Date post: | 04-Jan-2016 |
Category: |
Documents |
Upload: | jodie-terry |
View: | 214 times |
Download: | 1 times |
- Technology for Sweden's Security
- Technology for Sweden's Security
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Developing Tools for Project Managers to Make Environmental
Considerations in the Systems Acquisition Process
Developing Tools for Project Managers to Make Environmental
Considerations in the Systems Acquisition Process
Joakim Thornéus, M. Sc.Swedish Defence Materiel Administration
(FMV)Stockholm, Sweden
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Independent Independent
• is an independent, civilian authority reporting directly to the Government
• primarily works for the Swedish Armed Forces, its most important customer
• also undertakes assignments on behalf of other authorities
• is assigned by the Government to handle export support
FMV
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
"FMV is to contribute through cost-effective, business-like and reliable supply of materiel to strengthening the operational capability of the Swedish Armed Forces."
Business conceptBusiness concept
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
From stockings to systemsFrom stockings to systems
1896 2000
Complete Systems
Essential supplies
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
NEEDS
REQUIREMENTS
VALIDATION
PROCUREMENT
MAINTENANCE
PHASE -OUT
FMV has a variety of assignments
Technology for Sweden's SecurityTechnology for Sweden's Security
• controls the design and procurement of new materiel
• develops materiel and systems for the defence of the future
• takes technical responsibility for the materiel throughout its lifetime
• creates scope for renewal by phasing out obsolete materiel
FMV
The Armed Forces
FMV
Supplier
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
FMV Environmental Guidelines in the Acquisition ProcessFMV Environmental Guidelines in the Acquisition ProcessWhy?
• Driving forces for environmental considerations
• Environmental impact
• Environmental objectives
• Support for project teams
• Standardization of environmental requirements
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Customers demands
The Owner´s demands
Legal Demands
Goodwill
Driving ForcesDriving Forces
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
FMV have identified the systems acquisition process as the activity with the greatest environmental impact
Environmental FootprintEnvironmental Footprint
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Environmental ObjectivesEnvironmental Objectives
FMV shall have a quality assured, environmental sound and process oriented workflow.
Indicators:
• A minimum of 50% of all acquisitions shall contain environmental requirements
• A minimum of 50% materiel systems (weapon) lifecycle management plans shall have approved environmental plans”
• Approved environmental plans in the materiel tests shall increase during 2004
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Main Players InternallyMain Players Internally
Project Manager:
The full responsibility for the project
Product Manager:
The full responsibility for the system in the life cycle
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
FMV Environmental Management SystemFMV Environmental Management System
Integrated Management System based on:
• ISO 14001
• ISO 9001:2000
• ISO 15288
• OHS
• Rules of Military Aviation
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
“FMV participates in long-term sustainable development of society by
considering the environmental aspects of materiel systems from a life-cycle
perspective”
Environmental PolicyEnvironmental Policy
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Tools availableTools available
• FMV Environmental Guidelines in the Acquisition Process
– The Swedish Defence’ Criteria For Chemical Substances
– Chemical Products database
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
FMV Environmental Guidelines in the Acquisition ProcessFMV Environmental Guidelines in the Acquisition ProcessWhat we knew:
• Project managers have basic environmental knowledge
• Different environmental requirements in different acquisition programs
• Environmental requirements not always on level with the systems environmental impact
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
FMV Environmental Guidelines in the Acquisition ProcessFMV Environmental Guidelines in the Acquisition ProcessWhat we wanted:
• Cover all phases in the acquisition process
• Increase the quality of environmental requirements
• An integrated part of the management system
• Easy to access and to use
• Information on legal demands and other applicable demands
• Examples of texts to use in requests for proposal and contracts
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
FMV Environmental Guidelines in the Acquisition ProcessFMV Environmental Guidelines in the Acquisition ProcessResult so far:
• The tool easily accessible on the Intranet
• Three phases covered:
– Studies (generating and evaluating concepts)
– Purchase
– Phasing out and disposal
• Information of legislation and other demands
• Continuously updated and improved
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Basic structureBasic structure
Phase in the acquisition process/product life cycle
Information on basic requirements, responsibilities, demands from interested parties:Legislation, customer, owner etc…
Detailed requirementson contractor or product
Hazardous Materials
Environmental Guidelines in the acquisition process
Studies Purchase Phase-out
ProductContractor
EMS
Environmental plan
etc…
Electronics
etc…
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Requirements on the contractor
(Statement of Work)
• Environmental management system
• Environmental plan
• EMS auditing
Environmental RequirementsEnvironmental Requirements
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Environmental RequirementsEnvironmental Requirements
Requirements on the product(Specification of Technical
Requirements)
• Hazardous materials– Batteries
– Electronics
– Construction materials
– Chemicals
• Energy consumption
• Emissions
• Design for demil
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Still to be done:
• Develop the tool for the Operational and Maintenance phases
• More concrete examples of texts to use
• Proceed with the integration with the Environmental Management System
FMV Environmental Guidelines in the Acquisition ProcessFMV Environmental Guidelines in the Acquisition Process
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
The Criteria For Chemical SubstancesThe Criteria For Chemical Substances
• Aimed at substances common in defence materiel
• Aprox. 150 substances and groups of substances
• Support the acquisition process of chemicals and hazardous materials
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
The Criteria For Chemical SubstancesThe Criteria For Chemical Substances
• General FMV policy
• Three parts:
1. Evaluation criteria according to classification
2. Substances prohibited by law
3. Undesirable substances
• Sorted according to application
• Hazardous substances in materials
• Substances that will be banned/restricted in the future
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
The Criteria For Chemical SubstancesThe Criteria For Chemical Substances
The general policy:
As far as possible all materiel supplied to FMV shall be free from substances that are very toxic, carcinogenic, allergenic, environmentally hazardous, affect genetic material, reproduction, the climate and the ozone layer
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
Chemical Products DatabaseChemical Products Database
• Chemical management tool
• Consists of Material Safety Data Sheets (MSDS) for chemical products used in the Swedish Armed Forces
• Approximated 1700 MSDS
• Benefits:
– Overview over chemicals used
– Tool for substitution
– Statistics
Joakim Thornéus, 30th Environmental and Energy symposium & Exhibition, San Diego, april 8, 2004
SummarySummary
• The Environmental Guidelines in the Acquisition Process
– Important tool in greening our acquisition process
– Will make it easier to fulfil our environmental objectives
– Will continuously improve the tools in cooperation with the project managers
- Technology for Sweden's Security
- Technology for Sweden's Security