    1 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Introduction to Parameter Planning

    BSSPAR

    Module 00

  • 8/11/2019 00_Introduction to Parameter Planning

    2/10

    2 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Legal Notice

    Intellectual Property Rights

    All copyrights and intellectual property rights for Nokia training documentation,

    product documentation and slide presentation material, all of which are forthwithknown as Nokia training material, are the exclusive property of Nokia. Nokia ownsthe rights to copying, modification, translation, adaptation or derivatives includingany improvements or developments. Nokia has the sole right to copy, distribute,

    amend, modify, develop, license, sublicense, sell, transfer and assign the Nokiatraining material.

    Individuals can use the Nokia training material for their own personal self-

    development only, those same individuals cannot subsequently pass on that sameIntellectual Property to others without the prior written agreement of Nokia.

    The Nokia training material cannot be used outside of an agreed Nokia trainingsession for development of groups without the prior written agreement of Nokia.

  • 8/11/2019 00_Introduction to Parameter Planning

    3/10

    3 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Module Objectives

    At the end of the module, the participant will be able to:

    Sketch a BSS Managed Object Hierarchy

    Look up the parameters at each level, in a parameter dictionary Identify parameter value ranges and default settings

    Find the changes to objects and parameters, that occur with each BSS softwarerelease

    Introductionto Parameter

    Planning

  • 8/11/2019 00_Introduction to Parameter Planning

    4/10

    4 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Managed Object Hierarchy

    ADJC FHS

    RTSL

    TRX HOC POC

    BTS

    HW-DB

    BTS-SW

    BCFMABA

    BSC

    Introductionto Parameter

    Planning

    Segmen

    t!

  • 8/11/2019 00_Introduction to Parameter Planning

    5/10

    5 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Example of a BSC Level ParameterIntroductionto ParameterPlanning

  • 8/11/2019 00_Introduction to Parameter Planning

    6/10

    6 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Example of a BCF Level ParameterIntroductionto ParameterPlanning

  • 8/11/2019 00_Introduction to Parameter Planning

    7/10

    7 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Example of a BTS Level ParameterIntroductionto ParameterPlanning

  • 8/11/2019 00_Introduction to Parameter Planning

    8/10

    8 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Example from theBSS and NSS RNW Par. Dictionary

    Introductionto Parameter

    Planning

  • 8/11/2019 00_Introduction to Parameter Planning

    9/10

    9 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    Example of a Summary of ChangesIntroductionto ParameterPlanning

  • 8/11/2019 00_Introduction to Parameter Planning

    10/10

    10 BSSPAR-Introduction to Parameter Planning 2006. 13-467817-V3 NOKIA

    MOC Call Phases

    MS BTS BSC

    AUTHENTICATION (SDCCH)Phase 2 : MM signalling

    CIPHERING MODE (SDCCH)Phase 8 : Ciphering

    TMSI REALLOCATION (SDCCH)

    SETUP (SDCCH)

    Phase 2 : MM signalling

    CH. REQUEST (RACH)

    IMMEDIATE ASSIGN(AGCH)

    SERVICE REQUEST (SDCCH)

    Phase 1 : Paging, initial MS

    CH.RELEASEPhase 4 : Release

    ALERTING & CONNECT (FACCH)Phase 2 : MM signalling

    CONN. ACK. and MEASUREMENTPhase 15 : Conversation

    DISCONNECT & RELEASE (FACCH) Phase 4 : Release

    ASSIGNMENT (SDCCH-FACCH)Phase 3 : Basic assignment

    Introductionto Parameter

    Planning