BASIC B.I.M PRESENTATION
STEPHENSON & TURNER BUILDING INFORMATION MODELING (B.I.M)
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M Environment
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1
Everything should be as simple as it is, but not simpler.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1
Everything should be as simple as it is, but not simpler.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1
Everything should be as simple as it is, but not simpler.
Any intelligent fool can make things bigger & more complex...It takes a touch of genius and a lot of courage to move in the opposite direction.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1
Everything should be as simple as it is, but not simpler.
Any intelligent fool can make things bigger & more complex...It takes a touch of genius and a lot of courage to move in the opposite direction.
1. In this forum can we apply this principle?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
OBJECTIVE To have an open forum.
We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1
Everything should be as simple as it is, but not simpler.
Any intelligent fool can make things bigger & more complex...It takes a touch of genius and a lot of courage to move in the opposite direction.
1. In this forum can we apply this principle?
2. Disclaimer
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
Prior to defining the B.I.M process, one needs to ask the question:
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”
Why B.I.M ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”
Why B.I.M ?
Internationally B.I.M has been proven to be the most cost effective construction process
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”
Why B.I.M ?
Internationally B.I.M has been proven to be the most cost effective construction process
1 - Money
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
B.I.M, What is it ?
Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”
Why B.I.M ?
Internationally B.I.M has been proven to be the most cost effective construction process
1 - Money
2 - Demand for information
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client} Have the most to gain
No real cost in implementation
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
} Have the most to gain No real cost in implementation
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
}
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
4 - Main Design Team ( Primary Data User )
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
}
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
4 - Main Design Team ( Primary Data User )
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact
}
}
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
4 - Main Design Team ( Primary Data User )
5 - Larger Design Team ( Secondary Data User )
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact
}
}
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
4 - Main Design Team ( Primary Data User )
5 - Larger Design Team ( Secondary Data User )
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact
}
}
}Reduced cost due to better Input information, only if the model stays intactMinimal cost until 4D & 5D
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
4 - Main Design Team ( Primary Data User )
5 - Larger Design Team ( Secondary Data User )
6 - Sub Contractors ( Third Data User )
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact
}
}
}Reduced cost due to better Input information, only if the model stays intactMinimal cost until 4D & 5D
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Who are the main beneficiaries of the B.I.M process ?
1 - Tenant / Occupant
2 - Client
3 - Construction Company
4 - Main Design Team ( Primary Data User )
5 - Larger Design Team ( Secondary Data User )
6 - Sub Contractors ( Third Data User )
} Have the most to gain No real cost in implementation
Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D
New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact
}
}
}
}
Reduced cost due to better Input information, only if the model stays intactMinimal cost until 4D & 5D
Reduced cost due to 2D or 3D content for there shop drawings , only if the model stays intact.2D Minimal cost. 3D Increased cost.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance Analogy
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Woman
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.
The men want to impress and get the opportunity to have a dance.
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.
The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.
The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?Is this a singular partnership dance ?Or is this a group dance ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.
The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?Is this a singular partnership dance ?Or is this a group dance ?Do we all have the same song sheets ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
1 - Tenant / Occupant2 - Client1 & 2 can be combined
Who is Next ?( This is not a hierarchical structure )
Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.
The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?Is this a singular partnership dance ?Or is this a group dance ?Do we all have the same song sheets ?Is there a band leader ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - Documentation
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost
Client’s brief in a B.I.M environment:Clients give work to...?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost
Client’s brief in a B.I.M environment:Clients give work to...?
1- People they trust
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost
Client’s brief in a B.I.M environment:Clients give work to...?
1- People they trust2- People with the knowledge to achieve their goals
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost
Client’s brief in a B.I.M environment:Clients give work to...?
1- People they trust2- People with the knowledge to achieve their goals
3- Main goals: On time/ To budget / Max. profit
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers
In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost
Client’s brief in a B.I.M environment:Clients give work to...?
1- People they trust2- People with the knowledge to achieve their goals
3- Main goals: On time/ To budget / Max. profit4- To Specification
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
Do we have B.I.M contracts ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery
Consultant’s primary mission is ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery
Consultant’s primary mission is ?1- Provide value to clients
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery
Consultant’s primary mission is ?1- Provide value to clients2- B.I.M provides better value
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
Construction CompaniesWhere are they positioned?
QS & Project ManagersWhere are they positioned?
Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )
2 - Standard NZ Larger Project3 - Novated
What defines these contracts ? - NZIA Terms of engagement
Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery
Consultant’s primary mission is ?1- Provide value to clients2- B.I.M provides better value
THAT’S IT!!!
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver2- What the design team will deliver
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M
Consultants’ main point of difference regarding B.I.M:
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M
Consultants’ main point of difference regarding B.I.M:1- Multi- Disciplined Company Standards and processes Co-ordinated
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M
Consultants’ main point of difference regarding B.I.M:1- Multi- Disciplined Company Standards and processes Co-ordinated2- Fully understanding the B.I.M process
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)
How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education
(In-house & design team)
This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M
Consultants’ main point of difference regarding B.I.M:1- Multi- Disciplined Company Standards and processes Co-ordinated2- Fully understanding the B.I.M process3- Cloud technology
B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)