UP
RECEPTION1.98 X 2.90
ELE.
CA
BIN
DRINKING WATER
2.75 X 0.90
SECURITYCABIN
24.30
50.30
DIE
SEL
GEN
ERA
TOR
PRODUCTION AREA4.26X 7.95
CABIN2.55 X 5.19
PRODUCTION AREA
COOLINGTOWER
6.02 X 5.79
GENTS TOILET2.40 X 1.10
ST. ROOM2.75 X 1.47
1.20
BOILER SHED
THERMOPAK SHEDCHIMNEY
D3
D2
D2
D3UP
UP
UP
UP
UP
PLATFORM @ 3.20 M.
R.M. STORAGE AREA7.60 x 4.10
CHIMNEY
UP
DN
DN
DN
DN
DN
D2
VOID
VOID
RAIL
ING
UPT
O 1
.0 M
. HT.
RAIL
ING
UPT
O 1
.0 M
. HT.
RAIL
ING
UPT
O 1
.0 M
. HT.
D2
DN
D2DN
VOID
GROUND FLOOR PLANSCALE 1 : 100
FIRST FLOOR PLANSCALE 1 : 100
SECOND FLOOR PLANSCALE 1 : 100
A A
B
B26.20
12.05
5.27
5.78
4.47
9.80
C
C
D D8
9
3
3
3
6 6 6 6
5 5 5 5
1013
14
13
10
WATERTANK10 KL
WATERTANK10 KL
1716
19
CHEMICALTESTING/
QC LAB. (A.C.)2.75X8.00
TOIL
ET2.
60 X
1.2
0
S FELINE21, SWARLATA BASEMENT, BEHIND DEODHAR HOSPITAL, GOKHALE ROAD, NAUPADA,
THANE (W) - 400 602. TEL : 2542 16 01, 2540 72 93
S E R V I C E S
PREPARED BY:
OWNER:
TITLE:
DWG.NO.: SCALE:
DRAWNBY:
SHEETNO:
CHEKEDBY:
PLAN, SECTION, BLOCK PLAN AND LOCATION PLAN
1:100
1 OF 1
PLOT NO. W-156, TTC INDL. AREA, M.I.D.C. PAWANE, THANE - BELAPUR ROAD, NAVI MUMBAI - 400 710
JNC
SS/16-03/0496
AUTHORISED SIGN.:
1.70
1.27
1.93
1.32
1.00
1.00
1.00
1.00
1.001.00
1.20
1.00
1.20
1.20
A.C. SHEET ROOF
A.C. SHEET ROOF
A.C. SHEET ROOF
RAILING
RAILING
M.S. PLATFORM
M.S. PLATFORMM.S. PLATFORM
STORAGE AREA
CABINPRODUCTION AREAPRODUCTION AREAPRODUCTION AREA
COOLINGTOWER
STORAGE AREA
ELE.
CA
BIN
1.0
M P
ASS
AG
E
ETP
UP
FIRE FIGHTINGWATER TANK (U.G.)
G A
T E
GA
TE
DN
13.82
4.65
3.35
6.75
3.90
1.65
21.705.58
12.05
GEN
TS C
HA
NG
E RM
.7.
20 X
1.7
5
W.P.
W.P.
1.00
M. W
IDE
PASS
AG
E
A A
B
B
GENTSCHANGERM.
STORAGE AREA
FALSE CEILING
COATED SHEET ROOF
A.C. SHEET ROOFM.S. TRUSS
M.S. PLATFORM
STORAGE AREA
A.C. SHEET ROOF A.C. SHEET ROOF
SECTION A-A SECTION B-B SECTION C-C SECTION D-D
BOILER SHED THERMOPAK SHEDGL GL GL GL GL GL GL GL
D3W2
W2
W2 DN
W1
W1
W1
3.20
3.00
4.00
1.00
3.75
3.00
6.00
2.60
3.15
3.15
2.60
2.00
2.60
5.00 5.00
A
B
B
A
16.57
12.05
4
GATE
D1
DESCRIPTIONSR. NO. SIZE
RS1 - ROLLING SHUTTER1 2.00 X 2.40
2
3
4
5
6
1.00 X 2.10
D2 - DOOR 0.75 X 2.10
D3 - PANEL DOOR WITH AIR CURTAIN 2.00 X 2.10
W1 - WINDOW 1.90 X 1.00
W2 - WINDOW 1.00 X 1.20
SCHEDULE OF OPENING
D1 - DOOR
SECURITY
GENERATOR
COOLINGTOWER
BOILER SHED
THERMOPAKSHED5.78
4.479.80
ETP
WATERTANK (U.G.)
GA
TE
GATE
FACTORY SHED
PLA
NT
ETPSCRUBBER
GA
TE5.27
BLOCK PLANSCALE 1 : 500
RECYCLETANK (U.G.)7
RECYCLETANK (U.G.)
7
RAIL
ING
18
PAX ENTERPRISE PVT. LTD.
SBS
D2
C/o PAXCHEM LTD .
LADIES TOILET
2.75 X 0.90D2
D1
D1
D1
PRODUCTION AREA4.90 X 9.02
PACKING & LABELLING AREA9.46X2.65
15 15
D2
D2
UP
DN
REACTOR PLATFORM4.19x10.60
D2
D1
OFFICE (A.C.)2.75X4.00
ELE.
CA
BIN
D1
RS
RS
NAME OF MACHINERYM/C NO. SIZE
FLUID BED DRYER1 1.45 X 1.30
2
3
4
5
6
7
8
SCRUBBER 1.20 X 0.65
SCHEDULE OF MACHINERY
9
10
11
12
13
14
15
16
17
FLUID BED DRYER
18
19
WATER FILTER 0.50 Ø
CENTRIFUGE 1.10 Ø
CHILLING PLANT 2.10 X 1.35
SCRUBBER TANK 1.10 Ø
STEAM BOILER 1.00 Ø
THERMOPAK 1.10 Ø
GLASS LINED REACTOR 2.00 Ø
RECEIVER 0.70 Ø
CONDENSER 2.5X0.5
SS REACTOR 1.50 Ø
GLR REACTOR 1.80 Ø
FRP REACTOR 1.80 Ø
WATER TANK 1.00 X 1.00
LDO DAY TANK 1.00 X 1.00
WATER SOFTNER 0.60 Ø
EXPANSION TANK (O.H.) 0.90 X 0.50
1
2
3
12
11
11
STORAGE AREA
13
14
1.00
1.24
PLATFORM @ 3.75 M.
LAD
IES
CHA
NG
E RM
.4.
85 X
1.7
5
CHEMICALTESTING/
QC LAB. (A.C.)
STORAGE AREA 6.00
2.00
3.40
2.60
3.40
2.00
D1
D1
D4
D1
PB
D1
D3
FINISHED GOODSQUARANTINESTORAGE AREA4.40 X 2.80
METER ROOM5.57 X 1.20
CHANGINGROOMGENTS1.82 X 3.48
CHANGINGROOMLADIES1.82 X 3.48
PVC CURTAIN STRIPS
PV
C C
UR
TAIN
STR
IPS
PB
FINISHED GOODSSTORAGE AREA4.40 X 8.00
R.M. STORAGE AREA5.10 x 2.40
PASSAGE
PASSAGE
PASS
AG
E
D1
AHU
AHU
AHU
20 20
20 BATCH TANK (SUSPENDED) Ø 0.50 X 1.00 HT.
PASSAGE
1.45 X 1.30
17.75
4.65
3.16
2.79
D5
D4
REJECTED R.M.STORAGE AREA
3.00 X 2.00
REJECTED F.G.STORAGE AREA
3.00 X 2.00
D4
PB
21
22
23
24
25
26
27
21
22
23
24
25
26
27
ANALYTICAL WEIGHING BALANCE
PH METER
OVEN
MUFFLE FURNACE
WATER BATH
KARL FISCHER TITRATOR
GLASS WARES
0.50 X 0.50
0.50 X 0.50
0.50 X 0.50
0.50 X 0.50
0.50 X 0.50
0.50 X 0.50
0.50 X 0.50
LOCATION PLANSCALE - 1 : 5000
18.5 M R/W
18.5
M R/
W
15.0
M R/
W
18.5 M R/W
CENTRAL ROAD 61.0 M R/W
C-39/A
24.5
M R/
W
UP
previous plan approval no.:
PLN / GVK / 115 / 2004 / 1900 / THN DT. 26.05.2004
MAHARASHTRA POLLUTION CONTROL BOARDPhone
Fax
(022)-27572739(022)-27572740(022)-27571586
Email : [email protected]
Visit At : http;//mDcb.govJn
Regional Office Navi Mumbai.Ralgad Bhavan 7th floorSector -11 .C.B.D Belapur
Navi Mumbai-400614
Red/S*S,I Date: 30/Apr/2013
Consent No: RONM/NNBm!C/RED/O/CaC'MPCB/W03782
Consent to Operate under Section 26 of the Water (Prevention &of Pollution) Act, 1974 & under Section 21 of the Air (PreventControl of Pollution) Act, 1981 and Authorization /Authorization under Rule 6 of the Hazardous WastesHandling & Transboundry Movement) Rules 2008
i(To he referred as WaterAct, AirActand HW (M&H) B ^i^ectivelyl.
CONSENT is hereby granted toM/s. Pax Enterprises Pvt.PlotNo.W-156,TTC,
TTC Inds. Area Navi
Thane,Maharashtr
located in the area declared under theAuthorization under the provisioisubject to the provisions of themade further and subject to the fg
ntrol
wane.
,ons of the Water Act, Air act and:H) Rules and amendments thereto
e Rules and the Orders that may be'terms and conditions:
1. The Consent to Operate2. The Consent is valfi
anted for a period up to:28/02/2018e manufacture of-
Sr.
No.
Prod net Nome Maximum
QuantityMT/M
2 imPmd^t/Styrenated Phenol 5 MT/M
3 (Pfe^^zers 1 MTM
. 4%. ^^ester Polyols 2 MT/M :
^lorosulphonated products 100 MT/M
3. CONDITIONS UNDER WATER ACT:(i)The daily quantity of trade effluentfrom the factnry shall not exceed 2.00M®.(ii)The daily quantity ofsewage effluentfrom the factory shall not exceed 1.60M®.
(iii) Trade Effluent:Treatment: The applicant shall provide comprehensive treatment systemconsisting ofprimary / secondary and/or tertiary treatment as is warrantedwithreference to influent qualify and operate and maintain the same continuously soas to achieve the quahlyofthe treatedeffluent to the following standards:
OFFICE
NAVI imSRO Navi Mumbai I/I/R/S/88807000
MUMBAI
1) PH Between 5.5 to 9.0
2) Suspended Solids Not to exceed 100 mg/l.
3) Oil & Grease Not to exceed 10 mg/l
4) Phenolic Compound Not to exceed 5 mg/l
(iv) Trade Effluent Disposal: The treated effluent shall be discharge to CETPthrough pipeline provided by MIDC for further treatment. Industry shall becomemember of CETP.
(v) Sewage Effluent Treatment: The applicant shall provide comprehensivetreatment system as is warranted with reference to influent quality ^d operateand maintain the same continuously so as to achieve the quality^^qf treatedeffluent to the following standards.
(1) Suspended Solids(2) BOD 3 days 27o C.
Not to exceed
Not to exceed
(vi) Sewage Effluent Disposal: The treated domestic effl^soak pit, which shall be got cleaned periodically. Ov^;CETP only.
Lt^hm be soaked in a^ any, shall be sent to
(vii) In case MIDC pipeline and orchamber can^^^^m treated effluent is broken /leakage, either you shall stop discharging ^u&tf to said pipeline/ chamber orshall send it by Tanker to CETP only and?^bmit the receipt copy of the same. Atno point of time your effluent shall, fi|id4t^ Vay to nalla/ open areas. You shallreport it to MPCB, MIDC, and CE*]
(viii) Non-Hazardous Solid
(viii)Other Conditions:Indqsk^^ould monitor effluent qualily regularly.
4. The applicant shalL^xpnly with the provisions oftheWater (Prevention &Control of PqU^^^^^tless Act, 1977 (to be referred as Cess Act) andamendment there under
The daily^ss^tE^bonsumption for the following categories is as under:(i) Donfos^^rpose ... 2.00 CMD
Vl^^£^ets Polluted &fP^Stants are Biodegradable ... 2.00 CMD
Iter gets Polluted, Pollutantsire not Biodegradable & Toxic ... 0.00 CMD
Industrial Cooling, sprayingin mine pits or boiler feed ... 6.00CMD
(vi) Other such as Agriculture/Gardening 1.00 CMDThe applicant shall regularly submit to the Board the returns of water
consumption in the prescribed form and pay the Cess as specified underSection 3 of the said Act.
REGtONAL
SRC Navi Mumbai I/I/RyS/88807000
5. CONDITIONS UNDER AIR ACT;(i) The applicant shall install a comprehensive control system
consisting of control equipments as is warranted with reference togeneration of emission and operate and maintain Uie samecontinuously so as to achieve the level of pollutants to the followingstandards:
a. Control Equipment:Industry shall provide dust collector of sufficient capacity to control the emissions.
b. Standards for Emissions ofAir Pollutants:
1) SPM Not to exceed 150mg/Nm32) S02 Not to exceed 7.2 .kg/day
6. Conditions for D.G. Set
a. Noise from the D.G. Set should be controUed^->hij^hrdVlcling anacousticendosure or by treatu^ the room acou^
b. Industry should provide acoustic enclosure foi^^t);ol ofnoise. Theacoustic enclosure/ acoustic treatment ^qf'̂ neJroom should bedesigned for minimum 25 dB (A) insertioi^l^ or for meeting theambient noise standards, whiche^ is^q^dgher side. Asuitableexhaust muffler with insertion £s\(g|2b dB (A) shall also beprovided. The measurement of i^s^rtion loss wiU be done atdifferent points at 0.5 meters &^l^coustic enclosure/room and thenaverage. I
c. The indust^ shal^*^1^^m\^^dequate measures for control of noiselevels &om ite own slhi^^^ithin the premises in respect ofnoise toless than 55 dB|A)&!^g day time and 45 dB(A) during the nighttime. Day tim^i^eNmned between 6a.m. to 10 p.m and night timeis reckoned b;e^e^ 10 p.m to 6a.m.
d. Industry^si^ul^make efforts to bring down noise level due to DGset, industrial premises, within ambient noise requirementsby pi^lih^ir^ing and control measures.
n of DG Set must be strictly in compliance withendations ofDG Set manufacturer,
oper routine and preventive maintenance procedure for DG setbuld be set and followed in consultation with the DG
manufacturer which would help to prevent noise levels of DG setfrom deteriorating with useD.G. Set shall be operated only in case of power faBureThe applicant should not cause any nuisance in the surroundingarea due to operation of D.G. Set
(i) The applicant shall observe the following fuel pattern:-
Sr. No. Type or Fuel Quantity UOM
1 LDO 200.00 lit/Day i
REGIONAL
SRO Navi Mumbai I/I/R/^88807000&V
(ii) The applicant shall erect the chininey(s) of the followingspecifications:-
1 Sr. No. Chimney Attached To Height in Mtrs.
11 Boiler i 16.00
(iii)
(iv)
(V)
The applicant shall provide ports in the chimney/(s) and facilities such asladder, platform etc. for monitoring the air emissions and the same shall beopen for inspection to/and for use of the Board's Stafi. The chimney(s) ventsattached to various sources of emission shall be designated by numberssuch as S-1, S-2, etc. and these shall be painted/ displayed ^facilitateidentification. <
The industry shall take adequate measures for control o^qi^levels fi:omits own sources within the premises so as to maintaih^u&i^t air quahtystandard in respect ofnoise to less than 75 dB(A)^^priiL^^y tune and 70dB(A) during n^ht time. Bay time is reckonedp.m. and night time is reckoned between 10 p.^<Industry shoidd use PNG as a fiie,'commenced.
reen 6 a.m. and 10
;a.m.
ind when supply is
(vi) Other Conditions:1) The industry should not cause2) The industry should monitdi^i
Regularly. XTs
7. CONDITIONS UNDER
TRANSBOUNDRYMO
(i) The Industry s
uisance in surrounding area,missions and ambient air qualify
WASTE CMANAGEMENT, HANDLING &ES,2008:hazardous wastes as specified below.
Sr.
No
Type 01" Waste Quantity UOM Disposal
1 34.3 Chemi^^^gefrom
treat&enJ^
0.12 MT/A CHWTSDF
5ver due to any accident or gas leakage or other unforeseen act orsuch emissions occur or is apprehended to occur in excess of
standards laid down, such Information shall be forthwith Reported toCollector, Directorate of Industry, Safety and Health, Police Station, fireBrigade, Directorate of Health services, Department of Explosives, Boardand local Body and the production process should be stopped by taking allnecessaiy safety measures. Industry shall also monitor the emission andensure ±at the emission do not cause any harm or nuisance in thesurrounding. The industry should not restart the process withoutpermission of the Board and other statutory organization as require underthe law.
SRO Navi Mumbai I/l/R/S/88807000
REGIONAL
OFFICE
NAVI
MUMBAI
9. Industry shall comply with following additional conditions:
i. The applicant shall maintain good housekeeping and take adequate measuresfor control of pollution &om all sources so as not to cause nuisance tosurrounding area / inhabitants.
II.
111.
IV.
v.
VI.
The applicant shall bring minimum 33% of the available open land under greencoverage/ tree plantation.Solid waste - The non hazardous sohd waste arising in the factory premises,sweepings, etc., be disposed of scientifically so as not to cause any nuisance /pollution. The apphcant shall take necessary permissions firomcivic authoritiesfor disposal to dumping ground.The applicant shall provide for an alternate electric power sourc^st^Sdent tooperate aU pollution control facihties installed by he apphca^^^bc^^bEmintaincompliance with the terms and conditions of the consent. Imtik^Qli^ence, theapplicant shall stop, reduce or otherwise, control product^i^Jqjj^e by terms& conditions of this consent regarding pollution levels.The applicant shall not change or alter quantity, quaUt^l^e rate of discharge,temperature or the mode of the effiuent / emis^i&\^hazardous wastes orcontrol equipments provided for without previj^^^^^dtten permission of theBoard.
The applicant shall provide fiidlity for cop:nim^fenvironmental samples andsamples of trade and sewage effiuents, a^eii^sions and hazardous wastes totheBoard staffat the terminal ordesi^i^apoints and shall pay to theBoardfor the services rendered in this beh^X ^
vii. The applicant shall make an ap^^^^^ for renewal of the consent at least 60days before the date ofthe ^p^^^^ie consent.
viii.The firm shall submit to the 30*'' day of September every year, theEnvironmental Statem^W^tt for the financial year ending 31®* March in
provisions of rule 14 of the Environment^dment) Rules, 1992.
be opened and made available to the Board's officersapphcant.
the prescribed Form-(Protection) (SeconcU
ix. As inspection bpo^slduring their.visl&ra^BI
X. The apphcantenergy foCiei|pe^ibn of domestic and industrial effluent treatment plants andair polh|aG%^trol system. Aregister showing consumption of chemicals usedfor tr^M^be^ shah be maintained.
stall a separate electric meter showing the consumption of
;ate drainage system shah be provided for coUection of trade and sewageluents. Terminal manholes shah be provided at the end of cohection
System with arrangement for measuring the flow. No effluent shah beadmitted in the pipes / sewers down- stream of the terminal manholes. Noeffluent shah find its way other than in designed and provided cohectionSystem.
xu. Neither storm water nor discharge fi:om other premises shah be ahowed tomix with the effluents firom the factory.
SRO Navi Mumbai l/l/R/S/88807000
REGIONAL
OFFICE
10. The Capital investment of the industry is Rs.467.3ILacs.11. Board reserves right of revoke, suspend or amend the consent issued.
12. The consent should not be construed as any exemption £rom obtainednecessary NOC £rom other Govt. agencies as may deemed fit necessary.
To,M/s. Pax Enterprises Pvt Ltd,Plot No.W-156, TTC, MIDC, Pawane,TTC Inds. Area Naid Mumbai,Thane,Maharashtra, India.
Copy toa. SRONM-I
b. CAO/Cess Branch/ Master File
Received Consent fee of-
For & On behalfof
Maharashtra Polfi^n Control Board
Dr.Y.B.SdfttaKJce
Regional Ofhcer, Navi Mumbai^
^yKEGIOIiAL
Sr.
No.
Aniount(I\s.) DO. No. Date Drawn On
1 175Q00 589871X, 21 Feb 2013 North Kanara USB Uo-
Op Bank
SRO Navi Mumbai I/l/R/S/88807000