+ All Categories
Home > Documents > 0 Apache East N - OpenGov · Apache West Apache East 0.5 0 0.75 miles Apache East N UCMP Sub Areas...

0 Apache East N - OpenGov · Apache West Apache East 0.5 0 0.75 miles Apache East N UCMP Sub Areas...

Date post: 24-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
4
DRAFT CITY OF TEMPE URBAN CORE MASTER PLAN - APRIL 2019 19 Figure 2. Places with Potential to see Change by 2040 Union Pacific Railroad Parks and Preserves UCMP Project Area Streetcar TOD Focus Area Light Rail TOD Focus Area Areas for Balanced and Holistic Planning Downtown ASU Novus Apache West Apache East 0.5 0 0.75 miles N Apache East UCMP Sub Areas Proposed High Capacity Transit Future Premium Bus Route Light Rail Route and Stop Streetcar Route and Stop Smith Industrial Innovation Hub
Transcript
Page 1: 0 Apache East N - OpenGov · Apache West Apache East 0.5 0 0.75 miles Apache East N UCMP Sub Areas Light Rail Route and Stop Streetcar Route and Stop Future Premium Bus Route Proposed

DRAFT CITY OF TEMPE URBAN CORE MASTER PLAN - APRIL 2019 19

Figure 2. Places with Potential to see Change by 2040

Uni

on P

acifi

c Ra

ilroa

d

Park

s an

d Pr

eser

ves

UC

MP

Proj

ect A

rea

Stre

etca

r TO

D F

ocus

Are

a

Ligh

t Rai

l TO

D F

ocus

Are

aA

reas

for B

alan

ced

and

Hol

istic

Pla

nnin

g

Dow

ntow

n

ASU

Nov

us

Apa

che

Wes

t

Apa

che

East

0.5

00

.75

mile

sN

Apa

che

East

UC

MP

Sub

Are

as

Prop

osed

Hig

h C

apac

ity T

rans

itFu

ture

Pre

miu

m B

us R

oute

Ligh

t Rai

l Rou

te a

nd S

top

Stre

etca

r Rou

te a

nd S

top

Smit

h In

dust

rial

Inno

vati

on H

ub

Page 2: 0 Apache East N - OpenGov · Apache West Apache East 0.5 0 0.75 miles Apache East N UCMP Sub Areas Light Rail Route and Stop Streetcar Route and Stop Future Premium Bus Route Proposed

DRAFT CITY OF TEMPE URBAN CORE MASTER PLAN - APRIL 2019 21

Figure 3. Maximum Building Heights

0.5

00

.75

mile

sN

Dow

ntow

nA

SU N

ovus

Apa

che

East

Ligh

t Rai

l Rou

te a

nd S

top

Uni

on P

acifi

c Ra

ilroa

d

UC

MP

Proj

ect A

rea

UC

MP

Sub

Are

asLi

ght R

ail R

oute

and

Sto

p

Uni

on P

acifi

c Ra

ilroa

d

UC

MP

Proj

ect A

rea

UC

MP

Sub

Are

asPa

rks

and

Pres

erve

sSt

reet

car

Rout

e an

d St

opSt

reet

car

Rout

e an

d St

op45

feet

35 fe

et

55 fe

et

70 fe

et

UC

MP

Max

imum

Hei

ghts

90 fe

et

160

feet

130

feet

200

+ fe

et*

250

+ fe

et*

*To

be a

chei

ved

thro

ugh

a de

velo

pmen

t bo

nus

prog

ram

cur

rent

ly b

eing

cra

fted

Smith

Indu

stria

l Inn

ovat

ion

Hub

Apa

che

Wes

t

Smit

h In

dust

rial

Inno

vati

on H

ub

Page 3: 0 Apache East N - OpenGov · Apache West Apache East 0.5 0 0.75 miles Apache East N UCMP Sub Areas Light Rail Route and Stop Streetcar Route and Stop Future Premium Bus Route Proposed

DRAFT CITY OF TEMPE URBAN CORE MASTER PLAN - APRIL 2019 25

Figure 6. General Plan Land Use

Stre

etca

r Ro

ute

and

Stop

Ligh

t Rai

l Rou

te a

nd S

top

Uni

on P

acifi

c Ra

ilroa

d

UC

MP

Proj

ect A

rea

0.5

00

.75

mile

sN

Dow

ntow

nA

SU N

ovus

Apa

che

East

UC

MP

Sub

Are

as

Mix

ed U

se

Indu

stria

lM

ixed

Use

Indu

stria

l

Resi

dent

ial

Com

mer

cial

Civ

ic

Publ

ic R

ecre

atio

nal /

Cul

tura

l

Wat

er

Educ

atio

nal

Publ

ic O

pen

Spac

e

Smit

h In

dust

rial

Inno

vati

on H

ub

Apa

che

Wes

t

Page 4: 0 Apache East N - OpenGov · Apache West Apache East 0.5 0 0.75 miles Apache East N UCMP Sub Areas Light Rail Route and Stop Streetcar Route and Stop Future Premium Bus Route Proposed

26

Figure 7. General Plan Density

Low

to M

oder

ate

Den

sity

(up

to 9

du/

ac)

Low

Den

sity

(up

to 3

du/

ac)

Cul

tura

l Res

ourc

eM

ediu

m D

ensi

ty (u

p to

15

du/a

c)M

ediu

m D

ensi

ty to

Hig

h D

ensi

ty (u

p to

25

du/a

c)

Hig

h D

ensi

ty (u

p to

65

du/a

c)H

igh

Den

sity

Urb

an C

ore

Park

s an

d Pr

eser

ves

0.5

00

.75

mile

sN

Dow

ntow

nA

SU N

ovus

Apa

che

East

Uni

on P

acifi

c Ra

ilroa

d

UC

MP

Proj

ect A

rea

UC

MP

Sub

Are

asLi

ght R

ail R

oute

and

Sto

pSt

reet

car

Rout

e an

d St

op

Apa

che

Wes

t

Smit

h In

dust

rial

Inno

vati

on H

ub

Note: Proposed changes to the General Plan densities are as of 4/24/2019, and are being further reviewed


Recommended