Mining Methods
Block 150
Level330
Level300
Level270
2
Stope 9А
Stage 1
Stage 260 m
Level330
Level300
Level270
Block 150
Slot raise
Down drill blasting holes
Block 150Stope 9А
Upper drill blasting holes
Level330
Level300
Level270
Stage 1
Stage 2
Mined stope
3D model (CMS)
Stage 1
Level330
Level300
Level270Block 150
Stope 9А
Stage 1
Stage 2
Slot raise
Pillar rings
Upper drill blasting holes
Stage 1
Stage 2
Level330
Level300
Level270Block 150
Stope 9А
Mined stope
3D model (CMS)
Stage 1 and 2
Stage 1
Stage 2
Level330
Level300
Level270Block 150
Stope 9А