Breiđaldalur Tunnel (D&B) shortly after huge water inflow from the fault 1 - 1993
Botnsheiđi Tunnel – D&B face. Water inflow from the fault 2 - 1993
Hydropower Kárahnjúkar Project – TBM excavation. Material washed out from the fault - 2005
Hydropower Kárahnjúkar Project – D&B tunnel. Water coming from the post-grouted fault - 2007
Héðinsfjarðargöng Project - leakage at the face of Ólafsfjörður Tunnel - 2007
Héðinsfjarðargöng Project - leakage at the face of Siglufjörður Tunnel - 2007
Hydropower Kárahnjúkar Project – TBM excavation. Collapsing tunnel crown in TBM section
Hydropower Kárahnjúkar Project – TBM excavation. Collapsing tunnel wall in TBM section
Hydropower Kárahnjúkar Project – TBM excavation. Overbreak in TBM tunnel
Hydropower Kárahnjúkar Project – TBM excavation. Slabbing
Hydropower Kárahnjúkar Project – TBM excavation. Overbreak in TBM tunnel
Hydropower Kárahnjúkar Project – TBM excavation. Leakages and „wash-out“ effect
Hydropower Kárahnjúkar Project – TBM excavation. Leakages and „wash-out“ effect
Hydropower Kárahnjúkar Project – TBM excavation. Material falling down from the wall
Hydropower Kárahnjúkar Project – TBM excavation. Material washed out from the fault
Héðinsfjarðargöng Project - leakage at the face of Ólafsfjörður Tunnel - 2007
Hydropower Kárahnjúkar Project – TBM excavation. Overbreak, ribbs and netting
Hydropower Kárahnjúkar Project – TBM excavation. Rock falling down from the fault and
overbreak