reconstruct Richardson Highway and adjacent frontage roads, including construction of new frontage roads and elimination of highway access points.

Construct new median on College Road from Costco driveway to Illinois Street, including roadside hardware, drainage, and intersection improvements.

Reconstruct right turn ramps at multiple locations in Fairbanks to improve sight distance, including roadside hardware, utilities, and other improvements.

Replace the lighted air�eld signs at Fairbanks International Airport for runway 2L/20R.

Resurface the bike and pedestrian path along the Johansen Expressway and the path along Danby Street between Wembley Avenue and College Road.

Rehabilitate Chena Hot Springs Road from MP 0-6, including drainage, embankment stabilization, roadside hardware, utilities, and intersection improvements.

Rehabilitate the Chena Pump Road path between Riverstone Way on Geist and Grebe Drive on Chena Pump, including widening shoulders, bridge work, and drainage.

Upgrade the concrete barriers on the Johansen Expressway, Mitchell Expressway, Steese Expressway, and Richardson Highway to current design standards.

Resurface pavement, replace pavement markings, install ADA-compliant curb ramps, and install cross culverts on various streets and sidewalks in Fairbanks and North Pole.

Reconstruct McGrath Road and adjacent bike path, between Farmers Loop and the Old Steese Highway, including roadside hardware, drainage improvements, and utilities.

Construct a bypass lane and retaining wall at the Steese Highway northbound ramp at Chena Hot Springs Road.

Construct roundabouts at the Steese Highway and Chena Hot Springs Road Interchange, including drainage and ADA improvements and utilities.

Reconstruct Tanana Loop and portions of South Chandalar Drive, including intersection improvements and pedestrian facility construction and improvements.

Rehabilitate and widen University Avenue at Airport Way from the DNR and BLM entrance to Rewak Drive, including Geraghty Avenue.

Replace the Wendell Avenue Bridge and rehabilitate Wendell Ave/Old Steese between Clay Street and 3rd Street, including pedestrian and bicycle access improvements.

Construct a �ber optic signal interconnection along Illinois Street from Terminal Street to College Road and College Road from University Avenue to the Steese Expressway.

DAVIS ROAD RESURFACINGResurface Davis Road from University Avenue to Lathrop Street, including ADA improvements and sidewalk repairs.

34

33

32

3031

29

23

2827

22

26

25

24

21

20

19

18 35

CONT

INUI

NG IN

TO 2N

D YE

ARWI

LL B

ID IN

TIM

E FOR

2020

ALRE

ADY B

ID

WILL

BID

IN TI

ME F

OR 20

20 C

ONST

RUCT

ION

2020CONSTRUCTION

FAIRBANKS AREAAREA-WIDE PROJECTS