+ All Categories
Home > Documents >  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade...

 · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade...

Date post: 03-Mar-2019
Category:
Upload: lamdung
View: 217 times
Download: 0 times
Share this document with a friend
14
Just a few questions, around Data Migration, how much data and what is the SAN we would be migrating from? Can we initiate it and let them drive or do we have to perform the full migration? PGCB currently uses an IBM DS3400 with approximately 9TB of storage. The scope of this project would require full migration. I saw a hint of virtualizing servers, if so how many will we be moving from physical to virtual? There are approximately 40 physical servers contained within the scope of this SOW. What is the current SAN where data will be migrated from? The current SAN is an IBM DS3400 How many hosts are attached to the SAN? There are approximately 30 hosts. How much data is to be migrated? Approximately 7TB If they require physical to virtual server migration to VMWare, how many physical servers? There are approximately 40 physical servers contained within the scope of this SOW. Per the Q & A response to the Server Modernization Bid issued 6/23/2014, per Supplier Questions #1: Stated: Are you anticipating the same company to provide the servers, etc.? PGCB Answer: We are not looking to purchase any equipment. We have already purchased the following below. *
Transcript
Page 1:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Just a few questions, around Data Migration, how much data and what is the SAN we would be migrating from? Can we initiate it and let them drive or do we have to perform the full migration?

PGCB currently uses an IBM DS3400 with approximately 9TB of storage. The scope of this project would require full migration.

I saw a hint of virtualizing servers, if so how many will we be moving from physical to virtual?

There are approximately 40 physical servers contained within the scope of this SOW.

What is the current SAN where data will be migrated from?

The current SAN is an IBM DS3400

How many hosts are attached to the SAN?

There are approximately 30 hosts.

How much data is to be migrated?

Approximately 7TB

If they require physical to virtual server migration to VMWare, how many physical servers?

There are approximately 40 physical servers contained within the scope of this SOW.

Per the Q & A response to the Server Modernization Bid issued 6/23/2014, per Supplier Questions #1:  Stated: Are you anticipating the same company to provide the servers, etc.?

PGCB Answer: We are not looking to purchase any equipment. We have already purchased the following below. *Can you advise if an IBM remarketer or incumbent vendor assisted the PGCB in preparing those specifications?

Indirectly. Electronic access was granted to Pierson Computing Connection Inc. for the purpose of using their internal tools to analyze our infrastructure. This analysis

Page 2:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

was the basis for the PGCB to identify the hardware needed to be purchased from IBM to upgrade our compute and storage infrastructure.

If so, can you advise the name of that vendor?

Pierson Computing Connection Inc.

Again as per the Q & A posted to the Server Modernization Bid issued on 6/24/2014, the question submitted was: Also can you please provide quantities of what you have installed to be evaluated?

PGCB Answer:   Here is the information needed.* Please confirm that this is the products and quantities reflected below are the correct ones for consideration in this procurement?

Yes

If no, please advise discrepancies?

Configuration for: IBM BladeCenter HS23 4

7875AC1 IBM BladeCenter HS23 1

A3BS 16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM

8

A1RG HS23 Blade Base

A584 IBM USB Memory Key for VMWare ESXi 5.5

1462 Qlogic 8Gb Fibre Channel Expansion Card (CIOv) for IBM BladeCenter

A23Z Addl Intel Xeon Processor E5-2658 8C 2.1GHz 20MB Cache 1600MHz 95W

A23S Intel Xeon Processor E5-2658 8C 2.1GHz 20MB Cache 1600MHz 95W

Page 3:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

67567Y7 3 Year Onsite Repair 24x7 4 Hour Response 1

00Y3254 Cisco Catalyst Switch Module 3110G for IBM BladeCenter

2

Configuration for: IBM Storwize V3700 SFF Dual Control Enclosure 1

207224C IBM Storwize V3700 SFF Dual Control Enclosure 1

ACSK 5m Fiber Cable (LC) 8

ACBN IBM Storwize V3700 SFF Dual Control Enclosure

ACHK 8Gb FC 4 Port Host Interface Card 2

ACLK 600GB 10K 2.5 Inch HDD 24

675685B 3 Year Onsite Repair 24x7 4 Hour Response 1

Configuration for:IBM Storwize V3700 SFF Expansion Enclosure 2

207224E IBM Storwize V3700 SFF Expansion Enclosure 1

ACTA 0.6m SAS Cable (mSAS HD to mSAS HD) 2

ACBS IBM Storwize V3700 SFF Expansion Enclosure

ACLK 600GB 10K 2.5 Inch HDD 24

675685K 3 Year Onsite Repair 24x7 4 Hour Response 1

Page 4:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Please confirm the number of BladeCenter Chassis and related devices?

PGCB currently uses 3 Blade Center Chassis

Please advise the number of HS23 blades; the number of Cisco Net switches and the number of fibre switches within the Blade Chassis?

Configuration for:IBM BladeCenter HS23 47875AC1 IBM BladeCenter HS23 1

A3BS 16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM

8

A1RG HS23 Blade BaseA584 IBM USB Memory Key for VMWare ESXi 5.51462 Qlogic 8Gb Fibre Channel Expansion Card

(CIOv) for IBM BladeCenterA23Z Addl Intel Xeon Processor E5-2658 8C

2.1GHz 20MB Cache 1600MHz 95WA23S Intel Xeon Processor E5-2658 8C 2.1GHz

20MB Cache 1600MHz 95W67567Y7 3 Year Onsite Repair 24x7 4 Hour Response 1

00Y3254 Cisco Catalyst Switch Module 3110G for IBM BladeCenter

2

Configuration for:IBM Storwize V3700 SFF Dual Control Enclosure

1

207224C IBM Storwize V3700 SFF Dual Control Enclosure

1

ACSK 5m Fiber Cable (LC) 8ACBN IBM Storwize V3700 SFF Dual Control

EnclosureACHK 8Gb FC 4 Port Host Interface Card 2ACLK 600GB 10K 2.5 Inch HDD 24

675685B 3 Year Onsite Repair 24x7 4 Hour Response 1

Configuration for:IBM Storwize V3700 SFF Expansion Enclosure 2207224E IBM Storwize V3700 SFF Expansion

Enclosure1

ACTA 0.6m SAS Cable (mSAS HD to mSAS HD) 2ACBS IBM Storwize V3700 SFF Expansion

EnclosureACLK 600GB 10K 2.5 Inch HDD 24

675685K 3 Year Onsite Repair 24x7 4 Hour Response 1

Page 5:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Please confirm the number of V3700(s) and the number of Expansion Drawers?

Configuration for:IBM BladeCenter HS23 47875AC1 IBM BladeCenter HS23 1

A3BS 16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM

8

A1RG HS23 Blade BaseA584 IBM USB Memory Key for VMWare ESXi 5.51462 Qlogic 8Gb Fibre Channel Expansion Card

(CIOv) for IBM BladeCenterA23Z Addl Intel Xeon Processor E5-2658 8C

2.1GHz 20MB Cache 1600MHz 95WA23S Intel Xeon Processor E5-2658 8C 2.1GHz

20MB Cache 1600MHz 95W67567Y7 3 Year Onsite Repair 24x7 4 Hour Response 1

00Y3254 Cisco Catalyst Switch Module 3110G for IBM BladeCenter

2

Configuration for:IBM Storwize V3700 SFF Dual Control Enclosure

1

207224C IBM Storwize V3700 SFF Dual Control Enclosure

1

ACSK 5m Fiber Cable (LC) 8ACBN IBM Storwize V3700 SFF Dual Control

EnclosureACHK 8Gb FC 4 Port Host Interface Card 2ACLK 600GB 10K 2.5 Inch HDD 24

675685B 3 Year Onsite Repair 24x7 4 Hour Response 1

Configuration for:IBM Storwize V3700 SFF Expansion Enclosure 2207224E IBM Storwize V3700 SFF Expansion

Enclosure1

ACTA 0.6m SAS Cable (mSAS HD to mSAS HD) 2

Page 6:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

ACBS IBM Storwize V3700 SFF Expansion Enclosure

ACLK 600GB 10K 2.5 Inch HDD 24675685K 3 Year Onsite Repair 24x7 4 Hour Response 1

Please advise the product information of the SAN infrastructure?

It is unclear as to what is meant by the ‘product information’ as used in this question. The question needs clarification.

What manufacturer is the designated workstation and what operating system, version etc. is currently installed?

It is unclear as to what is meant by the ‘designated workstation’ as used in this question. The question needs clarification.

What type of SAN switches (Brocade? Cisco?) does the PGCB use?

Cisco

How many LUNS will require creation?

This will be determined through the scope of this project based on industry best practices conducted by service provider.

Can we assume that the core LAN switch is Cisco? If not what product is it?

Page 7:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Yes

How many 3110G switches?

Configuration for:IBM BladeCenter HS23 47875AC1 IBM BladeCenter HS23 1

A3BS 16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM

8

A1RG HS23 Blade BaseA584 IBM USB Memory Key for VMWare ESXi 5.51462 Qlogic 8Gb Fibre Channel Expansion Card

(CIOv) for IBM BladeCenterA23Z Addl Intel Xeon Processor E5-2658 8C

2.1GHz 20MB Cache 1600MHz 95WA23S Intel Xeon Processor E5-2658 8C 2.1GHz

20MB Cache 1600MHz 95W67567Y7 3 Year Onsite Repair 24x7 4 Hour Response 1

00Y3254 Cisco Catalyst Switch Module 3110G for IBM BladeCenter

2

Configuration for:IBM Storwize V3700 SFF Dual Control Enclosure

1

207224C IBM Storwize V3700 SFF Dual Control Enclosure

1

ACSK 5m Fiber Cable (LC) 8ACBN IBM Storwize V3700 SFF Dual Control

EnclosureACHK 8Gb FC 4 Port Host Interface Card 2ACLK 600GB 10K 2.5 Inch HDD 24

675685B 3 Year Onsite Repair 24x7 4 Hour Response 1

Page 8:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Configuration for:IBM Storwize V3700 SFF Expansion Enclosure 2207224E IBM Storwize V3700 SFF Expansion

Enclosure1

ACTA 0.6m SAS Cable (mSAS HD to mSAS HD) 2ACBS IBM Storwize V3700 SFF Expansion

EnclosureACLK 600GB 10K 2.5 Inch HDD 24

675685K 3 Year Onsite Repair 24x7 4 Hour Response 1

Are all four (4) HS23 blades are the ESXi hosts? If not please clarify?

This will be determined through the scope of this project based on industry best practices conducted by service provider.

How many VM’s are there?

This will be determined through the scope of this project based on industry best practices conducted by service provider.

Can you clarify how many TSM Server(s)?

1

Can the PGCB confirm that the tape library is on the TSM supported list?

Yes

Approximately how much data will be migrated?

Approximately 7TB

Please advise how many Old Servers?

There are approximately 40 physical servers contained within the scope of this SOW.

Please advise what the PGCB considers a final validation that ensures the data was moved successfully?

Page 9:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Analysis and confirmation by PGCB IT staff that data integrity has been upheld and migration completed in full.

Please advise the number of staff that the PGCB will be committing to support this effort?

The PGCB will initially commit 2 IT staff personnel to support this effort and then adjust the staff as necessary as the project proceeds.

Please advise the total number of IT Technical staff at the PGCB?

6

Please advise the number of staff that the PGCB will require to be trained as a result of this server modernization effort?

5

Please identify job roles of the staff to be trained?

Application Developers and IT Support Specialists

Does the PGCB have training facilities available for utilization by the awarded vendor?

Yes

Does the PGCB have a preference for training methodologies?

• Train the trainer• Mentoring• Classroom

Please provide the location for the anticipated work effort(s) to occur?

PGCB Harrisburg Offices at 303 Walnut Street, Harrisburg, PA 17101

Does the PGCB have an anticipated start and stop date for the completion of this project?

The start date must commence as soon as possible with the completion date determined when the last system and its corresponding data are migrated to the new environment and validated.

Page 10:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Does the PGCB anticipate any of this work effort to take place after normal business hours, weekends, or holidays?

Yes, to reduce operational impact certain functions should take place after normal M-F business hours.

The SOW does not reference applications only mentioning hardware migration and data migration. Please advise what applications are to be migrated?

The SOW does mention that PGCB currently operates 26 systems and the scope of the project is to migrate these systems to a virtualized environment.

Page 11:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

Please advise any third party applications such as FileNet or other(s) that are resident and anticipated as part of the migration effort?

PGCB does utilize FileNet and it is anticipated to be migrated to a virtual environment within the scope of this project. All other systems are internally developed and maintained.

Please advise the currency of third party software offerings and any support contracts or warranty (ies) currently in place?

All third party contracts and warranties are current.

As part of a demonstration of experience and qualifications, does the PGCB desire the submission of resumes for the qualified professional who will work on this project?

Yes

* Where noted with an asterisk, the “PGCB Answer” provided was the response provided by the PGCB to the

Page 12:  · Web view16GB (1x16GB, 2Rx4, 1.5V) PC3-12800 CL11 ECC DDR3 1600MHz VLP RDIMM 8 A1RG HS23 Blade Base A584 IBM USB Memory Key for VMWare ESXi 5.5 1462 Qlogic 8Gb Fibre Channel Expansion

06/23/14 RFQ. It is provided here as it is part of the questions submitted.


Recommended