Government of the Islamic Republic of Afghanistan/GIRA
Procurement Plan for Procurement of Goods & Works and Non consulting services - NSPII
1 2 3 4 5 6 7 8 9
Ref. No. Contract (Description) Present Position Contract Details
1 Vehicles 1,100,000 ICB No Yes Prior 7-Oct-08
2 200,000 SSS No Yes Post Apr-09 Details at Annex. E
3
Office Equipment -Several Package
107,000 Shopping No N/A Post Details in Annex. A
4
IT equipment - Several Packages
310,000 Shopping No N/A Post Details in Annex.B
5
(i) Communication Equipment
30,000 Shopping No N/A Post Details in Anenex.D
368,000 Shopping/SSS No N/A Post/Prior
(iii) Communication Services(Internet)
172,000 NCB No N/A Prior Jun-09 Earlier contract extended up to August 31, 2009.
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Estimated Cost (US$)
Procurement Method
Pre-qualification (Yes/No)
Domestic Preferences
(Yes/No)
Review by Bank (Prior/
Post)
Expected Bid-Opening Date
Contract finalised on M/sGFS on 08/02/09. Contract Value =Us $ 913,254
MRRD/NSP II/GN/ 076 dated 08/02/09 on M/S GFS End date: 31.08.09 Contract value: US $ 913,254, Value including customs duty would be approx. USD1,200,000
Construction Quality Control Equipment- Several Packages
Annexure E attached. Total value of items procured till December, 2008 is USD6530.Plan for Procurement upto September,2009 is for USD9685
Several Packages
Annexure A Attached. Total value of items procured till December,2008 is USD 69,047.Plan for Procurement upto September,2009 is for USD37,631.
Several Packages
Annexure B Attached. Total value of items procured till December,2008 is USD 153,624 (approx.).Plan for Procurement upto September,2009 is for USD156,922 .
Several Packages
Annexure D Attached. Total value of items procured till December,2008 is USD 9,929. Plan for Procurement upto September,2009 is for USD19,880
(ii) Communication Services(Internet)- Several packages
An amount of USD367,867 has been spent till December.2008.
Bid documents have been sent to WB for NOL for processing Bids for a period of one year.
Procurement Plan for Procurement of Goods & Works and Non consulting services - NSPII
1 2 3 4 5 6 7 8 9
Ref. No. Contract (Description) Present Position Contract Details
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Estimated Cost (US$)
Procurement Method
Pre-qualification (Yes/No)
Domestic Preferences
(Yes/No)
Review by Bank (Prior/
Post)
Expected Bid-Opening Date
5
Total (i) + (ii) + (iii) 570,000
6 525,000 NCB
7 Hiring time for broadcasting TV spots 58,000 Shopping No No Post Oct-09
8 Printing and supply of publicity materials 25,000 Shopping No No Post TBD Several packages
9 300,000 Shopping/NCB No N/A Post
10 1,200,000 Shopping/NCB No N/A Post
11 Office furniture 83,000 Shopping No No Post Details in Anenex.C
Total 4,478,000
CDC Sub-Projects
Internet services Period April,2010 to September, 2011
Civil works for renovations/improvement/Maintenance of MRRD/NSP Buildings Several
packages
Annexure F attached. Works already procured for USD 172,535 till December,2008. Further projections would be made by May,2009.
Civil works for renovations/improvement/rehabilitation of provincial offices (several packages) Several
Packages
Annexure G attached.An amount of USD11,385 has been spent till December,2008. A requirement has been projected for USD165,200 and further requirement for USD 1,023,415 would be made by April, 2009
Several Packages
Annexure C Attached. Total value of items procured till December,2008 is USD 57,958. Plan for Procurement upto September,2009 is for USD24,593
Procurement Plan for Procurement of Goods & Works and Non consulting services - NSPII
1 2 3 4 5 6 7 8 9
Ref. No. Contract (Description) Present Position Contract Details
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Estimated Cost (US$)
Procurement Method
Pre-qualification (Yes/No)
Domestic Preferences
(Yes/No)
Review by Bank (Prior/
Post)
Expected Bid-Opening Date
1 644,800 NCB No N/A Prior 1/10/2009
2 Faryaab Bridge & Culverts 185,240 NCB No N/A Prior 12/15/2008 Case finalized.
3 Power Grid Line Project 609,057 SSS No N/A Prior May,2009
Four Schools in Faryaab Province ( 1. Badhisy in Khwaza Sabz Posh 2.Sary Qalla in Khwaza Sabz Posh 3. Baloch in ShirinTagab 4. Gulnaor in Daulatabad )
Contract issued for 4 Schools at a total value of USD 519,440 for schools at S.No. 1. to 4.
Letter of acceptance issued on 10.02.09. Meanwhile a complaint has been received on 22.02.09 which is under investigation.
Case under discussion with Ministry of Energy and Water resources
Method of selection as SSS based on the discussions with WB. Issue is being discussed by NSP with Ministry of Energy
Status as on 31.07.09 Status as on 20.02.2010
Details are in Annex.E Details are in Annex.E
Details in Annex. A Details in Annex. A
Details in Annex.B Details in Annex.B
Details in Anenex.D Details in Anenex.D
Vehicles are expected to be shipped by end August,2009.
Vehicles have arrived at Kabul and are under pre delivery inspection.
Bid opened on 14.06.09 and BER prepared with recommendations for rebidding due to revision in specifications and sent to the Bank on 27.07.09. WB had asked some queries reply to which is to be sent. NSP would be requesting for extension of existing contract for another 2 months.
WB did not agree for further extension of contract beyond August 31, 2009 and advised to process separate case with revised specifications.
Status as on 31.07.09 Status as on 20.02.2010
Detail are at Annexure G.
Details in Anenex.C
Bidding has been processed as per revised specifications.
Bids opened on February 10,2010. BER is being made out.
This item has been added in liu of Communication Campaign at S.No.82 in Consultancy services. It is a non consultancy service as production of Spots shall be done in-house by PCD team of NSP by hiring few individual Actors for the Spots.
Details are at Annexure F. Further procurement would be undertaken based on the requirement.
Status as on 31.07.09 Status as on 20.02.2010
Contract signed.
(i) Contract no. MRRD/NSP-II/WR/72-NCB/Lot 1,3&4 Dated April 26, 2009 Completion date October 27, 2009 (ii) Contract no. MRRD/NSP-II/WR/72-NCB/Lot 2 Dated April 21, 2009 Completion date October 20, 2009
District School Construction and Rehabilitation Window/NSP Position as on February 25, 2010
No Province District Schools Name
1
Balkh
Keshendeh N/A Tonj High School 16 20.08.2006
2 Keshendeh Aaq-koprok 16 20.08.2006
3 Chimtal Abul Mashar Balkhi 16 20.08.2006
4
Bamyan Bamyan Center
Sari Qool Topchi 8 20.08.2006
5 Sar Ahangaran 8 20.08.2006
6 Qazan 8 20.08.2006
7 Baariki 8 20.08.2006
8
Ghazni
Malistan
Shena Deh girls School 16 20.08.2006
9 Shahid Balkhi Girls School 8 20.08.2006
10 Nawa-e-Pashaee 16 20.08.2006
11
Khoja Omari
Dr.Zubair Shahid 16 20.08.2006
12 Sultan Masod h. 16 20.08.2006
13 Hazrat-Mustafa 8 20.08.2006
14
Behsud # 2 N/A
Baba-e Wali 8 23.01.2006
15 Dahne Ojay 8 23.01.2006
16 Kamarak Qaume Dehqan 8 23.01.2006
17Mujahid
8 23.01.2006
18
Parwan
CharikarAmanullah Shahid 16 09.08.2006
Construction Company
# of Classes
Signing date of Contract
Farhat Construction Company
Wahidullah Baktash Construction Company.
Yama Zahir Construction Company
Wahidullah Baktash Construction Company
Maidan-Wardak
Fawad Bakhshi Construction Company
19
Parwan
CharikarTelanchi 8 09.08.2006
20
Salang
Do Aab 8 20.08.2006
21 Awraty 8 20.08.2006
22 Wewa 8 20.08.2006
23 Hunar Wah 8 20.08.2006
24 Bagram Enayatullah Co. Maidan Boys School 24 09.08.2006
25
Panjshir
Muhib Omarz Co. Shutol girls School 8 20.08.2006
26 Sefat Construction Co. Hesarak 8 04.10.2009
27
Bazark to Khinj
Mohd. Panah Shahid 8 20.08.2006
28 Khinj girls school 8 20.08.2006
29 Khawak school 8 20.08.2006
30 Sari Pul Sayad Sefat Dara-e- band 8 24.08.2009
31Baghlan Andarab Enayatullah Co.
Qasan 16 23.01.2006
32 Naw bahar 16 23.01.2006
Fawad Bakhshi Construction Company
Iqbal Construction Company
Shutol to Bazark
Mahboob Nayebzai Co.
District School Construction and Rehabilitation Window/NSP Position as on February 25, 2010
Status % Remarks Commitment
30.04.2007 0.00 N/A
20.10.2009 100.00 Completed
18.07.2009 100.00 Completed
30.04.2007 43.25
N/A30.04.2007 49.42
30.04.2007 71.78
30.04.2007 70.49
31.08.2010 41.40
31.08.2010
31.08.2010 60.10
31.08.2010 22.76
30.04.2007 11.67
N/A30.04.2007 23.40
30.04.2007 40.11
25.09.2006 10.65
25.09.2006 26.33
25.09.2006 22.07
25.09.2006 21.79
31.08.2009 100.00 Completed.
Latest contract End Date
The contract had been cancelled on 15 July 2008 as the original site was found unfit for having sixteen class room school due to low load bearing capacity of the soil. New site has been finalised and BoQ is being formulated.
Due to financial crisis of Wahidullah Baktash Construction Company schools contract was cancelled and his case was sent to General Attorney for investagation, General Attorney rejected his case and stated that: Wahidullah Baktash Company is ready to complete the schools remaining work. Letter from the contractor for reopening of contracts has been received but performance security is awaited.
In Malistan district of Ghazni province, work has been restarted in two schools. However in one school work has not restarted due to security problem. Contractor is being contacted for his plan about Nawa-e Pashaee school. The end date of contract is up to 31.08.2010.
Due to financial crisis of Wahidullah Baktash Construction Company schools contract was cancelled and his case was sent to General Attorney for investagation, General Attorney rejected his case and stated that: Wahidullah Baktash Company is ready to complete the schools remaining work. Letter from the contractor for reopening of contracts has been received but performance security is awaited.
Contracts had been cancelled and the performance Bank Guarantee of 5% had been encashed. The process of rebidding has been done, The bid evaluation report has been sent to WB on Dec. 24, 2009 and further revised BER sent on Feb. 08, 2010.
22.04.2007 100.00 Completed.
21.03.2010 100.00 Completed.
21.03.2010 29.19
21.03.2010 100.00 Completed
21.03.2010 45.55
22.04.2007 100.00 Completed.
30.04.2007 100.00 Completed.
04.10.2010 0.36 Re-contracted with Sefat C.Co. and the civil work has started. 04.10.2010
30.09.2009 100.00 Completed.
30.04.2007 100.00 Completed.
31.08.2010 21.23 31.08.2010
24.12.2009 95.00
15.10.2009 96.40
15.10.2009 98.93
Due to cold wheather construction work has been stopped. Contractort has promised to complete the work by 31.12.2010 and asked for the end date extension which is under process.
Due to cold wheather construction work has been stopped. Contractort has promised to complete the work by 31.12.2010 and asked for the end date extension which is under process.
WB's NoL for Ammendment was received in October 09 and ammendment issued. End date has now been extended upto 31st August 2010. Work has not been restarted due to extreme cold weather but will be completed within due date.
Contractor has requested time up to April, 2010 to complete the remaining work. Formal letter from contractor is awaited.
Contractor has requested time up to April, 2010 to complete the remaining work. Formal letter from contractor is awaited.
Contractor has requested time up to April, 2010 to complete the remaining work. Formal letter from contractor is awaited.
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Activity Schedule: Goods
Num
ber
PP S
tatu
s
Cat
egor
y C
ompo
nent
- wis
e
Pack
age
Ref
.No.
Con
trac
t Ref
.
Description of Goods
Est
imat
e C
ost i
n U
SD
Proc
urem
ent M
etho
d
Pos
t/Pri
or R
evie
w S
tatu
s
Issu
e in
vita
tion
For
Bid
/RFQ
Bid
Ope
ning
Dat
e
IDA
cle
aran
ce o
f BE
R
NoA
(Not
ifica
tion
of A
war
d)
Con
trac
t Sig
ned
Dat
e
Exp
ecte
d D
ate
of D
eliv
ery
Con
trac
t Com
plet
ion
Dat
e
Con
trac
t Val
ue
Exp
endi
ture
Inc
urre
d to
Dat
e
Kab
ul O
ffic
e R
ef C
ontr
act N
o.
Rem
arks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26
1
Planned Vehicles 1,100,000 ICB Prior 8-Jul-08 22-Jul-08 5-Aug-08 19-Aug-08 7-Oct-08 6-Nov-08 20-Nov-08 4-Dec-08 7-Dec-08 6-Jan-09 12-May-09 9-Jun-09
Revised
Actual 913,254 ICB prior 8-Jul-08 27-Jul-08 18-Aug-08 8/21/2008 7-Oct-08 4-Dec-08 1-Jan-09 NA 13-Jan-09 8-Feb-09 NA Vehicles arrived.
2
Planned 200,000 SSS Post 8-Jan-09 22-Jan-09 5-Feb-09 19-Feb-09 9-Apr-09 9-May-09 23-May-09 6-Jun-09 9-Jun-09 9-Jul-09 3-Sep-09 1-Oct-09
Revised
Actual
5(iii)
Planned 172,000 NCB Prior 15-Mar-09 29-Mar-09 12-Apr-09 26-Apr-09 14-Jun-09 14-Jul-09 28-Jul-09 11-Aug-09 14-Aug-09 13-Sep-09 8-Nov-09 6-Dec-09
Revised
Actual 14-Jun-09
CDC Sub-Projects - Civil construction works
1
Planned 644,800 NCB Prior 11-Oct-08 25-Oct-08 8-Nov-08 22-Nov-08 10-Jan-09 9-Feb-09 23-Feb-09 9-Mar-09 12-Mar-09 11-Apr-09 15-Aug-09 12-Sep-09
Revised 11-Oct-08 25-Oct-08 8-Nov-08 22-Nov-08 10-Jan-09 9-Feb-09 23-Feb-09 9-Mar-09 12-Mar-09 11-Apr-09 15-Aug-09 12-Sep-09
Actual 1-Aug-08 5-Aug-08 20-Aug-08 13-Dec-09 10-Jan-09 18-Feb-09 25-Mar-09 N/A 25-Mar-09 27-Apr-09 27-Oct-09
2
Planned Faryaab Bridge & Culverts 185,240 NCB Prior 30-Sep-08 14-Oct-08 28-Oct-08 11-Nov-08 15-Dec-08 14-Jan-09 28-Jan-09 11-Feb-09 14-Feb-09 16-Mar-09 20-Jul-09 17-Aug-09
Revised 30-Sep-08 14-Oct-08 28-Oct-08 11-Nov-08 30-Dec-08 29-Jan-09 12-Feb-09 26-Feb-09 1-Mar-09 31-Mar-09 4-Aug-09 1-Sep-09
Actual 19-May-08 2-Sep-08 1-Oct-08 9-Oct-08 15-Dec-08 17-Jan-09 28-Jan-09 N/A 10-Feb-09 30-Sep-09 N/A 30-Sep-10
4
Planned 252,000 NCB Prior 27-May-09 10-Jun-09 24-Jun-09 8-Jul-09 11-Aug-09 10-Sep-09 24-Sep-09 8-Oct-09 11-Oct-09 10-Nov-09 16-Mar-10 13-Apr-10
Revised 27-May-09 10-Jun-09 24-Jun-09 8-Jul-09 11-Aug-09 10-Sep-09 24-Sep-09 8-Oct-09 11-Oct-09 10-Nov-09 16-Mar-10 13-Apr-10
Actual 27-May-09 18-Jun-09 18-Jun-09 14-Jul-09 11-Aug-09 12-Sep-09 27-Sep-09 N/A 28-Sep-09 15-Nov-09 N/A 10-Nov-10
Prep
arat
ion
of sp
ecifi
catio
ns,
cost
est
imat
es,
Sanc
tion/
appr
oval
and
Bid
do
cum
ents
Bid
Doc
umen
ts
Prep
ared
/Tra
nsm
it B
id
docu
men
ts/R
FQ to
IDA
IDA
cle
aran
ce o
f Bid
do
cum
ents
/RFQ
BE
R C
ompl
eted
/Tra
nsm
it B
ER
to
ID
A fo
r N
OL
SPC
(Spe
cial
Pro
cure
men
t C
omm
issi
on, M
oF) C
lear
ance
Nam
e of
C
ontr
acto
r/N
atio
nalit
y& z
ip
code
MRRD/NSPII/GD/076
16 weeks openng of LC and LC opened in
September, 2010
January, 2010
GFS, Thailand
USD 913,254
MRRD/NSPII/GD/076-ICB
Construction Quality Control Equipment- Several Packages
Demand yet to be received from TSD
Internet sevices for NSP HQ ,Regional and Provincial Offices
BER sent to WB proposing for rebidding. WB has NoLed rebidding with revised specifications.
MRRD/NSPII/WR/072
Four Schools in Faryaab Province ( 1. Badhisy in Khwaza Sabz Posh 2.Sary Qalla in Khwaza Sabz Posh 3. Baloch in ShirinTagab 4. Gulnaor in Daulatabad )
MRRD/NSPII/WR/062
After notification of award, there was a complaint which had to be investigated and hence delay in issue of contract
MRRD/NSPII/WR/072
Two schools in Faryab Province ( 1. Shar-e-Naw in Daulatabad 2.Chakmaq in Pashtoon Kot)
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288Consultancy Assignments with Selection Methods and Time Schedule
1 2 3 4 5 6 7 8
Ref. No. Description of Assignment Comments Contract ReferenceAmendment if any
Status as on February 20, 2010Various Amendments
3,170,924 SSS Prior Dec-06 4,768,724
798,412 SSS Prior Dec-06 Contract signed with ActionAid 1,222,012
841,600 SSS Prior Dec-06 Contract signed with ADA 1,063,000 Contract cancelled due to poor performance
1,863,590 SSS Prior Dec-06 2,710,790
2,254,403 SSS Prior Dec-06 3,350,003
2,601,132 SSS Prior Dec-06 3,855,732
3,316,797 SSS Prior Dec-06 4,244,997
903,159 SSS Prior Dec-06 1,368,159
663,981 SSS Prior Dec-06 1,023,381
Estimated Cost (US$)
Selection Method
Review by Bank (Prior /
Post)
Expected Proposals
Submission Date Value as per Ammendment/ Proposed amendment
1.
Follow-up facilitation in Faizabad, Kishim, Shari Buzurg, Yawaan, Yaftal, Nahrin, Pul Khumri, Burka, Ahmar, Pashtunkot, Qaisar, Archi, Imam Sahib, Ishkamish, Kwaja Gar, Taloqan, Yangi Kala, Bangi, Darqad Districts where NSP has begun prior to April 2007
Contract signed with ACTED
Cont Ref. MRRD/NSPII/CONT/01-ACTED S-Date: 15-05-2007 E-date: 14-05-2008 Value: USD 3,170,924
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 ,Amendment III E-Date: 30 Sept,09 Payment schedule
Ammendment 4 for extension of end date up to 9/30/2011 issued.
2.
Follow-up facilitation in Surobi, Musayi, Khaki Jabar, Questepa, Khamyab, Darzab Districts where NSP has begun prior to April 2007
Cont Ref. MRRD/NSP II/CONT/02-Action Aid S-Date: 15-04-2007 E-date: 31-03-2008 Value: USD 798,412
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09
Ammendment 4 for extension of end date up to 9/30/2011 isssued.
3.
Follow-up facilitation in Tirinkot, Khas Urugan, Qalat, Shar-e-Safa(Tarnak Jaldak) Districts where NSP has begun prior to April 2007
Cont Ref. MRRD/NSP II/CONT/03-ADA S-Date: 15-03-2007 E-date: 30-06-2008 Value: USD 841,600
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09
4.
Follow-up facilitation in Cheghcharan, Shaharak, Lal-wa-Sarjangal, Dawlatyar, Charsada, Aybak, Kamdesh, Bargematal, Warduj, Baharak, Shuhada, Argu Districts where NSP has begun prior to April 2007
Contract signed. Awarded to AfghanAid
Cont Ref. MRRD/NSP II/CONT/04-Afghan Aid S-Date: 15-03-2007 E-date: 31-05-2008 Value: USD 1,863,590
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
5.
Follow-up facilitation in Darwaz, Darwaz-e-Bala, Jorm, Kash, Kofab, Kuran wa Menjan, Shikai, Sheghnan, Wakhan, Zebak, Baharak, Andarb, Dahni Ghori, Doshi, Khejan, Tala wa Barfak, Kalafgan, Waras, Panjab, Shebar, Surkhe Parsa, Shekh Ali Districts where NSP has begun prior to April 2007
Contract signed. Awarded to AKDN
Cont Ref. MRRD/NSP II/CONT/05-AKDN S-Date: 15-03-2007 E-date: 31-03-2008 Value: USD 2,254,403
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 ,Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
6.
Follow-up facilitation in Sharan, Urgun, Yayaquil, Sarobi, Chahar Bran, Yousef Khail, Khari Kot, Achin, Bati Kot, Surkh Rod, Behsood, Dih Bala, Garmser, Nahri Sarrai, Lashkar Gah, Musa Qala, Naway--i-Barakzayi, Dare-e-Souf Bala, Dare-e-Payan, Ab Kamary, Muqur Districts where NSP has begun prior to April 2007
Contract signed. Awarded to BRAC
Cont Ref. MRRD/NSP II/CONT/06-BRAC S-Date: 15-03-2007 E-date: 31-03-2008 Value: USD 2,601,132
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 Amendment III E-Date: 30 Sept.09 Payment schedule revise Amendment IV
Ammendment 5 for extension of end date up to 9/30/2011 issued.
7.
Follow-up facilitation in Baghlan Center (Puli-Hisar), Chahar Kint, Khulm, Marmol, Sholgara, Bahrami Shahid (Jaghato), Deh Yak, Ghazni Center, Jaghuri, Malestan, Nawur, lija Ahmad Khel, Sayed Karam, Zurmat, Gardez, Ghorband, Chaki Wadak, Day Mirdad Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to CARE International
Cont Ref. MRRD/NSP II/CONT/07-CARE S-Date: 15-03-2007 E-date: 30-06-2008 Value: USD 3,316,797
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 ,Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
8.
Follow-up facilitation in Char Bolack, Dawlatabad, Shirin Tagab, Khwaja Sabzpush, Tolak, Saghar Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to CHA
Cont Ref. MRRD/NSP II/CONT/08-CHA S-Date: 15-03-2007 E-date: 31-03-2008 Value: USD 903159
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
9.
Follow-up facilitation in Farkhar, Chal, Rustaq, Reghistan, Kohistan Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Concern Worldwide
Cont Ref. MRRD/NSP II/CONT/09-CONCERN S-Date: 15-03-2007 E-date: 20-02-2008 Value: USD 663,981
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 ,Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
1,840,397 SSS Prior Dec-06 2,812,397
990,317 SSS Prior Dec-06 1,515,917
867,198 SSS Prior Dec-06 1,233,798
1,515,600 SSS Prior Dec-06 2,277,600
1,539,940 SSS Prior Dec-06 2,335,540
266,393 SSS Prior Dec-06 417,593
380,752 SSS Prior Dec-06 545,752
678,210 SSS Prior Dec-06 Contract Signed. Awarded to PIN 1,052,610
295,897 SSS Prior Dec-06 445,297
207,604 SSS Prior Dec-06 276,004
880,109 SSS Prior Dec-06 1,331,909
10.
Consultancy contracts for FPs to follow-up facilitation in Alishing, Alingar, Mehterlam, Jaji, Chamkani, Khwaja Omari, Qadis, Pashtum Zarghon, Robat-e-Sangi, Obe districts where NSP has begun prior to April 2007
Contract Signed. Awarded to DACAAR
Cont Ref. MRRD/NSP II/CONT/10-DACAAR S-Date: 15-05-2007 E-date: 31-03-2008 Value: USD 1,840,397
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 ,Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
11.
Follow-up facilitation in Dur Baba, Dare Noor, Nazian, Agcha, Faizabad, Qarqin, Khanaqa, Qaramqol, Khani Chaharbagh, Qorghan Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to GAA
Cont Ref. MRRD/NSP II/CONT/11-GAA S-Date: 15-05-2007 E-date: 31-05-2008 Value: USD 990,317
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 Amendment III E-Date: 30 Sept.09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
12.
Follow-up facilitation in Ali Abad, Chardara, Khan Abad, Kunduz Center, Baghlan Jadid, Khawaj Hijran Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to GRSP
Cont Ref. MRRD/NSP II/CONT/12-GRSP S-Date: 15-05-2007 E-date: 31-03-2008 Value: USD 867,198
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
13.
Follow-up facilitation in Jaji Maidan, Musa Khel, Tani, Lakan, Matum, Azra, Baraki Barak, Charkh, M. Agha, Puli Alam Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to IRC
Cont Ref. MRRD/NSP II/CONT/13-IRC S-Date: 15-05-2007 E-date: 31-03-2008 Value:
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09
Ammendment 4 for extension of end date up to 9/30/2011 issued.
14.
Follow-up facilitation in Taywarah, Pasaband, Chawky, Sarkanay, Marawara, Khas Kunar, Narang, Want Waygal, Wama Parum, Nangaraj, Doah, Dawlacha, Qarghay Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to MADERA
Cont Ref. MRRD/NSP II/CONT/14-MADERA S-Date: 15-05-2007 E-date: 31-03-2008 Value: USD 1,539,940
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 Ammendment 4 for extension of end date up to
9/30/2011 issued.
15.
Follow-up facilitation in Qala-e-Naw, Khiwa, Kushke-e-Kohna, Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to NPO
Cont Ref.MRRD/NSP II/CONT/15-NPO/RRAA S-Date: 15-05-2007 E-date: 16-03-2008 Value: USD 266,393
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 Amendment III E-Date: 30 Sept.09 Payment schedule revise
Ammendment 4 for extension of end date up to 9/30/2011 issued.
16.
Follow-up facilitation in Miramora, Ashtelay, Shahristan,Khidir, Nilli Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Oxfam
Cont Ref. MRRD/NSP II/CONT/16-OXFAM S-Date: 15-05-2007 E-date: 31-08-2008 Value: USD 380,752
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09 Amendment III E-Date: 30 Sept.09 Payment schedule revise
Ammendment 4 for extension of end date up to 9/30/2011 issued.
17.
Follow-up facilitation in Dand Wa Patan, Loja Manga, Chamkani, Shortepa, Kaldar, Nahre Shahi, Zare Districts where NSP has begun prior to April 2007
Cont Ref. MRRD/NSP II/CONT/17-PIN S-Date: 15-05-2007 E-date: 30-06-2008 Value: USD 678,210
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
18.
Follow-up facilitation in Asadabad, Pech, Nurgal Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Relief Int.
Cont Ref. MRRD/NSP II/CONT/18-RI-Kunar S-Date: 15-05-2007 E-date: 31-03-2008 Value: USD 295,897
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
19.
Follow-up facilitation in Zaranj, Kanj, Chakhansoor Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Relief Int.
Cont Ref. MRRD/NSP II/CONT/19-RI-Nimroz S-Date: 15-05-2007 E-date: 30-06-2008 Value: USD 207,604
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
20.
Follow-up facilitation in Sayedabad, Markaz-e-Behsud, Hisa-e-Awal (Behsud), Jalrez, Nirkh Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to SCA
Cont Ref. MRRD/NSP II/CONT/20-SCA S-Date: 15-05-2007 E-date: 28-02-2008 Value: USD 880,109
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
915,084 SSS Prior Dec-06 1,308,684
214,792 SSS Prior Dec-06 335,392
4,062,390 SSS Prior Dec-06 6,021,990
255,980 SSS Prior Dec-06 Contract Signed with ZOA 398,180
1,327,200 SSS Prior Dec-06 1,919,400
SUB TOTAL 32,651,861 SUB TOTAL 47,834,861
1,931,830 SSS Prior Jan-07 2,277,000
125,993 SSS Prior Jan-07 148,500
403,200 SSS Prior Jan-07 Contract cancelled due to poor performance
1,568,626 SSS Prior Jan-07 1,849,056
1,528,741 SSS Prior Jan-07 1,801,741
1,537,200 SSS Prior Jan-07 1,811,700
1,680,010 SSS Prior Jan-07 1,980,010
21.
Follow-up facilitation in Guldara, Farza, Kalakan, Paghman, Shakar Dara, Deh Sabz, Mirbachakot, Estalif, Chahar Asyab Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to SDO
Cont Ref. MRRD/NSP II/CONT/21-SDO S-Date: 15-05-2007 E-date: 31-01-2008 Value: USD 915,084
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09
Ammendment 4 for extension of end date up to 9/30/2011 issued.
22.
Follow-up facilitation in Ruy Duab District where NSP has begun prior to April 2007
Contract Signed. Awarded to Solidarities
Cont Ref.MRRD/NSP II/CONT/22-Solidarites S-Date: 11-11-2006 E-date: 31-10-2007 Value: USD 214,792
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
23.
Follow-up facilitation in Bamyan Dist, Yakawlang, kamard, Farah Markaz, Khaki Safid, Bala Buluk, Anar Darah, Qala-e-Kah, Nahri Shahi, Deh Dadi, Enjil, Guzara, Maiwand, Zahri, Panjwayi, Dand, Daman, Arghandab, Shiga (Takhta Pul), Kohistan 1, Mahmood Raqi, Nejrab, Kohistan 2, Charikar, Sayed Khel, Kohi Safi, Jabal Saraj, Bazarak, Onaba, Shutal, Rukha, Pareeyan, Khenj, Kerman (Dara), Kama, Goshta Districts where NSP has begun prior to April 2007
Contract Signed with UN-HABITAT
Cont Ref. MRRD/NSP II/CONT/23-UN-H S-Date: 15-03-2007 E-date: 31-03-2008 Value: USD 4,062,390
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 isssued.
24.
Follow-up facilitation in Sheberghan Districts where NSP has begun prior to April 2007
Cont Ref. MRRD/NSP II/CONT/24-ZOA S-Date: 15-05-2007 E-date: 31-10-2008 Value: USD 255,980
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
25.
Follow-up facilitation in Gosfandi, Sosma Qala, Kohistanat, Sanchorak, Saripul Center, Balkhab Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to ZOA Refugee Care
Cont Ref. MRRD/NSP II/CONT/25-ZOA S-Date: 15-05-2007 E-date: 30-03-2008 Value: USD 1,327,200
Ammendment 1 Clarification, Amendment II: E-Date: 30 June,09, Amendment III E-Date: 30 Sept,09 Payment schedule revised
Ammendment 4 for extension of end date up to 9/30/2011 issued.
26.
NSP facilitation in New communities in Fayzabad, Shahri Buzug, Pashtun Kot, Dashti Archi, Imam Sahib Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to ACTED
Cont Ref. MRRD/NSP II/NEW/01-ACTED S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Ammendment 1 Clarification, Amendment II End Date: 30 Sep. 09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
27.
NSP facilitation in New communities in Khwaja Du Koh District where NSP has begun prior to April 2007
Contract Signed. Awarded to Action Aid
Cont Ref. MRRD/NSP II/NEW/02-Action Aid S-Date: 01-04-2007 E-date: 31-03-2009
Ammendment 1 Clarification, Amendment II End Date: 31st May 2010
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
28.
NSP facilitation in New communities in Tiriknot District where NSP has begun prior to April 2007
Contract Signed. Awarded to ADA
Cont Ref. MRRD/NSP II/NEW/03-ADA S-Date: 01-04-2007 E-date: 31-03-2009 Value:
29.
NSP facilitation in New communities in Cheghcharan, Lal wa Sarjangal, Dawlatyar, Aybek, Argu Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Afghan Aid
Cont Ref. MRRD/NSP II/NEW/04-Afghan Aid S-Date: 01-06-2007 E-date: 31-05-2009
Ammendment 1 Clarification, Amendment II End Date: 31st Dec.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
30.
NSP facilitation in New communities in Darwaz, Darwaz e Bala, Khash, Koofab, Kuran wa Menjan, Shikai, Wakhan, Baharak, Waras, Panjab, Sheikh Ali Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to AKDN
Cont Ref.MRRD/NSP II/NEW/05-AKDN S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD 1528741
Ammendment 1 Clarification, Amendment II End Date 28th Feb.2010
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
31.
NSP facilitation in New communities in Surkh Rod, Behsood, Jawand, Muqur Districts where NSP has begun prior to April
Contract Signed. Awarded to BRAC
Cont Ref. MRRD/NSP II/NEW/06-BRAC S-Date: 01-06-2007 E-date: 31-05-2009 Value: USD
Amendment I Clarification Amendment II End Date: 30 Sept.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
32.
NSP facilitation in New communities in Nawor, Jaghori, Baghlan(Puli Hisar), Sholgara Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to CARE Int.
Cont Ref. MRRD/NSP II/NEW/07-CARE S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD
Amendment I Clarification Amendment II End Date:31st October.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
1,125,330 SSS Prior Jan-07 1,326,332
33.
NSP facilitation in New communities in Shirin Tagab, Khawja Sabzpush, Tulak, Saghar Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to CHA
Cont Ref. MRRD/NSP II/NEW/08-CHA S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD
Amendment I Clarification Amendment II End Date:31st Dec.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
587,985 SSS Prior Jan-07 692,985
1,234,798 SSS Prior Jan-07 1,455,298
470,400 SSS Prior Jan-07 554,400
487,200 SSS Prior Jan-07 574,200
739,198 SSS Prior Jan-07 871,198
344,400 SSS Prior Jan-07 405,900
479,584 SSS Prior Jan-07 569,580
587,999 SSS Prior Jan-07 693,000
335,621 SSS Prior Jan-07 Contract Signed. Awarded to PIN 395,640
428,256 SSS Prior Jan-07 504,747
605,007 SSS Prior Jan-07 710,010
822,230 SSS Prior Jan-07 969,220
2,586,934 SSS Prior Jan-07 3,050,434
SUB TOTAL 19,610,542 SUB TOTAL 22,640,951
34.
NSP facilitation in New communities in Rustaq, Chal, Raghistan, Kohistan Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Concern WW
Cont Ref. MRRD/NSP II/NEW/09-CONCERN S-Date: 01-04-2007 E-date: 31-03-2009
Amendment I Clarification Amendment II End Date:30th Nov.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
35.
NSP facilitation in New communities in Mehterlam, Chamkani, Qadis, Pashtum Zarghun, Robat-e-Sangi, ObeDistricts where NSP has begun prior to April 2007
Contract Signed. Awarded to DACAAR
Cont Ref. MRRD/NSP II/NEW/10-DACAAR S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Amendment I Clarification Amendment II End Date:30th June .09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
36.
NSP facilitation in New communities in Dur Baba, Dare-Noor, Nazian Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to GAA
Cont Ref. MRRD/NSP II/NEW/11-GAA S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Amendment I Clarification Amendment II End Date:31st Oct .09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
37.
NSP facilitation in New communities in Ali Abad, Baglan Jadid Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to GRSP
Cont Ref. MRRD/NSP II/NEW/12-GRSP S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Amendment I Clarification Amendment II End Date:3oth Nov .09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
38.
NSP facilitation in New communities in Jaji Maldan, Tani Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to IRC
Cont Ref. MRRD/NSP II/NEW/13-IRC S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD 739198
Amendment I Clarification Amendment II End Date:31st July .09 Amendment III End Date: 31st Jan.2010
Ammendment 4 for extension of end date up to 31/03/2014 isssued.
39.
NSP facilitation in New communities in Qarghai, Chawky Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to MADERA
Cont Ref.MRRD/NSP II/NEW/14-MADERA S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Amendment I End Date:May.09
Ammendment 2 for extension of end date up to 31/03/2014 isssued.
40.
NSP facilitation in New communities in Qala-e-Naw, kushke-e-Kohna Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to NPO
Cont Ref.MRRD/NSP II/NEW/15-NPO/RRAA S-Date: 01-04-2007 E-date: 31-03-2009
Amendment I Clarification Amendment II End Date:30th April.2010
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
41.
NSP facilitation in New communities in Miramora, SharistanDistricts where NSP has begun prior to April 2007
Contract Signed. Awarded to Oxfam
Cont Ref. MRRD/NSP II/NEW/16-OXFAM S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Amendment I Clarification Amendment II End Date:28th Feb .2010
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
42.
NSP facilitation in New communities in Zare District where NSP has begun prior to April 2007
Cont Ref. MRRD/NSP II/NEW/17-PIN S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD
Amendment I Clarification Amendment II End Date:31st Aug .09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
43.
NSP facilitation in New communities in Nurgal Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Relief Int.
Cont Ref. MRRD/NSP II/NEW/18-RI-Kunar S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD 428256
Amendment I Clarification Amendment II End Date:30th June.09 Amendment III End Date:31st Aug.2010
Ammendment 4 for extension of end date up to 31/03/2014 isssued.
44.
NSP facilitation in New communities in Char Burjak, Khash Rod Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to Relief Int.
Cont Ref. MRRD/NSP II/NEW/19-RI-Nimroz S-Date: 01-04-2007 E-date: 31-03-2009 Value: USD 605007
Amendment I Clarification Amendment II End Date:31st Aug.09 Amendment III End Date:31st Aug.2010
Ammendment 4 for extension of end date up to 31/03/2014 isssued.
45.
NSP facilitation in New communities in Markazi Bihsud II District where NSP has begun prior to April 2007
Contract Signed. Awarded to SCA
Cont Ref.MRRD/NSP II/NEW/20-SCA S-Date: 15-08-2007 E-date: 14-08-2014 Value:
Amendment I Clarification Amendment II End Date:3oth Nov.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
46.
NSP facilitation in New communities in Enjil, Guzara, Karokh, Nejrab, Kohsitan 2, Kama, Goshta Districts where NSP has begun prior to April 2007
Contract Signed. Awarded to UN-Habitat
Cont Ref. MRRD/NSP II/NEW/23-UN-H S-Date: 01-04-2007 E-date: 31-03-2009 Value:
Amendment I Clarification Amendment II End Date:31st Oct.09
Ammendment 3 for extension of end date up to 31/03/2014 isssued.
1,415,981 FBS Prior Mar-07 799,280 31st March 2014
2,131,200 FBS Prior Mar-07
Contract cancelled.
NSP facilitation in New Baharak Districts 710,392 FBS Prior Mar-07 400,796 31st March 2014
NSP facilitation in New Barmal Districts 708,804 FBS Prior Mar-07 Contract Canelled
3,648,054 FBS Prior Mar-07 2,616,951 31st March 2014
3,551,996 FBS Prior Mar-07 2,003,998 31st March 2014
1,420,750 FBS Prior Mar-07 801,576 31st March 2014
2,482,470 FBS Prior Mar-07 Contract Signed. Awarded to FG 1,583,984 31st March 2014
7,813,211 FBS Prior Mar-07 Contract Signed. Awarded to FI Contract cancelled.
NSP facilitation in New Chishti Sharif Districts 710,400 FBS Prior Mar-07 Contract Signed. Awarded to IC 400,800 31st March 2014
6,570,351 FBS Prior Mar-07 4,369,200 31st March 2014
1,363,200 FBS Prior Mar-07 1,603,200 31st March 2014
2,839,416 FBS Prior Mar-07 1,602,160 31st March 2014
NSP facilitation in New tangi Takht District 709,359 FBS Prior Mar-07 400,304 31st March 2014
3,674,042 FBS Prior Mar-07 Contract Signed. Awarded to PIN 2,636,719 31st March 2014
NSP facilitation in New Kijran Districts 707,502 FBS Prior Mar-07
47.
NSP facilitation in New Darayim, Dulayna Districts
Contract Signed. Awarded to Afghan Aid
Cont Ref. MRRD/NSP II/ New District/03-AAD S-Date: 15-08-2007 E-date: 14-08-2014 Value:
48.
NSP facilitation in New Hazar Sumuch, Namk Ab, Dashti Qala Districts
Contract Signed. Awarded to ADA
Cont Ref.MRRD/NSP II/ New District/06-ADA S-Date: 15-08-2007 E-date: 14-08-2014 Value:
49.
Contract Signed. Awarded to AKDN
Cont Ref. MRRD/NSP II/ New District/02-AKDN S-Date: 15-08-2007 E-date: 14-08-2014 Value:
50.
Contract Signed. Awarded to AREP
Cont Ref. MRRD/NSP II/ New District/01-AREP S-Date: 15-08-2007 E-date: 14-08-2014 Value:
Contract being Cancelled due to poor performance
51.
NSP facilitation in New Pachir wa Agam, Muhmand Dara, Gayan, Nika, Ziruk, Chah Ab, Khwaja Bahawuddin Districts
Contract Signed. Awarded to BRAC Afghanistan
Cont Ref. MRRD/NSP II/ New District/08-BRAC S-Date: 15-08-2007 E-date: 14-08-2014 Value:
52.
NSP facilitation in New Bilchiragh, Gurziwan, Farsi, Kohsan, Shindand Districts
Contract Signed. Awarded to CHA
Cont Ref. MRRD/NSP II/ New District/09-CHA S-Date: 15-08-2007 E-date: 14-08-2014 Value:
53.
NSP facilitation in New Andkhoy & Shinwari Districts
Contract Signed. Awarded to DACAAR
Cont Ref. MRRD/NSP II/ New District/14-DACAAR S-Date: 15-08-2007 E-date: 14-08-2014 Value:
54.
NSP facilitation in New Khogyani, Zana Khan, Waghaz and Andar Districts
Cont Ref. MRRD/NSP II/ New District/16-FG S-Date: 15-08-2007 E-date: 14-08-2014 Value: USD
55.
NSP facilitation in New Ab Band, Ajristan, Muqur, Nawa, Qarabagh, Giro, Gelan, Arghanjkhwa, Khwahan, Tagabi Kishim & Tashkan Districts
Cont Ref. MRRD/NSP II/ New District/12-FI S-Date: 15-08-2007 E-date: 14-08-2014 Value: USD
Contract being Cancelled due to poor performance
56.
Cont Ref. MRRD/NSP II/ New District/15-IC S-Date: 15-08-2007 E-date: 14-08-2014 Value: USD
57.
NSP facilitation in New Bak, Ghoryan, Gulran, Gurbuz, Nadir Shah Kot, Qalandar, Sabari, Sherzad, Teri Zayi, Shinwar, Shamal Districts
Contract Signed. Awarded to IRC
Cont Ref. MRRD/NSP II/ New District/17-IRC S-Date: 15-08-2007 E-date: 14-08-2014 Value:
58.
NSP facilitation in NewBar Kunar, Dangam, Nari and Chapa Dara Districts
Contract Signed. Awarded to MADERA
Cont Ref.MRRD/NSP II/ New District/11-MADERA S-Date: 15-08-2007 E-date: 14-08-2014
59.
NSP facilitation in New Akraskan, Ghaziabad, Kot, & Shygal wa Shiltan. Districts
Contract Signed. Awarded to NPO/RRA
Cont Ref.MRRD/NSP II/ New District/07-NPO S-Date: 15-08-2007 E-date: 14-08-2014 Value:
60.
Contract Signed. Awarded to OXFAM
Cont Ref. MRRD/NSP II/ New District/05-OXFAM S-Date: 15-08-2007 E-date: 14-08-2014 Value:
61.
NSP facilitation in New Farang Wa Gharo, Ghozargahe Noor, Hisarak, Khost Wa Firing, Jani Khel, Balkh, Lal Poor Districts
Cont Ref. MRRD/NSP II/ New District/13-PIN S-Date: 15-08-2007 E-date: 14-08-2014 Value: USD 3674042.2
62.
Contract Signed. Awarded to PSD
Cont Ref. MRRD/NSP II/ New District/10-PSD S-Date: 15-08-2007 E-date: 14-08-2014 Value: USD 707502
Contract being Cancelled due to poor performance
NSP facilitation in New Jaghato Districts 710,157 FBS Prior Mar-07 400,685 31st March 2014
SUB TOTAL 41,167,285 SUB TOTAL 19,619,653
2,392,194 FBS Prior Jun-06
1,607,846 FBS Prior Jun-06
6,753,600 FBS Prior May-08 Contract signed. Awarded o SDO
SUB TOTAL 10,753,640
4,213,754 SSS Prior Jan-08 4,213,754
Consultancy Contract for Management Support 11,000,000 QBS Prior Mar-07 10,084,170
Mid Term Evaluation 250,000 QBS Prior Nov-09
950,000 QBS Prior Jul-08
100,000 CQS Prior Mar-08 Contract cancelled.
63.
Contract Signed. Awarded to SCA
Cont Ref. MRRD/NSP II/ New District/04-SCA S-Date: 15-08-2007 E-date: 14-08-2014 Value: USD 710157
64.
NSP facilitation in Chora, Shahid Hassas and Dihrawud Districts
Contract Signed. Awarded to ANCC-Afghanistan
Cont Ref. MRRD/NSP II/ Priority Provincet/18-ANCC S-Date: 15-08-2007 E-date: 01-04-2010 Value: USD 2,392,194
65.
NSP facilitation in Washer and Nad Ali Districts
Contract signed. Awarded o BRAC
Cont Ref. MRRD/NSP II/ Priority Provincet/19-BRAC S-Date: 15-08-2007 E-date: 01-04-2010 Value: USD 1,607,846
67.
NSP facilitation in Ghorak, Shah Wali Kot,Arghistan,Shorabak, Maruf, Miya Nishin, Nish Districts in Kandahar Province
Cont Ref. MRRD/NSPII/CN/043 S-Date: 30-11-2008 E-date: 30-11-2012 Value: USD
70.
Continuation of 18 FP Contracts for Fourth Year of NSP facilitation in districts already entered under NSP I
Amendments processed and in effect.
All ammendements issued. In Feb 08 . End date:31.07-08 Enhanced value: US $ 4213754.50
Amendments issued for all contracts except SDO
extending the time ranging from August to
Nov.,2009
Contract end dates extended up to Sept 30, 2011
71.
Contract Signed. Awarded to Maxwell Stamp PLC. Signed contract for $ 8.5 million. Negotiations ongoing for potential amendment including need for additional staff.
MRRD/NSP II/0080 dt. 01.04.07 End Date:30.11.09 Value US $ 8501330
Ammendment 2 issued revising value from USD 8.5 M to 9.755 M USD ammending number of staff also. Amendment No. 3 issued in regard to certain TA positions. However, contract value remains unaltered. Ammendment 4 issued for time up to Feb. 28, 2010 with revised cost.
72.
MoF had asked MRRD for an independent evaluation of NSP. Accordingly, it was decided for conducting of an independent evaluation of NSP. Indian Govt. is supposed to conduct the evaluation. The TOR is submitted and there will be an Indo-Afghan Joint Working group meeting sometime in February,2009. After this meeting, NSP will be in a position to know if it has to cover cost for the evaluation or the Indian Govt would do it free.
73.
Performance Evaluation, Technical as well as Financial Audit of Facilitating Partners
Contract finalized with Particip, Germany (with Ernst & Young as subcontractor).Evaluation ongoing.Report yet to be submitted
MRRD/NSPII/CN/006 DATED 30.09.08 End Date=15.01.09 Value Euro 598,866.35+ AFN 2,212807.93
Final Report submitted. Amendmend no.II issued End date
September 30, 2009
74.
Contract compliance performance and financial audit of Management Support Consultants
Contract signed with PWC in July 08. Evaluation on going.Report yet to be submitted
MRRD/NSP II/CN/008 dt 30.06.08. End date 30.09.08 Value US $ 91875
End date extended 30.11.2008
Financial Audit of Oversight Consultants 70,000 CQS Post Sep-08 Contract Completed
Baseline & Impact Assessment 600,000 SSS Prior Sept. 07
75.
Contract Signed with PWC. Contract completed.
MRRD/NSP II/07/03/CQS dated 05-09-07 End date 15-10-07 Value: 15-10-07
76.
This is part of the Bank procured Harvard consultancy services. Ongoing baseline.
450,000 QBS Prior Sep-08
Diagnosis study of the M&E system 120,000 SSS Prior Nov-08 Contract Completed
Economic Benefit Analysis 250,000 QBS Prior Jan-08
Nil CQS Post
Procurement Agent 480,000 SSS Prior Sep-08 Contract finalized with RITES. 597020
20,000 CQS Post Sep-09
15,500,000 FBS/SSS Prior Jul-08
85 9,000 CQS Post 9-Jul Finalised
86 Financial Management Agents 2,700,000 QCBS Prior 7-Oct-09 Contract under finalization
Total
77.
Survey on the technical quality of sub projects and Engineering Quality of rural electrification projects
Consultant was shortlisted. However, Contract Negotiations has failed. NSP proposes to utilize the resources of this consultancy on in-house evaluation and on remedial actions proposed as part of in-house evaluation.
NSP proposed to utilize the resources of this consultancy on in house evaluation and on remedial actions which has not been agreed by the Bank. Matter to be discussed internally by NSP management for the further course of action
78.
Contract placed on M/S Group URD. Work is Completed.
MRRD/NSPII/CN/003 DATED 10- 01-08 End Date=25-03-08 Value US $ 126,751.13
Extended End Date : 30-06-08
79.
Contract handled by WB. Work completed.
80.
Analysis of conflict resolution and peace building activities by FPs
Originally an amount of USD50,000 was provided against this item.However,it is being removed from the Plan as indicators on Conflict resolution and peace building activities will be added to ongoing Base Line Survey
81.
MRRD/NSP II/CN/086 Dated 16.09.08 Value: Euro300,504 Ammendment: Cost
revised to Euro 334,790, ammendment II issued on 24/12/09 for cost and time
extension, Value Euro 411,738
Value converted to equivalent US $ taking 1 Euro = !.45 US $
82.
Communication Campaign- Translation of NSP website in Dari. Translation in Pashto shall be done in house
Earlier version of PP included the item as Communication Campaign- Designing of
various templates for NSP information and publicity and also Supply of publicity
materials. It has been decided to change the item for translation of NSP website in Dari and Pashtoo. Also TV spots shall be produced by
using in house capabilities by hiring few Actors as individuals. Hiring of TV spots is being
84.
Contract Amendments for FPs for continued work in CII and CII+ communities. Total 25 contracts for 23 FPs.
Amendments for 24 out of 25 Contracts have already been issued
All ammendements issued. In Nov 08 & Jan09. Details indicated from 1 to 25 Enhanced value: 14,247,000
Extended End Date : 30-06-09
Position already indicated against individual contract at S.No.1 to 25
Translation of NSP's revised Operation Manual-V in Dari and Pashtoo
Technical evaluation is under process
New Roll Out of communities-2009Proposed facilitation contracts for Category I communities
Ref. No. Description of Assignment Comments Reference Number Comments
87 3,587,700 Prior B1Jan-10
88 1,501,272 Prior B1Jan-10
89 4,011,600 Prior B1Jan-10
90 2,766,248 Prior B1Jan-10
91 10,887,664 Prior B1Jan-10
92 4,363,900 Prior B1Jan-10
93 1,254,016 Prior B1Jan-10
94 5,551,000 Prior B1Jan-10
95 788,100 Prior B1Jan-10
96 2,086,800 Prior B1Jan-10
97 6,736,236 Prior B1Jan-10
98 3,967,300 Prior B1Jan-10
99 3,196,800 Prior B1Jan-10
100 1,481,664 Prior B1Jan-10
101 1,542,900 Prior B1Jan-10
102 1,566,760 Prior B1Jan-10
103 3,712,016 Prior B1Jan-10
104 735,172 Prior B1Jan-10
105 4,545,652 Prior B1Jan-10
106 337,456 Prior B1Jan-10
Estimated Cost (US$)
Selection Method
Review by Bank (Prior /
Post)
Expected Proposals
Submission Date
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Badakhshan, Baghlan, Faryab, Kunduz and Takhar Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/01-ACTED
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Jawzjan and Kabul Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/02-Action Aid
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Badakhshan, Ghor, Nuristan and Samangan Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/03-Afghan Aid
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Badakhshan, Baghlan, Bamyan, Parwan and Takhar Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/04-AKDN
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Balkh, Ghazni, Paktia, Parwan and Wardak Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/06-CARE
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Faryab, Ghor, and Hirat Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/07-CHA
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Badakhshan and Takhar Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/08-CONCERN
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Faryab, Hirat, Laghman and Parwan Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/09-DACAAR
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Wardak Province.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/05 FG
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Kunduz and Baghlan Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/10-GRSP
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Hirat, Khost, Logar and Nangarhar Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/12-IRC
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Ghor, Kunar, Laghman and Nuristan Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/13-MADERA
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Badghis, Hirat, Kunar and Nangarhar Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/14-NPORRA
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Dai Kundi Province.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/15-OXFAM
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Balkh, Nangarhar and Paktia Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/16-PIN
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Kunar and Nimroz Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/17-RI
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Wardak Province.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/18-SCA
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Kabul Province.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/19-SDO
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Farah, Hirat, Kandahar, Kapisa and Parwan Provinces.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/20-UNH
New contract as extension of existing contracts are under issue.
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Sari Pul Province.
Amendment to existing contract
MRRD/NSPII/NEW PHASE II -2009/21-ZOA
New contract as extension of existing contracts are under issue.
Proposed facilitation consultancies for Category II communities
Ref. No. Description of Assignment Comments
Contract Reference
107 403,932 SSS Prior B1Feb-10
108 1,657,000 SSS Prior B1Jan-10
109 216,932 SSS Prior B1Feb-10
110 409,768 SSS Prior B1Feb-10
111 2,072,944 SSS Prior B1Feb-10
112 421,800 SSS Prior B1Feb-10
113 445,924 SSS Prior B1Feb-10
114 1,332,000 SSS Prior B1Mar-10 Procurement under process
115 3,827,060 SSS Prior B1Mar-10 Procurement under process
Sub Total 10,787,360
Proposed facilitation consultancies for Category III communities
Ref. No. Description of Assignment Comments
116 301,300 FBS Prior B1May-10 REoI is under process.
117 2,759,908 FBS Prior B1May-10 REoI is under process.
118 602,600 FBS Prior B1May-10 REoI is under process.
119 8,002,528 FBS Prior B1Apr-10
Estimated Cost (US$)
Selection Method
Review by Bank
(Prior / Post)
Expected Proposals
Submission Date
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Ghazni Province.
MRRD/NSPII/CN/FP - 2009/04-CARE
Closing date for Technical and Financial proposal submission 23.02.2010
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Faryab Province.
MRRD/NSPII/CN/FP - 2009/05-CHA
TER sent to the WB on 30.01.10 and revised TER sent on 08.02.10
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Baghlan Province.
MRRD/NSPII/CN/FP - 2009/07-GRSP
Closing date for Technical and Financial proposal submission 17.02.2010
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Logar Province.
MRRD/NSPII/CN/FP - 2009/08-IRC
Closing date for Technical and Financial proposal submission 16.02.2010
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Dai Kundi Province.
MRRD/NSPII/CN/FP - 2009/09-OXFAM
Closing date for Technical and Financial proposal submission 23.02.2010
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Paktia Province.
MRRD/NSPII/CN/FP-2009/10-PIN
Closing date for Technical and Financial proposal submission 14.02.2011
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Nimroz Province.
MRRD/NSPII/CN/FP - 2009/11-RI
Closing date for Technical and Financial proposal submission 17.02.2010
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Kabul Province.
MRRD/NSPII/CN/FP - 2009/02-………
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Farah Province.
MRRD/NSPII/CN/FP - 2009/12-UNH
Estimated Cost (US$)
Selection Method
Review by Bank
(Prior / Post)
Expected Proposals
Submission Date
NSP facilitation in new communities in Badakshan Province-2009
NSP facilitation in new communities in Badghis Province-2009NSP facilitation in new communities in Farah Province-2009
NSP facilitation in new communities in Helmand Province-2009
REoI had been closed and short listing report and draft RFP sent to WB on 14.02.2010. WB
gave comments to incorporate some modifications in RFP.
120 313,352 FBS Prior B1May-10 REoI is under process.
121 6,496,028 FBS Prior B1May-10 REoI is under process.
122 711,068 FBS Prior B1May-10 REoI is under process.
123 795,432 FBS Prior B1May-10 REoI is under process.
124 542,340 FBS Prior B1May-10 REoI is under process.
125 1,144,940 FBS Prior B1May-10 REoI is under process.
126 4,844,904 FBS Prior B1Apr-10
127 1,506,500 FBS Prior B1May-10 REoI is under process.
128 1,566,760 FBS Prior B1Apr-10
129 7,472,240 FBS Prior B1Apr-10
Sub Total 37,059,900
Proposed facilitation consultancies for Cluster CDCs
Ref. No. Description of Assignment CommentsReference No.
130 108,500 SSS Prior B1Jan-10
131 949,000 SSS Prior B1Feb-10 Being processed
132 468,000 SSS Prior B1Feb-10
Sub Total 1,525,500
New proposed consultancy assignments133 FMA contractual performance 100,000 QCBS Prior Nov-10
134 FPs contractual performance 750,000 QCBS Prior Nov-10
135 200,000 QBS Prior Sep-10
136NSP's Impact on Security and Peace Building 200,000 QBS
Prior Sep-10
137NSP's Impact on Women's Empowerment 100,000 QBS
Prior Sep-10
138350,000 QCBS
Prior 1-Jul
139200,000 QCBS
Prior 1-Jul
140CCDC-JSDF subprogramme pilot 150,000 QCBS
Prior Nov-10
141150,000 QBS
Prior Sep-10
142300,000 QCBS
Prior 25-Sep
143150,000 QCBS
Prior 10-Jul
144 150,000 QCBSPrior 5-Jul
NSP facilitation in new communities in Hirat Province-2009NSP facilitation in new communities in Kandhar Province-2009
NSP facilitation in new communities in Khost Province-2009
NSP facilitation in new communities in Nangarhar Province-2009
NSP facilitation in new communities in Nuristan Province-2010
NSP facilitation in new communities in Paktia Province-2009
NSP facilitation in new communities in Paktika Province-2009
REoI had been closed and short listing report and draft RFP sent to WB on 14.02.2010. WB
gave comments to incorporate some modifications in RFP.
NSP facilitation in new communities in Takhar Province-2009
NSP facilitation in new communities in Uruzgaon Province-2009
REoI had been closed and short listing report and draft RFP sent to WB on 14.02.2010. WB
gave comments to incorporate some modifications in RFP.
NSP facilitation in new communities in Zabul Province-2009
REoI had been closed and short listing report and draft RFP sent to WB on 14.02.2010. WB
gave comments to incorporate some modifications in RFP.
Estimated Cost (US$)
Selection Method
Review by Bank
(Prior / Post)
Expected Proposals
Submission Date
NSP II Facilitating Partner for Clustering CDC in Khulm, Dihadadi, Kishindah Districts of Bulkh Province
MRRD/NSPII/CN/CLUSTERING - 2010/14-
CHA
NoL for TER received on 23.02.10 and financial proposal is being opened on 24.02.10
NSP II Facilitating Partner for Clustering CDC in Shiber, Panjab Districts of Bamyan Province
MRRD/NSPII/CN/CLUSTERING - 2010/15-
AKDN
NSP II Facilitating Partner for Clustering CDC in Rodat Districts ofNangarhar Province
MRRD/NSPII/CN/CLUSTERING - 2010/16-
IRC
Closing date to submit Technical and financial proposal 09.03.2010
Expected to start assignment from Mar 2011
Expected to start assignment from Mar 2011
NSP's impact on Governance and state Building
Expected to start assignment from Jan 2011
Expected to start assignment fromJan 2011
Expected to start assignment fromJan 2011
Quality of NSP financed and completed infrasrtucture subprojects
Expected to start assignment from Nov 2010
Capacity Building/ Training of CDCs in NSP mandated packages
Expected to start assignment from Nov 2010
Expected to start assignment from Mar 2011
NSP MIS Design Efficiency/ Improvements Needed
Expected to start assignment from Jan 2011
Community Procurement and Financial Management of NSP Block Grants
Expected to start assignment from Feb 2011
Impact of NSP infrastructure subprojects on the environment
Expected to start assignment from Nov 2010
Use of NSP safeguard forms and procedures, and their impact
Expected to start assignment from Nov 2010
145 Rackspac Webhosting 7,900 Prior27-Jun-10 Aug-10 MRRD/NSPII/SR/384
Sub Total 2807900.2
Direct Contracting
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Activity Schedule: Consulting Services
Num
ber
PP S
tatu
s
Cat
egor
y C
ompo
nent
- wise
Pack
age
No.
Con
trac
t Ref
.Description of Services
Est
imat
e C
ost i
n U
SD ,
000
Pos
t/Pri
or R
evie
w S
tatu
s
RE
OI (
Clo
sing
Dat
e)
Issu
e of
RFP
IDA
Cle
aran
ce o
f TE
R
Ope
ning
of F
inan
cial
Pro
posa
l
IDA
cle
aran
ce o
f dra
ft co
ntra
ct
Sign
ing
of C
ontr
act
Mob
iliza
tion
of C
ontr
act
Con
trac
t Com
plet
ion
Dat
e
Con
trac
t Val
ue
Exp
endi
ture
Incu
rred
to D
ate
Kab
ul O
ffice
Ref
Con
trac
t No.
Remarks
72
Planned Mid term evaluation 250,000 QBS Prior 28-Jun-09 15-Jul-09 22-Jul-09 29-Jul-09 26-Aug-09 23-Sep-09 7-Oct-09 14-Oct-09 25-Nov-09 23-Dec-09 6-Jan-10 13-Jan-10 3-Feb-10 17-Feb-10 N/R 3-Mar-10 31-Mar-10
Revised
Actual
73
Planned 950,000 QBS Prior 9-Feb-08 26-Feb-08 4-Mar-08 11-Mar-08 8-Apr-08 6-May-08 20-May-08 27-May-08 8-Jul-08 5-Aug-08 19-Aug-08 26-Aug-08 16-Sep-08 30-Sep-08 21-Oct-08 4-Nov-08 2-Dec-08
Revised
Actual 20-Nov-07 29-Nov-07 4-Dec-07 1-Jan-08 29-Jan-08 10-Mar-08 23-Mar-08 16-Apr-08 18-May-08 8-Jun-08 12-Jun-08 3-Jul-08 11-Aug-08 25-Aug-08 N/A 30-Sep-08 15-Jan-09 Final Report submitted
74
Planned 100,000 CQS Prior 10-Oct-07 27-Oct-07 3-Nov-07 10-Nov-07 8-Dec-07 5-Jan-08 19-Jan-08 26-Jan-08 8-Mar-08 5-Apr-08 19-Apr-08 26-Apr-08 17-May-08 31-May-08 N/R 14-Jun-08 12-Jul-08
Revised
Actual 12-Nov-07 1-Jan-08 4-Jan-08 6-Jan-08 6-Feb-08 1-Apr-08 8-Apr-08 11-Apr-08 14-May-08 20-May-08 23-May-08 24-May-08 7-Jun-08 13-Jun-08 N/A 29-Jun-08 29-Jun-08 30-Nov-08 PWC US $91,875 Contract cancelled.
77
Planned 450,000 QBS Prior 24-Apr-08 11-May-08 18-May-08 25-May-08 22-Jun-08 20-Jul-08 3-Aug-08 10-Aug-08 21-Sep-08 19-Oct-08 2-Nov-08 9-Nov-08 30-Nov-08 14-Dec-08 N/R 28-Dec-08 25-Jan-09
Case closed as negotiation failed
Revised
Actual 2-Apr-08 14-Apr-08 22-Apr-08 24-Apr-08 15-May-08 15-Jul-08 27-Jul-08 19-Aug-08 21-Sep-08 14-Oct-08 28-Oct-08 10-Nov-08 23-Nov-08 29-Nov-08
86
Planned 2,700,000 QCBS Prior 10-May-09 27-May-09 3-Jun-09 10-Jun-09 8-Jul-09 5-Aug-09 19-Aug-09 26-Aug-09 7-Oct-09 4-Nov-09 18-Nov-09 9-Dec-09 30-Dec-09 13-Jan-10 3-Feb-10 17-Feb-10 17-Mar-10
Revised
Actual
107
Planned 403,932 SSS Prior 14-Nov-09 1-Dec-09 8-Dec-09 N/R 15-Dec-09 22-Dec-09 5-Jan-10 12-Jan-10 23-Feb-10 9-Mar-10 N/A 16-Mar-10 6-Apr-10 20-Apr-10 N/R 4-May-10 1-Jun-10
Revised
Actual
108
Planned 1,657,000 SSS Prior 11-Oct-09 28-Oct-09 4-Nov-09 N/R 11-Nov-09 18-Nov-09 2-Dec-09 9-Dec-09 20-Jan-10 3-Feb-10 N/A 10-Feb-10 3-Mar-10 17-Mar-10 7-Apr-10 21-Apr-10 19-May-10
Revised
Actual
Met
hod
of S
elec
tion
(QC
BS/
QB
S/C
QS/
LC
S/FB
S/SS
S)
Prep
arat
ion
of T
OR
, cos
t es
timat
e, sa
nctio
n et
c.,
Tra
nsm
it T
OR
and
cos
t est
imat
e to
IDA
IDA
cle
aran
ce o
f TO
R a
nd C
ost
estim
ate
Tra
nsm
it E
OI f
or P
ublic
atio
n to
W
B an
d Pu
blic
atio
n by
PIU
Tra
nsm
it Sh
ortli
st (T
ER +
RFP
) to
IDA
; In
case
of I
C C
ER
IDA
Cle
aran
ce o
f sho
rt-li
st a
nd
RFP
; In
case
of I
C C
ER
Ope
ning
of R
FP (T
echn
ical
Pr
opos
al)
Tra
nsm
it th
e T
ER
(Tec
hnic
al
Eval
uatio
n R
epor
t) to
IDA
Tra
nsm
it C
ER
(Com
bine
d Ev
alua
tion
Rep
ort),
Neg
otia
tion
- D
raft
Con
trac
t to
IDA
SPC
(Sen
ior
Proc
urem
ent
Com
mis
sion,
MoF
) cle
aran
ce
Nam
e of
Con
trac
tor/
Nat
iona
lity&
zi
p co
de
MRRD/NSPII/CN/006
Performance Evaluation, Technical as well as Financial Audit of Facilitating Partners
Particip GmbH
Euro 598,866.35+
AFN 2,212,807.93
Euro179660+AFN 663842
MRRD/NSPII/CN/008
Contract compliance performance and financial audit of Management Support Consultants
US $ 27563
MRRD/NSPII/CN/065
Survey on the technical quality of sub projects and Engineering Quality of rural electrification projects
MRRD/NSPII/CN/192
Financial Management Agents
MRRD/NSPII/
CN/FP - 2009/04-CARE
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Ghazni Province.
MRRD/NSPII/
CN/FP - 2009/05-
CHA
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Faryab Province.
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Activity Schedule: Consulting Services
Num
ber
PP S
tatu
s
Cat
egor
y C
ompo
nent
- wise
Pack
age
No.
Con
trac
t Ref
.Description of Services
Est
imat
e C
ost i
n U
SD ,
000
Pos
t/Pri
or R
evie
w S
tatu
s
RE
OI (
Clo
sing
Dat
e)
Issu
e of
RFP
IDA
Cle
aran
ce o
f TE
R
Ope
ning
of F
inan
cial
Pro
posa
l
IDA
cle
aran
ce o
f dra
ft co
ntra
ct
Sign
ing
of C
ontr
act
Mob
iliza
tion
of C
ontr
act
Con
trac
t Com
plet
ion
Dat
e
Con
trac
t Val
ue
Exp
endi
ture
Incu
rred
to D
ate
Kab
ul O
ffice
Ref
Con
trac
t No.
Remarks
Met
hod
of S
elec
tion
(QC
BS/
QB
S/C
QS/
LC
S/FB
S/SS
S)
Prep
arat
ion
of T
OR
, cos
t es
timat
e, sa
nctio
n et
c.,
Tra
nsm
it T
OR
and
cos
t est
imat
e to
IDA
IDA
cle
aran
ce o
f TO
R a
nd C
ost
estim
ate
Tra
nsm
it E
OI f
or P
ublic
atio
n to
W
B an
d Pu
blic
atio
n by
PIU
Tra
nsm
it Sh
ortli
st (T
ER +
RFP
) to
IDA
; In
case
of I
C C
ER
IDA
Cle
aran
ce o
f sho
rt-li
st a
nd
RFP
; In
case
of I
C C
ER
Ope
ning
of R
FP (T
echn
ical
Pr
opos
al)
Tra
nsm
it th
e T
ER
(Tec
hnic
al
Eval
uatio
n R
epor
t) to
IDA
Tra
nsm
it C
ER
(Com
bine
d Ev
alua
tion
Rep
ort),
Neg
otia
tion
- D
raft
Con
trac
t to
IDA
SPC
(Sen
ior
Proc
urem
ent
Com
mis
sion,
MoF
) cle
aran
ce
Nam
e of
Con
trac
tor/
Nat
iona
lity&
zi
p co
de
109
Planned 216,932 SSS Prior 8-Nov-09 25-Nov-09 2-Dec-09 N/R 9-Dec-09 16-Dec-09 30-Dec-09 6-Jan-10 17-Feb-10 3-Mar-10 N/A 10-Mar-10 31-Mar-10 14-Apr-10 N/R 28-Apr-10 26-May-10
Revised
Actual
110
Planned 409,768 SSS Prior 7-Nov-09 24-Nov-09 1-Dec-09 N/R 8-Dec-09 15-Dec-09 29-Dec-09 5-Jan-10 16-Feb-10 2-Mar-10 N/A 9-Mar-10 30-Mar-10 13-Apr-10 N/R 27-Apr-10 25-May-10
Revised
Actual
111
Planned 2,072,944 SSS Prior 14-Nov-09 1-Dec-09 8-Dec-09 N/R 15-Dec-09 22-Dec-09 5-Jan-10 12-Jan-10 23-Feb-10 9-Mar-10 N/A 16-Mar-10 6-Apr-10 20-Apr-10 11-May-10 25-May-10 22-Jun-10
Revised
Actual
112
Planned 421,800 SSS Prior 5-Nov-09 22-Nov-09 29-Nov-09 N/R 6-Dec-09 13-Dec-09 27-Dec-09 3-Jan-10 14-Feb-10 28-Feb-10 N/A 7-Mar-10 28-Mar-10 11-Apr-10 N/R 25-Apr-10 23-May-10
Revised
Actual
113
Planned 445,924 SSS Prior 8-Nov-09 25-Nov-09 2-Dec-09 N/R 9-Dec-09 16-Dec-09 30-Dec-09 6-Jan-10 17-Feb-10 3-Mar-10 N/A 10-Mar-10 31-Mar-10 14-Apr-10 N/R 28-Apr-10 26-May-10
Revised
Actual
114
Planned 1,332,000 SSS Prior 17-Dec-09 3-Jan-10 10-Jan-10 N/R 17-Jan-10 24-Jan-10 7-Feb-10 14-Feb-10 28-Mar-10 11-Apr-10 N/A 18-Apr-10 9-May-10 23-May-10 13-Jun-10 27-Jun-10 25-Jul-10
Revised
Actual
MRRD/NSPII/
CN/FP - 2009/07-
GRSP
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Baghlan Province.
MRRD/NSPII/
CN/FP - 2009/08-
IRC
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Logar Province.
MRRD/NSPII/
CN/FP - 2009/09-OXFAM
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Dai Kundi Province.
MRRD/NSPII/CN/FP-
2009/10-PIN
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Paktia Province.
MRRD/NSPII/
CN/FP - 2009/11-RI
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Nimroz Province.
MRRD/NSPII/
CN/FP - 2009/02-………
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Kabul Province.
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Activity Schedule: Consulting Services
Num
ber
PP S
tatu
s
Cat
egor
y C
ompo
nent
- wise
Pack
age
No.
Con
trac
t Ref
.Description of Services
Est
imat
e C
ost i
n U
SD ,
000
Pos
t/Pri
or R
evie
w S
tatu
s
RE
OI (
Clo
sing
Dat
e)
Issu
e of
RFP
IDA
Cle
aran
ce o
f TE
R
Ope
ning
of F
inan
cial
Pro
posa
l
IDA
cle
aran
ce o
f dra
ft co
ntra
ct
Sign
ing
of C
ontr
act
Mob
iliza
tion
of C
ontr
act
Con
trac
t Com
plet
ion
Dat
e
Con
trac
t Val
ue
Exp
endi
ture
Incu
rred
to D
ate
Kab
ul O
ffice
Ref
Con
trac
t No.
Remarks
Met
hod
of S
elec
tion
(QC
BS/
QB
S/C
QS/
LC
S/FB
S/SS
S)
Prep
arat
ion
of T
OR
, cos
t es
timat
e, sa
nctio
n et
c.,
Tra
nsm
it T
OR
and
cos
t est
imat
e to
IDA
IDA
cle
aran
ce o
f TO
R a
nd C
ost
estim
ate
Tra
nsm
it E
OI f
or P
ublic
atio
n to
W
B an
d Pu
blic
atio
n by
PIU
Tra
nsm
it Sh
ortli
st (T
ER +
RFP
) to
IDA
; In
case
of I
C C
ER
IDA
Cle
aran
ce o
f sho
rt-li
st a
nd
RFP
; In
case
of I
C C
ER
Ope
ning
of R
FP (T
echn
ical
Pr
opos
al)
Tra
nsm
it th
e T
ER
(Tec
hnic
al
Eval
uatio
n R
epor
t) to
IDA
Tra
nsm
it C
ER
(Com
bine
d Ev
alua
tion
Rep
ort),
Neg
otia
tion
- D
raft
Con
trac
t to
IDA
SPC
(Sen
ior
Proc
urem
ent
Com
mis
sion,
MoF
) cle
aran
ce
Nam
e of
Con
trac
tor/
Nat
iona
lity&
zi
p co
de
115
Planned 3,827,060 SSS Prior 20-Dec-09 6-Jan-10 13-Jan-10 N/R 20-Jan-10 27-Jan-10 10-Feb-10 17-Feb-10 31-Mar-10 14-Apr-10 N/A 21-Apr-10 12-May-10 26-May-10 16-Jun-10 30-Jun-10 28-Jul-10
Revised
Actual
116
Planned 301,300 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 N/R 2-Sep-10 30-Sep-10
Revised
Actual
117
Planned 2,759,908 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 9-Sep-10 23-Sep-10 21-Oct-10
Revised
Actual
118
Planned 602,600 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 N/R 2-Sep-10 30-Sep-10
Revised
Actual
119
Planned 8,002,528 FBS Prior 21-Nov-09 8-Dec-09 15-Dec-09 22-Dec-09 19-Jan-10 16-Feb-10 2-Mar-10 9-Mar-10 20-Apr-10 18-May-10 1-Jun-10 15-Jun-10 6-Jul-10 20-Jul-10 10-Aug-10 24-Aug-10 21-Sep-10
Revised
Actual
120
Planned 313,352 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 N/R 2-Sep-10 30-Sep-10
Revised
Actual Case closed as negotiation failed
MRRD/NSPII/
CN/FP - 2009/12-
UNH
For NSP Facilitation in New Communities in Districts Already Entered by NSP Prior to November 2009 in Farah Province.
NSP facilitation in new communities in Badakshan Province-2009
NSP facilitation in new communities in Badghis Province-2009
NSP facilitation in new communities in Farah Province-2009
NSP facilitation in new communities in Helmand Province-2009
NSP facilitation in new communities in Hirat Province-2009
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Activity Schedule: Consulting Services
Num
ber
PP S
tatu
s
Cat
egor
y C
ompo
nent
- wise
Pack
age
No.
Con
trac
t Ref
.Description of Services
Est
imat
e C
ost i
n U
SD ,
000
Pos
t/Pri
or R
evie
w S
tatu
s
RE
OI (
Clo
sing
Dat
e)
Issu
e of
RFP
IDA
Cle
aran
ce o
f TE
R
Ope
ning
of F
inan
cial
Pro
posa
l
IDA
cle
aran
ce o
f dra
ft co
ntra
ct
Sign
ing
of C
ontr
act
Mob
iliza
tion
of C
ontr
act
Con
trac
t Com
plet
ion
Dat
e
Con
trac
t Val
ue
Exp
endi
ture
Incu
rred
to D
ate
Kab
ul O
ffice
Ref
Con
trac
t No.
Remarks
Met
hod
of S
elec
tion
(QC
BS/
QB
S/C
QS/
LC
S/FB
S/SS
S)
Prep
arat
ion
of T
OR
, cos
t es
timat
e, sa
nctio
n et
c.,
Tra
nsm
it T
OR
and
cos
t est
imat
e to
IDA
IDA
cle
aran
ce o
f TO
R a
nd C
ost
estim
ate
Tra
nsm
it E
OI f
or P
ublic
atio
n to
W
B an
d Pu
blic
atio
n by
PIU
Tra
nsm
it Sh
ortli
st (T
ER +
RFP
) to
IDA
; In
case
of I
C C
ER
IDA
Cle
aran
ce o
f sho
rt-li
st a
nd
RFP
; In
case
of I
C C
ER
Ope
ning
of R
FP (T
echn
ical
Pr
opos
al)
Tra
nsm
it th
e T
ER
(Tec
hnic
al
Eval
uatio
n R
epor
t) to
IDA
Tra
nsm
it C
ER
(Com
bine
d Ev
alua
tion
Rep
ort),
Neg
otia
tion
- D
raft
Con
trac
t to
IDA
SPC
(Sen
ior
Proc
urem
ent
Com
mis
sion,
MoF
) cle
aran
ce
Nam
e of
Con
trac
tor/
Nat
iona
lity&
zi
p co
de
121
Planned 6,496,028 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 9-Sep-10 23-Sep-10 21-Oct-10
Revised
Actual
122
Planned 711,068 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 N/R 2-Sep-10 30-Sep-10
Revised
Actual
123
Planned 795,432 FBS Prior 22-Dec-09 8-Jan-10 15-Jan-10 22-Jan-10 19-Feb-10 19-Mar-10 2-Apr-10 9-Apr-10 21-May-10 18-Jun-10 2-Jul-10 16-Jul-10 6-Aug-10 20-Aug-10 N/R 3-Sep-10 1-Oct-10
Revised
Actual
124
Planned 542,340 FBS Prior 22-Dec-09 8-Jan-10 15-Jan-10 22-Jan-10 19-Feb-10 19-Mar-10 2-Apr-10 9-Apr-10 21-May-10 18-Jun-10 2-Jul-10 16-Jul-10 6-Aug-10 20-Aug-10 N/R 3-Sep-10 1-Oct-10
Revised
Actual
125
Planned 1,144,940 FBS Prior 21-Dec-09 7-Jan-10 14-Jan-10 21-Jan-10 18-Feb-10 18-Mar-10 1-Apr-10 8-Apr-10 20-May-10 17-Jun-10 1-Jul-10 15-Jul-10 5-Aug-10 19-Aug-10 9-Sep-10 23-Sep-10 21-Oct-10
Revised
Actual
126
Planned 4,844,904 FBS Prior 22-Nov-09 9-Dec-09 16-Dec-09 23-Dec-09 20-Jan-10 17-Feb-10 3-Mar-10 10-Mar-10 21-Apr-10 19-May-10 2-Jun-10 16-Jun-10 7-Jul-10 21-Jul-10 11-Aug-10 25-Aug-10 22-Sep-10
Revised
NSP facilitation in new communities in Kandhar Province-2009
NSP facilitation in new communities in Khost Province-2009
NSP facilitation in new communities in Nangarhar Province-2009
NSP facilitation in new communities in Nuristan Province-2010
NSP facilitation in new communities in Paktia Province-2009
NSP facilitation in new communities in Paktika Province-2009
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Consulting Assignment (Individual-International ) with selection method & Time Schedule
1 2 3 4 5 6 7 8
Ref. No. Description of Assignment Comments Status as on 15.04.09
1. 206,380 Indv Prior
Jul-08
From January 14, 2009
2. 122,000 Indv Prior Jan-09(ii)Advisor,Program Planning
Selection finalised.
3 396,000 Ind. Prior Dec. 09
4 200,200 Indv Prior Apr-09(ii) to be hired
Postion Vacant
5Micro-Hydro Power Expert
100,000 Indv Prior Mar-08
6 40,000 Indv Prior Nov-08
Estimated Cost (US$)
Selection Method
Review by Bank (Prior / Post)
Expected Proposals
Submission Date (i) Director of Operations Mr. Karim Merchant Employed From July,2007 to
July,2008Employed From July,2007 to July,2008 @US $ 13000 PM
(ii ) Director of Operations Mr. Marshuk Ali Shah Employed from January 14, 2009 to
March 17,2009 @ US $ 17549 PM. Contract terminated. Position nationalized.
(i)Fund Raising Specialist and Grant Writer -- Mr. Karim Merchant Employed From March,2007 to
June,2007Employed From March,2007 to June,2007 @ US $ 13000 PM
Advisor Programme Planning ( From March 01 to Sept. 2011)
Selection of new incumbent has been processed. CVs are under evaluation.
(i)Human Capital Development Consultant -- Ms. Sayora Habibulloevna
Employed From 02 April,2008 to 02 August,2008
Employed From 02 April,2008 to 02 August,2008
To be processed after analysing the need
Consultant hired and work completed under MSC contract.
Social and Environmental Safeguard Expert Selection has been
completed.The consultant expected to take up assignment by mid March,2009
Selection has been completed.The consultant has taken up the assignment w.e.f.18.03.09. Contract value = US $39,350
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Consulting Assignment (Individual - National - Prior)
Duty Stations Positions Name ID Number Starting Date
1 Exec. Dir.'s Office
01-Apr-07Vacant 29-Dec-08
A-0937 07-May-09
07-May-11
3A-0103 12-Apr-09
12-Apr-10
4
A-0103 01-Apr-07
Vacant 12-Apr-09
A-0725 01-Jul-09
01-Jul-11
5 TSD Head, TSDAjmal Shams 16-Aug-09
16-Aug-10
6
HRD&T
HRD Head
Karima A-0152 01-Jan-09Vacant 01-Mar-09Ishaq Atmar 01-Jul-09
01-Jul-11
7 M&EA-0766 01-Sep-09
01-Sep-10
8Administration Khyber Farahi A-0001 01-Apr-07
Vacant 05-Aug-09Shoaib Suha 1-Mar
9 PCDA-0142
11-Mar-09
11-Mar-1011-Mar-11
10 MISJalal Hameed 01-Dec-09
01-May-11
11 FP-ManagementEssa Qudrat A-0102 19-Dec-09
Ref. No.
Executive Director
Eng. Wais Barmak
Mohammad Tariq Ismati
Director of Operation's Office
Director of Operation
Abdul Rahman Ayobi
Director of Operation's Office
Deputy Director of Operations
Abdul Rahman Ayobi
Ghulam Rasoul Wahid
Head of Department
Nasrullah Ahmadzai
Head, Administrati
on Department
Head of Department
Ahmad Jamshid Ahmadi
Head of Department
Head of Department
11 FP-Management19-Apr-11
12 Exec. Dir.'s OfficeKhyber Farahi A-0001 15-Aug-09
8/15/2011
13 Hamid Mjidee 12/3/2010
Head of Department
Bileteral Funding Project
Manager
Director of Operation's Office
TA,MIS and M&E
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Consulting Assignment (Individual - National - Prior)
End Date # of Months
28-Dec-08 20.9 G11/S1 5,086 2,034 148,816 Indv.5/6/2009 4.2 Indv.
06-May-11 24.0 G11/S3 5,878 2,351 197,226 Indv.
30-Sep-11 4.8 6,178 2,471 41,228
11-Apr-10 12.0 G10/5 5,582 2,233 93,517 Indv.
30-Sep-11 17.6 5,954 2,382 146,707
11-Apr-09 24.3 G9/S2 3,003 1,201 102,302 Indv.
30-Jun-09 2.6
30-Jun-11 24.0 G9/S2 4,328 1,731 145,219 Indv.
30-Sep-11 3.0 4,416 1,766 18,341 15-Aug-10 12.0 G8/S8 4,215 1,686 70,615 Indv.30-Sep-11 13.5 4,502 1,801 84,878 28-Feb-09 1.9 G8/S5 3,350 1,340 8,911 Indv.30-Jun-09 4.0 30-Jun-11 24.0 G8/S4 3,146 1,258 105,559 Indv.30-Sep-11 3.0 3,434 1,374 14,263
31-Aug-10 12.0 G8/S2 3,135 1,254 52,668 Indv.
30-Sep-11 13.0 3,434 1,374 62,339 14-Aug-09 28.4 G8/S6 3,575 1,430 142,309 Indv.
28-Feb 6.8 30-Sep-11 19.0 G8/S1 2,620 1,048 69,570
10-Mar-10 12.0 G8/S2 2,750 1,100 46,072 Indv.
10-Mar-11 12.0 G8/S3 3,000 1,200 50,260 Indv.30-Sep-11 6.6 3,210 1,284 29,810
30-Apr-11 17.0 G8/S6 3,675 1,470 87,293 Indv.
30-Sep-11 5.0 3,932 1,573 27,341
18-Apr-11 16.0 G8/S5 3,434 1,374 76,761 Indv.
Grade/ Step
Basic Salary (US$)
Total Allowances
(US$)
Total : Basic Salary +
Allowances
Selection Method
30-Sep-11 5.4 3,675 1,470 27,611
14-Aug-11 24.0 G8/S9 3,905 1,562 131,026 Indv.
30-Sep-11 1.5 4,207 1,683 8,835
02-Dec-11 12.0 7,740 92,622 Indv.
Total Value 2,082,098
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Consulting Assignment (Individual - National - Prior)
Prior RecruitedPrior Vacant
Prior Recruited
Prior Recruited
Prior Recruited
Vacant
Prior Recruited
Prior Recruited
Prior RecruitedVacant
Post Recruited
Prior Recruited
Post RecruitedVacant
Prior Recruited
Prior Recruited
Prior Recruited
Prior Recruited
Review by Bank (Prior / Post)
Expected Proposals
Submission Date
Comments
Government of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Consulting Assignment (Individual - National - Post)
Ref. No Duty Station Position Name ID Number
A-0725
Vacant
Shekib Montazery A-0176
Abdul Sami A-0930
Basir Ahmad A-172
Sayed Jawed A-0933
Marzia Kakar A-0225
Analysis Officer Freshta A-0129
Shafi A-0982
Obaidullah Rahmani A-0977
Sr. Program Officer Ghulam Rasoul WahidVacantMamoon Khawar A-0974
Office Assistant Naqshband A-0749
Shafiq Ahmad A-0170
Amina SulaimanzadaA-0173Nilofar modaber A-0947VacantLida Popalzai A-0963
Amina SulaimanzadaA-0173
Operations Assistant Arafat Safi A-0735
Arzoo Kawusi
Vacant
Sr. Field Coordinator Sayed Murtaza A-0948
Exective Director's Office
Bileteral Funding Project Manager
Ghulam Rasoul Wahid
Head, Complaints Handing Unit
Complaints Handling OfficerComplaints Handling OfficerComplaints Handling Officer
Office Management Officer
Head, Internal Control Unit
Senior Internal Control Officer
Management Assistant
Secretary to Executive Director Office
Sr. Management Assistant
Director of Operation's Office
Administrative Assistant
Management Assistant
Sr. Field Coordinator Eng. Noorullah Rasikh
Sr. Field Coordinator Haris Adib
Sr. Operations Officer Shershah Ghory A-0901
Operations Officer Arafat Safi A-0735
Vacant
Vacant
Security OfficerAhmad Khalid HaidarA-0061VacantNiaz Mohammad Ghaznawi
Secretary Kamaluddin A-0174Deputy Head, FOD Noorullah Rasikh A-0175
Administration
Head, Logistics Unit Ziaulhaq A-0058
Administrative Officer Vacant
Vacant
Stock Assistant VacantFauzia SarwariVacantSaid Ahmad NaweedA-0805
Fleet Assistant Mohammad MansoorA-0028
Rajab Ali A-0781
Fleet Officer Tawab Rahmati A-0907
Office AssistantAmanullah A-0741
Vacant
Procurement OfficerMohammad Rahman VacantAbdul Rahman
Procurement OfficerAhmad ZahirVacantYama Yawar A-0871
Logistics AssistantAbdul Rahman
Vacant
Director of Operation's Office
Sr. Contract Management Officer
Contract Management Officer
Asset/ Inventory & Stock Management Officer
Administrative Assistant
General Maintenance Technician
Administration
Ramin Kerami A-0059VacantSayed Ibrar Hashimi A-0821
Finance
Rahmatullah Safi A-0069
Ulfat Yousafi A-0837
Shams Faizi A-0071
Mohammad Rafi SeeA-0068
Mohammad Kabeer A-1012
Haroon Shams A-0747
Muzhgan Kakar A-0224
Abdul Zahir Wali A-0838
Cashier Nazeefullah A-1006Liaison Officer Ahmad Maqsood A-0908Junior Accountant Mohammad Muhib A-0985
Junior AccountantVacant Vacancy to be filedSaid Sahim A-0894
Block Grant Officer Fatima Muradi A-0066
Abdul Aziz Nadim A-0073
Block Grant Officer Farid Ahmad Zahin A-0841 Block Grant Officer Ahmad Saboor AhmaA-0310Senior Accountant Habiburahman A-0079
Waqar A-0067
Documentation Clerk Ahmad Khalid SultanA-0834
Documentation Clerk Mujtaba A-0848
Block Grant Officer Muzhgan Rahimi A-0074
Dildaruddin A-0075
MIS
Ahmad Mukhtar SabrA-0111
Husian Ahmad Khali A-0896
Head, IT Unit Mohammad Shoaib A-0116
Snr. Administrative Officer
Head, Program Fund Unit
Head, Operation Fund Unit
Head, Block Grants Unit
Senior Block Grant Officer
Senior Program Fund Officer
Senior Program Fund Officer
Operation Fund Officer
Operation Fund Officer
Operation Fund Officer
Senior Block Grant Officer
Documentation Manager
Operation Fund Officer
Head, IC and Data Entry Unit
Senior Database Developer
MIS
Head, Archive Unit Khalilullah Gulistani A-0105
Nasratullah A-0949
Abdul Rahman A-0900GIS Specialist Fazel Rabi A-0789Senior IT Officer Mohammad Hashim A-0108
Sayed Hassan A-0918
Vacant Vacancy to be filed
Vacant
Vacancy to be filed
Ahmad Jawad Miske A-0109
Said Safdar Sultani A-0114
Shakila Yosofzai A-0115
Wahid Mehrzad A-0120
IT officer Hamid Yaqobi A-0121Obaidullah SadeqyarA-0113
Farima Rashidi A-0248
Archive Officer Haseebullah SarwaryA-0107Archive Officer Nek Mohammad A-0110Archive Officer Vacancy to be filedArchive Officer Najibullah Nadersha A-0112
FPMD
Deputy Head, FPMD Essa Qudrat A-0102Contract Officer Akbar Sadaat Qurais A-0976Data Analyst Ahmad Shah A-0767
Data Entry OfficerPayam sabriVacantMirbaz A-0916
Program Assistant Muzhda Sadat A-0765Wahidullah AmeriVacant
Database Reporting OfficerSenior Database Developer
Information Coordination and Data Entry OfficerInformation Coordination and Data Entry OfficerInformation Coordination and Data Entry Officer
Information Coordination and Data Entry Officer
Information Coordination and Data Entry Officer
Information Coordination and Data Entry Officer
Information Coordination and Data Entry Officer
Information Coordination and Data Entry OfficerInformation Coordination and Data Entry Officer
Senior FP Contract Monitor
FPMDHaroon Basharyar A-0788
Supervision Unit Head Vacant
Supervision Manager Haroon Basharyar A-0788
Supervision Officer Ihsanullah Sedeqi A-0126Supervision Officer Zabiullah A-0118
Sr. Contract OfficerAbdul MalikVacantDastagir Humraze A-0635
HRD&T
Abdul Baqi A-0153
Jawed Azizi A-0155
Hashmat NawabiVacantAbdul Sabour A-0917Hashmat NawabiKhalid A-0160VacantVacany to be filed
HCD Coordinator Mina Azizi A-0730
Vacant
Head, HRD Unit
Dr. Javid QaemVacantHomayon AhmadiVacantMohammad Salim A-0158
Tarana Amini A-0157
Sr. Training Officer Vacant
Vacant
Field Officer Vacant
Vacant
M&E
Lona Safari A-0752VacantRoya Saqeb A-1004Vacant
Sr. Monitoring Analyst Vacant
Head, Monitoring Unit Vacant
Senior FP Contract Monitor
Budget Mgt and Data Base officer
Human Resource Assistant
Senior Staffing/Job Analysis Officer
Junior Staffing/Job Analysis Officer
Sr. Human Resource Officer/FSFO
Head, Mainstreaming Unit
HR & Training Database Officer
Administrative Assistant
M&E
Dilawar Anwari A-0123
Najibullah Habib A-0124
Abdul Wali A-0127
Nadera Safari A-0128Malalai A-0879
Vacant
Freshta Sahil A-0129VacantJamila A-0941Fazil Rahim Monib A-0950
Vacant
Sr. IM Officer Roya Sana A-0865VacantIhsanullah Sedeqi A-0126
Vacant
Hidayatullah A-0882
Vacant
Snr. Database Officer Zahir Jan A-0987
Deputy Head Nasrullah Ahmadzai A-0766Hamed SarwaryVacantMaiwand HabibiVacancy to be filedHamid SidiqiVacantHidayatullahHashmatullah sayar
Vacant
Senior CPM Officer Allaha Najmyar A-09984Senior CPM Officer Assadullah Battar A-09957
Jawad Noori A-0974
Marwa Mitra A-0177
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Post Implementation Monitoring Officer
Snr. Technical Support Officer
Head, Implementation Unit
Head, Post Implementation Team Unit
Sr. Training & Capacity Building Officer
Sr. Monitoring and Evaluation OfficerSenior Reporting Officer
M&E
Diana Nawazi A-0828
PCD
Mohammad Daud MaA-0132
Vacant
Web Developer Vacant
Administration Officer Abdul Wahab SarwarA-0146
Humaira Hashimi A-0137
CameramanMasood Hashimi A-0136VacantVacancy to be filedAbdul Haq Walizada A-0820
Deputy Head Jamshid Ahmadi 1042Ruqia KohistaniVacantMohammad Arif
Vacant
Mohammad Jawad HaA-0969
Azam Azghari A-0130
Mohammad Daud BoA-0131
Zalmai Nahib Khill A-0790
Ezatullah ShamszaiVacantAbdul Wahab SarwarA-0146
Narrator Sadiq Speenghar A-0148Narrator Abdullah Frotan A-0149Narrator Nasreen Sherzad A-0150Narrator Noor Jahan A-0151Pashto Editor Abdul Hai Rasekh A-0139Radio Editor Nader Nazhat A-0133Snr. Radio Editor Atiqullah Naweed A-0145Snr. Radio Editor Hakim MehryTV Editor Hashmat Nadeem A-0138TV Sound Producer Mohammad Ismail AA-0141
Nangialai Ibrahimi A-0786
Sr. Writer and Editor Mahmood Ghaus A-0134
Senior Reporting Officer
Head, Creative Production Unit
News Magazine Writer/ Editor
Administration/Archivist
Communication Officer
Communication Officer
Correspondent Coordinator
Correspondent Coordinator
Dari and Pashto Translator
Head, Stakeholder Relations Unit
English Writer and Editor
Procurement
Khumaruddin A-0163
Procurement OfficerAtiqullah Raheel A-0165VacantVacancy to be filed
Procurement OfficerSafiullah A-0168VacantVacancy to be filed
Procurement OfficerMohammad RahmanA-0164VacantMohammad Rahman
Procurement OfficerAhmad ZahirVacantAmanullahNabiullah A-0851
Abdul Hadi Noorzad A-0792
VacantVacancy to be filed
Vacant
Asadullah NooriVacany to be filed
TSD
Bridge Specialist Bashirullah Qudsi A-0094
Safeguard Unit Head Vacant
Safeguard Officer Vacant
Jamila A-0088
Deputy Head, TSD Fazil Omer Mujadidi A-0812
Ahmad Shah A-0092
Mohammad Zaman WATSAN Engineer A-0580
Abdul Jamil Mobeen A-0087
Irrigation Engineer Abdul Basir A-0084Irrigation Engineer Waheed Navidi A-0470RAEU Engineer Lutfullah Wahidi A-0093
Abbas Ali A-0081
Unit Team leader Ahmad Saboor Arya A-0090WATSAN Engineer Mohammad Shafiq A-0098
Sr. Procurement Officer
Deputy Head, ProcurementHead, Works & Goods Unit
Head, Consultancy Services Unit
Head, Contract Management Unit
Sr. Procurement Officer
Civil Construction Engineer
Head, Project Support Unit
Hydro Geologist Engineer
Technical Training Component Specialist
TSD
Shukria Fariwar A-0586
Bridge EngineerAhamd ShoaibVacantAbdul Ghani A-0905
Civil Engineer Said Najib A-0097
Head, RAEU UnitFazlullah FazliVacantRamin Mehry
Vacant
Shams-ul-Haq A-0798
Planning Coordinator Salim Kohi A-0179
Database Operator Mohammad MansooA-0205
Quality control
Deputy QA Wahidullah Ameri A-0100
Marwa Mitra A-0177
Diana Nawazi A-0828
Central Region
Regional Coordinator Najibullah MosoumyA-0210
HCD Specialist Zabiullah A-0759IT Specialist Hamidullah A-0214
Mujeeb-ur-Rahman A-0211
Meherzad Pawhwak A-0206
Training CoordinatorGhulam Farooq A-0212Vacant
Vacant
Hamid SidiqiVacant Abdul MalikHabib Naseri A-0883
Regional Engineer Nader Haqmal A-0732Engineer Abdul Qasim A-0281Provincial Manager Mohammad Anwar A-0280Engineer Khoshal A-0282
Razia A-0287VacantMohammad Naeem A-0779
Database Administrative Assistant
Head, Standardization Unit
Hydro Geologist Engineer
Senior Reporting Officer
Senior Reporting Officer
Regional Finance Officer
Social Liaison Assistant
Post Implementation Monitoring Officer (2 Positions)
FP Contract Monitoring Officer
Bameyan/Central Region
Administrative Assistant/Data Assistant
Mohammad Nabi MuzA-0286
Accountant Abdullah Navid A-0285
Mohammad Abass AsA-0283
Fatima Hussiani A-0284Bustan Ali A-0968
Fatima Kazimi A-0980
Provincial Manager Ali Jan A-0494RezaVacantHamidullah A-0942
Engineer
Mohammad Naim VacantGol WaliVacantVacancy to be filed
Accountant Hasibullah A-0886
Engineer Mohammad Haleem A-0928
Engineer
EnayatullahVacantMohammad RazaVacantFaridullah A-0943Fazila HussianiVacantRezaVacantGhulam Hassan Kari A-0946KhadijaVacantMasooma A-0890Mohammad SharifVacantNowroz Ali A-0904Saleem KhanVacantAbdul KarimVacantMusa Mohammad A-0852Jan Mohammad A-0262
Bameyan/Central Region
Data Manager/database Officer
Implementation Monitoring OfficerImplementation Monitoring OfficerMonitoring and Evaluation OfficerMonitoring and Evaluation Officer
Daikundi/Central Region
Administrative Assistant/Data Assistant
Data Manager/database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Ghazni/Central Region
Administrative Assistant/Data Assistant
Data Manager/database Officer
VacantAbdul Wajid A-0998Abdul FatahVacantRahmatullah A-0770Sharifa Maryam A-0912VacantVacany to be filed
Accountant Said Essah A-0261
Engineer Aziz Ahmad A-0256
EngineerMohammad RafiqVacantMohammad Asif A-0932
Provincial Manager Dad Mohammad ZurA-0257Provincial Manager Nazar Mohamamd OA-0218
Sadiq A-0743
Muzghan KakarVacantZabihullahMustafa A-0760
Abdul Wasai Dost A-0221
Accountant Abdul Wahid A-0223
Shahla Sumaya A-0222
Engineer Farid Ahmad A-0219Engineer Ghulam Rabi A-0220Provincial Manager Aziz Jawed A-0243
Nafisa A-0249
NafisaVacantJamshid A-0923
Accountant Abdul Jabar Danish A-0501
Noor MohammaddosA-0245
Hura Nasiri A-0246Engineer Mohammad Sharif A-0244
Ghazni/Central Region
Data Manager/database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Kabul/Central Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Kapisa/Central Region
Data Manager/Database Officer
Administrative Assistant/Data Assistant
Implementation Monitoring OfficerImplementation Monitoring Officer
EngineerAziz AhmadVacantNajibullah A-0870
Provincial Manager Amir Mohammad A-0305SafiullahVacantKhadimullah A-0921
Accountant Ayub Khan A-0312
NajibullahVacantSaid Jalal A-0311Mohammad Wasil A-0308VacantSalam Gul Benawa A-0959Malalay Bahand A-0309VacantVacancy to be filed
Engineer Abdul Rahman A-0306Engineer Abdullah Zazai A-0307Engineer Said Tamim A-0183Provincial Manager Ghulam Mahfoz A-0229
EngineerZia Mohammad NekzA-0294VacantVacancy to be filed
Accountant Ahmad Javid A-0936
Mustafa A-0191
Anis Gul VacantMohammad SadeqElyas A-0939
Qudratullah A-0298
Mohammad Abass AseerVacantFazluddin A-0295Ateeqa A-0296
Engineer Yousuf Ali A-0181Provincial Manager Zaki Ahmad A-0293
Frozan Barekzai A-0236
Kapisa/Central Region
Paktika/Central Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Panjsheer/Central Region
Social Liaison Assistant
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Parwan/Central Region
Administrative Assistant/Data Assistant
Ihsanullah Waseqee A-0235
Accountant Raihanullah A-1009
Walina Jawhari A-0233
Abdul Jalal A-0539
Nooruddin A-0194
Social Liaison Officer Turyalai A-0190
Engineer Safiullah A-0231Engineer Basir Ahmad A-0736Provincial Manager Naseer Fareed A-0268
Shahla Habibi A-0275
Accountant Farhad Hamdrad A-0273
Zabi-u-haq Najmeye A-0274
Mohammad Salim A-0271
Jamila Sediq A-0272
Engineer Mohammad Ishaq AbA-0269Engineer Nabiullah A-0270
Eastern Region
Regional CoordinatorZalmay A-0318VacantVacancy to be filedLodmila A-0328VacantVacancy to be filed
HCD SpecialistMohammad RahmanA-0164
Vacant
IT SpecialistNaseer AhmadVacantEzatullah A-0724
Haji Younus A-0320
Vacant
Parwan/Central Region
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Social Liaison Assistant
Wardak/Central Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Administrative Assistant/Data Assistant
Regional Finance OfficerPost Implementation Monitoring Officer
Eastern Region
Daud Takle A-0832
Ajmal Safi
Vacant
Ghulam Sakhi RazaqiA-0322
Logar/East Region
Provincial Manager Zafar Khan A-0400Engineer Hamidullah Habibi A-0401
EngineerAbdul Naeem A-0402VacantGhulam Sakhi A-0952
Accountant Basir Ahmad A-0458
Abdul Ghafar A-0406
Homa Ahmadi A-0405VacantVacancy to be filed
Ghulam Muhiudin SaA-0403
Zubida Estanekzai A-0404VacantMalalay A-0309
Khost/East Region
Provincial Manager Abdul Basir A-0390Engineer Mohammad Shafiq A-0413Engineer Jan Mohammad A-0958
Accountant Abdul Jabar Danish A-0501
Mastan A-0396
Said Ahmad ShahVacantAssadullah Salimi A-0733Ali Khan WafaVacantSayed Ahmad Shah A-0945Taj MahalVacantHougai
Provincial Manager Mir Zaman Momand A-0378
Accountant Shakib Shah A-0383
Regional Communication Officer
Regional Training Coordinator
FP Contract Monitoring Officer
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Kunar/Eastern Region
Engineer Najibullah Safi A-0379
Shabudin Saqeb A-0385
Ziauddin A-0951
Khaliluallah Nizam A-0381
Karima A-0827
Engineer Waheedullah A-0380Engineer Arif Sahak A-0366
EngineerMohammad Arif SahakVacantObaidullah A-0906
Accountant Badam Gul A-0572
Faridullah A-0372
Abdul Naseer Ansari A-0371
Pashtana A-0369Shah Jahan Safi A-0368Vacant Mohammad Aemal A-0802
Provincial Manager Humayoun Akseer A-0365Provincial Manager Habib-ur-Rahman SalA-0331Engineer Malang A-0332Engineer Lal Agha Sherzad A-0333Engineer Mia Pacha A-0346Engineer Enayatullah A-0495
AccountantVacant Vacancy to be filed
Mohammad Daud A-0338
Mohibullah A-0337
Abdul Majeed A-0334
Ferdusia A-0335
Kunar/Eastern Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerImplementation Monitoring OfficerImplementation Monitoring Officer
Laghman/East Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Nangarhar/East Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring OfficerImplementation Monitoring Officer
Farkhunda A-0971
Hamid Tahdi A-0349
Provincial Manager Essah Wahdat A-0344Engineer Said Ghulam A-0345Engineer Ajab Gul A-0347Engineer Said Hassan A-0348Accountant Abdul Rahim A-0354
Shafiullah A-0356
Omara KhanVacantWaheedullah A-0750Hamid Tahdi A-0349Vacancy to be filed Rafiullah A-0352
Nasima A-0353
Matiullah AndusVacantSaid Naser A-0778
Shafiqullah A-0357
Paktia/East Region
Provincial Manager Kalimuallah Sahibza A-0412Engineer Mohammad Hassan A-0940Engineer Safar Mohammad A-0414
Accountant Sibghatullah A-0417
Safiullah A-0419
Najibullah A-0418
Bas Bibi A-0416
Baidar A-0771
Regional Coordinator
Abdul Raziq Radman A-0657VacantArif Ameri A-0082Vacant
Nangarhar/East Region
Monitoring and Evaluation Officer
Monitoring and Evaluation Officer
Nuristan/East Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring OfficerImplementation Monitoring OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Administrative Assistant/Data Assistant
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
North Eastern Region
Regional Coordinator
Vacancy to be filedIT Specialist Anayatullah A-0663
Mohammad Ihsan A-0880
Mujeeb-ur-Rahman
Vacant
Vacant
Ghulam Dastagir A-0635
vacant
Mahboobuallah RaufA-0659
HCD Specialist Assadullah A-0662Regional Engineer Abdul Wasai A-0658Engineer Abdul Qadir A-0682Provincial Manager Nazira Badakhsh A-0680
Najai Ahamdi A-0691
Nooria MujadidiVacantAsadullah Sadaqi A-0859
Accountant Haroon Yousufzai A-0688
Samia A-0690
Mohamaduallah MirzA-0685
Mahfuzullah A-0686
Karima A-0687
EngineerKhoja Najibullah A-0684VacantHafizullah A-0988
Engineer Faizullah A-0681Engineer Salih Mohammad A-0683
Zarmina A-0718
Said Zekria A-0717
North Eastern Region
Communication Officer
Regional Training Coordinator
Post Implementation Monitoring Officer
FP Contract Monitoring Officer
Regional Finance Officer
Badakhshan/North Eastern Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Data Manager Assistant/Data AssistantImplementation Monitoring OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Baghlan/North Eastern Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Mohammad Ibrahim A-0714
Halima A-0715Engineer Amam Ali A-0713Engineer Sarwer Mazuri A-0184
Accountant Torpekay A-0716
Engineer Samiullah A-0634Provincial Manager Mohammad Nabi A-0711Provincial Manager Said Qurban Shah A-0669
Gulalay A-0675
Accountant Mehrabuddin Abid A-0673
Nasima Nazary A-0674Rahmatullah A-0671VacantVacany to be filed Roya Mehry A-0672VacantVacany to be filed
Engineer Abdul Ghani A-0670Engineer Mohammad Tareq A-0808Provincial Manager Mohammad Ismail ZaA-0700
Imdadullah QanbaryVacantHomayon Sharifi A-0888
Accountant Mohammad Sabir A-0813
Hashmatullah A-0705
Atiqullah A-0702
Friba A-0703
Engineer Ahmad Shah Hushm A-0701Engineer Aziz-ur-Rahman A-0816
Mohammad Salim AliA-0911
Regional Coordinator Lutfullah Safi A-0579
Administration OfficerShukria Fariwar
Vacant
HCD SpecialistAbdul Basir Barak
Baghlan/North Eastern Region
Implementation Monitoring OfficerImplementation Monitoring Officer
Kunduz/Northeast Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Takhar/Northeast Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
North Western Region
Regional Finance Officer
HCD SpecialistVacant
IT Specialist Mohibullah Farzam A-0585
Habibullah Ashna As A-0582
Ahmad Farid Sadat A-0613
Social Liaison Officer Merzad Pazhwak A-0206
Vacant
Wida A-0583
Vacant
Regional Engineer
Lutfullah Safi A-0579VacantMohammad Zaman A-0580
Vacant
Provincial Manager Fazel Haq Fazli A-0607
Suhrab Sepehr A-0614
Ahmad Farid Sadat A-0613
Mohammad Tamim AA-0858Accountant Hidayatullah A-0868
Shujaudin Deljay A-0610
Mahboba Sharifi A-0611VacantSajida Bashardost A-0881
Engineer Nesar Ahmad A-0608Engineer Ghulam Nabi Karimi A-0632Provincial Manager Ahmad Zaki A-0620
Abdul Bashir Wahidi A-0639
Suraya Moshfiq A-0638
Dastagir HumrazeVacantAhmad Fahim A-0931
North Western Region
Regional Training CoordinatorCommunication Officer
Post Implementation Monitoring Officer
FP Contract Monitoring Officer
Samangan/Northwest Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerData Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Sar-e-pul/Northwest Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Accountant Husain Haydari A-0637
Saleha Ahmadyar A-0636
Engineer Shafi Ahmad A-0633
EngineerSamiullah VacantAbdul Qader A-0895
Accountant Mohammad Shafi A-0649
Provincial Manager Ahmad Zia A-0644
EngineerSharukh A-0646VacantRahimullah A-1002
EngineerHedayatullahVacantGhulam Abbas A-0825
Engineer Habibullah A-0826
Jamila A-0651
Walid Ahmad A-0650
Arsalan A-0647
Farakh LegaVacantMaria Noori A-0755
Provincial Manager Abdul Bashir A-0619
Accountant Sherin Mullah A-0624
Rokay A-0626
Khadija A-0625
Ahmad Jawad A-0622
Madina A-0623
Engineer Abdul Samad A-0621
EngineerAhmad ZakiVacant
Sar-e-pul/Northwest Region
Implementation Monitoring Officer
Fareyab/Northwest Region Administrative
Assistant/Data Assistant
Data Manager/database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Jawzjan/Northwest Region
Administrative Assistant/Data Assistant
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
EngineerAzizullah A-0902
Provincial Manager Homayon Ajam A-0595
Hussian Ashna A-0962
Hanifa Ashna A-0961
Fahima Farand A-0601
Accountant Mari Raufi A-0599
Seyawash Siddiqi A-0598
Mari RaufiShakira A-0600Jamshid Qarizada A-0602
EngineerHaroon NasiriVacant Sharukh A-0646
Engineer Mohammad Qasim A-0597Engineer Haq Nazar A-0646
Western Region
Regional Engineer Ahmad Zaki A-0425
Regional Coordinator Hares Adib A-0424
IT SpecialistMohammad AsgharzadaVacantOmid Alam A-0922
Saboor Samit A-0426
Logistic Manager Omar Akarami A-0430BasitVacantMalika Rassully A-0757
Lida A-0847
Vacant
Bashir Ahmad Pazh A-0428
Mohammad Yaqoob
Vacant
Engineer
Farzad FarzamVacantZekrullah A-0860
Jawzjan/Northwest Region
Mazar/NorthWestern
Region
Monitoring and Evaluation Officer
Monitoring and Evaluation Officer
Data Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring OfficerAdministrative Assistant/Data Assistant
Regional Finance Officer
Regional Training Coordinator
Communication OfficerPost Implementation Monitoring OfficerFP Contract Monitoring Officer
Rural Development Specialist
Badghis/Western Region
Engineer
Nabiullah A-0967
EngineerNasir Ahmad A-0484VacantShafiqullah A-1003
Provincial ManagerHadi Fahim A-0481VacantVacancy to be filed
Fauzia A-0489
Accountant Atiqullah Sherzad A-0892
Mohammad Nasim A-0488Said Hamidullah VacantMohyaddin A-0891
Razia Mahmoody A-0486
Provincial Manager
Nasir AhmadKhaliq FakoryVacantSafiullah A-0466
EngineerVacantVacancy to be filed
Fatima A-0460
Accountant Roshan Ahmadi A-0457
Zubaidah Noorzai A-0459Mohammad Ashraf FarahmandVacantKhalil Rahel A-0829LailaVacantRoshan AhmadiVacantGeety A-0874
Provincial Manager Noor Mohammad A-0468Mohammad AnwariVacantAhmad Samim A-0772Ahmad OzairVacantHameedullah A-0474
Badghis/Western Region Administrative
Assistant/Data Assistant
Data Manager/database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Farah/Western Region
Administrative Assistant/Data Assistant
Data Manager/database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Ghor/Western Region
Administrative Assistant/Data Assistant
Data Manager/database Officer
Mohammad Arif QazizadaVacantMohammaduddin A-0475
Accountant Ahmad Hilal Tanha A-0815
Maryam A-0472
Engineer Ahmad Sohail A-0793Engineer Wahid Navidi A-0470Engineer Mohammad Masou A-0817
EngineerMohammad Shah MoshtaqVacantAbdul Ghani Rahimi A-0863
Engineer Mohammad Naqib A-0861Provincial Manager Atiquallah Sorosh A-0440
Accountant Nasir Ahmad A-1007
Engineer Mohammad Sohail A-0441Engineer Naseer Ahmad A-0442Engineer Mohammad Shoaib A-0443
Muzhda Lala A-0448
Sadia Sadaat A-0447
Abdul Wahid A-0444Sadaat Arezo A-0445
Southern Region
Said Abdul Ahad A-0514
IT Specialist Abdullah Ulfat A-0513
Najeeburahman A-0510
Shah Mahmood A-0509
Ahmad Khoshal A-0511
Regional EngineerHayatulahVacant
Vacant
Regional CoordinatorNaseer AhmadVacantAhmad Wali Aziz A-0822Haibatuallah Azizi A-0512
Ghor/Western Region
Implementation Monitoring Officer
Implementation Monitoring Officer
Hirat/Western Region Administrative
AssistantData Manager/Database OfficerImplementation Monitoring OfficerImplementation Monitoring OfficerAdministrative Assistant/Data Assistant
Regional Training Coordinator
Regional Finance Officer
FP Contract Monitoring Officer
Post Implementation Monitoring Officer
Human Capital Development Officer
Southern Region
Vacant
Accountant Said Jawed A-0542
Provincial ManagerAwal Khan AhmadzaiVacantNisar Ahmad A-0536HekmatullahVacantAbdul RahmanVacantAbdul Rashid A-0913VacantVacancy to be filedRomahVacantAbdul JalalVacantZalmaiVacantMohammad Aslam A-0929QandiVacant
Provincial Manager Taimur Shah A-0521Rangina Had A-0529VacantAbdul Hadi A-0530
Accountant Mohammad WaheedA-0527
Ilyas A-0528
Zarmina A-0526
Ahmad Jan NazariVacantFarid Ahmad A-0737
Engineer Ahmad Fahim Fayeq A-0522Engineer Rahmatullah A-0523Engineer Mohammad Fahim A-0524Provincial Manager Abdul khalilullah Ba A-0550
EngineerMohammad NaimvacantAbdullah Latify A-0869
Nabia A-0555
Human Capital Development Officer
Helmand/South Region
Data Manager/Database Officer
Implementation Monitoring Officer
Special Support Officer
Kandehar/South Region
Administrative Assistant/Data Assistant
Data Manager/Database OfficerImplementation Monitoring Officer
Implementation Monitoring Officer
Nimroz/South Region
Administrative Assistant/Data Assistant
Accountant Mohammad Asif A-0849
Daud Rasoli A-0734
Mohammad AkbarVacantAbdul Ghani A-0552SadiqaVacantRoya A-0864Shafiqa A-1001
Provincial Manager Amir Khan A-0560Engineer Najeebullah A-0876Engineer Mohammad Yousuf A-875
Accountant Ghulam Yahya A-0563
Engineer Mohammad Zahir A-0877Engineer Vacancy to be filed
Shamim OmarzoiVacantQudratullah A-0966
Abdul Aziz A-0561
Zabul/South Region
Provincial Manager Dost Mohammad A-0568Engineer Said Abdullah A-0569
Sayed FazullahVacancy to be filed
Accountant Hameedullah A-0850
Mohammad Hanif A-0831
Mohammad HalimVacantMirwaisVacantSaid Fazlullah A-0574
Vacant
Vacant
Nimroz/South Region Data
Manager/Database Officer
Implementation Monitoring Officer
Implementation Monitoring Officer
Urozgan/South Region
Data Manager/Database Officer
Implementation Monitoring Officer
Administrative Assistant/Data Assistant
Implementation Monitoring Officer
Data Manager/Database Officer
Provincial Management Units
Engineers (68 Positions)
Administrative Officer (40 Positions)
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Starting Date End Date No. of Months
08-Sep-08 30-Jun-09 9.7 G8/S9 3,550 1,420 48,375 Indv.
01-Jul-09 14-Aug-09 1.4 Indv.
7-Mar-09 29-Sep-11 30.7 G6/S3 1,348 539 58,000 Indv.
19-May-09 30-Sep-11 28.4 G4/S2 680 272 27,005 Indv.
17-May-09 30-Sep-11 28.4 G4/S3 741 296 29,497 Indv.
31-May-09 30-Sep-11 28.0 G4/S2 680 272 26,656 Indv.
8-May-09 30-Sep-11 28.7 G4/S2 680 272 27,354 Indv.
19-May-09 30-Sep-11 28.4 G4/S4 808 323 32,088 Indv.
12-Oct-09 28-Jan-10 3.5 G6/S8 2,075 830 10,264 Indv.
08-Sep-09 30-Sep-11 24.7 G5/S7 1,360 544 47,092 Indv.
01-Oct-07 07-Sep-08 11.2 G6/S9 1,925 770 30,184 Indv.08-Sep-08 11-Sep-09 12.1 12-Sep-09 30-Sep-11 24.6 G6/S8 2,075 830 71,463 Indv.1-Dec-07 30-May-10 30.0 G2/S4 450 180 18,879 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
20-May-07 24-Jul-09 26.1 G4/S8 925 370 33,843 Indv.25-Jul-09 12-Dec-09 4.6 G4/S1 633 253 4,047 Indv.
13-Dec-09 18-Dec-0919-Dec-09 30-Sep-11 21.4 G4/S2 680 272 20,341 Indv.
25-Jul-09 30-Sep-11 26.2 G5/S6 1,248 499 45,718 Indv.
24-Nov-07 21-Dec-09 24.9 G5/S7 1,360 544 47,410 Indv.
13-Oct-08 20-Dec-08 2.2 G3/S4 675 270 2,111 Indv.
01-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
28-Jul-09 30-Sep-11 26.1 G6/S6 1,746 698 63,717 Indv.
Grade/St
ep
Basic Salary (US$)
Total Allowances (US$)
Total : Basic Salary +
Allowances Selection Method
01-Feb-10 30-Sep-11 20.0 G6/S5 1,602 641 44,781
01-Feb-10 30-Sep-11 20.0 G6/S5 1,602 641 44,781
07-Mar-09 28-Feb-10 11.7 G6/S8 2,075 830 33,989 Indv.
22-Dec-09 30-Sep-11 21.3 G6/S5 1,602 641 47,697 Indv.
01-Apr-10 30-Sep-11 18.0 G6/S5 1,602 641 40,296
01-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
01-Jul-07 11-Aug-09 25.3 G5/S4 990 396 35,112 Indv.12-Aug-09 31-Aug-0901-Oct-09 30-Sep-11 24.0 G5/S5 1,145 458 38,419 Indv.04-Oct-09 30-Sep-11 23.9 G4/S2 680 272 22,721 Indv.01-Apr-07 30-May-10 38.0 G7/S7 2,971 1,188 157,919 Indv.05-Jun-07 30-Sep-11 51.8 G6/S6 1,746 698 126,701 Indv.
01-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
01-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
01-Apr-10 30-Sep-11 18.0 G3/S5 678 271 17,054 01-Apr-07 17-Apr-08 12.5 G3/S1 450 180 7,896 Indv.18-Apr-08 13-Jun-0814-Jun-08 30-May-10 23.5 G3/S2 523 209 17,231 Indv.1-Apr-07 30-Sep-11 54.0 G2/S4 450 180 33,999 Indv.
1-Apr-08 30-Sep-11 42.0 G3/S2 523 209 30,728 Indv.
24-Mar-09 30-Sep-11 30.2 G4/S4 808 323 34,162 Indv.5-Dec-07 18-Dec-09 24.4 G3/S1 450 180 15,393 Indv.
19-Dec-09 30-May-10
8-Sep-08 31-Dec-08 3.8 G4/S3 743 297 3,918 Indv.1-Jan-09 10-Feb-09
11-Feb-09 30-May-10 15.6 G4/S4 808 323 17,684 Indv.8-Sep-08 30-Sep-08 0.7 G4/S1 575 230 590 Indv.1-Oct-08 12-Dec-08
13-Dec-08 30-May-10 17.6 G4/S2 680 272 16,723 Indv.5-Dec-08 10-Feb-09 2.2 G3/S1 450 180 1,365 Indv.
11-Feb-09 30-May-10
01-Dec-07 19-Apr-08 4.6 G5/S2 830 332 5,345 Indv.20-Apr-08 13-Jul-0814-Jul-08 30-Sep-11 38.5 G5/s3 964 386 52,005 Indv.
01-Mar-10 30-Sep-11 19.0 G6/S10 2,465 986 65,454 Indv.
01-Mar-10 30-Sep-11 19.0 G6/S10 2,465 986 65,454 Indv.
01-Mar-10 30-Sep-11 19.0 G6/S8 2,075 830 55,098 Indv.
01-Dec-09 30-Sep-11 22.0 G5/S10 1,761 704 54,157 Indv.
01-Dec-09 30-Sep-11 22.0 G5/S5 1,145 458 35,213 Indv.
01-Dec-09 30-Sep-11 22.0 G5/S7 1,360 544 41,825 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S1 624 250 19,190 Indv.01-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.01-Dec-09 30-Sep-11 22.0 G4/S2 680 272 20,912 Indv.01-Dec-09 20-Feb-10 2.6 21-Feb-10 30-Sep-11 19.3 G4/S5 881 352 23,805 Indv.01-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.01-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Dec-09 30-Sep-11 22.0 G5/S7 1,360 544 41,825 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S3 741 296 22,788 Indv.01-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.01-Dec-09 30-Sep-11 22.0 G5/S7 1,360 544 41,825 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S7 1,047 419 32,199 Indv.
01-Dec-09 30-Sep-11 22.0 G3/S4 622 249 19,129 Indv.
01-Dec-09 30-Sep-11 22.0 G3/S4 622 249 19,129 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Dec-09 30-Sep-11 22.0 G6/S5 1,602 641 49,267 Indv.
01-Dec-09 30-Sep-11 22.0 G6/S7 1,904 762 58,554 Indv.
01-Dec-09 30-Sep-11 22.0 G6/S7 1,904 762 58,554 Indv.
01-Dec-09 30-May-10 6.0 G6/S3 1,348 539 11,260 Indv.
01-Dec-09 30-Sep-11 22.0 G5/S8 1,483 593 45,607 Indv.
01-Dec-09 30-Sep-11 22.0 G6/S7 1,904 762 58,554 Indv.01-Dec-09 30-Sep-11 22.0 G5/S4 1,050 420 32,291 Indv.01-Dec-09 30-Sep-11 22.0 G5/S6 1,248 499 38,380 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S2 680 272 20,912 Indv.
01-Dec-09 20-Mar-10 3.6 21-Mar-10 30-Sep-11 18.3 G4/S5 881 352 22,571 Indv.
01-Dec-09 20-Mar-10
21-Mar-10 30-Sep-11 18.3 G4/S5 881 352 22,571 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S2 680 272 20,912 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S7 1,047 419 32,199 Indv.01-Dec-09 30-Sep-11 22.0 G4/S3 741 296 22,788 Indv.
01-Dec-09 30-Sep-11 22.0 G4/S2 680 272 20,912 Indv.
01-Dec-09 30-May-10 6.0 G4/S4 808 323 6,749 Indv.01-Dec-09 30-May-10 6.0 G4/S2 680 272 5,680 Indv.01-Dec-09 30-May-10 6.0 G4/S5 881 352 7,359 Indv.01-Dec-09 30-May-10 6.0 G4/S5 881 352 7,359 Indv.16-Sep-07 18-Dec-09 27.1 G7/S7 2,550 1,020 96,628 Indv.08-Sep-09 30-Sep-11 24.7 G4/S3 741 296 25,658 Indv.23-Mar-08 30-Sep-11 42.2 G5/S7 1,360 544 80,412 Indv.15-Jan-09 28-Jan-09 0.4 G4/S6 825 330 501 Indv.29-Jan-09 17-Apr-0918-Apr-09 30-Sep-11 29.4 G4/S6 960 384 39,514 Indv.15-Mar-08 06-Oct-09 18.7 G4/S3 625 250 16,363 Indv.1-Apr-07 19-Apr-08 12.6 G5/S9 1,390 556 24,520 Indv.
20-Apr-08 09-May-08
10-May-08 18-Nov-08 6.3 G5/S7 1,353 541 11,870 Indv.1-Apr-10 30-May-10 2.0 G6/S5 1,602 641 4,411
19-Nov-08 30-Sep-11 34.4 G5/S9 1,616 646 77,751 Indv.
23-May-09 30-Sep-11 28.2 G4/S4 808 323 31,938 Indv.1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
10-Apr-08 26-Apr-09 12.5 G5/S3 1,001 400 17,564 Indv.27-Apr-09 27-Jul-0928-Jul-09 30-Sep-11 26.1 G5/S4 1,050 420 38,318 Indv.
1-Apr-07 01-Oct-11 54.0 G4/S2 680 272 51,408 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Oct-08 15-Mar-09 5.5 G5/S3 1,001 400 7,661 Indv.16-Mar-09 17-Apr-0918-Apr-09 30-May-10 13.4 G5/S4 1,050 420 19,698 Indv.1-Apr-07 30-Sep-08 18.0 G5/S2 725 290 18,236 Indv.1-Oct-08 15-Jan-10 15.5 G4/S5 881 352 19,077 Indv.16-Jan-10 31-Mar-101-Apr-10 30-May-10 2.0 G4/S5 881 352 2,426 Indv.
21-Oct-07 04-Oct-09 23.4 G5/S6 1,265 506 41,500 Indv.
05-Oct-09 30-May-10
08-Sep-07 11-Oct-07 1.1 G6/S3 1,150 460 1,771 Indv.12-Oct-07 11-Dec-0712-Dec-07 30-Sep-08 9.6 G6/S3 1,150 460 15,456 Indv.01-Oct-08 21-Oct-0822-Oct-08 30-Sep-11 35.3 G6/S3 1,348 539 66,555 Indv.
01-Jan-08 30-Sep-11 45.0 G5/S8 1,483 593 93,360 Indv.
01-Apr-10 30-Sep-11 18.0 G5/S5 1,145 458 28,801
01-Apr-10 30-Sep-11 18.0 G6/S5 1,602 641 40,296
01-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
01-Apr-10 30-May-10 2.0 G5/S5 1,145 458 3,153
2-Feb-08 20-Oct-09 20.6 G4/S1 575 230 16,583 Indv.21-Oct-09 08-Dec-09 1.6 Indv.9-Dec-09 30-Dec-09 0.7 G3/S3 570 228 559 Indv.
31-Dec-09 01-Feb-10 1.0 G3/S5 678 271 981 Indv.
1-Apr-10 30-Sep-11 18.0 G5/S5 1,145 458 28,801
1-Apr-10 30-Sep-11 18.0 G6/S5 1,602 641 40,296
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
4-Apr-07 30-Sep-11 53.9 G4/S4 808 323 60,934 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.27-Dec-08 27-Jul-09 7.0 G4/S3 743 297 7,281 Indv.
28-Jul-09 30-May-10
1-Apr-07 18-May-09 25.6 G4/S3 743 297 26,594 Indv.19-May-09 15-Jul-0916-Jul-09 30-Sep-11 26.5 G4/S2 680 272 25,196 Indv.
26-Aug-09 25-Oct-09 2.0 G4/S2 688 275 1,894 Indv.
26-Oct-09 30-May-10
11-Nov-08 29-Sep-09 10.6 G5/S3 910 364 13,504 Indv.10-Sep-09 01-Feb-10 4.7 G5/S5 1,145 458 7,534 Indv.1-Apr-07 22-May-09 25.7 G4/S3 743 297 26,733 Indv.
23-May-09 30-May-10
9-Jan-09 07-Sep-09 7.9 G5/S1 825 330 9,163 Indv.
8-Sep-09 30-May-10
24-Oct-09 30-Sep-11 23.2 G5/S3 964 386 31,311 Indv.
22-Mar-08 31-Aug-09 17.3 G7/S4 2,250 900 54,495 Indv.13-Feb-08 28-Jun-09 16.5 G6/S9 1,925 770 44,468 Indv.29-Jun-09 11-Sep-0912-Sep-09 17-Oct-09 1.2 G6/S9 1,925 770 3,144 Indv.18-Oct-09 15-Mar-10 4.9 G6/S5 1,602 641 10,990 Indv.01-Jul-08 17-Jul-09 12.5 G6/S4 1,375 550 24,127 Indv.18-Jul-09 07-Sep-0908-Sep-09 30-Sep-11 24.7 G6/S1 1,135 454 39,301 Indv.01-Mar-08 12-Jun-09 15.4 G5/S2 913 365 19,642 Indv.
13-Jun-09 30-May-10
25-Oct-09 30-Sep-11 23.2 G5/S5 1,145 458 37,136 Indv.01-Sep-09 30-Sep-11 25.0 G5/S2 884 354 30,899 Indv.
14-Sep-09 30-Sep-11 24.5 G5/S3 964 386 33,110 Indv.
08-Aug-09 30-Sep-11 25.7 G5/S7 1,360 544 48,996 Indv.
08-Aug-09 30-Sep-11 25.7 G5/S7 1,360 544 48,996 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
01-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
01-Apr-10 30-Sep-11 18.0 G5/S5 1,145 458 28,801
1-Apr-07 20-Apr-09 24.6 G4/S3 743 297 25,624 Indv.
1-Apr-07 30-May-10 38.0 G3/S3 570 228 30,297 Indv.
19-May-08 17-Oct-09 16.9 G3/S1 491 196 11,640 Indv.18-Oct-09 15-Feb-10
16-Feb-10 30-Sep-11 3.9 G4/S5 881 352 4,810 Indv.5-Jul-08 30-Sep-11 38.8 G4/S2 680 272 36,969 Indv.
17-Dec-07 10-Mar-09 14.8 G7/S1 2,145 858 44,344 Indv.5-Jul-08 25-Oct-08 3.7 G4/S1 633 253 3,249 Indv.
26-Oct-08 11-Jan-0912-Jan-09 26-Mar-09 2.5 G4/S1 633 253 2,186 Indv.
27-Mar-09 7-Sep-09
8-Sep-09 30-Sep-11 24.7 G4/S2 680 272 23,546 Indv.
1-Apr-07 30-May-10 38.0 G3/S2 523 209 27,799 Indv.
1-Apr-07 30-May-10 38.0 G3/S2 523 209 27,799 Indv.
24-May-08 30-May-10 24.2 G4/S2 680 272 23,038 Indv.
11-Oct-08 20-Mar-09 5.3 G6/S3 1,265 506 9,386 Indv.21-Mar-09 20-Apr-0921-Apr-09 30-Sep-11 29.3 G6/S3 1,348 539 55,295 Indv.1-Apr-07 30-May-10 38.0 G1/S5 290 116 15,414 Indv.1-Apr-07 30-May-10 38.0 G1/S5 290 116 15,414 Indv.1-Apr-07 30-Sep-11 54.0 G1/S5 290 116 21,910 Indv.1-Apr-07 30-Sep-11 54.0 G1/S5 290 116 21,910 Indv.1-Apr-07 30-May-10 38.0 G3/S3 570 228 30,297 Indv.1-Apr-07 30-May-10 38.0 G3/S5 678 271 36,038 Indv.1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.8-Sep-07 19-Feb-09 17.4 G3/S7 660 264 16,047 Indv.1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.1-May-08 30-Sep-11 41.0 G4/S7 1,047 419 60,049 Indv.
28-Apr-08 30-Sep-11 41.1 G5/S4 1,050 420 60,368 Indv.
08-May-08 30-May-10 24.7 G5/S2 884 354 30,610 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S7 1,360 544 102,753 Indv.
1-Apr-07 20-Dec-08 20.6 G4/S7 963 385 27,818 Indv.21-Dec-08 01-Apr-10
2-Apr-10 30-Sep-11 15.3 G4/S5 881 352 18,912 Indv.20-Aug-07 17-May-09 20.9 G4/S1 - - Indv.18-May-09 01-Apr-10
2-Apr-10 30-Sep-11 10.4 G4/S5 881 352 12,868 Indv.1-Apr-07 07-Sep-08 17.2 G4/S5 775 310 18,662 Indv.8-Sep-08 18-Dec-09
19-Dec-09 30-Sep-11 21.4 G4/S6 960 384 28,717 Indv.1-Oct-07 07-Sep-08 11.2 G4/S3 675 270 10,584 Indv.8-Sep-08 18-Dec-09
19-Dec-09 30-Sep-11 21.4 G4/S2 680 272 20,341 Indv.27-Sep-08 30-Sep-11 36.1 G7/S4 2,358 943 119,173 Indv.
27-May-08 30-Sep-11 40.1 G6/S7 1,650 660 92,631 Indv.
1-Apr-09 01-Apr-102-Apr-10 30-Sep-11 12.0 G6/S5 1,602 641 26,914 Indv.
30-May-10
1-Apr-07 15-Apr-08 12.5 G5/S7 1,230 492 21,468 Indv.16-Apr-08 1-Apr-10 23.5 G5/S5 1,145 458 37,671 Indv.01-Apr-07 30-Sep-11 54.0 G6/S7 1,904 762 143,854 Indv.
01-Apr-10 30-Sep-11 18.0 G6/S5 1,602 641 40,296
01-Apr-10 30-Sep-11 18.0 G5/S5 1,145 458 28,801
01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
21-Jun-08 30-Sep-11 39.3 G7/S5 2,547 1,019 140,136 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S8 2,075 830 156,773 Indv.
20-Nov-08 30-Sep-11 34.3 G6/S5 1,602 641 77,003 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.16-Jul-08 30-Sep-11 38.5 G6/S4 1,470 588 79,164 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S8 2,075 830 156,773 Indv.01-Sep-07 30-Sep-11 49.0 G6/S5 1,602 641 109,822 Indv.
5-Jul-08 30-Sep-11 38.8 G4/S2 680 272 36,969 Indv.
26-Jul-08 27-Nov-08 4.0 G6/S5 1,350 540 7,623 Indv.28-Nov-08 16-Mar-0917-Mar-09 30-Sep-11 30.4 G6/S5 1,602 641 68,256 Indv.01-Sep-07 30-Sep-11 49.0 G6/S4 1,470 588 100,773 Indv.08-Sep-07 31-Mar-08 6.8 G6/S5 1,350 540 12,789 Indv.01-Apr-0801-Mar-08 07-Aug-09 17.2 G6/S5 1,350 540 32,508 Indv.
08-Aug-09 30-May-10
08-Jun-08 30-Sep-11 39.7 G6/S4 1,470 588 81,771 Indv.
01-Apr-07 30-May-10 38.0 G6/S6 1,746 698 92,806 Indv.
1-Apr-07 30-May-10 38.0 G3/S4 622 249 33,061 Indv.20-Apr-08 09-Jan-09 8.6 G7/S1 1,950 780 23,569 Indv.
01-Apr-07 09-Aug-09 28.3 G5/S6 1,150 460 45,509 Indv.
22-Jul-08 09-Aug-09 12.6 G5/S6 1,150 460 20,232 Indv.
22-May-07 30-Sep-11 52.3 G7/S5 2,547 1,019 186,372 Indv.
24-Feb-08 30-May-10 27.2 G4/S4 808 323 30,769 Indv.1-Apr-07 30-May-10 38.0 G3/S6 739 296 39,280 Indv.
1-Dec-09 30-Sep-11 22.0 G5/S9 1,616 646 49,697 Indv.
8-Jan-07 26-Feb-09 25.6 G2/S1 418 167 14,981 Indv.
1-Apr-07 03-Oct-09 30.1 G4/S6 825 330 34,727 Indv.4-Oct-09 30-May-10
30-May-10 30-Sep-11 16.0 G4/S5 881 352 19,734 Indv.
10-Apr-08 26-Apr-09 12.5 G5/S2 830 332 14,564 Indv.27-Apr-09 01-Jul-092-Jul-09 25-Jan-09 (5.2) G5/S2 830 332 (6,081) Indv.
26-Jan-09 30-May-10 16.1 G5/S3 964 386 21,774 Indv.05-May-08 30-Sep-11 40.8 G6/S6 1,746 698 99,813 Indv.01-Apr-07 30-Sep-11 54.0 G5/S7 1,360 544 102,753 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.01-Apr-07 06-May-09 25.2 G2/S3 451 180 15,890 Indv.07-May-09 09-Jun-0910-Jun-09 30-Sep-11 27.7 G3/S4 622 249 24,092 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.12-Sep-09 30-Sep-11 24.6 G4/S2 680 272 23,419 Indv.
2-Oct-09 30-Sep-11 23.9 G4/S3 741 296 24,828 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.01-Apr-07 28-Oct-08 18.9 G2/S2 380 152 10,055 Indv.29-Oct-08 27-Jul-0928-Jul-09 30-Sep-11 26.1 G3/S4 622 249 22,699 Indv.01-Apr-07 01-Jul-07 3.0 G5/S3 910 364 3,822 Indv.02-Jul-07 28-May-0807-Jun-08 16-Dec-08 6.3 G5/S3 910 364 8,026 Indv.17-Dec-08 01-Jul-1002-Jul-10 30-Sep-11 14.9 G5/S5 1,145 458 23,938 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
05-Jun-09 30-Sep-11 27.8 G5/S4 1,050 420 40,915 Indv.01-Apr-07 28-Apr-08 12.9 G5/S2 830 332 14,990 Indv.29-Apr-08 28-May-0829-May-08 21-Aug-08 2.7 G5/S2 830 332 3,176 Indv.22-Aug-08 24-Aug-0925-Aug-09 30-Sep-11 25.2 G5/S3 964 386 33,965 Indv.1-Apr-07 20-Apr-07 0.6 G3/S1 450 180 399 Indv.
21-Apr-07 29-Jun-0730-Jun-07 28-Oct-08 15.9 G3/S1 450 180 10,038 Indv.29-Oct-08 15-Aug-0916-Aug-09 30-Sep-11 25.5 G4/S4 808 323 28,808 Indv.1-Apr-07 21-Oct-08 18.7 G3/S1 450 180 11,760 Indv.
22-Oct-08 19-Jan-0920-Jan-09 30-Sep-11 32.3 G4/S2 680 272 30,781 Indv.1-Apr-07 31-Oct-08 19.0 G3/S1 450 180 11,970 Indv.1-Nov-08 13-Mar-09
14-Mar-09 30-Sep-11 30.5 G4/S2 680 272 29,068 Indv.1-Apr-07 01-Oct-07 6.0 G3/S1 450 180 3,780 Indv.2-Oct-07 03-Mar-08
04-Mar-08 04-Jun-08 3.0 G3/S1 450 180 1,890 Indv.05-Jun-08 23-Sep-0824-Sep-08 30-Sep-11 36.2 G3/S4 622 249 31,523 Indv.30-Apr-07 20-Mar-08 10.7 G3/S1 450 180 6,720 Indv.
21-Mar-08 13-Nov-0914-Nov-09 30-Sep-11 22.5 G4/S1 623 249 19,654 Indv.23-Apr-07 12-Oct-07 5.6 G3/S3 520 208 4,101 Indv.13-Oct-07 28-Mar-0829-Mar-08 30-Sep-11 42.0 G4/S2 680 272 40,016 Indv.1-Apr-07 02-Apr-09 24.0 G3/S3 520 208 17,496 Indv.5-Apr-09 19-Sep-09 5.5 G3/S3 520 208 3,980 Indv.
20-Sep-09 01-Mar-102-Mar-10 30-Sep-11 5.4 G4/S5 881 352 6,619 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S6 1,248 499 94,291 Indv.01-Apr-07 21-Apr-09 24.7 G5/S3 910 364 31,425 Indv.22-Apr-09 29-May-0930-May-09 30-Sep-11 28.0 G5/S4 1,050 420 41,160 Indv.01-Apr-07 30-Sep-11 54.0 G6/S4 1,470 588 111,063 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
8-Dec-07 30-Sep-11 45.7 G3/S4 622 249 39,825 Indv.
1-Apr-07 25-Sep-07 5.8 G3/S3 520 208 4,222 Indv.26-Sep-07 23-Feb-0824-Feb-08 20-Jun-08 3.9 G3/S3 520 208 2,815 Indv.24-Feb-08 30-Sep-11 43.2 G4/S4 808 323 48,868 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S7 1,350 540 101,997 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 08-Sep-08 17.2 G2/S3 410 164 9,892 Indv.09-Sep-08 4-May-095-May-09 30-Sep-11 28.8 G3/S4 622 249 25,108 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 860 344 64,976 Indv.01-Apr-07 30-Sep-11 54.0 G5/S6 1,248 499 94,291 Indv.
01-Apr-07 08-Jul-08 15.2 G5/S1 750 300 15,995 Indv.09-Jul-08 28-Oct-0829-Oct-08 30-Sep-11 35.0 G5/S4 1,050 420 51,499 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.1-Apr-07 01-Dec-08 20.0 G2/S3 410 164 11,480 Indv.
02-Dec-08 5/4/20095-May-09 30-Sep-11 28.8 G3/S4 622 249 25,108 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.
1-Apr-07 07-Aug-07 4.2 G3/S3 520 208 3,058 Indv.08-Aug-07 23-Feb-0824-Feb-08 30-Sep-11 43.2 G4/S4 808 323 48,868 Indv.1-Apr-07 19-Apr-08 12.6 G3/S4 555 222 9,790 Indv.
20-Apr-08 25-Aug-0925-Aug-09 30-Sep-11 25.2 G4/S2 680 272 23,959 Indv.1-Apr-07 28-Sep-09 29.9 G3/S4 611 244 25,576 Indv.
29-Sep-09 01-Apr-102-Apr-10 30-Sep-11 6.1 G4/S5 881 352 7,483 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S7 1,360 544 102,753 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 26-Sep-08 17.8 G5/S5 1,070 428 26,714 Indv.27-Sep-08 01-Jul-10
2-Jul-10 30-Sep-11 21.1 G5/S5 1,070 428 31,658 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Mar-10 36.0 G2/S5 504 202 25,378 Indv.
1-Apr-07 01-Dec-07 8.0 G2/S4 440 176 4,928 Indv.2-Dec-07 07-Dec-07 0.2 Indv.8-Dec-07 28-Jun-09 18.7 G2/S4 440 176 11,499 Indv.1-Jul-09 30-Sep-11 27.0 G3/S4 622 249 23,483 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 22-May-07 1.7 G3/S3 520 208 1,238 Indv.23-May-07 3/7/20088-Mar-08 30-Sep-11 42.7 G4/S2 523 209 31,289 Indv.1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S7 1,360 544 102,753 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S1 624 250 19,190 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Mar-10 36.0 G2/S5 504 202 25,378 Indv.
1-Apr-07 30-Mar-10 36.0 G4/S8 1,141 456 57,453 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S6 1,248 499 94,291 Indv.01-Apr-07 30-Sep-11 54.0 G5/S6 1,248 499 94,291 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 22-Oct-09 30.7 G7/S4 2,250 900 96,705 Indv.23-Oct-09 01-Feb-10
2-Feb-10 30-Sep-11 3.3 G7/S5 2,547 1,019 11,648 Indv.24-Apr-07 21-Nov-09 30.9 G2/S2 380 152 16,439 Indv.22-Nov-09 20-Feb-1021-Feb-10 30-May-10 3.3 G3/S5 678 271 - Indv.1-Jan-09 30-Nov-09 11.0 G4/S3 675 270 10,364 Indv.
1-Dec-09 30-May-10
1-Apr-07 30-Apr-07 1.0 G4/S2 680 272 920 Indv.1-May-07 14-Sep-07 4.4 Indv.15-Sep-07 30-May-10 32.5 G4/S2 680 272 30,940 Indv.
1-Dec-09 30-Sep-11 22.0 G5/S7 1,360 544 41,825 Indv.
30-May-10 30-Sep-11 16.0 G4/S5 881 352 19,734 Indv.
9-Aug-08 30-May-10 21.7 G4/S2 680 272 20,658 Indv.
01-Apr-07 20-Apr-09 24.6 G4/S3 675 270 23,279 Indv.
21-Apr-09 30-May-10
01-Apr-07 30-May-10 38.0 G5/S4 1,050 420 55,811 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 20-May-09 25.6 G5/S3 913 365 32,765 Indv.21-May-09 14-Aug-0915-Aug-09 30-Sep-11 25.5 G5/S3 964 386 34,415 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 09-Jan-10 33.3 G4/S4 808 323 37,631 Indv.10-Jan-10 01-Feb-10
2-Feb-10 30-Sep-11 0.7 G4/S5 881 352 863 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 23-Jul-09 27.7 G3/S4 555 222 21,549 Indv.24-Jul-09 28-Sep-0929-Sep-09 30-Sep-11 24.0 G4/S2 680 272 22,880 Indv.01-Apr-07 30-Sep-11 54.0 G6/S3 1,348 539 101,846 Indv.01-Oct-07 30-Sep-11 48.0 G5/S5 1,145 458 76,891 Indv.01-Sep-09 30-Sep-11 25.0 G5/S3 964 386 33,695 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 22-Oct-07 6.7 G3/S3 520 208 4,878 Indv.23-Oct-07 9-May-0810-May-08 30-Sep-11 40.7 G4/S4 808 323 46,002 Indv.1-Apr-07 20-Mar-09 23.6 G3/S1 450 180 14,889 Indv.
21-Mar-09 7/24/200925-Jul-09 30-Sep-11 26.2 G4/S2 680 272 24,911 Indv.1-Apr-07 20-Mar-09 23.6 G3/S5 590 236 19,521 Indv.
21-Mar-09 07-Aug-0908-Aug-09 30-Sep-11 25.7 G4/S2 680 272 24,498 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Aug-09 30-Sep-11 26.0 G4/S4 808 323 29,373 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
2-Jul-08 30-Sep-11 38.9 G4/S2 680 272 37,065 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 19-Jan-09 21.6 G5/S2 830 332 25,099 Indv.20-Jan-09 3/17/200918-Mar-09 30-Sep-11 30.4 G5/S3 964 386 41,028 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
24-Apr-07 30-Sep-11 53.2 G4/S2 680 272 50,646 Indv.01-Apr-07 01-Apr-08 - G3/S4 555 222 - Indv.02-Apr-08 09-Jun-0810-Jun-08 30-Sep-11 39.7 G4/S2 680 272 37,763 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.1-Dec-09 05-Feb-10
6-Feb-10 30-Sep-11 2.1 G4/S5 881 352 2,631 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
15-Sep-09 30-Sep-11 24.5 G4/S2 680 272 23,324 Indv.
8-Sep-09 30-Sep-11 24.7 G4/S3 741 296 25,658 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 30-Sep-11 54.0 G5/S6 1,248 499 94,291 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.10-Jun-08 30-Sep-11 39.7 G5/S4 1,050 420 58,310 Indv.1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 15-Sep-07 5.5 G3/S3 520 208 3,980 Indv.16-Sep-07 11-Jan-0812-Jan-08 30-Sep-11 44.6 G4/S4 520 208 32,469 Indv.1-Apr-07 07-Sep-09 29.2 G3/S4 555 222 22,688 Indv.9-Sep-09 01-Mar-10 5.7 G4/S5 881 352 7,071 Indv.8-May-07 30-Sep-11 52.7 G4/S2 680 272 50,202 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
1-Apr-07 29-Feb-08 10.9 G3/S3 520 208 7,959 Indv.01-Mar-08 19-Apr-0820-Apr-08 30-Sep-11 41.3 G4/S2 680 272 39,349 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.25-Jul-09 30-Sep-11 26.2 G5/S2 884 354 32,384 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-08 30-Sep-11 42.0 G4/S2 680 272 39,952 Indv.
01-Apr-07 03-May-09 25.1 G7/S2 2,255 902 79,135 Indv.04-May-09 10-May-0911-Jun-09 05-Jan-11 18.8 G7/S3 2,184 874 57,483 Indv.06-Jan-11 15-Feb-10
16-Feb-10 30-Sep-11 (10.7) G7/S5 2,547 1,019 (38,154) Indv.1-Apr-07 30-May-10 38.0 G4/S6 960 384 51,027 Indv.
4-Jan-09 30-May-10 16.9 G4/S2 680 272 16,057 Indv.
8-Sep-07 20-Mar-09 18.4 G4/S2 688 275 17,723 Indv.
21-Mar-09 30-May-10
30-May-10 30-Sep-11 16.0 G4/S5 881 352 19,734 Indv.
01-Apr-07 27-Jul-09 27.9 G5/S1 750 300 29,260 Indv.
28-Jul-09 30-May-10
1-Dec-09 30-Sep-11 22.0 G5/S7 1,360 544 41,825 Indv.
01-Apr-07 30-May-10 38.0 G5/S3 964 386 51,240 Indv.01-Apr-07 30-Sep-11 54.0 G6/S2 1,237 495 93,459 Indv.01-Apr-07 30-Sep-11 54.0 G5/S8 1,483 593 112,046 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 29-Aug-08 16.9 G3/S1 450 180 10,668 Indv.30-Aug-08 18-Oct-0819-Oct-08 30-Sep-11 35.4 G4/S4 808 323 40,007 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S5 881 352 66,562 Indv.
1-Apr-07 30-Apr-09 25.0 G5/S2 830 332 29,011 Indv.1-May-09 21-Oct-09 5.7 22-Oct-09 30-Sep-11 23.3 G5/S3 964 386 31,401 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S6 1,248 499 94,291 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.1-Apr-07 22-Aug-09 28.7 G3/S5 649 260 26,077 Indv.
23-Aug-09 01-Feb-102-Feb-10 30-Sep-11 19.9 G4/S5 881 352 24,586 Indv.1-Apr-07 30-Nov-09 32.0 G4/S2 688 275 30,790 Indv.1-Dec-09 01-Mar-10
2-Mar-10 30-Sep-11 3.0 G4/S5 881 352 3,700 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.21-Jun-08 30-Sep-11 39.3 G5/S5 1,145 458 62,998 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.1-Apr-07 22-Jul-08 15.7 G2/S2 380 152 8,352 Indv.23-Jul-08 2/6/20097-Feb-09 30-Sep-11 31.8 G3/S4 622 249 27,662 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
12-May-07 30-Sep-11 52.6 G4/S2 680 272 50,075 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.21-Jun-08 30-Sep-11 39.3 G5/S4 1,050 420 57,771 Indv.
1-Dec-09 30-Sep-11 22.0 G5/S4 1,050 420 32,291 Indv.
01-Apr-07 30-Sep-11 54.0 G7/S5 2,547 1,019 192,434 Indv.01-Apr-07 04-Jul-08 15.1 G3/S8 695 278 14,692 Indv.
5-Jul-08 30-May-10
24-Mar-07 07-Sep-08 17.4 G4/S2 625 250 15,254 Indv.
8-Sep-08 30-May-10
1-Apr-07 30-May-10 38.0 G3/S7 805 322 42,788 Indv.
1-Apr-07 30-May-10 38.0 G4/S6 960 384 51,027 Indv.
26-Oct-08 30-May-10 19.1 G4/S2 680 272 18,215 Indv.
10-Mar-09 30-May-10 14.7 G4/S2 680 272 13,963 Indv.
30-May-10 30-Sep-11 16.0 G4/S5 881 352 19,734 Indv.
1-Apr-07 10-Dec-08 20.3 G5/S3 910 364 25,862 Indv.
11-Dec-08 30-May-10
1-Apr-07 01-Jun-07 2.0 1,173 469 3,284 Indv.02-Jun-07 24-Aug-0825-Aug-07 19-Nov-08 14.8 G6/S4 1,375 550 28,490 Indv.
20-Nov-08 30-Sep-11
01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 25-Oct-08 18.8 G3/S3 520 208 13,686 Indv.
26-Oct-08 30-Sep-11 35.1 G4/S4 808 323 39,743 Indv.1-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 22-Oct-08 18.7 G3/S5 590 236 15,446 Indv.23-Oct-08 26-Dec-0827-Dec-08 30-Sep-11 33.1 G4/S2 680 272 31,511 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.01-Apr-07 30-Sep-11 54.0 G6/S3 1,348 539 101,846 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 25-Jan-09 21.8 G3/S6 590 236 18,007 Indv.26-Jan-09 30-May-09
31-May-09 30-Sep-11 28.0 G4/S2 680 272 26,656 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 25-Jan-09 21.8 G5/S3 910 364 27,773 Indv.26-Jan-09 06-Mar-0907-Mar-09 30-Sep-11 30.8 G5/S4 1,050 420 45,227 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S5 1,904 762 143,854 Indv.01-Apr-07 26-Aug-09 28.8 G5/S2 913 365 36,855 Indv.27-Aug-09 09-Dec-0910-Dec-09 30-Sep-11 21.7 G5/S1 811 324 24,600 Indv.12-Feb-08 26-Apr-08 2.5 G5/S2 830 332 2,866 Indv.27-Apr-08 11-Jul-0812-Jul-08 30-Sep-11 38.6 G5/S4 1,050 420 56,742 Indv.12-Jul-08 30-Sep-11 38.6 G5/S4 1,050 420 56,742 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
1-Apr-07 21-Nov-07 7.7 G3/S1 450 180 4,830 Indv.22-Nov-07 15-Feb-0816-Feb-08 30-Sep-11 43.5 G4/S2 680 272 41,380 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 520 208 39,288 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S4 1,050 420 79,331 Indv.01-Apr-07 04-Feb-09 22.1 G5/S2 830 332 25,680 Indv.05-Feb-09 7-Mar-09
08-Mar-09 30-Sep-11 30.7 G5/S4 1,050 420 45,178 Indv.1-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.
19-Sep-09 30-Sep-11 24.4 G4/S2 680 272 23,197 Indv.
12-Sep-09 30-Sep-11 24.6 G4/S2 680 272 23,419 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 19-Feb-08 10.6 G3/S1 450 180 6,678 Indv.20-Feb-08 30-Sep-11 43.3 G4/S2 680 272 41,253 Indv.1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.1-Apr-07 08-Apr-09 24.2 G5/S5 1,070 428 36,302 Indv.9-Apr-09 26-Aug-09
27-Aug-09 30-Sep-11 25.1 G5/S2 830 332 29,166 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S7 1,360 544 102,753 Indv.01-Apr-07 30-Sep-11 54.0 G6/S3 1,348 539 101,846 Indv.
01-Apr-07 30-Sep-11 54.0 G7/S6 2,751 1,100 207,847 Indv.
1-Apr-07 06-Apr-09 24.2 G4/S1 575 230 19,454 Indv.7-Apr-09 21-May-09
22-May-09 30-May-10 12.3 G4/S2 680 272 11,678 Indv.
1-Dec-09 30-Sep-11 22.0 G5/S8 1,483 593 45,607 Indv.
1-Apr-07 30-May-10 38.0 G3/S7 805 322 42,788 Indv.1-Apr-07 29-Oct-07 6.9 G4/S1 575 230 5,581 Indv.
30-Oct-07 04-Mar-085-Mar-08 30-May-10 26.8 G4/S2 680 272 25,545 Indv.
22-Sep-08 30-May-10 20.3 G4/S2 680 272 19,294 Indv.
30-May-10 30-Sep-11 16.0 G4/S5 881 352 19,734 Indv.
01-Apr-07 30-May-10 38.0 G5/S3 864 346 45,924 Indv.
01-Apr-07 08-Oct-08 18.2 G5/S2 830 332 21,187 Indv.
09-Oct-08 30-May-10
01-Apr-07 10-Jul-08 15.3 G5/S3 910 364 19,492 Indv.11-Jul-08 18-Nov-08 4.2
19-Nov-08 07-Sep-09 9.6 G5/S3 910 364 12,230 Indv.
08-Sep-09 30-Sep-11 24.7 G5/S2 884 354 30,610 Indv.01-Apr-07 07-Sep-07 5.2 G5/S2 830 332 6,042 Indv.08-Sep-07 11-Dec-0912-Dec-09 30-Sep-11 21.6 G5/S1 811 324 24,525 Indv.01-Apr-07 05-Jan-10 33.1 G6/S2 1,237 495 57,380 Indv.06-Jan-10 01-Feb-1002-Feb-10 30-Sep-11 19.9 G6/S5 1,602 641 44,706 Indv.
22-Jun-07 30-Sep-11 51.3 G3/S4 570 228 40,911 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.1-Apr-07 13-Sep-08 17.4 G3/S1 450 180 10,962 Indv.
14-Sep-08 08-Feb-099-Feb-09 30-Sep-11 31.7 G4/S2 680 272 30,178 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S3 741 296 55,985 Indv.
1-Apr-07 31-Jan-09 22.0 G5/S3 910 364 28,028 Indv.1-Apr-07 07-Sep-08 17.2 G6/S2 1,050 420 25,284 Indv.8-Sep-08 11-Feb-09
12-Feb-09 30-Sep-11 31.6 G6/S2 1,237 495 54,725 Indv.01-Jan-09 15-Apr-10
16-Apr-10 30-Sep-11 15.5 G5/S5 1,145 458 75,240 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.1-Apr-07 07-Sep-07 5.2 G3/S1 450 180 3,276 Indv.8-Sep-07 21-Jul-0822-Jul-08 30-Sep-11 38.3 G4/S2 680 272 36,430 Indv.1-Apr-07 07-Sep-07 5.2 G3/S1 450 180 3,276 Indv.8-Sep-07 30-Sep-071-Oct-07 16-Jun-08 8.5 G3/S1 450 180 5,355 Indv.
17-Jun-08 21-Dec-0822-Dec-08 30-Sep-11 33.3 G4/S2 680 272 31,670 Indv.01-Apr-07 30-Sep-11 54.0 G6/S5 1,602 641 121,036 Indv.1-Apr-07 06-Nov-07 7.2 G2/S2 380 152 3,813 Indv.
07-Nov-07 19-Apr-0820-Apr-08 30-Sep-11 41.3 G3/S4 622 249 35,993 Indv.1-Apr-07 05-May-08 13.1 G3/S1 450 180 8,274 Indv.
06-May-08 3-Oct-084-Oct-08 30-Sep-11 35.9 G4/S4 808 323 40,572 Indv.
1-Apr-07 08-Feb-09 22.2 G3/S1 450 180 14,007 Indv.09-Feb-09 3-Apr-094-Apr-09 30-Sep-11 29.9 G4/S2 680 272 28,433 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S5 881 352 27,094 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
01-Jun-08 30-Sep-11 40.0 G5/S4 1,050 420 58,751 Indv.01-May-07 15-Jul-08 14.5 G4/S2 625 250 12,658 Indv.03-Jul-08 30-Sep-11 38.9 G5/S4 1,050 420 57,183 Indv.1-May-07 21-Aug-08 15.7 G5/S4 1,050 420 23,030 Indv.22-Aug-08 31-Oct-0801-Nov-08 30-Sep-11 35.0 G5/S4 1,050 420 51,401 Indv.01-Nov-08 30-Sep-11 35.0 G5/S4 1,050 420 51,401 Indv.01-Apr-07 30-Sep-11 54.0 G6/s6 1,746 698 131,916 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.
01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S3 964 386 72,833 Indv.1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.1-Apr-07 30-Sep-11 54.0 G4/S4 625 250 47,221 Indv.
1-Apr-07 30-May-10 38.0 G3/S4 622 249 33,061 Indv.
1-Apr-07 30-May-10 38.0 G3/S6 739 296 39,280 Indv.
1-Apr-07 30-May-10 38.0 G4/S3 741 296 39,387 Indv.
1-Dec-09 30-Sep-11 22.0 G5/S6 1,248 499 38,380 Indv.
01-Apr-07 30-May-10 38.0 G5/S6 1,248 499 66,335 Indv.
01-Aug-08 23-Sep-09 13.7 G5/S/4 1,089 436 20,938 Indv.24-Sep-09 30-Sep-11 24.2 G6/S5 1,904 762 64,508 Indv.
30-May-10 30-Sep-11 16.0 G4/S5 881 352 19,734 Indv.
01-Apr-07 20-Feb-08 10.6 G7/S1 1,950 780 29,029 Indv.21-Feb-08 08-Jul-0809-Jul-08 30-Sep-11 38.7 G7/S3 2,184 874 118,329 Indv.01-Apr-07 19-Oct-09 30.6 G5/S3 910 364 38,984 Indv.
20-Oct-09 30-May-10
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 31-Dec-08 21.0 G6/S1 950 380 27,930 Indv.01-Jan-09 20-May-09
21-May-09 30-Sep-11 28.3 G6/S1 1,135 454 44,969 Indv.01-Apr-07 15-May-07 1.5 G3/S2 485 194 996 Indv.16-May-07 8-Jun-07
9-Jun-07 24-Dec-08 18.5 G3/S2 485 194 12,562 Indv.25-Dec-08 27-Apr-09 4.1 Indv.27-Apr-09 20-Oct-09 5.8 G3/S2 485 194 3,916 Indv.21-Oct-09 01-Feb-10
1-Mar-10 30-Sep-11 19.0 G4/S5 881 352 23,393 Indv.1-Apr-07 31-Dec-08 21.0 G3/S3 520 208 15,288 Indv.01-Jan-09 1-Mar-101-Apr-07 8-Dec-07 8.2 G3/S2 485 194 5,590 Indv.9-Dec-07 31-Mar-0801-Apr-08 24-Dec-08 8.8 G3/S2 485 194 5,953 Indv.25-Dec-08 24-May-0925-May-09 30-Sep-11 28.2 G4/S2 680 272 26,815 Indv.01-Apr-07 20-Apr-09 24.6 G2/S5 470 188 16,209 Indv.21-Apr-09 30-May-1001-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.1-Apr-07 07-Sep-09 29.2 G2/S3 410 164 16,761 Indv.8-Sep-09 24-Nov-09
25-Nov-09 30-Sep-11 22.2 G3/S1 480 192 14,896 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
1-Apr-07 06-Nov-07 7.2 G3/S4 555 222 5,569 Indv.07-Nov-07 4-Dec-075-Dec-07 30-Sep-11 45.8 G4/S3 741 296 47,548 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.05-May-07 30-Sep-11 52.8 G5/S4 1,050 420 77,665 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.1-Apr-07 12-Jul-08 15.4 G5S2 830 332 17,856 Indv.13-Jul-08 28-Oct-0829-Oct-08 30-Sep-11 35.0 G5/S5 1,145 458 56,158 Indv.
1-Apr-07 30-Sep-11 54.0 G3/S4 622 249 46,994 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S4 808 323 61,047 Indv.
1-Apr-07 26-Aug-07 4.8 G3/S3 520 208 3,519 Indv.27-Aug-07 30-Sep-071-Oct-07 30-Sep-11 48.0 G4/S2 680 272 45,664 Indv.1-Apr-07 27-Apr-08 12.9 G3/S2 485 194 8,736 Indv.
28-Apr-08 28-Sep-0829-Sep-08 21-Dec-09 14.7 G3/S2 485 194 10,004 Indv.22-Dec-09 30-Sep-11 21.3 G4/S1 624 250 18,579 Indv.01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.20-Dec-08 30-Sep-11 33.3 G5/S5 1,145 458 53,433 Indv.20-Dec-08 30-Sep-11 33.3 G5/S5 1,145 458 53,433 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S6 960 384 29,523 Indv.
20-Dec-08 30-Sep-11 33.3 G5/S5 1,145 458 53,433 Indv.01-Oct-10 01-Apr-10 (6.0) G5/S5 1,145 458 (9,618) Indv.1-Apr-07 10-Mar-08 11.3 G3/S4 555 222 8,780 Indv.
11-Mar-08 25-Sep-0926-Sep-09 30-Sep-11 24.1 G4/S4 808 323 27,300 Indv.
1-Apr-07 30-Sep-11 54.0 G4/S2 680 272 51,376 Indv.
01-Apr-07 30-Sep-11 54.0 G6/S6 1,746 698 131,916 Indv.01-Apr-07 30-Sep-11 54.0 G5/S5 1,145 458 86,509 Indv.01-Apr-07 06-Jun-08 14.2 G2/S2 380 152 7,537 Indv.7-Jun-08 30-Apr-10 22.8 G3/S5 678 271 21,610 Indv.
1-Dec-09 30-Sep-11 22.0 G4/S4 808 323 24,849 Indv.
5-Aug-08 30-Sep-11 37.8 G4/S2 680 272 36,017 Indv.
1-Apr-07 30-Aug-07 5.0 G3/S3 520 208 3,616 Indv.31-Aug-07 1-Oct-072-Oct-07 25-Feb-08 4.8 G3/S3 520 208 3,470 Indv.
26-Feb-08 6-Jun-087-Jun-08 30-Sep-11 39.8 G4/S4 808 323 44,984 Indv.
30-May-10 30-Sep-11 16.0 G5/S5 1,145 458 25,648 Indv.
1-Apr-10 30-Sep-11 18.0 G4/S5 881 352 22,160
Total 29,325,620
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Comments
Post Recruited
Prior Vacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Vacant
Post Recruited
Post RecruitedVacant
Post RecruitedPost Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Post Recruited
Post Recruited
As per Rightsizing
Post Recruited
Review by Bank (Prior / Post)
Expected Proposals
Submission Date
Recruited As per Rightsizing
Recruited As per Rightsizing
Post Recruited
Post Recruited
As per Rightsizing
As per Rightsizing
Post RecruitedVacant
Post RecruitedPost RecruitedPost RecruitedPost Recruited
As per Rightsizing
As per Rightsizing
As per RightsizingPost Recruited
VacantPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost Recruited
vacant
Post RecruitedVacant
Post RecruitedPost Recruited
VacantPost RecruitedPost Recruited
vacant
Downsized (Abolished)
This Position has been transferred to
Procurement
Downsized (Abolished)
Post RecruitedVacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
VacantPost VacantPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Will be taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
VacantPost Vacant
Vacant
Post Vacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post RecruitedPost RecruitedPost VacantPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
vacantPost RecruitedPost RecruitedPost Recruited
Vacant
Taken over from MSC(Maxwell)
Post RecruitedAs per Rightsizing
Post Recruited
Post RecruitedPost RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Post Recruited
Post Recruitedvacant
Post RecruitedPost RecruitedPost Recruited
vacantPost vacantPost Recruited
Post Recruitedvacant
Post Recruitedvacant
Post Recruited
Post Recruited
As per Rightsizing
As per Rightsizing
As per Rightsizing
As per Rightsizing
Post RecruitedPost vacantPost RecruitedPost vacant
As per Rightsizing
As per Rightsizing
Downsized (Abolished)
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
vacant
Post RecruitedVacant
Post RecruitedPost Recruited
vacant
Post recruitedPost VacantPost Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost RecruitedPost vacantPost Recruited
VacantPost RecruitedPost Recruited
Vacant
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Downsized (Abolished)
Downsized (Abolished)
Downsized (Abolished)
Downsized (Abolished)
Downsized (Abolished)
Post Recruited
Post Recruited
As per Rightsizing
As per Rightsizing
Post Recruited
Post Recruited
Post RecruitedVacant
Post VacantPost RecruitedPost RecruitedPost Recruited
vacantPost Recruited
vacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruitedvacant
Post vacantPost Recruited
vacantPost vacantPost Recruited
VacantPost RecruitedPost Recruited
vacantPost RecruitedPost Recruited
Post Recruited
Post vacant
vacant
Post RecruitedPost VacantPost Recruited
As per Rightsizing
As per Rightsizing
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost Recruited
Downsized (Abolished)
Post Recruited
Post Recruitedvacant
Post RecruitedPost RecruitedPost Recruited
VacantPost Recruited
Vacant
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Post RecruitedVacant
Post
Post RecruitedVacant
Post RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
VacantPost Recruited
Downsized (Abolished)
Downsized (Abolished)
Taken over from MSC(Maxwell)
Downsized (Abolished)
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost RecruitedPost Recruited
VacantPost Recruited
VacantPost Vacant
Post Recruited
Post RecruitedPost Recruited
VacantPost Recruited
VacantPost RecruitedPost Recruited
VacantPost Recruited
VacantPost RecruitedPost Recruited
VacantPost RecruitedPost Recruited
VacantPost RecruitedPost Recruited
VacantPost Recruited
VacantPost RecruitedPost Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
vacantPost RecruitedPost Recruited
VacantPost RecruitedPost RecruitedPost Recruited
vacantPost vacant
Post Recruited
Post RecruitedPost Recruited
VacantPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedVacant
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post RecruitedVacant
Post RecruitedPost RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost Recruited
VacantPost RecruitedPost Recruited
VacantPost VacantPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
VacantPost Vacant
Post Recruited
Post Recruited
Post RecruitedPost VacantPost RecruitedPost Recruited
Post Recruited
Post Recruitedvacant
Post RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
VacantPost VacantPost Recruited
VacantPost VacantPost Recruited
Vacant
Post RecruitedPost VacantPost Recruited
Post Recruited
Post
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Downsized (Abolished)
Post Recruited
Post
vacant
Post RecruitedPost RecruitedPost RecruitedPost RecruitedPost VacantPost Recruited
Post Recruited
Post Recruited
Post Recruitedvacant
Post vacant
Post Recruited
Post RecruitedVacant
Post RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruitedvacant
Post RecruitedPost Recruited
vacantPost RecruitedPost Recruited
vacantPost RecruitedPost Recruited
Post Recruited
Downsized (Abolished)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
vacantPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
vacantPost vacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost RecruitedPost VacantPost Recruited
Post Recruited
Post RecruitedVacant
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedVacant
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post VacantPost Recruited
Post Recruited
Post Recruited
vacant
Post
Post Recruited
Vacant
Post Recruited
Post RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedVacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Downsized (Abolished)
Downsized (Abolished)
Taken over from MSC(Maxwell)
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost VacantPost Recruited
VacantPost VacantPost RecruitedPost RecruitedPost RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post RecruitedPost Recruited
vacant
Post Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Downsized (Abolished)
vacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post
Post Recruited
Vacant
Post RecruitedVacant
Post Recruited
Vacant
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post RecruitedVacant
Post Recruited
Downsized (Abolished)
Downsized (Abolished)
Downsized (Abolished)
Taken over from MSC(Maxwell)
Post Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Post RecruitedPost Recruited
vacantPost RecruitedPost Recruited
vacantPost RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruitedvacant
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Recruited
Vacant
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost RecruitedPost Recruited
VacantPost RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post Recruitedvacant
Post Recruited
Post Recruited
Post RecruitedPost Recruited
vacantPost Recruited
Post Recruited
Post
Post Recruited
Post Recruited
Vacant
Post RecruitedVacant
Post Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Downsized (Abolished)
Post RecruitedPost Recruited
VacantPost RecruitedPost Recruited
VacantPost Vacant
Post Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Post RecruitedPost Recruited
VacantPost Recruited
VacantPost Vacant
Post Recruited
Post Recruited
Post RecruitedPost Recruited
vacantPost RecruitedPost Recruited
vacantPost Recruited
vacantPost RecruitedPost RecruitedPost Recruited
VacantPost RecruitedPost Recruited
VacantPost Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Post RecruitedVacant
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost RecruitedPost RecruitedPost Recruited
VacantPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedPost Vacant
Post
Post RecruitedVacant
Post RecruitedPost Recruited
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Vacant
Post Recruited
Post Recruitedvacant
Post RecruitedPost Recruited
vacantPost RecruitedPost vacantPost Recruited
VacantPost VacantPost Recruited
vacantPost Recruited
vacantPost Recruited
vacantPost RecruitedPost Recruited
vacantPost RecruitedPost Recruited
vacantPost Recruited
Post Recruited
Post Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
VacantPost Recruited
Post Recruited
Downsized (Abolished)
Taken over from MSC(Maxwell)
Downsized (Abolished)
Taken over from MSC(Maxwell)
Post Recruited
Post Recruited
Post RecruitedVacant
Post RecruitedPost Recruited
VacantPost RecruitedPost RecruitedPost RecruitedPost RecruitedPost Recruited
Post Recruited
Post RecruitedPost VacantPost Recruited
vacantPost Recruited
Post Recruited
Post RecruitedPost RecruitedPost RecruitedPost vacant
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post Recruited
Post As per Rightsizing
As per Rightsizing
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Taken over from MSC(Maxwell)
Government of the Islamic Republic of Afghanistan/GIRA
Consulting Assignment (Individual - National - Post)
Position Grade/Step Start Date End Date
Assistant Cook G1/S6 1 4/1/2007 9/30/2011 54.0 336 134 Cleaner G1/S8 62 4/1/2007 9/30/2011 54.0 18,670 7,468 Cook G1/S6 1 4/1/2007 9/30/2011 54.0 336 134 Driver G1/S10 73 4/1/2007 9/30/2011 54.0 28,782 11,513 Electrician G2/S5 1 4/1/2007 9/30/2011 54.0 504 202 Gardener G1/S1 1 4/1/2007 9/30/2011 54.0 160 64 Guard G1/S7 149 4/1/2007 9/30/2011 54.0 43,515 17,406
G1/S7 1 4/1/2007 9/30/2011 54.0 390 156
Head, Cleaners G1/S7 1 4/1/2007 9/30/2011 54.0 390 156 Messenger G2/S7 6 4/1/2007 9/30/2011 54.0 2,793 1,117 Receptionist G2/S4 2 4/1/2007 9/30/2011 54.0 868 347 Total 298 96,744 38,698
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
# of Position
# of Months
Total: Basic Salary (US$)
Total Allowances (US$)
Guard's Supervisor
Government of the Islamic Republic of Afghanistan/GIRA
Consulting Assignment (Individual - National - Post)
25,386 1,410,581 25,386 2,174,576 38,079 12,089 3,287,703
29,466
29,466 211,020 65,580 7,309,332
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA
Total : Basic Salary + Allowances
Government of the Islamic Republic of Afghanistan/GIRA
Professional Development Training
1 2 3 4 5 6 7Ref. No. Description of Assignment Selection Method Comments
1 400,000 Post
2 172,000 Post Upto March-2010
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Estimated Cost (US$)
Review by Bank (Prior /
Post)
Expected Proposals Submission Date
Professional Development Training (Software Training, Finance, Management, Human Resources & NSP Legal Law Issue )
Package (With individual packages not exceeding US$ 50,000)
Between September 2007 and March 2009
Detail are at Annexure H attached
CPM Pilot training and CPM training of Trainers
Package (With individual packages not exceeding US$ 50,000)
To be processed after the training plan is approved.
Procurement PlanGovernment of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
ANNEX A: Office Equipment
Items procured between the period April, 2007 to December, 2008NSP-HQ
Ref. No. Description Contractor Cost Purchase Order/Contract Date
1 Split Air Condition Omid Sherzai Store $285 Local Shopping No No Post 07/05/2007
2 Photo Copier Sharp United Norm Equipment $3,700 Local Shopping No No Post 08/07/20073 UPS APC 750 Aftech International $620 Local Shopping No No Post 19/2/20074 Water Tank Firzad Trading Co. Ltd. AFA 10,000 Local Shopping No No Post 22/07/20075 Water Pump Mujeeb Sameer Co. Ltd. AFA 11,500 Local Shopping No No Post 28/07/20076 Paper Shrender Zubair Stationary AFA 13,000 Local Shopping No No Post 09/08/20077 Water Pump + Pipe Ramin Parwez Co. Ltd. AFA 13,300 Local Shopping No No Post 16/08/2007
8 AFA 14,750 Local Shopping No No Post 12/04/2007
9 Atemad Electronic Store AFA 18,180 Local Shopping No No Post 16/06/2007
10 Digital Camera Ram Parkash Photo Studio AFA 21,500 Local Shopping No No Post 04/07/2007
11 Stabilizers New Heart Electronics Store AFA 21,600 Local Shopping No No Post 14/08/2007
12 Digital Camera Sharja Computer Co. Ltd. $300 Local Shopping No No Post 24/05/200713 Paper Shrender Ikhlas Stationary AFA 4,400 Local Shopping No No Post 19/07/2007
14 Asad Electronics AFA 5,370 Local Shopping No No Post 14/05/2007
15 Boiler AFA 5,600 Local Shopping No No Post 18/07/2007
16 Asad Electtic AFA 5,900 Local Shopping No No Post 11/07/2007
17 Refrigerator AFA 7,000 Local Shopping No No Post 07/05/2007
18 Asad Electrics AFA 93,600 Local Shopping No No Post 19/07/2007
19 Extensions for Archive Room $16,669 Local Shopping No No Post 06/05/2007
20 Farkha Kash (Tool set for AC) Iqbal Wali Store AFA 3,300 Local Shopping No No Post 14/06/0821 Maintenance of NSP buildings Norhaan Conex & C. Co AFA 514,735 Local Shopping No No Post Under Work
22 Load Box of MHP for (TSD) MHP AFA 17,000 Local Shopping No No Post 26/05/08
23 Fawad Farshad Ltd. AFA 15,500 Local Shopping No No Post 28/05/08
24 Projector (Beamer) Computer World AFA 39,500 Local Shopping No No Post 08/07/08
25 Digital Camera Hamed Camera Sale Center AFA 49,500 Local Shopping No No Post 01/03/08
26 Metalic Ladders Humayon Construction Co. AFA 18,250 Local Shopping No No Post 18/03/0827 Labeling Machines Khurshid Aria Co. Ltd. $ 450 Local Shopping No No Post 10/02/0828 Driling Machine Shirkat Imran Waris AFA 16,800 Local Shopping No No Post 04/02/08
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank
(Prior / Post)
Construction Of New Door In Finance Department
New Paghman Construction Company
Electric Items (Joint Clids ,Cable, Main Switch)
Electronic Equipment (Frequancy Meter ,Wire, Stand For Rods,Nut And Bold ,Trerminal Columns, Tool Box
Sardar Mohammad Haji Zada Store
Satnds For Rods, Wire, Rods, Clamp Meter, Nut & Bold Tool Box, Cumpas
Siemens Electronics Super Store
Satnds For Rods,Wire , Rods ,Clamp Meter,Nut Bolt Tool Box, Cumpas
Erfan Afghanistan Construction Co.
Air Pump For Service of Generators
29 Copier Machine Unted Norm Equipments $ 1300 Local Shopping No No Post 30/01/0830 Stabilizers HIRAT Electronics AFA 2,500 Local Shopping No No Post Petty Cash31 Stove With Gas Cylinder Haroon Store AFA 11,500 Local Shopping No No Post 24/11/0732 Stabilizers Mohammad Aqa Store AFA 10,000 Local Shopping No No Post 12/12/0733 Digital Camera Aria Middle East Co. Ltd. AFA 82,500 Local Shopping No No Post 24/06/0834 Fans Khawdi Store AFA 20,050 Local Shopping No No Post 24/05/0835 Electric Heater Haroon Store AFA 2,000 Local Shopping No No Post Petty Cash36 Flash Disk 1 GB Al-Rahman Computer AFA 24,000 Local Shopping No No Post 07/12/200837 Mouse,Key Boards Ali Sina Ltd.Co AFA 15,000 Local Shopping No No Post 12/07/0838 Laptop Bags Khurshid Aria Co. Ltd. AFA 16,500 Local Shopping No No Post 29/07/0839 UPS APC 1000 Aftech International AFA 8,750 Local Shopping No No Post 29/07/0840 UPS APC 750 VA Aftech International AFA 42,000 Local Shopping No No Post 13/08/0841 UPS APC 750 VA Computer World AFA 21,750 Local Shopping No No Post 17/08/0842 Printer Hp 1005 Aftech International AFA 6,000 Local Shopping No No Post 7/09/0843 Stablizer for Finance Sohil Computers AFA 2,750 Local Shopping No No Post 21/10/200844 Laptop bages for Stock Sohil Computers AFA 30,000 Local Shopping No No Post 15/11/200845 Mini disk casset for PCD Hafizullah Store AFA 30,000 Local Shopping No No Post 26/11/200846 Seat cover for ED Mrtaza Decoration AFA 7,600 Local Shopping No No Post 15/11/200847 Digital Camera 10 mega pixel fouSohil Computers AFA 76,000 Local Shopping No No Post 16/10/2008
48 Tool box for vehicles AFA 6,000 Local Shopping No No Post 08/11/2008
49 Sleeping bag 11 pc Ahmad Shah Store AFA 11,000 Local Shopping No No Post 14/10/2008
50 Digicome AFA 15,000 Local Shopping No No Post 15/11/2008
51 Cliping tool Sohil Computers AFA 1,100 Local Shopping No No Post 05/11/200852 Stablizer Sohil Computers AFA 2,750 Local Shopping No No Post 05/11/200853 Electonic Broom Khawdi Store AFA 5,500 Local Shopping No No Post 05/11/200854 Vacum Cleaner Kabulestan Store AFA 11,600 Local Shopping No No Post 23/12/2008
Total Amount Utilized till 31 December 2008 AFA 1,382,135 $21,574Sub-Total USD 49,217
Field Offices
Ref. No. Description Contractor Cost Purchase Order/Contract Date
55 Vacum Cleaner Akarami AFA 4,500 Local Shopping No No Post 26/08/200756 Air Conditioner (Window) Kawsar AFA 15,500 Local Shopping No No Post 19/06/200857 Generator Abdul Ghafoor AFA 100,000 Local Shopping No No Post 30/01/200858 Heater - Diesel Herat Share-naw Shops AFA 3,460 Local Shopping No No Post 10/12/200859 Heater - Diesel Sohail AFA 1,830 Local Shopping No No Post 25/11/200860 Heater - Electric Herat Share-naw Shops AFA 3,200 Local Shopping No No Post 10/12/200861 Medical Kit and outfit Golzar Darmaltun AFA 2,280 Local Shopping No No Post 12/10/200862 Medical Kit and outfit Shawali AFA 2,280 Local Shopping No No Post 21/10/200863 Medical Kit and outfit $46 Local Shopping No No Post 21/09/200864 Fire Extinguisher (6kg) Jamaluddin AFA 1,550 Local Shopping No No Post 12/10/200865 Wooden Heater Abdullah $66 Local Shopping No No Post 06/01/200866 Fan Hajee Akram store AFA 3,000 Local Shopping No No Post 25/06/2007
67 Abdul Raouf store AFA 11,000 Local Shopping No No Post 25/05/2008
68 Abdul Raouf store AFA 6,000 Local Shopping No No Post 09/06/2008
69 Air Conditioner (Window) 2Pc Arian Store AFA 13,700 Local Shopping No No Post 18/06/200870 Heater - Electric QareZada Store AFA 450 Local Shopping No No Post 16/11/200871 Medical Kit and outfit Saberi Pharmacy AFA 1,500 Local Shopping No No Post 20/10/2008
72 Fire Extinguisher (6kg) Niamatzada Store AFA 4,000 Local Shopping No No Post 30/12/2007
73 Fire wood Heater Ghulam Sakhi AFA 3,000 Local Shopping No No Post 22/11/200874 Fire Extinguisher (5kg) - 2 pcs Qaayemul Mahdi store AFA 1,500 Local Shopping No No Post 19/06/2008
75 Heater - Diesel Haitullah AFA 1,800 Local Shopping No No Post 18/12/2008
76 Heater - Diesel Gulshan AFA 7,050 Local Shopping No No Post 01/12/200877 Container 20 Ft for archieve Latif Faisal AFA 75,000 Local Shopping No No Post 12/10/200878 Emergency box Mohsin $34 Local Shopping No No Post 03/05/200879 Vacum Cleaner Ahmadi $86 Local Shopping No No Post 21/02/200880 Fan Ajmal $225 Local Shopping No No Post 31/05/200881 Fan Jadai Nder pashton/Shop $78 Local Shopping No No Post82 Fan Ihsanullah Hotak $164 Local Shopping No No Post 24/05/200883 Cooker Nayeem $15 Local Shopping No No Post 16/12/200884 Gas Stove Mirwias $100 Local Shopping No No Post 18/11/200885 Stove Qouway Merkaz $52 Local Shopping No No Post 03/09/138786 Stove Noor Agha stor $10 Local Shopping No No Post 07/05/200787 Carpet Nili Shop $70 Local Shopping No No Post 10/11/200788 Carpet Noor Mohammad $18 Local Shopping No No Post 07/05/200889 Carpet Tajmohammad $66 Local Shopping No No Post 21/04/2008
Ghazniwian Technical Workshop
Labeling tape for the inventory machine
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank
(Prior / Post)
Air Conditioner (Window) Water systemAir Conditioner (Window) Water system
90 Carpet Moh/Dawod $62 Local Shopping No No Post 10/10/200891 Carpet Sary shamali $189 Local Shopping No No Post 31/04/200892 Carpet Abdul Saboor $40 Local Shopping No No Post 28/02/200893 Carpet Hajj Ghani $186 Local Shopping No No Post 01/08/200794 Catpet Ayamudeen $414 Local Shopping No No Post 09/04/200895 Fan Khuwadi $30 Local Shopping No No Post 04/07/200796 Refrigerator Ahmadi $308 Local Shopping No No Post 27/03/200897 Refrigerator Jadai Nder pashton/Shop $280 Local Shopping No No Post 20/02/138798 Refrigerator Zei store $326 Local Shopping No No Post 06/24/200899 Refrigerator Haji Abdul Malik $320 Local Shopping No No Post 28/05/2008100 Refrigerator Al Emarat Store $316 Local Shopping No No Post 08/01/2008101 Refrigerator Qasimi $270 Local Shopping No No Post 14/06/2008102 Gas Heater Naik $75 Local Shopping No No Post 17/08/2008103 Gas Heater Abdul Manan AFA 40,090 Local Shopping No No Post 19/05/2008104 Gas Stove Nayeem $25 Local Shopping No No Post 19/11/2008105 Wooden Heater Farid $123 Local Shopping No No Post 13/11/2008106 Wooden Heater Moh/zaman $35 Local Shopping No No Post 13/11/2008107 Wooden Heater Abdul Rahim $138 Local Shopping No No Post 11/11/2008108 Wooden Heater Abdul rashid khair khowa $17 Local Shopping No No Post 12/06/2008109 Wooden Heater Agha Mohd $90 Local Shopping No No Post 28/11/2007110 Wooden Heater Brotheran $27 Local Shopping No No Post 22/12/2007111 Electric Heater Hamidi $10 Local Shopping No No Post 11/06/2007112 Electric Heater LG Store $20 Local Shopping No No Post 25/10/2008113 Water Pump Haji Chaman $60 Local Shopping No No Post 04/11/2008114 Water Pump Qouway Merkaz $86 Local Shopping No No Post 05/03/2008115 Water Pump Mohammad Jan $67 Local Shopping No No Post 07/01/2008116 Ballon Gas /DSCRW AnabaStore $17 Local Shopping No No Post 05/08/2008
117 Generator HP20 Ko KW Dynamo Niazi Brothers $810 Local Shopping No No Post 07/12/2008
118 Vacum Cleaner Naeemullah $96 Local Shopping No No Post 04/02/2008119 Fan Khawadi $28 Local Shopping No No Post 07/06/2007120 Fan Azizullah $190 Local Shopping No No Post 25/4/09 to 21/6/08121 Air Conditioner (Split) Karam Store $405 Local Shopping No No Post 05/12/1987122 Air Conditioner (Window) Azizullah $500 Local Shopping No No Post 1410/2008123 Heater - Diesel Azizullah $76 Local Shopping No No Post 13/01/2008124 Heater Hafizullah $198 Local Shopping No No Post 23/12/2007125 Heater - Gas Nasir $219 Local Shopping No No Post 17/11/2008126 Heater - Gas Hekmatullah $729 Local Shopping No No Post 17/12/2007127 Air Cooler Hafizullah $231 Local Shopping No No Post 28/06/2008128 Air Cooler Basir $198 Local Shopping No No Post 20/6/08129 Vacum Cleaner AFA 6,000 Local Shopping No No Post130 Fan AFA 5,400 Local Shopping No No Post131 Fan Mumtaz AFA 1,250 Local Shopping No No Post132 Fan AFA 1,550 Local Shopping No No Post133 Air Conditioner (Split) Afghan Shirkat AFA 25,000 Local Shopping No No Post134 Air Conditioner (Split) AFA 95,000 Local Shopping No No Post 06/01/2008135 Air Conditioner (Window) Afghan Shirkat AFA 19,250 Local Shopping No No Post136 Generator (15 KW) Rastagar Ltd. AFA 67,500 Local Shopping No No Post 06/01/2008137 Generator Set AFA 1,500 Local Shopping No No Post138 Fire Extinguisher (6kg) Wahid Qasim Ltd. AFA 3,000 Local Shopping No No Post139 Water Pump AFA 3,500 Local Shopping No No Post140 Vacum Cleaner Safiullah AFA 2,500 Local Shopping No No Post 08/06/2008141 Vacum Cleaner Farkhary $57 Local Shopping No No Post 12/11/2008142 Fan Qari Hokum Khan AFA 1,500 Local Shopping No No Post 06/05/2008143 Fan Safiullah AFA 3,300 Local Shopping No No Post 16/06/2008144 Fan Farkhary $120 Local Shopping No No Post 29/06/2008145 Air Conditioner (Split) Safiullah AFA 17,000 Local Shopping No No Post 07/08/2008146 Heater - Electric Pamir AFA 1,000 Local Shopping No No Post 12/11/2008147 Fire Extinguisher (6kg) Sayed Jamil AFA 2,400 Local Shopping No No Post 16/06/2008148 Refrigerator Itefaq AFA 4,300 Local Shopping No No Post 26/07/2008149 Cooker Pressure Qayum Bay AFA 700 Local Shopping No No Post 08/09/2007150 Tea Pot Mohammad Amin AFA 300 Local Shopping No No Post 10/04/2007151 Gas Stove Hajizada AFA 6,500 Local Shopping No No Post 03/12/2008
Total Amount Utilized till 31 December 2008 AFA 571,140 $8,408Sub-Total USD 19,831
Total USD 69,047
Items for procurement between the period January, 2009 to September , 2011
NSP HQ
Ref. No. Description Quantity RemarksEstimated Cost (USD)
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank
(Prior / Post)
Anticipated Purchase Order/Contract Date
QTY Purchased
P.O Numbers
Name of Supplier
Total Value (AFN)
Delivary time
1
Labeling Machine 4 400
Local Shopping No No Post Jan. to June,2009 4 AD-162 10850 24/02/2009
2
Vacum Cleaner 4 280
Local Shopping No No Post Jan. to June,2009 2+1=3 AD-122 AD-196 Kabulestan Store 17300
3 Fan 10 360 Local Shopping No No Post Jan. to June,2009
4Air Conditioner (Split) 3 2,100
Local Shopping No No Post Jan. to June,2009 2+1=3 AD-172 AD-286 65600
5 Air Conditioner (Window) Local Shopping No No Post Jan. to June,2009
6 Generator (30 KW) Local Shopping No No Post Jan. to June,2009
7Generator Set
Local Shopping No No Post Jan. to June,2009 1 AD-166 Aria Goster Naveen Ltd 65000 16/02/2009
8 Heater - Diesel 2 200 Local Shopping No No Post Jan. to June,2009
9 Heater - Electric 4 240 Local Shopping No No Post Jan. to June,2009
10 Medical Kit and outfit 8 240 Local Shopping No No Post Jan. to June,2009
11 Fire Extinguisher (6kg) 3 600 Local Shopping No No Post Jan. to June,2009
12 Water Pump Local Shopping No No Post
Sub-Total USD 4,420
Field Offices
Ref. No. Description Quantity Remarks
1Labeling Machine 17 1,500
Local Shopping No No Post Jan/Feb 17 AD-17741600
2
Vacum Cleaner 13 1,456
Local Shopping No No Post Jan/Feb/May 1+1+1=3 FAR/PMU/01
150123 Fan 22 640 Local Shopping No No Post Jan/April/May/April 2 Salimi Store 2775 25/6/2009 East Region
4 Air Conditioner (Split) 20 12,190 Local Shopping No No Post Jan/Feb/April/Jun 1+1=2 41700 East Region
5 Air Conditioner (Window)
6 Generator 1 600 Local Shopping No No Post Jan
7 Generator Set 5 420 Local Shopping No No Post Jan/May 1 303 Abdul Jalil Store 69000 5/6/2009 wardak RMU
8 Heater - Diesel 3 134 Local Shopping No No Post Jan/Feb 1 Mohammad Hussain Sto 1450 12/1/2009 North West Region
9 Heater - Electric 3 250 Local Shopping No No Post Jan
10 Heater - Wooden 5 125 Local Shopping No No Post Jan 3 BAD/PMU/08 Zaboly 1200 04/02/2009 West Region
11
Medical Kit and outfit 26 1,132
Local Shopping No No Post Jan/Feb/May 1+2+2+2=7
765012 Fire Extinguisher (6kg) 40 6,484 Local Shopping No No Post Jan/Feb/Oct 6 Qasim Store 9600 25/04/2009 South Region
13 Safe 1 400 Local Shopping No No Post Jan 1 Brothres Shop 5500 5/4/2009 East Region14 Container 4 6,000 Local Shopping No No Post Jan/Feb15 Refrigerator 3 960 Local Shopping No No Post Jan/April 16 Boiler 4 520 Local Shopping No No Post Jan17 Water Pump 4 400 Local Shopping No No Post Feb 1 BAD/PMU/006 H M Naser 800 28.06.2009 West Region
Sub Total USD 33,211
Total in USD USD 37,631
Total Value of items procured and prposed to be procured USD 106,678
After International Ltd
23/12/2008 17/03/2009
Akira Ltd Kabulestan Store
23/02/2009 24/06/2009
Estimated Cost (USD)
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior
/ Post)
Anticipated Purchase Order/Contract Date
QTY Purchased
P.O Numbers
Name of Supplier
Total Value (AFN)
Delivary time
Hamed Warasta Zalmai Sakhi
24/02/2009 05/04/2009
Purchased in HQ for Field Offices Central Region
Akira Store Naeemullah Store Brotheran Akrami Store
24/02/2009 10/09/1387 14/03/2009
North West Region East Region West Region
Khyber Store Najem Store
1/6/2009 23/05/2009
BAD/PMU/07 FAR/PMU/03
Alshafa Store Azam Store Asia Farms
29/01/2009 30/03/2009 12/02/2009 21/04/2009
South Region Central Region West Region
Procurement PlanGovernment of the Islamic Republic of Afghanistan/GIRAMinistry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288Project Name: Second National Solidarity Program (NSPII)
ANNEX B: IT Equipment
Items procured between the period April, 2007 to December, 2008
NSP-HQ
Ref. No. Description Contractor Cost
1 Computer P4, Flash Disk Digi Com $1,262 Local Shopping No No Post 20/05/20072 Laptop Computer Dell 820 Aftech International $1,370 Local Shopping No No Post 07/08/2007
3 Khurshid Aria Co. Ltd $1,466 Local Shopping No No Post 29/7/2007
4 Laptop Dell 830 Aria Middle East $1,535 Local Shopping No No Post 07/11/2007
5 $1,548 Local Shopping No No Post 19/06/2007
6 Laptop Dell 830 Aftech International $1,550 Local Shopping No No Post 10/06/2007
7 Flash Disk, UPS, Cartridge, Keyboard Computer City Co. Ltd. $1,554 Local Shopping No No Post 11/01/2007
8 DVD Duplicator With 8 DVDs Star Computer Service $1,800 Local Shopping No No Post 07/08/20069 Desktop Computer P4 Digi Com $1,866 Local Shopping No No Post 20/05/2007
10 Aria Middle East $2,500 Local Shopping No No Post 06/07/2007
11 Laptops Computer City Co. Ltd. $2,720 Local Shopping No No Post 06/10/200712 Scanner 6410 Aftech International $200 Local Shopping No No Post 21/08/200713 Internal HDD 500 GB Kahkashan Computer $240 Local Shopping No No Post 15/05/200714 Digital Camera, CD Writer Aria Middle East $270 Local Shopping No No Post 28/07/2007
15 Laptops Toshiba (2 Units) $3,510 Local Shopping No No Post 24/09/07
16 Color Printer HP 1600 Kahkashan Computers $440 Local Shopping No No Post 06/05/2007
17 Kahkashan Computers $5,229 Local Shopping No No Post 26/06/2007
18 Sohail Computer Ltd. $5,910 Local Shopping No No Post 21/08/2007
19 External HDD 80 GB Kahkashan Computers $55 Local Shopping No No Post 08/06/200720 External HDD 1000 GB Aria Middle East $590 Local Shopping No No Post 28/03/0721 LCD Monitors 17" Al Rahman Computers $600 Local Shopping No No Post 20/10/0722 80 GB External HDD,Computer P4,) Kahkashan Computers $650 Local Shopping No No Post 23/07/200723 Flat Screen Monitor, UPS, Mouse Iqra Computer Products $650 Local Shopping No No Post 10/08/2007
24 Aria Middle East $660 Local Shopping No No Post 07/09/2018
25 CPU P4 Iqra Computer Products $666 Local Shopping No No Post 29/07/2007
26 Kahkashan Computers $8,400 Local Shopping No No Post 07/07/2007
27 Aria Middle East $825 Local Shopping No No Post 10/02/2007
28 LCD Monitor, Mouse, UPS Aftech International $840 Local Shopping No No Post 23/07/200729 Dell LCD Monitor Aria Middle East $880 Local Shopping No No Post 13/5/200730 Scanner HP Scan Jet Aftech International $95 Local Shopping No No Post 19/06/2007
31 Kahkashan Computers $950 Local Shopping No No Post 21/07/2007
32 Laptop Computer Dell 6400 Khurshid Aria Co. Ltd $990 Local Shopping No No Post 07/10/202333 Dell LCD Monitor 17 Inch Aria Middle East AFA 1,000 Local Shopping No No Post 04/02/200734 Printer 2015 Dell International AFA 15,750 Local Shopping No No Post 23/04/200735 External HDD Aftech International AFA 27,500 Local Shopping No No Post 07/11/2007
36 Zubair Stationary AFA 32,145 Local Shopping No No Post 04/05/2007
37 Flash Disks Kingston (10 units) Kahkashan Computers AFA 4,800 Local Shopping No No Post 07/11/2007
38 AFA 42,240 Local Shopping No No Post 30/06/2007
39 DVD RW For Lap Top Nx 9010 Laptop Zone Co. Ltd. AFA 6,250 Local Shopping No No Post 22/05/2007
40 UPS 5000 VA $1,650 Local Shopping No No Post 08/08/07
41 Laptop & Color Printer Aftech International $1,055 Local Shopping No No Post 20/09/0742 Flat Screen and Printer Sohail Computer Ltd. $545 Local Shopping No No Post 05/09/0743 Laptop Batteries Laptop Zone Co. Ltd. AFA 59,500 Local Shopping No No Post 05/09/07
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)Purchase Order/Contract
Date
LCD Monitor, UPS, Key Board, USB Mouse
Desk Top Computer, Key Board, Mouse, UPS
Smart Tech Computer Co. Ltd.
2 Desk Top Computers P4 with LCD Monitors
Smart Tech Computer Co. Ltd.
Desktop Computer P4, UPS APC 750 VA, Mouse, Printer 1018, Desk Jet
Printer 5063
Lap Top Computer Dell 6400, Desktop Dell Branded with LCD Monitor (4
units) Desk Top ,UPS, External USB Cards, DVD R W Drive
80 GB HDD, Toner For Printer 1010, 2015, External Combo Drive
Desktops P4 with LCD Monitor (15 units)
Cartridge 1300.1320, External HDD 80GB WD
Desktop Computer with LCD Monitor AND Digital Camera
DVD Writer, Optical Mouse Key Board, Highlighter,CD Pen, Correction Pen,
Ram 512 , Flash Disk 1 GB, CD Writer
Connectors, Laptop Adaptor, Laptop Bags, Window Xp CDs
Smart Tech Computer Co. Ltd.
Smart Tech Computer Co. Ltd.
44 Desktop computer and USB cables Aftech International AFA 7,200 Local Shopping No No Post 05/09/0745 Flat Screen and computers Iqra Computer Products $3,181 Local Shopping No No Post 08/10/0746 Printer HP 1018 Computer City Co. Ltd. $105 Local Shopping No No Post 22/10/0747 Printer HP 1280 Khurshid Aria Co. Ltd $240 Local Shopping No No Post 23/10/0748 CPU P4 Iqra Computer Products $666 Local Shopping No No Post 29/10/0749 Flash drive and printer Star Computer Service $300 Local Shopping No No Post 05/11/0750 IT Equips (different) Kahkashan computer $270 Local Shopping No No Post 12/12/0751 Laptop Batteries Laptop Zone Co. Ltd. AFA 5,500 Local Shopping No No Post 20/10/0752 PC Branded P4 Iqra Computer Products $530 Local Shopping No No Post 24/10/0753 IT Tool Kit Aftech International $160 Local Shopping No No Post 24/22/0754 IT Equips (different) Aftech International $5,326 Local Shopping No No Post 03/01/0855 HP Laserjet printer 2015 Star Computer Service $270 Local Shopping No No Post 12/01/0856 IT Equips (different) Aria Middle East $2,370 Local Shopping No No Post 30/01/0857 IT Equips (different) Aria Middle East $275 Local Shopping No No Post 31/01/0858 IT Equips (different) Khurshid Aria Co. Ltd $795 Local Shopping No No Post 10/02/0859 Battery for laptop Laptop Zone Co. Ltd. AFA 5,500 Local Shopping No No Post 13/02/0860 Laptop computer Khurshid Aria Co. Ltd $1,450 Local Shopping No No Post 23/02/0861 IT Equips (different) Star Computer Service AFA 45,300 Local Shopping No No Post 23/02/0862 Branded computers Aftech International AFA 246,000 Local Shopping No No Post 03/03/0863 Printer HP 2600 Aftech International $390 Local Shopping No No Post 27/02/0864 Ext HDD Aftech International $390 Local Shopping No No Post 01/03/0865 IT Equips (different) Ali Sina Computer AFA 10,600 Local Shopping No No Post 04/03/0866 Ext HDD Aftech International AFA 6,750 Local Shopping No No Post 06/03/0867 IT Equips (different) Aria Middle East AFA 14,750 Local Shopping No No Post 10/03/0868 Ext HDD Aftech International AFA 4,750 Local Shopping No No Post 22/03/0869 IT Equips (different) Computer World AFA 19,000 Local Shopping No No Post 01/04/08
70 Laptop computers Zekria Hamed Computers $ 3450 Local Shopping No No Post 05/04/08
71 Laptop Batteries Computer World AFA 3,200 Local Shopping No No Post 01/05/0872 Laptop Computer Aftech International AFA 95,000 Local Shopping No No Post 07/05/0873 Desktop Computers Aftech International AFA 55,000 Local Shopping No No Post 08/05/0874 UPS 750 VA Aria Middle East AFA 21,000 Local Shopping No No Post 14/05/0875 Scanner Aftech International AFA 19,250 Local Shopping No No Post 25/05/0876 Internal HDD 80 GB Computer Source AFA 2,450 Local Shopping No No Post 28/05/0877 Laptop Computer Aftech International AFA 80,000 Local Shopping No No Post 25/06/0878 Ext HDD Aftech International AFA 9,500 Local Shopping No No Post 01/07/0879 Printer 1018 Aria Middle East AFA 40,250 Local Shopping No No Post 01/07/0880 UPS 750 VA Aria Middle East AFA 140,000 Local Shopping No No Post 07/07/0881 Rams 512 MB Computer World AFA 4,200 Local Shopping No No Post 08/07/0882 Charger for Laptop Computers Laptop Zone Co. Ltd. AFA 2,500 Local Shopping No No Post 08/07/0883 Laptop Computers Aftech International AFA 130,000 Local Shopping No No Post 09/07/0884 Plotter Aftech International AFA 200,000 Local Shopping No No Post 15/07/0885 Desktop Computer Branded P4 Aftech International AFA 48,000 Local Shopping No No Post 14/07/0886 Laptop Computers Hp 530 Aftech International AFA 301,000 Local Shopping No No Post 23/07/0887 Laptop Computer Hp 530 Aftech International AFA 86,000 Local Shopping No No Post 29/07/0888 Laptop Computer Sony Aftech International AFA 88,000 Local Shopping No No Post 02/08/0889 Desktop Computer P4 Branded Computer World AFA 86,000 Local Shopping No No Post 25/08/0890 Memory Chip 128 MB for Plotter Aftech International AFA 21,000 Local Shopping No No Post 13/08/0891 CPU P4 Branded Computer World AFA 34,300 Local Shopping No No Post 25/08/0892 Laptop Computers Hp 530 Aftech International AFA 120,000 Local Shopping No No Post 31/08/0893 LCD Monitor Computer World AFA 12,200 Local Shopping No No Post 21/07/0894 Laptop Computer 410 E Sony Laptop Zone Co. Ltd. AFA 76,000 Local Shopping No No Post 7/09/0895 Branded Computer P4 Aftech International AFA 40,000 Local Shopping No No Post 7/08/0896 LCD Monitor Computer Source AFA 11,800 Local Shopping No No Post 07/09/0897 Printer Hp 1005 Aftech International AFA 6,000 Local Shopping No No Post 16/09/2008
98 Istambul Furniture AFA 7,500 Local Shopping No No Post 16/09/2008
99 Branded computer for MIS Aftech International AFA 40,000 Local Shopping No No Post 22/09/2008100 Scanner for Administartion Computer World AFA 4,500 Local Shopping No No Post 10/08/2008101 Scanner for DESCRW Computer World AFA 4,500 Local Shopping No No Post 10/08/2008102 Scanner for ED Computer World AFA 4,500 Local Shopping No No Post 10/08/2008103 RAM for Finance Computer World AFA 3,200 Local Shopping No No Post 10/08/2008104 Laptop computer HRD Aftech International AFA 43,000 Local Shopping No No Post 28/09/2008105 Cartridge for HQ Sohil Computers AFA 168,050 Local Shopping No No Post 10/08/2008106 Laptop computer for HRD Computer World AFA 43,000 Local Shopping No No Post 14/10/2008107 UPS 6000 VA Sharja computer AFA 84,000 Local Shopping No No Post 14/10/2008108 UPS 750 Sohil Computers AFA 6,500 Local Shopping No No Post 21/10/2008109 Computer system for Mazar Manjadik Digicome AFA 64,000 Local Shopping No No Post 11/04/2008110 Laptop computer for Josh Computer World AFA 74,500 Local Shopping No No Post 11/06/2008111 Laptop for DDO Computer World AFA 74,500 Local Shopping No No Post 11/06/2008112 Branded computer for Operations Digicome AFA 31,500 Local Shopping No No Post 20/11/2008113 Branded computer for Operations Computer World AFA 31,500 Local Shopping No No Post 11/05/2008114 External Hardisk for ED Computer World AFA 5,750 Local Shopping No No Post 25/10/2008115 LCD Monitor Sohil Computers AFA 9,600 Local Shopping No No Post 11/05/2008116 Laptop computer of Salim Wardak Computer World AFA 55,000 Local Shopping No No Post 11/04/2008117 computer AFA 11,600 Local Shopping No No Post 18/11/2008118 External Hard Disk 120GB Computer World AFA 5,800 Local Shopping No No Post 15/12/2008
Small shelf with three drawers Lockable
External hard disk for Deputy head of Procurement
119 Branded Computer PC Digi Com AFA 38,500 Local Shopping No No Post 16/12/2008120 UPS Santak 800 Digi Com AFA 6,952 Local Shopping No No Post 16/12/2008121 Stabilizer Digi Com AFA 4,377 Local Shopping No No Post 16/12/2008122 Laptop Computer Toshiba Sohail Computer Ltd. AFA 53,500 Local Shopping No No Post 15/12/2008123 Laptop Computer Sony Computer World AFA 75,400 Local Shopping No No Post 15/12/2008
Total Amount Utilized till 31 December 2008 AFA 3,238,414 $71,789Sub-Total in USD USD 136,557
Field Offices
Ref. No. Description Contractor Cost
124 Desktop Computer (Assembled) Dorukhshan AFA 27,800 Local Shopping No No Post 20/10/2007125 Projector Advance Business Com. $890 Local Shopping No No Post 03/06/2008126 Printer (Black & White) Saydian AFA 14,000 Local Shopping No No Post 11/10/2008127 Printer (Black & White) Khateraha AFA 28,000 Local Shopping No No Post 25/09 (1), 03/03 2008(1)128 Stabilizer Tajdar AFA 1,400 Local Shopping No No Post 01/12/2008
129 Router Foshange Comupter Serv. $90 Local Shopping No No Post 03/01/2008
130 Digital Camera Etemad Computer house AFA 13,750 Local Shopping No No Post 21/02/2008
131 Printer (Black & White) Niyazi Computer House AFA 4,900 Local Shopping No No Post 29/11/2008132 Scanner Ariana Computer House AFA 4,400 Local Shopping No No Post 03/03/2008133 Stabilizer Zabi Work Shop AFA 15,600 Local Shopping No No Post 01/10/2007
134 Stabilizer Sharif electrict AFA 4,000 Local Shopping No No Post 23/02/2008
135 UPS SEAGAT Store AFA 7,500 Local Shopping No No Post 28/08/2008136 UPS SEAGAT Store AFA 5,800 Local Shopping No No Post 28/11/2008
137 Hard disk drive 40 GB Etemad Computer house AFA 2,000 Local Shopping No No Post 19/04/2008
138 Lab top Adapter Rahnuma Computer store AFA 1,500 Local Shopping No No Post 27/02/2008
139 Printing Calculator Eqbal Computer store AFA 4,000 Local Shopping No No Post 08/04/2008
140 Monitor Etemad Computer house AFA 5,900 Local Shopping No No Post 29/09/2007
141 Hard disk Driver 80 GB Etemad Computer house AFA 3,000 Local Shopping No No Post 22/01/2008
142 Printing Calculator Qenaaat Store AFA 2,600 Local Shopping No No Post 30/10/2008
143 Flash Memory 2 Pcs AFA 1,800 Local Shopping No No Post 11/06/2007
144 Flash Memory 2 Pcs Access computer house AFA 1,600 Local Shopping No No Post 17/10/2007
145 Flash Memory 1 Pc Ariana Computer House AFA 900 Local Shopping No No Post 27/01/2008146 Flash Memory 2 Pcs SEAGAT Store AFA 1,500 Local Shopping No No Post 23/04/2008147 Memory stick - 1 GB Zekria Computer AFA 1,250 Local Shopping No No Post 16/09/2007
148 Memory stick - 1 GB Etemad Computer house AFA 750 Local Shopping No No Post 06/10/2008
149 Memory stick - 1 GB Etemad Computer house AFA 750 Local Shopping No No Post 29/11/2008
150 Desktop Monitor 15" -1 pce Ariana Computer house AFA 3,750 Local Shopping No No Post 28/02/2008151 Mother board ( Intel ) 1 pce Philips Computer house AFA 4,250 Local Shopping No No Post 18/06/2008152 Hard Disk - 80 GB Irteqa Computer hosue AFA 2,200 Local Shopping No No Post 18/06/2008153 Processor - 3.0 Intel Unique Computer house AFA 3,500 Local Shopping No No Post 18/06/2008154 Stabilizer ( Universal 7000 ) 1pce Jahan Noma store AFA 8,220 Local Shopping No No Post 08/02/2008155 Samsung CD Rom Niazi AFA 1,750 Local Shopping No No Post 24/08/2008156 RAM DDR 128 MB. Niazi AFA 1,500 Local Shopping No No Post 24/08/2008157 Projector AFA 3,600 Local Shopping No No Post 24/08/2008158 Processor -3GHZ Etemad AFA 3,600 Local Shopping No No Post 23/08/2008159 Hard Drive 80-GB Niaze AFA 2,500 Local Shopping No No Post 23/08/2008160 Main board -865 ( Intel orignal ) Zakaria AFA 4,000 Local Shopping No No Post 23/08/2008161 Ram DDr Zakaria AFA 1,250 Local Shopping No No Post 23/08/2008162 Flashdisk (Data traveler) Haseebullah AFA 1,250 Local Shopping No No Post 14/12/2007163 Stabilizer Ekhlas AFA 4,000 Local Shopping No No Post 31/01/2008164 UPS Unique AFA 4,250 Local Shopping No No Post 31/01/2008165 Monitor Haji raees $120 Local Shopping No No Post 15/11/2007166 Monitor Haji Omer $160 Local Shopping No No Post 08/02/2008
167 LCD Monitor $144 Local Shopping No No Post 11/06/2008
168 LCD Monitor Ghulam $150 Local Shopping No No Post 14/11/2008169 LCD Monitor Haji Omer $164 Local Shopping No No Post 14/08/2008170 Projector171 External Hard Disk 120 Durni $385 Local Shopping No No Post 09/09/2008172 External Hard Disk 120 Arya Sharq $95 Local Shopping No No Post 29/04/2008173 External HDD 160GB Rais $160 Local Shopping No No Post 13/05/2008174 External hard disk 160 GB Asad sana LTD $95 Local Shopping No No Post 16/11/2008175 External hard disk Ary sharq ltd $123 Local Shopping No No Post 10/05/2008
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)Purchase Order/Contract
Date
Digital Ware computer house
Gulam mohamad Computer saleing shop
176 External hard disk Kabul compuer $156 Local Shopping No No Post 30/12/2008177 External Hard Disk 120 COSMO LTD $260 Local Shopping No No Post 31/12/08178 External Hard Disc Aria Shop $95 Local Shopping No No Post 25/04/2008179 External Hard Disk 120 Al Emarat Store $100 Local Shopping No No Post 24/04/2008180 Digital Camera Aryan $170 Local Shopping No No Post 31/07/2008181 Digital Camera Itefaq $173 Local Shopping No No Post 09/08/2008182 Digital camera 8.1 MP sony Hafizullah store $246 Local Shopping No No Post 23/09/2008183 Memory card 512 MB AGFA Store $20 Local Shopping No No Post 18/02/2007184 Printer (Black & White) Arya Sharq LTD $260 Local Shopping No No Post 25/10/2008185 Printer (Black & White) DELL $230 Local Shopping No No Post186 Printer (Black & White) Abdul Malik $150 Local Shopping No No Post 10/12/2008187 Hp 2015 Printer Eria east co Ltd $231 Local Shopping No No Post 06/11/2008188 Printer HP(1018) black & white NT. Store $140 HQ Shopping No No Post 02/09/2008189 Printer (1018) black & white Kabul compuer $140 Local Shopping No No Post 27/08/2008190 Printer (1006) black & white Kabul compuer $138 Local Shopping No No Post 31/08/2008191 Hp 2710 Scanner Eria east co Ltd $95 Local Shopping No No Post 06/11/2008192 Scanner Bear Pow NT. Store $80 HQ Shopping No No Post 02/09/2008193 Scanner Jawid Computer Kabul $80 Local Shopping No No Post 27/08/2008194 Scanner Khurasan Electric's $80 Local Shopping No No Post 01/08/2008195 Stabilizer Ajmal $273 Local Shopping No No Post 31/05/2008196 Stepliser Qasimi $40 Local Shopping No No Post 14/06/2008197 Stepliser M. Agha $210 Local Shopping No No Post 27/10/2007198 Stabilizer Hanif $116 Local Shopping No No Post 17/11/2007199 Stebliser Mohd. Agha store $260 Local Shopping No No Post 24/06/2008200 Stabilizer Masood Ahmad $170 Local Shopping No No Post 11/06/2007201 Stabilizer Ahmad Osman $26 Local Shopping No No Post 10/09/2008202 Stabilizer Khurasan Electric's $121 Local Shopping No No Post 01/08/2008203 UPS Mohammad $210 Local Shopping No No Post 22/12/2008204 UPS Focus $65 Local Shopping No No Post 31/07/2008205 UPS AARIA $72 Local Shopping No No Post 22/04/2008206 UPS AARRIA $72 HQ Shopping No No Post 30/06/2008207 UPS Khurasan Electric's $204 Local Shopping No No Post 01/08/2008208 Camera Memory AARIA $25 Local Shopping No No Post 18/09/2007209 IT Box AARIA $55 Local Shopping No No Post 31/05/2008210 CPU Kabul compuer $350 Local Shopping No No Post 30/12/2008
211 C P U for office $283 Local Shopping No No Post 18/11/2008
212 CPU Omer Azizi $290 Local Shopping No No Post 11/06/2008213 CPU for office Ary sharq ltd $296 Local Shopping No No Post 10/11/2008214 CPU Eagle Coputer Zone $260 Local Shopping No No Post 31/12/2008215 Internet Switch Shahar $50 Local Shopping No No Post 06/01/2008216 External Hard Disk 120 Digitic computer $121 Local Shopping No No Post 27/6/08217 External Hard Disk 120 Digitic computer $12 Local Shopping No No Post 27/6/08218 External Hard Disk 120 Digitic computer $121 Local Shopping No No Post 27/6/08219 External Hard Disk 120 Digitic computer $121 Local Shopping No No Post 27/6/08220 External Hard Disk 120 Digitic computer $121 Local Shopping No No Post 27/6/08221 External Hard Disk 120 Digitic computer $121 Local Shopping No No Post 27/6/08222 External Hard Disk 120 Digitic computer $140 Local Shopping No No Post 27/6/08223 External Hard Disk 120 Digitic computer $121 Local Shopping No No Post 27/6/08224 IT Equipment REGION Brigth computer $132 Local Shopping No No Post 1/4/07 to 31 /12/08225 Printer Digitic computer $104 Local Shopping No No Post 18/12/08226 Scanner Brigth computer $43 Local Shopping No No Post 16/02/2008227 Scanner Hanif $96 Local Shopping No No Post 02/03/2008228 Scanner Digitic computer $100 Local Shopping No No Post 24/12/08229 Printing Calculator Ekhlas $56 Local Shopping No No Post 16/08/2007230 Printing Calculator Faizi $67 Local Shopping No No Post 10/05/2007231 Monitor S.nasir LTD $200 Local Shopping No No Post 23/3/08232 Monitor Brigth computer $100 Local Shopping No No Post 21/7/08233 Monitor Rafiullah $50 Local Shopping No No Post 28/06/2008234 Monitor hashimi $590 Local Shopping No No Post 16/9/08235 D-Link Switch Brigth computer $99 Local Shopping No No Post 10/06/2008236 D-Link Switch Sakhi Noor $60 Local Shopping No No Post 25/4/09237 Stabilizer Karam $46 Local Shopping No No Post 05/12/1987238 Stabilizer Faizi $178 Local Shopping No No Post 28/11/07239 Stabilizer Faizi $41 Local Shopping No No Post 15/11/08240 Stabilizer Faizi $160 Local Shopping No No Post 04/05/2008241 Stabilizer Hadi $74 Local Shopping No No Post 20/9/08242 Stabilizer Salim Shah $84 Local Shopping No No Post 21/5/07243 UPS hashimi $250 Local Shopping No No Post 01/01/1900244 Desktop Computer (Assembled) Sherzad $310 Local Shopping No No Post July 2008245 Printer (Black & White) $300 Local Shopping No No Post246 UPS $82 Local Shopping No No Post247 Scanner Bismillah $52 Local Shopping No No Post 08/11/2007248 Scanner Knowledge $156 Local Shopping No No Post 14/08/2007249 Stabilizer Itefaq AFA 4,900 Local Shopping No No Post 14/07/2008250 Stabilizer Masood Ahmadzai AFA 4,600 Local Shopping No No Post 16/06/2007251 Printing Calculator Hamid AFA 3,680 Local Shopping No No Post 24/01/2008
Omar Aziz Computer Saleing shop
252 Computer Casing Shahi AFA 1,500 Local Shopping No No Post 21/12/2008253 Router Andesha AFA 100 Local Shopping No No Post
Total Amount Utilized till 31 December 2008 AFA 219,100 $12,685Sub-Total in USD USD 17,067
Grand Total in USD USD 153,624
Items for procurement between the period January, 2009 to September , 2011
NSP HQ
Ref. No. Description Quantity Estimated Cost (USD)
1 Laptop Computer High Spec) 1 1,800 Local Shopping No No Post 20.Jan.2009 1AD-217
71820
2 Laptop Computer (Basic Spec) 4 4,000 Local Shopping No No Post 30.01.2009 4 AD-259 Computer Source Ltd 187540 25/05/2009
3 Desktop Computer (Branded) 21 16,800 Local Shopping No No Post 30.01.2009/December 08 691505
4 Desktop Computer (Assembled) 34 20,400 Local Shopping No No Post 2/1/20095 Projector 2 1,800 Local Shopping No No Post 01.01.2009 1 AD-188 Ali Sina Ltd 32000 5/3/2009
6 External Hard Disk 120 GB 16 1,440 Local Shopping No No Post 30.01.2009 2+2=4 AD-192, AD 265 21450
7 Digital Camera 6 2,100 Local Shopping No No Post 30.01.2009/March 09 1+2+2+1=6 119000
8 Printer (Black & White) 9 2,700 Local Shopping No No Post 30.01.2009 1+3+1+2=7 78000
9 Printer (Color) 3 1,650 Local Shopping No No Post December 08/February 09 1+1=2 AD-149 AD-223 73560
10 Scanner 35 4,200 Local Shopping No No Post 01.01.2009 1 AD-278 Computer World 17800 10/6/200911 Stabilizer 42 2,520 Local Shopping No No Post 02.Feb.2009/January 09 2 AD-127 Sohail Computer Ltd 3000 4/1/2009
12 UPS 750 VA 55 9,900 Local Shopping No No Post December 09/01.01.2009 4+1+2+1+2+3=13 137600
13 Copier Machine 3 5,400 Local Shopping No No Post December 08/01.01.2009 1+2+1+1=5
United Norm Equipments
774000
Sub-Total USD 74,710
Field Offices
Ref. No. Contract (Description) QTY Estimated Cost
1 Laptop Computer High Spec) 31 32,800 Local Shopping No No Post Jan/Feb 1 Al-Jadid Computer Store 65000 3/2/20092 Laptop Computer (Basic Spec) 3 2,700 Local Shopping No No Post Jan/Feb
3 Desktop Computer (Branded) 15 9,900 Local Shopping No No Post Jan/Feb 162400
4 Desktop Computer (Assembled)5 Projector 1 770 Local Shopping No No Post Jan 1 6/Jul/00 Ali Sina Ltd 32000 05.03.2009
6 External Hard Disk 120 GB 12 1,390 Local Shopping No No Post Feb/March 1+1+1=3 16650
7 Digital Camera 14 3,950 Local Shopping No No Post Feb/March 1 ACCESS computer store 10000 14/05/2009
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Anticipated Purchase Order/Contract
Date
QTY Purchased
P.O Numbers
Name of Supplier
Total Value (AFN)
Delivary time
Cyber Net Technology
19/04/2009 04/05/2009 25/04/2009
9+1+2+1+3+1+4=21
AD-133/A AD-176 AD 295AD - 272AD - 319 AD-359AD-380 AD-379AD-398
Sohail Computer Ltd Aftech International LtdSmart TechnologyHamid Warasta LtdSohail Computer LtdHamid Warsta LtdDigi ComDigi ComHamid warsta Ltd
25/01/2009 24/02/200901/08/200903/08/200923/11/200914/12/200930/12/2009
Aria East Co. LtdDigicom
12/3/2009 03/06/2009
AD-146 AD-163 AD-215AD- 335
Ram Parkash Photo Studio Sohail Computer Ltd Ram Parkash Photo StudioRam Parkash Photo Stuio
20/01/2009 12/02/2009 16/04/200914/09/2009
AD-212 AD-198 AD-186AD-342
Aftech International Ltd Computer Source Star Computer ServicesComputer World
14/04/2009 22/03/2009 03/03/200907/10/2009
Aftech International Ltd Computer World
03/02/2009 19/04/2009
AD-147 AD-127 AD-237 AD-258AD -310AD-379
Sohail Computer Ltd Digi Com Co. Ltd Asadullah Ishaq LtdComputer WorldDigi com
21/01/2009 04/01/2009 04/05/2009 24/05/200901/09/200928/12/2009
AD-169 AD-124 AD-246 AD-262
21/02/2009 18/01/2009 12/05/2009 27/05/2009
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)Anticipated Purchase Order/Contract Date
QTY Purchased
P.O Numbers
Name of Supplier
Total Value (AFN)
Delivary time
1+1+1+1+1+1+1=7
Afghan Foucus Computer Arya Sharq Computer Durani Usman Computer
05/04/200930/03/200924/02/200906/04/200910/05/200906/03
Arya Sharq Computer Store Unique Computer Store Al-Jadid Computer Store
28/02/2009 03/05/2009 06/05/2009
8 Printer (Black & White) 23 4,920 Local Shopping No No Post Feb/April 53080
9 Printer (Color) 5 2,180 Local Shopping No No Post Feb 1+1=2 Arya Sharq 7000 28.06.2009
10 Scanner 17 1,950 Local Shopping No No Post Feb/March/April 1 12400
11 Stabilizer 59 2,946 Local Shopping No No Post Feb/March/April
977
39499
12 UPS 750 VA 63 11,153 Local Shopping No No Post Jan/Feb/March/April 120960
13 Copier Machine 3 7,553 Local Shopping No No Post Jan 2 AD-279 United Norm Equipments 198000 14/06/2009
Sub-Total USD 82,212
Grand Total in USD USD 156,922
Total Value of items procured and prposed to be procured USD 310,546
Item not included in earlier revison of procurement plan and procured prior to June, 2009 due to urgency
HQ
1+1+1+1+1+1+1=7
Arya Sharq Computer Allince Computer Store Mashallah ComputerUnique Computer Store Hashimi Computer Store Salimi Computer Store Shirzad Computer Store
15/06/200911/03/200901/03/200924/02/2009 14/03/1388 13/01/2009
Unique Computer store Hashimi Computer Store
3/5/2009 28/06/2009
1+1+1+4+1+1+2+3=14
Mazar Computer Store Arya Sharq Computer Store Usmani Computer Sotre Focus Albasi Computer Shoaib StoreHashimi Computer Store
18/03/200925/05/200903/02/200930/03/200909/06/200915/08/200925/05/2009
1+2+2+1+1+1+2+4+3+2+1+1+2+5=
28
Durani Computer Store Afghan Fuousd Store Allinace Computer Store Arya Sharq Computer Awari Computer Store Afghan Foucous Store Segate ComputersUnique Computer Store Segate Computers Al-Jadid Computer Store
26/06/200924/04/200911/03/200925/05/200912/03/200912/02/200930/03/200910/05/2009 22/01/2009 24/02/2009 26/01/2009 05/01/2009
Remarks
Remarks
South Region
Central Region
Nengarhar RMU
North West Region
Central Region North West Region South Region
Central Region
Central Region East Region
North West Region East Region
Central Region North West Region
Central Region North West Region South Region
Procurement PlanGovernment of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
ANNEX C : Furniture
Items procured between the period April,2007 to December,2008NSP-HQ
Description Contractor Cost
1 Table Istanbul Furniture $130 Local Shopping No No Post 16/07/2007
2 Shelf European Furniture$225
Local Shopping No No Post 17/07/20073 Desk L-Shape Istanbul Furniture $325 Local Shopping No No Post 21/06/2007
4 Executive Chair Istanbul Furniture $330 Local Shopping No No Post 07/12/2007
5 Desk L-Shape European Furniture$425
Local Shopping No No Post 14/07/20076 Desk L-Shape European Furniture $425 Local Shopping No No Post 14/07/077 Meeting Table European Furniture $490 Local Shopping No No Post 19/09/078 European Furniture $855 Local Shopping No No Post 24/05/2007
9 AFA 12,900 Local Shopping No No Post 17/06/2007
10 AFA 12,900 Local Shopping No No Post 27/06/2007
11 Folad Felez
AFA 25,400
Local Shopping No No Post 28/05/2007
12 Partitions
AFA 29,960Local Shopping No No Post 10/09/2007
13 File Cabinets Sidaqat Felez AFA 3,800 Local Shopping No No Post 24/07/2007
14AFA 33,000
Local Shopping No No Post 07/08/200715 Partition (In Building A Of NSP) Samimi Furniture AFA 34,650 Local Shopping No No Post 24/06/2007
16AFA 38,500
Local Shopping No No Post 14/08/2007
17 Split Units Omid Sherzai StoreAFA 39,600
Local Shopping No No Post 22/07/200718 Shelf Samimi Furniture AFA 4,500 Local Shopping No No Post 07/07/200719 File Cabinets For Archive Samimi Furniture AFA 453,900 Local Shopping No No Post 07/08/2007
20
AFA 49,300
Local Shopping No No Post 14/08/200721 Furniture Book Shelf Samimi Furniture AFA 6,500 Local Shopping No No Post 27/06/2007
22 Vacancy Board Zabiullah Felez StoreAFA 6,500
Local Shopping No No Post 08/09/200723 Round Desk For Reception Samimi Furniture AFA 65,000 Local Shopping No No Post 07/09/2023
24 Meeting Table With ChairsAFA 9,500
Local Shopping No No Post 10/06/2007
25 Furniture DifferentAFA 7,300
Local Shopping No No Post 06/10/07
26 ShelvesAFA 12,100
Local Shopping No No Post 30/12/0727 Shelves for finance Samimi Furniture AFA 55,000 Local Shopping No No Post 07/01/08
28 Office DesksAFA 10,400
Local Shopping No No Post 03/02/0829 L-Shape Desk Istanbul Furniture AFA 472 Local Shopping No No Post 13/02/08
30 Books Shelf European FurnitureAFA 9,750
Local Shopping No No Post 03/03/08
31 Shelf Volo European FurnitureAFA 11,250
Local Shopping No No Post 12/03/0832 Partition Abdullah Furniture AFA 17,000 Local Shopping No No Post 20/03/0833 Office Chairs Istanbul Furniture AFA 16,500 Local Shopping No No Post 03/05/08
Ref. No.
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)Purchase
Order/Contract Date
Furniture (Computer Table, Book Shelf, Corner Table)Furniture (Office Desk ,Office Chair)
Rezvi Navin Furniture Store
Furniture (Office Chairs, Office Table)
Rezwani Navin Furniture Co. Ltd.
Furniture For NSP HQ And Kapisa Provincial Management Unit (Office Chair, Visitors Chairs, Metallic Cabinet, Shelves, Office Desk
Mohammad Aziz Furniture Making Dealer
Partitions For NSP Building A And B
Sebghatullh Zaker Carpentry Shop
Furniture (Office Desks, Office Chairs,Shelves,Metal Cabinet)
Rizwan Navin And Brothers Furniture
Furniture (Tea Table, Office Chair, Office Desk, Computer Desk, Shelf, Lock Table ,Metal Cabenit
Rizwan Navin And Brothers Furniture
Rezwani Navin Furniture Co. Ltd.Rezwani Navin Furniture Co. Ltd.M.Zahir Turkmany Furniture
Rezwani Navin Furniture Co. Ltd.
34 Shelves with doors Samimi Furniture AFA 65,000 Local Shopping No No Post 25/05/0835 Shelf and Partition Abdullah Furniture AFA 19,500 Local Shopping No No Post 08/06/08
36 Office Chairs Zahir Ameri furnitureAFA 2,200
Local Shopping No No Post 16/06/0837 Shelf Volo Istanbul Furniture AFA 12,500 Local Shopping No No Post 17/06/08
38 Office Chairs Zahir Ameri furnitureAFA 13,200
Local Shopping No No Post 30/06/08
39 Meetng Table with Chairs Zahir Ameri furnitureAFA 26,500
Local Shopping No No Post 16/07/0840 Meeting Chairs (Turkish) Istanbul Furniture AFA 455,000 Local Shopping No No Post 29/07/08
41 Revolving Chairs
AFA 4,200Local Shopping No No Post 16/08/08
42 Istanbul FurnitureAFA 235,700
Local Shopping No No Post 25/08/08
43 Office Desk Khoda Dad FurnitureAFA 5,600
Local Shopping No No Post 30/08/08
44 Office DeskAFA 4,200
Local Shopping No No Post 30/08/08
45 Office Chairs Zahir Ameri furnitureAFA 13,200
Local Shopping No No Post 12/07/08
46 Istanbol Furniture AFA 7,500 Local Shopping No No Post 10/09/2008
47 Istanbol Furniture AFA 7,592Local Shopping No No Post 27/10/2008
48 Chair for DDO Istanbol Furniture AFA 19,980 Local Shopping No No Post 22/11/2008
Sub-Total ### $3,205Total in USD USD 40,356
Field OfficesDescription Contractor Cost
49 Office Desk Buradaran AFA 12,200 Local Shopping No No Post 06/03/200750 Office Desk Jahan AFA 3,500 Local Shopping No No Post 04/02/200851 Office Desk Bahar Mobil AFA 3,700 Local Shopping No No Post 20/10/200852 Office Chair Buradaran AFA 4,500 Local Shopping No No Post 10/08/200853 Office Chair Makas AFA 2,200 Local Shopping No No Post 31/03/2008
54 Office Chair$92
Local Shopping No No Post 30/10/200855 Office Chair Bahar Mobil AFA 3,000 Local Shopping No No Post 20/10/200856 Visitor Chair Sohrab Mobil AFA 4,550 Local Shopping No No Post 19/04/200857 File Cabinet Haji Naseer AFA 1,400 Local Shopping No No Post 24/12/200758 File Cabinet Abdul Ahad $140 Local Shopping No No Post 07/02/200859 Office Shelf Masood AFA 20,000 Local Shopping No No Post 19/04/200860 Office Furniture Set Local AFA 28,000 Local Shopping No No Post 23/10/200861 Office Desk Royal Furniture AFA 7,000 Local Shopping No No Post 27/09/200762 Office Chair Royal Furniture AFA 1,900 Local Shopping No No Post 08/05/200863 Office Chair Ahmadi store AFA 2,300 Local Shopping No No Post 23/06/200864 Office Shelf Subhan Ltd AFA 5,500 Local Shopping No No Post 20/03/2008
65 Wooden Bed
AFA 5,000
Local Shopping No No Post 01/11/2008
66 Office Desk Mohd Qasim StoreAFA 2,450
Local Shopping No No Post 29/11/2008
67 Office ChairAFA 1,800
Local Shopping No No Post 02/06/200868 Visitor Chair one seat plastic Aminollah store AFA 4,000 Local Shopping No No Post 05/12/2007
69 File Cabinet 2 pcsAFA 14,000
Local Shopping No No Post 22/01/2007
70 Visitor Chair Royal FurnitureAFA 7,750
Local Shopping No No Post 20/11/200771 Meeting Table 3 PC Seyd Najeem AFA 6,900 Local Shopping No No Post 18/04/200872 Tea Table Mjtaba AFA 2,500 Local Shopping No No Post 10/12/200773 Office Shelf Mohammad Naim AFA 2,460 Local Shopping No No Post 02/04/200774 Office Shelf Setera AFA 2,230 Local Shopping No No Post 19/05/200775 Office Shelf Salim AFA 2,450 Local Shopping No No Post 29/09/200776 Office Shelf Salim AFA 2,240 Local Shopping No No Post 24/01/200777 Office Shelf Salim AFA 4,400 Local Shopping No No Post 12/03/200878 Office Shelf Salim AFA 3,240 Local Shopping No No Post 22/06/2008
M.Nader Mohammad Furniture
Meeting Tables for Conference room
Shikh Nazar Hussain Furniture
Small shelf with three drawers Lockable EDThree drawer shelf with lock and Keys
Ref. No.
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)Purchase
Order/Contract Date
Sohrab Furniture Store
Amir Mohd & Brothers Moble & Furniture
Rahmat Habib store
Ab Qader Furniture
79 Office Shelf Mohammad Naim AFA 2,240 Local Shopping No No Post 23/07/200880 Office Shelf Mohammad Naim AFA 2,240 Local Shopping No No Post 23/08/200881 Office Shelf Salim AFA 2,370 Local Shopping No No Post 27/09/200882 Tea Table Faryab AFA 1,000 Local Shopping No No Post 17/12/200883 Tea Table Faryab AFA 1,800 Local Shopping No No Post 17/12/200884 Office Shelf Yaqobi AFA 2,780 Local Shopping No No Post 10/12/200885 Office Shelf Yaqobi AFA 2,780 Local Shopping No No Post 02/12/200886 Office Shelf Yaqobi AFA 3,475 Local Shopping No No Post 15/12/200887 Office Desk Hussin $173 Local Shopping No No Post 05/01/200888 office disk Mohammad $188 Local Shopping No No Post 26/07/200889 office disk Nasrat Shoaeb $314 Local Shopping No No Post 10/10/200890 Office Desk Asmayi wat $279 Local Shopping No No Post 03/01/200791 Office Desk Khudiadad $104 Local Shopping No No Post 15/09/200892 Office Desk Fathhyan $192 Local Shopping No No Post 27/11/200793 Office Chair Hussin $90 Local Shopping No No Post 05/01/200894 Shelf for Office Kabul Shop $76 Local Shopping No No Post 29/10/200795 Chair Folad $168 Local Shopping No No Post 03/01/200896 Chair Nasrat Shoaeb $248 Local Shopping No No Post 10/10/200897 Office Chair Asmayi wat $230 Local Shopping No No Post 03/01/200798 Office Chair Fathhyan $120 Local Shopping No No Post 23/06/200899 Visitor Chair Renat $120 Local Shopping No No Post 03/05/2008
100 Visitor Chair Razwani nawen $100 Local Shopping No No Post 11/08/2008101 Visitor Chair Fathhyan $200 Local Shopping No No Post 27/11/2007102 Meeting Table Renat $198 Local Shopping No No Post 03/05/2008103 Meeting Table Asmayi wat $114 Local Shopping No No Post 03/09/1387104 Table for Office Abdullah $206 Local Shopping No No Post 04/03/2008105 Table Habiburahman $92 Local Shopping No No Post 16/05/2008106 Table M.Younus $50 Local Shopping No No Post 28/04/2008107 Tea Table Asmayi wat $54 Local Shopping No No Post 2008108 Tea Table Renat $80 Local Shopping No No Post 03/05/2008109 Tea Table Nasrat Shoaeb $80 Local Shopping No No Post 10/10/2008110 File Cabinet Hassan $300 Local Shopping No No Post 13/11/2008111 File Cabinet Abdullah $300 Local Shopping No No Post 29/03/2008112 File Cabinet Mohammad $124 Local Shopping No No Post 27/07/2008113 File Cabinet Brothers $320 Local Shopping No No Post 01/01/2008114 File Cabinet Brothers $240 Local Shopping No No Post 20/02/2008115 File Cabinet Dal Agha $972 Local Shopping No No Post 16/12/2008116 File Cabinet Asmayi wat $31 Local Shopping No No Post 2008117 Coat Hanger Ahmad $30 Local Shopping No No Post 29/03/2008118 Coat Hanger Nili Shop $120 Local Shopping No No Post 11/11/2007119 Coat Hanger Nasrat Shoaeb $100 Local Shopping No No Post 10/10/2008120 Coat Hanger Asmayi wat $26 Local Shopping No No Post 23/12/2008121 Office Shelf Khudinazar AFA 387 Local Shopping No No Post 27/08/2008122 Sleeping bag Kabul -store $102 Local Shopping No No Post 21/04/2008123 Bed Sheets Said Javeed $134 Local Shopping No No Post 27/11/2008124 Bed for guards Ahmadi sotre $29 Local Shopping No No Post 24/06/2008125 Office Desk Brotheran $544 Local Shopping No No Post 1/4/07 to 31/12/08126 Office Desk Nazir Hussain $54 Local Shopping No No Post 30/4/08127 Office Desk Safi $50 Local Shopping No No Post 04/04/2008128 Office Desk faizee $196 Local Shopping No No Post 20/12/08129 Office Desk hashimi $232 Local Shopping No No Post 18/1/08130 Office Chair Adam Khan $148 Local Shopping No No Post 1/4/07 to 31/12/08131 Office Chair pameer $60 Local Shopping No No Post 08/09/2008132 Office Chair Nazir Hussain $67 Local Shopping No No Post 02/04/2008133 Office Chair Adam Khan $240 Local Shopping No No Post 20/08/2007134 Office Chair A.rahim $360 Local Shopping No No Post 04/05/2008135 Office Chair Adam Khan $44 Local Shopping No No Post 18/1/08136 Sofa Wali Mohammad $350 Local Shopping No No Post 06/09/2008137 Sofa Farhad $216 Local Shopping No No Post 27/9/08138 Visitor Chair M.Yaqoub $60 Local Shopping No No Post 10/10/2007139 Visitor Chair Rahimi $198 Local Shopping No No Post 04/05/2008140 Visitor Chair Adam Khan $97 Local Shopping No No Post 15/12/08141 Meeting Table Brotheran $960 Local Shopping No No Post 1/4/07 to 31/12/08142 Meeting Table Adam Khan $80 Local Shopping No No Post 20/08/2007143 File Cabinet Adam Khan $276 Local Shopping No No Post 4/4/08144 File Cabinet Rohullah $396 Local Shopping No No Post 18/3/08145 Coat Hanger Hussain Ali $3 Local Shopping No No Post 16/08/2007146 Office Shelf Amir ahmad AFA 180 Local Shopping No No Post 16/10/08
147 Office Desk Mohabbat FurnituresAFA 3,700
Local Shopping No No Post
148 Office Chair Mohabbat FurnituresAFA 8,000
Local Shopping No No Post149 Tea Table Yasin AFA 3,250 Local Shopping No No Post May 2008150 File Cabinet Sami Furniture AFA 3,700 Local Shopping No No Post151 Office Shelf Gul Mohammad AFA 14,000 Local Shopping No No Post152 Office Desk Itefaq AFA 3,500 Local Shopping No No Post 13/04/2008
153 Office DeskAFA 3,800
Local Shopping No No Post 09/09/2007154 Office Desk Bashir Ahmad $40 Local Shopping No No Post155 Office Chair Faizabad AFA 2,500 Local Shopping No No Post 17/05/2007156 Office Chair Faizabad AFA 500 Local Shopping No No Post 28/07/2008157 Office Chair Itefaq AFA 2,200 Local Shopping No No Post 13/04/2008158 Office Chair Kunduz Mobil AFA 2,400 Local Shopping No No Post 28/10/2008159 File Cabinet Najibullah AFA 5,000 Local Shopping No No Post 18/11/2007160 File Cabinet Najibullah AFA 13,200 Local Shopping No No Post 16/04/2008161 Office Shelf Faqir AFA 15,000 Local Shopping No No Post 09/04/2007162 Office Shelf Faqir AFA 20,000 Local Shopping No No Post 24/01/2008163 Office Shelf Faqir AFA 14,000 Local Shopping No No Post 16/03/2008164 Office Shelf Amanullah AFA 3,500 Local Shopping No No Post 16/04/2008165 Office Shelf Nizamuddin AFA 13,500 Local Shopping No No Post 18/08/2008166 Office Shelf Habibullah AFA 5,000 Local Shopping No No Post 25/02/2008167 Carpet Haji Anwar AFA 2,590 Local Shopping No No Post 08/08/2007
Sub-Total AFA 319,762 $11,207Sub-Total in USD USD 17,602
Total in USD USD 57,958
Items for procurement between the period January, 2009 to September, 2011
NSP-HQ
Description Quantity Remarks
1 Office Desk 14 1,120 Local Shopping No No Post Jan. to June 2009 5+2+1=8 79000
2 Office Chair 13 650 Local Shopping No No Post Jan. to June 2009 2+1+10=13 110000
3 Visitor Chair 12 360 Local Shopping No No Post Jan. to June 2009
4 Meeting Table 2 640 Local Shopping No No Post Jan. to June 2009 1+1=2 183000
5 Computer Table 3 150 Local Shopping No No Post Jan. to June 2009
6 Tea Table 1 35 Local Shopping No No Post Jan. to June 2009
7 File Cabinet 13 650 Local Shopping No No Post Jan. to June 2009 2+1+6+6=15 132939
8 Coat Hanger 4 100 Local Shopping No No Post Jan. to June 2009
9 Office Shelf 8 400 Local Shopping No No Post Jan. to June 2009 5+4=9 Zahir Amiri Brothers Ltd 22100
Sub-Total USD 4,105
Field Offices
Contract (Description) QTY Estimated Cost Remarks
Aman Bakhtyar Stationary Centre
Ref. No.
Estimated Cost (USD)
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Anticipated Purchase
Order/Contract Date QTY
PurchasedP.O
NumbersName of Supplier
Total Value (AFN)
Delivary time
AD-230 AD-277 AD-249
Zahir Amiri Brother Co. Dubai Furniture Co. Ali Khan Furniture
27/04/2009 10/06/2009 17/05/2009
AD-136 AD-216 AD-230
Ishanlar Istanbul Furniture Zahir Amiri Brothers Co.
30/12/2008 16/04/2009 27/04/2009
AD-141 AD-168
Zahir Amiri Brothers Ltd Istanbul Furniture
18/01/2009 18/02/2009
AD-140 AD-190 AD-183AD-305
Istanbul Furniture Abdullah Moble CenterKabul Nawin Ltd
8/2/2009 11/03/2009 01/03/200923/07/2009
AD-245 AD-230
15/05/2009 27/04/2009
Ref. No.
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)Anticipated Purchase Order/Contract Date
QTY Purchased
P.O Numbers
Name of Supplier
Total Value (AFN)
Delivary time
1 Office Desk 33 1,940 Local Shopping No No Post Jan-May 77380
2 Office Chair 69 3,678 Local Shopping No No Post Jan-June 788 29470
3 Visitor Chair 108 3,410 Local Shopping No No Post Feb/March 6+10=10 10600 Central Region
4 Meeting Table 9 2,290 Local Shopping No No Post Feb/March 1+1+1=3 32400
5 Computer Table 14 800 Local Shopping No No Post Feb-May
6 Tea Table 43 1,360 Local Shopping No No Post Jan-May 2+2+1=5 GHR/PMU/010 7700
7 File Cabinet 51 4,070 Local Shopping No No Post Jan-May 1+2+2=5 GHR/PMU/011 27200
8 Coat Hanger 46 995 Local Shopping No No Post Jan-July
9 Office Shelf 29 2,305 Local Shopping No No Post Feb-May HRT/PMU/001 50700
Sub-Total USD 20,848
Grand Total in U USD 24,953
Total Value of items procured and prposed to be pr USD 82,911
Item not included in earlier revison of procurement plan and procured before June, 2009 due to urgency
HQ
Description Quantity Remarks
Meeting Table 1 26000 LS No No 1 AD-230 Zahir Amiri Brothers Ltd 24500 12.05.2009Paper Shredder 1 5000 LS No No 1 1162 Computer World Ltd 4200 22.04.2009Guard Room 1 26000 LS No No 1 AD-243 Abdullah mobile & Furnit 25000 09.05.2009
2+3++2+1+1+1+1+2=13
HRT/PMU/002 HRT/PMU/003 950
Bahar Furniture Store Aropa Furniture Store Brotheran Moble Store Ittefaq Furniture Store Ismail Furniture Store Arash Mosaver Store Brothers Shop Al Sayed Furniture Store
29/04/2009 30/03/2009 25/04/2009 22/06/2009 02/05/2009 07/02/2009 07/02/2009 08/01/2009
Central Region West Region North East Region North West Region East Region South Region
1+2+1+1+1+1+3=10
Abdul Hussin Khudidad Bahar Furniture Store H. Musa Furniture Store Tulu Furniture Store Rahimullah Furniture Store Al Sayed Furniture Store
29/06/2009 25/04/2009 07/06/2009 18/06/2009 27/04/2009 08/01/2009
Central Region North East Region East Region South Region
Abdullah Furniture Store Nasrat Furniture Store
31/03/2009 01/06/2009
Abdullah Furniture Store Abrahimi Furniture Store Khaliq Belal Co. Ltd
10/03/2009 31/03/2009 08/06/2009
Central Region North West Region
Abdullah Furniture Store Abdul Ahad Furniture Arash Mosaver Store
31/03/2009 15/02/2009 07/02/2009
Central Region West Region North West Region
Mukhtar Furniture Store Bahar Furniture Store Abdul Ahad Furniture
09/05/2009 29/04/200915/02/2009
Central Region West Region
1+1+2+1+1+3+1=10
Ab. Ahad Furniture Store, Sarwar Furniture Store Ghulm Furniture Store Khan Furniture Store Masood Furniture Store Sulaiman Furniture Store Samad Furniture Store
15/06/2009 07/03/2009 31/03/2009 26/05/2009 04/05/2009 18/05/2009 05/03/2009
Central Region East Region South Region
Ref. No.
Estimated Cost (AFS)
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Anticipated Purchase
Order/Contract Date QTY
PurchasedP.O
NumbersName of Supplier
Total Value (AFN)
Delivary time
Partitions 3 55000 LS No No 3 AD-242 Abdullah mobile & Furnit 51500 09.05.2009Total(AFN) 112000 Total(AFN) 105200Total(USD) 2240 Total(USD) 2104
Field Office
Description Quantity Remarks
1 Sofa Set 1 22000 LS No No Central Region Ali Khan Furniture 20000 15.06.2009 Central Region2 Rug 1 5000 LS No No East Region Rafiullah Store 4800 23/05/2009 East Region3 Sofa Set 1 22000 LS No No East Region Sahib Jamal Store 20500 26/02/2009 East Region
Total(AFN) 49000 Total(AFN) 45300Total(USD) 980 Total(USD) 906
Ref. No.
Estimated Cost (AFS)
Procurement Method
Pre-qualification
(yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Anticipated Purchase
Order/Contract Date QTY
PurchasedP.O
NumbersName of Supplier
Total Value (AFN)
Delivary time
Procurement Plan
Government of the Islamic Republic of Afghanistan/GIRA
ANNEX D : Communication Equipments
Items procured between the period April, 2007 to December, 2008NSP-HQ
Ref. No. Description Contractor Cost
1 Asia Mobile Store AFA 25,500 Local Shopping No No Post 06/09/20072 New National Corp $850 Local Shopping No No Post 22/08/20073 Nokia Mobile Sets 2310 Zeenat Mobile Store AFA 41,250 Local Shopping No No Post 06/04/08
4 Digital Lines of Afghan Telecom Afghan Telecom AFA 12,000 Local Shopping No No Post 13/03/08
5 Router Aftech International AFA 4,250 Local Shopping No No Post 16/03/086 Nokia Mobile Sets 1200 Asia Mobile Store AFA 29,250 Local Shopping No No Post 30/01/087 Nokia Mobile Set 1110 Sharif Mobile Store AFA 8,000 Local Shopping No No Post 03/01/08
8 Nokia Mobile Sets 1200 Irshad Stanekzai Mobile Store AFA 20,000 Local Shopping No No Post 12/12/07
9 Sim Cards For Mobile Sets Irshad Stanekzai Mobile Store AFA 2,000 Local Shopping No No Post 12/12/07
10 Digital phones Afghan telecom $1,200 Local Shopping No No Post 13/03/0811 Mobile Sets Nokia 2310 City Mobiles AFA 90,000 Local Shopping No No Post 12/07/08
12 Nokia mobile 5310 Blue color Irshad Stanakzair Mobile Store AFA 11,250 Local Shopping No No Post 23/11/2008
Sub-Total AFA 243,500 $2,050Sub-Total in USD USD 6,920
Field Offices
Ref. No. Description Contractor Cost
13 Digital Phone Nekbakht AFA 2,900 Local Shopping No No Post 09/11/200814 Cell Phone AFA 5,200 Local Shopping No No Post 03/02/2008, 03/200815 Cell Phone Mazar Store AFA 3,000 Local Shopping No No Post 19/11/200716 Cell Phone Sahadat Hand Set Seller AFA 2,500 Local Shopping No No Post 20/10/200817 Cell Phone Sahadat Hand Set Seller AFA 2,100 Local Shopping No No Post 20/11/200818 Cell Phone Ariana Mobile Seller AFA 1,800 Local Shopping No No Post 10/06/200719 Cell Phone Mawla Ali Mobile AFA 3,000 Local Shopping No No Post 11/09/200720 Cell Phone Mawla Ali Mobile AFA 1,800 Local Shopping No No Post 03/10/200721 Cell Phone - 2 pcs Mazar Mobile Store AFA 4,600 Local Shopping No No Post 03/01/200822 Cell Phone Abdul Kaber AFA 2,000 Local Shopping No No Post 14/06/200823 Intercom Phone ARYA $150 Local Shopping No No Post 03/05/200824 Cell Phone Rosh $415 Local Shopping No No Post 30/07/200725 Cell Phone Tolo Mobile $143 Local Shopping No No Post 05/10/200726 Cell Phone Ghaznawi store $76 Local Shopping No No Post 05/04/200827 Cell Phone Haji Mohd $62 Local Shopping No No Post 15/11/200728 Cell Phone Watan Mobil store $36 Local Shopping No No Post 23/06/200829 Cell Phone Afghan shop $50 Local Shopping No No Post 06/12/200730 Cell Phone Aryana $46 Local Shopping No No Post 10/5/0831 Cell Phone Noor Mobile $306 Local Shopping No No Post 11/6/07 to22/9/0832 Cell Phone Roshan comp. $516 Local Shopping No No Post 1/4/07 to 31/12/0833 Intercom Phone Rastin Store $185 Local Shopping No No Post 15/06/2008
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Purchase Order/Contract
Date 10 Phone Sets with 5 Sim cards, Nokia 110020 Mobile Phone Sets with 10 Sim Cards, Nokia 1110+ Simcard
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Purchase Order/Contract
Date
34 Cell Phone Almadina $43 Local Shopping No No Post35 Digital Phone Turkistan Mobile Store AFA 2,800 Local Shopping No No Post 21/05/200836 Cell Phone Noori AFA 2,950 Local Shopping No No Post 13/04/200837 Cell Phone Zakhel AFA 3,500 Local Shopping No No Post 26/08/200838 Cell Phone Fawad AFA 3,100 Local Shopping No No Post 05/10/200839 Cell Phone Nazeer AFA 4,200 Local Shopping No No Post 19/11/200840 Cell Phone Abdul Wasey AFA 4,200 Local Shopping No No Post 02/12/200841 Cell Phone Qarizada AFA 2,500 Local Shopping No No Post 19/05/2007
Sub-Total AFA 52,150 $1,966Sub-Total in USD USD 3,009
Total in USD USD 9,929
Items for procurement between the period January, 2009 to September, 2011
NSP-HQ
Ref. No. Description Quantity Remarks
1 Turaya Set 2 1400 Local Shopping No No Post Feb./March,2009
2 Turaya Sim Card 2 200 Local Shopping No No Post Feb./March,2009
3 Intercom Phone 1 20 Local Shopping No No Post Feb./March,2009
4 Digital Phone Feb./March,20095 Cell Phone 30 1800 Local Shopping No No Post Feb./March,2009 30 AD-164 Star Mobile 72970 15/02/20096 Handheld Radio Local Shopping No No Post Feb./March,2009
Sub-Total USD 3,420
Field Offices
Ref. No. Contract (Description) QTY Estimated Cost Remarks
1 Turaya Set 17 9,520 Local Shopping No No Post Feb/June,2009 4 170 New Ansari Ltd 109200 27.03.2009 kandahar RMU2 Turaya Sim Card 7 660 Local Shopping No No Post Feb/June,2009 4 Ansari Ltd 10000 9/4/2009 South Region3 Intercom Phone 5 170 Local Shopping No No Post Feb/June,20094 Digital Phone 5 310 Local Shopping No No Post Feb/June,2009
5 Cell Phone 38 5,800 Local Shopping No No Post Feb/June,2009 49520
6 Handheld Radio Sub-Total USD 16,460
Total in USD USD 19,880
Total Value of items procured and prposed to be procured USD 29,809
Estimated Cost (USD)
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Anticipated Purchase
Order/Contract Date
QTY Purchased
P.O Numbers
Name of Supplier
Total Value (AFN)
Delivary time
Procurement Method
Pre-qualification (yes/no)
Domestic Preference
(yes/no)
Review by Bank (Prior /
Post)
Purchase Order/Contract
Date QTY
PurchasedP.O
NumbersName of Supplier
Total Value (AFN)
Delivary time
1+2+1+1+1+1+3+1+5+2=18
HRT/RMU/001 951 961
Abaseen Mobile Store Pukhla Mobile Store Osmani Mobile Jawedan Mobile Ali Mobile Store Mohammadi Mobile Brotheran Nazir Store H. Sharif Dawood Pasarlay Mobile Store Al-Jadid Mobile Store
25/04/2009 07/03/2009 20/01/2009 01/03/2009 05/02/2009 19/01/2009 22/06/2009 16/03/2009 15/03/2009 12/04/2009
Central Region West Region North East Region North West Region East Region South Region
Procurement PlanGovernment of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Annexure E: Quality Control Equipment
Items procured during the period April,2007 to December, 2008
Ref. No. Description of Item Specification Qty Comments
1 1 6008 Shoping Post
2 RPM (Tachometer) Meter 2 522 Shoping Post
Total USD6530
Procurement Plan for the Period from January,2009 to September, 2011
Status on Jan.20, 2010
1 Power Quality meter 1 5900 SSS Prior April,09
2 2 600 SSS Prior April,09
3 1 950 SSS Prior April,09
4 Electric Load Box 5 – 50 KW 1 500 SSS Prior April,09
5 Global Positioning System German e trex Vista HCx 4 190 SSS Prior April,09
6 2 150 SSS Prior April,09
7 2 750 SSS Prior April,09
8 Water sampling bottle 2 150 SSS Prior April,09
9 Concrete Test Hammer ASTM C 805 1 495 SSS Prior April,09
Estimated Cost (US$)
Procurement Mehtod
Review by Bank
(Prior / Post)
Supply date/Expecte
d Bid Submission
Date
Protable Ultrasonic Flow meter - KF220
Model FLUKE 435 = Model PPQ-306 Portable power quality analyzer Voltage and current waveform analyses High power LCR High power LCR
These are low value items and generic specifications are not available. It is proposed to purchase these items on SSS basis from the reputed manufacturers of these items to be identified by Technical Support Department/Procurement Department of NSP
Awaiting ProcurementRequest Form from TSD and procurement would be processed subsequently.
Digital Clamp meter Included frequency meter
Model – FLUKE 337 Series clamp meter
Distance meter A multi –talent for any situation
Model- Leica Disto A8 Range = 0.05 – 200m
Water Level indicator 200 meter
DGSI MATEST, SO61-02 Water Level indicator 200m, cable length
Standard Test Kits for Potable Water
Fernox FG-K29500-KE ECON
Bottles 300, 500, 1000cc for taking water sample
Procurement PlanGovernment of the Islamic Republic of Afghanistan/GIRA
Annexure F: List of Civil Works for NSP-HQ
Items of work Procured between Period April, 2007 to January, 2008
S.No. Description of the Work Price in USD Review by Bank Comments
1 Extension of Archive Room 20,977 Shopping No No Post 25-Mar-07
2 Installation of new door in finance department 295 Shopping No No Post 11-Apr-073 Construction of Septic Tanks 17,680 Shopping No No Post 13-May-074 Wooden Partition 693 Shopping No No Post 24-Jun-075 Wooden Partitions 660 Shopping No No Post 8-Aug-07
6 150 Shopping No No Post 19-Aug-077 Wooden Partition 599 Shopping No No Post 10-Oct-078 Wooden Partitions 600 Shopping No No Post 4-Feb-089 Construction of door and grils for archive 1,563 Shopping No No Post 19-Feb-0810 Construction of Partitions 400 Shopping No No Post 20-Mar-0811 Maintenace of NSP buildings 7,577 Shopping No No Post 28-Jun-0812 Construction of Main Gate of NSP 55,637 Shopping No No Post 8-Aug-0713 Painting of inside the NSP buildings 7,420 Shopping No No Post 17-Jan-0814 Painting of outside of NSP buildings 5,742 Shopping No No Post 2/Jul/0715 Construction of Parking of NSP 29,000 Shopping No No Post Oct. 2007
16 Sound proof partition for Operations Directorate 120 Shopping No No Post 13-Sep-0817 Wooden Partition and glass for HRD&TD 410 Shopping No No Post 4-Nov-08
18 540 Shopping No No Post 2-Dec-0819 Vertical gutter drainage system 2,032 Shopping No No Post 1/Nov/0820 Road maintenance work 6,196 Shopping No No Post 19/Nov/0821 Kashi Works for Maint Gate of MRRD 13,189 Shopping No No Post 18/11/2008
22 Painting of Building A externally 1,056 Shopping No No Post 14-Nov-08Sub Total(USD) 172,535
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Procurement Method
Pre Qualification
of Bidders
Domestic Preference Bid Opening
Date
Construction of plaster and paint of wall of archive
Partition and door in the corridor opposite to DSCRW
Procurement PlanGovernment of the Islamic Republic of Afghanistan/GIRA
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Annexure G: List of Civil Works for Provincial Offices
Items of works Procured between Period April, 2007 to December, 2008
S.No. Description Contractor Price Review by Bank
Bid Opening Date
1 extension of office Electricity Najibullah Electrict AFA 11,028 Shopping No No Post 06/11/20082 Painting the office hall Gul Mohammad AFA 4,000 Shopping No No Post 19/04/2007
3Brotheran
AFA 84,717 Shopping No No Post 26/10/2008
4Partition for Geneartor
Amir Mohammad $260 Shopping No No Post 12/01/2008
5 Construction of Guard Room Amir Mohammad $9,130 Shopping No No Post 11/10/2008
Total AFA 99,745 $9,390 Total in USD USD 11,385
Items of works proposed to be procured up to September, 2011
S.No. Description Contractor Review by Bank Bid Opening Date Status as on Jan.20, 2010
1 23,600 Shopping No No Post TBD
2 295,252 NCB No No Prior 15-Dec-09
3 Construction of 4 rooms, Baghlan 23,600 Shopping No No Post TBD
4 Construction of 4 rooms, Kunduz 23,600 Shopping No No Post TBD
5 Construction of 4 rooms, Takhar 23,600 Shopping No No Post TBD
6 Construction of 4 rooms, Badakhshan 23,600 Shopping No No Post TBD
Procurement Method
Pre Qualifica
tion of Bidders
Domestic Preference
Construction of new room with hall for Stock
Estimated cost in USD
Procurement Method
Pre Qualifica
tion of Bidders
Domestic Preference
Construction of 4 rooms, Maidan Wardak
Procurement Requition Form and Detail Drawings and BOQ are yet to be received.
Construction of Typical Provincial Office building in Aibak District of Samangan
Proposal sent to WB along with draft Bidding documents. WB has not agreed to the proposal and mentioned that MRRD would submit a comprehensive proposal for NSP provincial office buildings as part of overall NSP/MRRD vision going forward.
Procurement Requition Form and Detail Drawings and BOQ are yet to be received.
7 Construction of 4 rooms, Kunnar 23,600 Shopping No No Post TBD
Procurement Requition Form and Detail Drawings and BOQ are yet to be received.
Procurement Plan
Government of the Islamic Republic of Afghanistan/GIRA
Annexure H: Training
Details of Training till Dec. 2009
S.No. Date of Training Name of Training
1 24-02-2007 GTZ Meeting 2120
2 14-03-2007 FP Meeting 22503 14-03-2007 Need Assessment 1024454 18-04-2007 FP Meetintg 24705 03-02-05-227 CDC By Law Training 769456 05-07-2007 CDC By Law Training 668457 04-06-06-2007 MHPWAT 527108 06-06-2007 FP Meeting 25109 17-18-06-2007 ACC.Training 42763
10 07-08-07- RTC T 1947411 17-07-2007 FP Meeting 250012 14-29-07-2007 T.D.D.E.T 58632513 29-09-2007 Hydraulic Refresher T 39860014 22/10/2007 Systematic Approach to Training 49,95015 28/10/2007 Systematic Approach to Training 49,95016 04/11/2007 Systematic Approach to Training 56,80017 11/11/2007 Systematic Approach to Training 65,41018 18/11/2007 Systematic Approach to Training 118,50019 24/11/2007 Medium Level of Irrigation Training 345,80020 10/12/2007 Performance Evaluation Workshop 10,00021 12/12/2007 Human Capital & RTC Workshop 92,60022 01/01/2008 MHP Training 490,59623 09/02/2008 Water Supply & water Sanitataion 404,60324 16/02/2008 BARC Proposal Planning Training 42,00025 16/02/2008 BARC M&E Training 84,00026 24/02/2008 OM Finance Training 97,68427 23-27/02/2008 Phase Training 39,62028 24-25/02/2008 Procurement Training 21,71029 1-6/03/2008 Irrigation Medium Level Training 160,00026 3-Feb-08 Management Security Training 45,00027 10-16/03/2008 Irrigation Medium Level Training 216,000
Ministry of Rural Rehabilitation and Development- Second National Solidarity Program (NSP II), IDA Grant No. H - 0261 , Project ID P102288
Expenditure on Training in AFA
28 12-19-03/2008 OM Training (Basic Introduction ) 18,00029 15-20-03-2008 General Management Training Ibasina 125,00030 4-Aug-08 Performance Evaluation Workshop 13,90031 19-20/04/2008 OM Finance and Procurement Module Training 17550032 19-20/04/2008 OM F and P Module Training for FP 16,50032 03-08/05/2008 Gender Training for M&E Staff in AWARD 23780033 12-14/05/2008 Engineering Monitoring Criteria Checklist Training 11165034 12-15/05/2008 Supervisory Management Course in IbanSina 5150035 17-22-05/2008 Report Writing Training in BRAC 19500036 17-22/05/2008 Engineering Monitoring Criteria Checklist Training 266,10037 03-08-05-2008 Per Dim Gender Training for M&E Staff in AWARD 82,80038 25-27-05/2008 HRM & Capacit Develpoment Training 138,95039 16-22-05-2008 Per diem Report Writing Training in BRAC 102,00040 16-19-05-2008 Engineering Monitoring Criteria Checklist Training 145,05041 23-26-05-2008 Engineering Monitoring Criteria Checklist Training 112,55042 26-27-05-2008 HRM & Capacit Develpoment Training 116,70043 27-31-05-2008 Engineering Monitoring Criteria Checklist Training 25,20044 01-03-06-2008 South Region HRM & Capacit Develpoment Training 116,70045 1-5-06-2008 Orgainzation Developmetn Training in Ibnesina 193,15046 28-06-03-07-2008 Water Supply & water Sanitataion 151,65047 03-10-07-2008 Water Supply & water Sanitataion 186,30048 06-10-07-2008 Per diem to Monitoring & Evaluation Training in Ibsina Training Center 102,20049 06-10-07-2008 Monitoring & Evaluation Training in Ibnasina 257,50050 20-24-07-2008 Report Writing Training in AWARD 154,50051 7-10-09-2008 Technical Workshop for Reginal Engineers 34,95052 24-28-08-2008 Training in Video Editing Course 100,00053 6-11-09-2008 Project Planning and Management Training 27,00054 11-16-10-2008 Engineering Bridge Low Level Training 250,50055 24-28-08-2008 Video Editing Training 100,00056 20-25-09-2008 Office Administraion Training 143,00057 12-16-10-2008 Proposal and Report Writing Training 25,75058 09-22-11-2008 Documentary Film Making Training 60,00059 01-06-11-2008 Engineering Power Line Training 293,70060 10-16-10-2008 Monitoring & Evaluation Training in Kabul NSP Training center 284,12561 15-19-02-2008 Engingeering Bulding Training 265,20062 15-19-02-2008 Engingeering Bulding Training 265,20062 28 -03- 02 -04 2009 MIS Databas Training 516,82363 28-03- 02 -04 2009 Structure in Practice Buildin Low Level Training 244,26664 06-08-04-2009 M&E Database Training South Region 145,70065 01-05-04-2009 M&E Database Training Central Region 118,05066 07-08-04-2009 M&E Database Training South Region 66,75067 22-23-04-2009 Environmental Social Safeguard Training 96,23768 12-13-05-2009 Procurement Training 65,49569 19-20-05-2009 Procurement Training 97,90070 23-28-05-2009 Bridget Low Level Traiing 22,00071 23-28-06-2009 Water Supply & water Sanitataion 175,000
72 07-08-07-2009 OM5 & CDC Accounting Training 70,45073 12-13-07-2009 OM5 & CDC Accounting Training 90,85574 19-21-08-2009 OM5 FPM&TSD Training 350,00075 01-06-082009 First MIS New System Training 548,30576 08-13-082009 Second round of MIS New System Training 496,77577 15-20-08-2009 Third round of MIS New System Training 113,40078 23-08-2009 LeaderSHIP Management Training 135,42279 24-29-10-2009 Engineering Bridge Low Level Training 109,80080 24-29-10-2009 Community Participatory Monitoring Training 21,57881 14-19-11-2009 Administration and Genral Management Training 19,90082 05-06-12-2009 Refresher MIS Database Training 220,79683 12-17-12-2009 Engineering Structure Practice in Building Training 146,320
Sub-Total in AFN 12,565,627Sub-Total in USD $251,313
Budget allocated to the Regions
S.No. Date Name of Training Region Amount in AFA1 24-02-2007 Renewable Energy Tra Northern 1525502 11-20-02-2007 MHPWAT Northern 1449753 26--02-03-2007 Water Supply Training Eastern 572504 10-14-03-2007 Renewable Energy Training Western 158305 10-15-04-2007 Renewable Energy Training Southern 750006 0404-2007 Cycle Training Northern 180507 13-15-05-2007 CDC By Law Training Eastern 799508 03-04-06-2007 ACC.Training Northern 582259 01-02-06-2007 ACC.Training Eastern 34300
10 19-07-2007 CDC By Law Training Western 167011 15-16-07-2207 ACC.Training Western 2595012 22-07-2007 ACC.Training Northern 920013 18-07-2007 CDC By Law Training Northern 565014 22-07-2007 NSP BI Training Eastern 3700015 26-07-2007 NSP BI Training Southern 4835016 28-07-2007 CDC By Law Training Southern 2480017 27-08-2007 NSP BI Training Central 4395018 05/11/2007 NSP BI Training Northern 17,405
19 06/11/2007 NSP BI Training Western 51,75020 8-9/03/2008 OM Finance Training Northeast (Kunduz) 20,65021 10-11/03/2008 OM Procurement Training Northeast (Kunduz) 17,27522 15-17/03/2008 OM Finance Training Northern (Mazar) 59,20023 16-17/03/2008 OM Procurement Training Northern (Mazar) 23,400
24 24-25/03/2008 OM Procurement Training Eastern 67,75025 26-27/03/2008 OM Finance Training Eastern 41,95026 31-01/04/2008 OM Finance Training Western 39,35027 31-01/04/2009 OM Procurement Training Western 45,55028 24/04/2008 NSP BI Training Kabul Region 49,07529 14-15/05/2008 NSP BI Training Eastern 29,65030 04-05-06-2008 NSP BI Training Northern(Mazar) 55,20031 31-02-06-2008 IT Training Northern(Mazar) 52,85032 29-2-07-2008 OM/MIS Training Norhtern(Mazar) 106,40033 07-08-07-2008 HRM& Capacity Training Western 85,24034 16-17-07-2008 HRM& Capacity Training Eastern 102,18035 26-27-08-2008 OM Trainning in Mazar Norhtern(Mazar) 193,80036 012-06-11-2008 M&E Training Norhtern(Mazar) 178,60037 21-25-12-2008 M&E Training Eastern 124,75038 01-06-03-2009 Water Supply Training Northeast (Kunduz) 10,150 39 4-5-03-2009 NSP BI Training Eastern 21,850 40 01-02-04-2009 M&E Database Training East Region Eastern 114,100 41 01-02-04-2009 M&E Database Training Northwest Region Northern(Mazar) 127,050 42 17-22-05-2009 Engineering Micro hydro Power Training Eastern 95,42043 14-15-06-2009 M&E Follow-up Database Training Eastern 74,90044 14-15-2009 M&E Follow-up Database Training Northern(Mazar) 105,20045 16-21-05-06 Outsource Leadership Management Training Northern(Mazar) 134,65046 10-11-06-06 Procurement Training Northern(Mazar) 37,60047 20-25-06-2009 MHPWAT Northeast (Kunduz) 83,25048 04-06-07-2009 Environmental Safe Guard Training Northern(Mazar) 107,15049 13-14-07-2009 Environmental Safe Guard Training Western 60,94050 01-06-08-2009 OM5 Training Norhtern(Mazar) 271,00051 08-13-08-2009 OM5 Training Western 228,90052 16-21-09-2009 Office Administration & General ManagemenNorthern(Mazar) 155,32753 26-01-10-2009 Office Administration & General ManagemenWestern 153,84754 05-09-10-2009 Leadership Management Eastern 159,570
Regions - Sub-Total in AFN 4,135,629Regions - Sub-Total in USD 82713