• Shoring steel delivery will be done early next week.
Text Box
• Current excavation depth is 30-35 feet • Dirt off-haul through end of the year • Installation of tie backs continues • Use caution and obey traffic control around the work site
sjlouie
Text Box
• Seismic retrofit work continues at roof; expect drilling noise and hand tools during this activity • Utility infrastructure work continues inside the job site. • No impacts to Santa Teresa or Panama Streets are anticipated 10/27-31
sjlouie
Text Box
• Installation of cable tie backs begins 10/27 - 10/31 • No dirt off-haul is planned 10/27 - 10/31 • Use caution and obey traffic control around the work site
HEADS UP is produced by the Stanford University Department of Project Management. For more information on our projects, visit our website: HEADSUP.stanford.edu Thank you in advance for your understanding and cooperation.
• Preparations for tree relocations and removals • Parking lots L-29 (Lagunita Lot) & L-31 (Roble Lot) remain closed
syuen23
Text Box
• Demolition of mezzanine level & trusses continues • Concrete foundation pour at courtyard on Panama Mall • General layout of roof trusses
elandy
Group
syuen23
Rectangle
syuen23
Text Box
SANTA TERESA BIKE IMPROVEMENTS
syuen23
Text Box
• Grading and concrete formwork on north side of Santa Teresa through end of October or early November; please use sidewalks on south side of Santa Teresa during this time. • After restoration of sidewalk on north side of Santa Teresa, concrete demolition on south side of Santa Teresa will begin.