+ All Categories
Home > Documents > 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water...

0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water...

Date post: 22-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
30
North Los Angeles / Kern County Recycled Water Project ES-1 ESA / 206359 Final PEIR November 2008 EXECUTIVE SUMMARY ES.1 Introduction The Los Angeles County Waterworks District No. 40, Antelope Valley (LACWWD40) as the Lead Agency has prepared this Final Program Environmental Impact Report (PEIR) in consultation with the following Responsible Agencies: the City of Lancaster, the City of Palmdale, the Rosamond Community Services District (RCSD), the County Sanitation Districts Nos. 14 and 20 of Los Angeles County (LACSD Nos. 14 and 20), Palmdale Water District (PWD), Antelope Valley-East Kern Water Agency (AVEK), and Quartz Hill Water District (QHWD). This Final PEIR has been prepared to provide information about the potential effects on the local and regional environment associated with the North Los Angeles/Kern County Regional Recycled Water Project (proposed project). The purpose of the proposed project is to construct a regional recycled water distribution system to help meet the growing demand for water in the region. The proposed project would be located in the Antelope Valley, which encompasses approximately 2,400 square miles in northern Los Angeles County, southern Kern County, and western San Bernardino County. The proposed project would be located within several cities including the City of Palmdale, the City of Lancaster, the Town of Rosamond, and portions of unincorporated Los Angeles County including Quartz Hill. This Final PEIR has been prepared in compliance with the California Environmental Quality Act (CEQA) of 1970 (as amended), codified at California Public Resources Code Sections 21000 et. seq.; the State CEQA Guidelines in the Code of Regulations, Title 14, Division 6, Chapter 3; and CEQA-Plus requirements of the State Water Resources Control Board. Inquiries about the proposed project should be directed to: Los Angeles County Waterworks District No. 40 Attn: Jonathan King 900 South Fremont Avenue Alhambra, CA 91803 FAX: (626) 300-3385
Transcript
Page 1: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

North Los Angeles / Kern County Recycled Water Project ES-1 ESA / 206359 Final PEIR November 2008

EXECUTIVE SUMMARY

ES.1 Introduction The Los Angeles County Waterworks District No. 40, Antelope Valley (LACWWD40) as the Lead Agency has prepared this Final Program Environmental Impact Report (PEIR) in consultation with the following Responsible Agencies: the City of Lancaster, the City of Palmdale, the Rosamond Community Services District (RCSD), the County Sanitation Districts Nos. 14 and 20 of Los Angeles County (LACSD Nos. 14 and 20), Palmdale Water District (PWD), Antelope Valley-East Kern Water Agency (AVEK), and Quartz Hill Water District (QHWD). This Final PEIR has been prepared to provide information about the potential effects on the local and regional environment associated with the North Los Angeles/Kern County Regional Recycled Water Project (proposed project). The purpose of the proposed project is to construct a regional recycled water distribution system to help meet the growing demand for water in the region.

The proposed project would be located in the Antelope Valley, which encompasses approximately 2,400 square miles in northern Los Angeles County, southern Kern County, and western San Bernardino County. The proposed project would be located within several cities including the City of Palmdale, the City of Lancaster, the Town of Rosamond, and portions of unincorporated Los Angeles County including Quartz Hill.

This Final PEIR has been prepared in compliance with the California Environmental Quality Act (CEQA) of 1970 (as amended), codified at California Public Resources Code Sections 21000 et. seq.; the State CEQA Guidelines in the Code of Regulations, Title 14, Division 6, Chapter 3; and CEQA-Plus requirements of the State Water Resources Control Board.

Inquiries about the proposed project should be directed to:

Los Angeles County Waterworks District No. 40 Attn: Jonathan King 900 South Fremont Avenue Alhambra, CA 91803 FAX: (626) 300-3385

Page 2: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Executive Summary

North Los Angeles / Kern County Recycled Water Project ES-2 ESA / 206359 Final PEIR November 2008

ES.2 Background The Antelope Valley is faced with serious challenges with respect to management of water and wastewater resources in the region. The population in the Antelope Valley is expected to increase by 161 percent by 2035 (RWMG, 2007). Currently, the demand for potable water exceeds supply in the region, and by 2035 this demand is expected to double (RWMG, 2007). Wastewater discharges also will increase in the future as population increases.

The Regional Water Management Group (RWMG) is a collection of 11 local agencies that are working collectively to resolve the water management challenges in the Antelope Valley. LACWWD40 and the partner agencies that are sponsoring the proposed project are members of the RWMG. Currently, the demand for potable water in the region is met largely by water imported through the State Water Project and groundwater pumped from the Antelope Valley Groundwater Basin. Imported water supplies are becoming less reliable; the AV Groundwater Basin is facing overdraft conditions; and the water rights of overlying landowners of the AV Groundwater Basin have not yet been adjudicated (although this process is currently under way) (DWR, 2008; RWMG, 2007). Thus, under current conditions, imported water and groundwater can not be expected to accommodate the future water demands of a growing population in the Antelope Valley. As a result, the RWMG is tasked with finding creative solutions for finding new sources of water for Antelope Valley residents.

The RWMG has prepared the Integrated Regional Water Management Plan (IRWMP) for the Antelope Valley as a roadmap for resolving the water management challenges in the region. The proposed project is identified in the IRWMP as a project that addresses the need for both increased water supplies and wastewater effluent management. The proposed project would provide a backbone system for distribution of recycled water throughout the Antelope Valley.

ES.3 Project Objectives The objectives of the proposed project are as follows:

• Provide recycled water conveyance backbone infrastructure sufficient to accommodate planned regional recycled water demands;

• Integrate regional recycled water production, distribution, and re-use capabilities in the Antelope Valley;

• Provide conveyance, storage, and pumping capacity sufficient to accommodate peak future demands;

• Reduce the region’s dependency on imported water; • Augment local water supplies; • Promote the State’s policies for beneficial reuse of recycled water to replace potable water

where possible.

Page 3: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Executive Summary

North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008

ES.4 Project Description The proposed project would include the following components: approximately 70 miles of recycled water conveyance pipelines, four storage reservoirs, two distribution pump stations, and two booster pump stations (Figure ES-1). The proposed project would provide the primary backbone system for distribution of recycled water to end users in the Antelope Valley. The end users would include but would not be limited to the following:

• Municipal and industrial (M&I) applications; • Agricultural irrigation1; • Cooling water for power plants; and • Groundwater recharge.

For existing and future end users identified to-date, the annual demand for recycled water in the Antelope Valley is estimated at 21,210 afy at buildout. The system capacity of the proposed project would be designed to meet this demand. This demand includes 17,491 afy for M&I end uses in Los Angeles County (Kennedy/Jenks, 2006), plus 1,119 afy for M&I end uses in Kern County (Seal, 2008), and 2,600 afy for use as cooling water at the planned Palmdale Hybrid Power Plant.

Recycled water use would comply with the California Department of Public Health recycled water regulations contained in Title 22 of the California Code of Regulations (see Chapter 1, Introduction for additional information). In addition, the proposed project would be subject to conditions imposed by the Regional Water Quality Control Board (RWQCB) pursuant to Water Recycling Requirements (WRRs). The proposed project would be constructed in phases, subject to funding and the identification of recycled water users. Each component would be constructed by LACWWD40 or one of the Responsible Agencies as part of the regional backbone distribution system.

This PEIR provides project-level coverage for the following project components: construction and operation of the recycled water pipelines and M&I applications for recycled water. The analysis of these components is conducted at a sufficient level of detail such that additional environmental documentation is not necessary. In other words, these project components are evaluated at a level of detail that is typically provided for a project EIR (CEQA Guidelines §15161).

Program-level coverage is provided for the remaining components of the proposed project, which include the following: construction and operation of the proposed pump stations and storage reservoirs, and the use of recycled water for agricultural irrigation (agricultural reuse), cooling water at power plants, and groundwater recharge. Prior to implementation of these components, additional analysis is required to determine the need for subsequent environmental documentation.

1 The Facilities Plans for the PWRP and LWRP include agricultural effluent management sites for application of

recycled water produced at both reclamation plants (LACSD No. 14, 2004; LACSD No. 20, 2005). The environmental effects of using recycled water for agricultural irrigation at these effluent management sites have been evaluated pursuant to CEQA in previous environmental documents (see Chapter 1, Section 1.5.2). This proposed project does not include these agricultural effluent management areas.

Page 4: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Kern CountyLos Angeles County

North LA/Kern County Regional Recycled Water Project . 206359

Figure ES-1Existing and Proposed Facilities

SOURCE: Kennedy/Jenks Consultants; ESA

Rosamond WWTP

Lancaster WRP

PalmdaleWRP

Existing Reservoir

Proposed Reservoir

Existing Waste Water Treatment Plant

Existing Pump Station

Proposed Pump Station

Existing Recycled Water Pipeline

Proposed Recycled Water Pipeline

Ave E

Rosamond Blvd

Ave D

Ave F

Ave L

Ave G

Ave I

Ave J

Ave K

Ave L

Ave P

Palmdale Blvd

Ave S

Ave T

Ave M

50th St E

40th St E

30th St E

20th St E

10th St E

60th

St W

30th

St W

Div

isio

n S

t

Sierra H

wy

90th St E

14

14

138AREA OFDETAIL

Reservoir 4

Reservoir 3

Reservoir 1

Reservoir 2

Booster PS 1

Booster PS 2

Distribution PS 1

Distribution PS 2

0 4

Miles

Gaskell RdMoj

ave

Trop

ico

Rd

Distribution PS 1A

Page 5: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Executive Summary

North Los Angeles / Kern County Recycled Water Project ES-5 ESA / 206359 Final PEIR November 2008

ES.5 Project Alternatives An EIR must describe a range of reasonable alternatives to the proposed project or alternative project locations that could feasibly attain most of the basic project objectives and would avoid or substantially lessen any of the significant environmental impacts to the proposed project. The alternatives analysis must include the “No Project Alternative” as a point of comparison. The No Project Alternative includes existing conditions and reasonably foreseeable future conditions that would exist if the proposed project were not approved (CEQA Guidelines §15126.6). The following alternatives are discussed further in Chapter 6, Alternatives Analysis. CEQA also requires that an EIR identify an environmentally preferred alternative (CEQA Guidelines §15126.6[e][2]).

No-Project Alternative Under the No-Project Alternative, LACWWD40 and the partner agencies would not implement the Regional Recycled Water Project. The LWRP, PWRP, and RWWTP would be upgraded as planned to produce tertiary-treated effluent; however, there would be no integrated system to distribute this recycled water to end users in the Antelope Valley. LACSD Nos. 14 and 20 would manage recycled water with agricultural reuse only. RCSD would need to develop alternative measures for discharge or distribution of the recycled water produced at the RWWTP. Under the No-Project Alternative, future water demand in the Antelope Valley would continue to grow and would be met with increased quantities of groundwater, surface water, and imported water, and/or increased conservation measures.

Alternative 1: Non-Integrated System Under Alternative 1, instead of implementing the proposed project, LACWWD40, PWD, QHWD, and RCSD would design, construct, and operate their own recycled water systems. Alternative 1 would result in four separate recycled water systems in the Antelope Valley instead of one integrated regional system. LACWWD40 would construct recycled water pipelines, pump stations, and storage reservoirs within its service area. LACWWD40 would contract independently with LACSD No. 14, LACSD No. 20, and RCSD to purchase recycled water for the end users in its service area.

ES.6 Summary of Impacts Table ES-1, at the end of this chapter, presents a summary of the impacts and mitigation measures identified for the proposed project. The complete impact statements and mitigation measures are presented in Chapter 3, Environmental Setting, Impacts, and Mitigation Measures. The level of significance for each impact was determined using significance criteria (thresholds) developed for each category of impacts; these criteria are presented in the appropriate sections of Chapter 3. Significant impacts are those adverse environmental impacts that meet or exceed the significance thresholds; less-than-significant impacts would not exceed the thresholds. Table ES-

Page 6: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Executive Summary

North Los Angeles / Kern County Recycled Water Project ES-6 ESA / 206359 Final PEIR November 2008

1 indicates the measures that will be implemented to avoid, minimize, or otherwise reduce significant impacts to a less-than-significant level.

ES.7 Organization of this PEIR This Final PEIR has been organized into the following sections:

ES. Executive Summary. This chapter summarizes the contents of the Final PEIR.

1. Introduction and Project Background. This section discusses the CEQA process and the purpose of the PEIR.

2. Project Description. This section provides an overview of the proposed project, describes the need for and objectives of the proposed project, and provides detail on the characteristics of the proposed project.

3. Environmental Setting, Impacts and Mitigation Measures. This chapter describes the environmental setting and identifies impacts of the proposed project for each of the following environmental resource areas: Aesthetics; Air Quality; Biological Resources; Cultural Resources; Geology and Soils; Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Agriculture; Noise; Environmental Justice; Transportation and Traffic; and Utilities and Service Systems. Measures to mitigate the impacts of the proposed project are presented for each resource area.

4. Cumulative Impacts. This chapter describes the potential impacts of the proposed project when considered together with other related projects in the project area.

5. Growth Inducement. This chapter describes the potential for the proposed project to induce growth.

6. Alternatives Analysis. This chapter presents an overview of the alternatives development process and describes the alternatives to the proposed project that were considered.

7. References.

8. Report Preparers. This chapter identifies authors and consultants involved in preparing this Final PEIR, including persons and organizations consulted.

9. Acronyms.

10. Comment Letters. This chapter includes all comment letter received during the Draft PEIR public comment period.

11. Response to Comments. This chapter includes written responses to all comment letters received during the Draft PEIR public comment period (Chapter 10).

12. Lead Agency Revisions to Final PEIR: This chapter includes revisions to the Draft PEIR made by the Lead Agency in addition to those included in Chapter 11 as a result of responses to comments.

Page 7: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-7

E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

TAB

LE E

S-1

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

Aest

hetic

s

3.1-

1: C

onst

ruct

ion

of th

e pr

opos

ed re

cycl

ed w

ater

pip

elin

e co

uld

gene

rate

sho

rt-te

rm im

pact

s to

aes

thet

ic re

sour

ces.

3.

1-1:

Fol

low

ing

cons

truct

ion

activ

ities

, the

impl

emen

ting

agen

cies

sha

ll re

stor

e di

stur

bed

area

s by

rees

tabl

ishi

ng p

re-e

xist

ing

cond

ition

s in

clud

ing

topo

grap

hy, r

epav

ing

road

way

s, re

plan

ting

trees

, and

/or

rese

edin

g w

ith a

nat

ive

seed

mix

typi

cal o

f the

imm

edia

te s

urro

undi

ng

area

. The

impl

emen

ting

agen

cies

sha

ll be

resp

onsi

ble

for m

onito

ring

the

repl

ante

d ar

eas

to e

nsur

e th

at re

vege

tatio

n is

suc

cess

ful.

Less

than

sig

nific

ant

3.1-

2: C

onst

ruct

ion

and

oper

atio

n of

the

prop

osed

sto

rage

rese

rvoi

rs

and

pum

p st

atio

ns c

ould

resu

lt in

sig

nific

ant i

mpa

cts

to a

esth

etic

re

sour

ces.

3.1-

2a: T

he im

plem

entin

g ag

enci

es s

hall

atte

mpt

to lo

cate

pum

p st

atio

ns a

nd re

serv

oirs

in a

reas

that

are

com

patib

le w

ith e

xist

ing

view

s an

d vi

stas

.

3.1-

2b: D

urin

g pr

ojec

t des

ign,

the

impl

emen

ting

agen

cies

sha

ll pr

epar

e a

land

scap

e pl

an fo

r eac

h ab

oveg

roun

d pr

ojec

t com

pone

nt. T

he

land

scap

e pl

an s

hall

incl

ude

mea

sure

s to

rest

ore

dist

urbe

d ar

eas

by

rees

tabl

ishi

ng e

xist

ing

topo

grap

hy, i

nclu

ding

repl

antin

g tre

es a

nd/o

r re

seed

ing

with

a n

ativ

e se

ed m

ix ty

pica

l of t

he im

med

iate

ly s

urro

undi

ng

area

. The

land

scap

e pl

an s

hall

incl

ude

a re

quire

d se

ed m

ix a

nd p

lant

pa

late

. Veg

etat

ion

scre

enin

g sh

all b

e in

clud

ed in

the

land

scap

e pl

an in

or

der t

o sh

ield

pro

pose

d ab

oveg

roun

d fa

cilit

ies

from

pub

lic v

iew

. The

la

ndsc

ape

plan

sha

ll in

clud

e a

mon

itorin

g pl

an to

ens

ure

that

the

site

re

stor

atio

n an

d th

e es

tabl

ishm

ent o

f veg

etat

ion

is s

ucce

ssfu

l.

3.1-

2c: T

he im

plem

entin

g ag

enci

es s

hall

ensu

re th

at s

tora

ge re

serv

oir

desi

gns

incl

ude

non-

glar

e ex

terio

r coa

tings

that

are

col

ored

an

earth

to

ne to

ble

nd in

with

the

surr

ound

ing

land

scap

e.

Less

than

sig

nific

ant

3.1-

3: O

pera

tion

of th

e pr

opos

ed s

tora

ge re

serv

oirs

and

pum

p st

atio

ns

coul

d re

sult

in a

dditi

onal

ligh

t and

gla

re im

pact

s du

e to

nig

httim

e se

curit

y lig

htin

g.

3.1-

3: T

he e

xter

ior l

ight

ing

inst

alle

d ar

ound

the

stor

age

rese

rvoi

rs a

nd

pum

p st

atio

ns s

hall

be o

f a m

inim

um s

tand

ard

requ

ired

to e

nsur

e sa

fe

visi

bilit

y. L

ight

ing

shal

l be

shie

lded

and

dire

cted

dow

nwar

d, a

way

from

ne

ighb

orin

g la

nd u

ses

to m

inim

ize

impa

cts

of li

ght a

nd g

lare

.

Less

than

sig

nific

ant

3.1-

4: A

pplic

atio

n of

recy

cled

wat

er fo

r gro

undw

ater

rech

arge

cou

ld

resu

lt in

sig

nific

ant i

mpa

cts

to a

esth

etic

reso

urce

s.

Impl

emen

t Miti

gatio

n M

easu

re 3

.1-2

b.

Less

than

sig

nific

ant

Air Q

ualit

y

3.2-

1: T

he p

ropo

sed

proj

ect c

ould

con

flict

with

or o

bstru

ct

impl

emen

tatio

n of

the

appl

icab

le a

ir qu

ality

pla

n.

3.2-

1a: T

he im

plem

entin

g ag

enci

es s

hall

incl

ude

in c

ontra

ctor

sp

ecifi

catio

ns th

e im

plem

enta

tion

of a

fugi

tive

dust

con

trol p

rogr

am

purs

uant

to th

e pr

ovis

ions

of A

VAQ

MD

Rul

e 40

3 or

KC

AP

CD

Rul

e 40

2.

3.2-

1b: A

ll co

nstru

ctio

n eq

uipm

ent s

hall

be p

rope

rly tu

ned

and

mai

ntai

ned

in a

ccor

danc

e w

ith m

anuf

actu

rer’s

spe

cific

atio

ns.

3.2-

1c: G

ener

al c

ontra

ctor

s sh

all m

aint

ain

and

oper

ate

cons

truct

ion

equi

pmen

t so

as to

min

imiz

e ex

haus

t em

issi

ons.

Dur

ing

cons

truct

ion,

tru

cks

and

vehi

cles

in lo

adin

g an

d un

load

ing

queu

es s

hall

turn

thei

r en

gine

s of

f whe

n no

t in

use

to re

duce

veh

icle

em

issi

ons.

Con

stru

ctio

n

Less

than

sig

nific

ant

Page 8: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-8

E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

emis

sion

s sh

all b

e ph

ased

and

sch

edul

ed to

avo

id e

mis

sion

s pe

aks

and

disc

ontin

ued

durin

g se

cond

-sta

ge s

mog

ale

rts.

3.2-

1d: E

lect

ricity

from

pow

er p

oles

rath

er th

an te

mpo

rary

die

sel-

or

gaso

line-

pow

ered

gen

erat

ors

shal

l be

used

to th

e ex

tent

feas

ible

.

3.2-

1e: A

ll co

nstru

ctio

n ve

hicl

es s

hall

be p

rohi

bite

d fro

m id

ling

in

exce

ss o

f fiv

e m

inut

es, b

oth

on- a

nd o

ff-si

te.

3.2-

1f: T

he p

roje

ct a

pplic

ant s

hall

utili

ze c

oatin

gs a

nd s

olve

nts

that

are

co

nsis

tent

with

app

licab

le A

VA

QM

D o

r KC

AP

CD

rule

s an

d re

gula

tions

.

3.2-

2: C

onst

ruct

ion

activ

ities

ass

ocia

ted

with

pip

elin

e co

nstru

ctio

n co

uld

gene

rate

sub

stan

tial a

mou

nts

of d

ust a

nd o

ther

crit

eria

pol

luta

nt

emis

sion

s.

Impl

emen

t Miti

gatio

n M

easu

res

3.2-

1a th

roug

h 3.

2-1f

. Le

ss th

an s

igni

fican

t

3.2-

3: O

pera

tion

of th

e pi

pelin

es w

ould

resu

lt in

min

imal

em

issi

ons

of

crite

ria a

ir po

lluta

nts.

N

one

requ

ired.

Le

ss th

an s

igni

fican

t

3.2-

4: O

pera

tion

of th

e pi

pelin

e w

ould

not

cre

ate

obje

ctio

nabl

e od

ors

affe

ctin

g a

subs

tant

ial n

umbe

r of p

eopl

e.

Non

e re

quire

d.

Less

than

sig

nific

ant

3.2-

5: T

he p

ropo

sed

proj

ect w

ould

resu

lt in

few

er g

reen

hous

e ga

s em

issi

ons

than

wou

ld re

sult

from

impo

rting

a s

imila

r am

ount

of w

ater

. N

one

requ

ired.

Le

ss th

an s

igni

fican

t

3.2-

6: C

onst

ruct

ion

activ

ities

ass

ocia

ted

with

rese

rvoi

rs a

nd p

ump

stat

ions

cou

ld g

ener

ate

subs

tant

ial a

mou

nts

of d

ust a

nd o

ther

crit

eria

po

lluta

nt e

mis

sion

s.

Impl

emen

t Miti

gatio

n M

easu

res

3.2-

1a th

roug

h 3.

2-1f

. Le

ss th

an s

igni

fican

t

3.2-

7: O

pera

tion

of th

e re

serv

oirs

and

pum

p st

atio

ns w

ould

resu

lt in

m

inim

al o

pera

tiona

l em

issi

ons

of c

riter

ia a

ir po

lluta

nts.

N

one

requ

ired.

Le

ss th

an s

igni

fican

t

Biol

ogica

l Res

ourc

es

3.3-

1: C

onst

ruct

ion

of th

e pi

pelin

e co

uld

have

a s

ubst

antia

l adv

erse

ef

fect

on

liste

d, c

andi

date

or s

peci

al-s

tatu

s gr

ound

dw

ellin

g w

ildlif

e sp

ecie

s in

clud

ing

the

Cal

iforn

ia re

d-le

gged

frog

and

Moh

ave

grou

nd

squi

rrel

.

3.3-

1a: T

he im

plem

entin

g ag

enci

es s

hall

have

a q

ualif

ied

biol

ogis

t co

nduc

t a p

re-c

onst

ruct

ion

field

reco

nnai

ssan

ce s

urve

y fo

r spe

cial

-st

atus

gro

und-

dwel

ling

spec

ies

with

in th

e co

nstru

ctio

n rig

ht-o

f-way

. If

pote

ntia

l for

spe

cial

-sta

tus

grou

nd-d

wel

ling

spec

ies

is id

entif

ied

then

pr

esen

ce/a

bsen

ce p

roto

col s

urve

ys s

hall

be c

ondu

cted

. If p

roto

col

surv

eys

iden

tify

the

pres

ence

of s

peci

al-s

tatu

s gr

ound

-dw

ellin

g sp

ecie

s,

the

impl

emen

ting

agen

cies

sha

ll co

nsul

t with

CD

FG to

det

erm

ine

furth

er re

quire

d m

itiga

tion.

3.3-

1b: T

he im

plem

entin

g ag

enci

es s

hall

avoi

d im

pact

s on

Cal

iforn

ia

red-

legg

ed fr

og b

y el

imin

atin

g co

nstru

ctio

n ac

tiviti

es w

ithin

are

as w

here

th

e sp

ecie

s m

ay o

ccur

. Im

plem

entin

g ag

enci

es s

hall

empl

oy tu

nnel

ing

or ja

ck a

nd b

ore

cons

truct

ion

met

hods

und

er d

rain

ages

that

may

su

ppor

t Cal

iforn

ia re

d-le

gged

frog

in o

rder

to a

void

impa

ctin

g th

e sp

ecie

s.

Less

than

sig

nific

ant

Page 9: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-9

E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.3-

1c: T

he im

plem

entin

g ag

enci

es s

hall

stak

e, fl

ag, f

ence

, or

othe

rwis

e cl

early

del

inea

te th

e co

nstru

ctio

n rig

ht-o

f-way

that

rest

ricts

th

e lim

its o

f con

stru

ctio

n to

the

min

imum

nec

essa

ry to

impl

emen

t the

pr

ojec

t nea

r are

as th

at m

ay s

uppo

rt C

alifo

rnia

red-

legg

ed fr

ogs

as

dete

rmin

ed b

y a

qual

ified

bio

logi

st.

3.3-

1d: T

he im

plem

entin

g ag

enci

es s

hall

inst

all a

silt

fenc

e or

som

e ot

her i

mpe

rmea

ble

barr

ier t

o ex

clud

e sm

all w

ildlif

e sp

ecie

s fro

m

ente

ring

the

activ

e w

ork

area

s. E

xclu

sion

fenc

ing

can

be li

mite

d to

ar

eas

of d

ocum

ente

d oc

curr

ence

s of

spe

cial

-sta

tus

wild

life

as

dete

rmin

ed d

urin

g pr

e-co

nstru

ctio

n su

rvey

s by

a q

ualif

ied

biol

ogis

t.

3.3-

1e: P

rior t

o pr

ojec

t im

plem

enta

tion,

a h

abita

t ass

essm

ent w

ill b

e co

nduc

ted

by a

qua

lifie

d bi

olog

ist t

o de

term

ine

the

pote

ntia

l for

the

Moh

ave

grou

nd s

quirr

el to

occ

ur w

ithin

con

stru

ctio

n zo

nes.

If th

e ha

bita

t ass

essm

ent d

eter

min

es th

at p

oten

tial h

abita

t for

the

Moh

ave

grou

nd s

quirr

el is

pre

sent

in th

e im

pact

zon

e or

with

in 3

00 fe

et o

f the

co

nstru

ctio

n zo

ne, t

hen

the

impl

emen

ting

agen

cies

hav

e tw

o op

tions

: 1)

assu

me

the

Moh

ave

grou

nd s

quirr

el is

pre

sent

and

eith

er ta

ke th

e st

eps

nece

ssar

y to

avo

id a

ny p

oten

tial d

irect

or i

ndire

ct im

pact

s (i.

e.,

cons

truct

ion

nois

e an

d du

st) t

hat m

ay b

e in

curr

ed b

y th

e M

ohav

e gr

ound

squ

irrel

or 2

) arr

ange

for a

qua

lifie

d bi

olog

ist w

ith th

e ne

cess

ary

perm

its to

impl

emen

t a tr

appi

ng p

rogr

am to

det

erm

ine

the

pres

ence

or

abse

nce

of th

e M

ohav

e gr

ound

squ

irrel

. If M

ohav

e gr

ound

squ

irrel

is

iden

tifie

d as

pre

sent

or a

ssum

ed p

rese

nt, i

mpl

emen

ting

agen

cies

sha

ll ob

tain

an

inci

dent

al ta

ke p

erm

it fro

m C

DFG

pur

suan

t to

Sec

tion

2081

of

the

Cal

iforn

ia F

ish

and

Gam

e C

ode

and

prov

ide

com

pens

atio

n at

a

ratio

det

erm

ined

by

CD

FG.

3.3-

1f: P

rior t

o pr

ojec

t im

plem

enta

tion,

a b

urro

win

g ow

l pr

esen

ce/a

bsen

ce s

urve

y sh

all b

e co

nduc

ted

by a

qua

lifie

d bi

olog

ist i

n ac

cord

ance

with

CD

FG’s

199

5 S

taff

Rep

ort o

n B

urro

win

g O

wl

Miti

gatio

n an

d th

e B

urro

win

g O

wl C

onso

rtium

’s 1

992

Bur

row

ing

Ow

l P

roto

col a

nd M

itiga

tion

Gui

delin

es to

det

erm

ine

the

pote

ntia

l for

the

burr

owin

g ow

l to

occu

r with

in im

pact

ed a

reas

and

con

stru

ctio

n zo

nes.

If

the

surv

ey re

sults

in d

isco

very

of b

urro

win

g ow

l, si

gn, o

r pot

entia

l bu

rrow

site

s in

the

impa

ct z

one,

then

add

ition

al s

urve

ys s

hall

be

perfo

rmed

dur

ing

the

bree

ding

sea

son

(Apr

il 15

to J

uly

15) i

n ac

cord

ance

with

the

1992

Gui

delin

es to

det

erm

ine

use

of th

e si

te b

y bu

rrow

ing

owl.

Follo

win

g th

is s

urve

y, th

e im

plem

entin

g ag

enci

es s

hall

cons

ult w

ith C

DFG

to d

eter

min

e av

oida

nce

or m

itiga

tion

mea

sure

to

min

imiz

e pr

ojec

t im

pact

s to

bur

row

ing

owl.

3.3-

2: C

onst

ruct

ion

of th

e pi

pelin

e co

uld

have

a s

ubst

antia

l adv

erse

ef

fect

on

liste

d, c

andi

date

or s

peci

al-s

tatu

s ba

t and

avi

an s

peci

es

incl

udin

g th

e S

wai

nson

’s h

awk,

Am

eric

an p

ereg

rine

falc

on,

3.3-

2a: P

rior t

o an

y gr

ound

-dis

turb

ing

activ

ities

, the

impl

emen

ting

agen

cies

sha

ll ha

ve a

qua

lifie

d bi

olog

ist c

ondu

ct a

pre

-con

stru

ctio

n sp

ring/

sum

mer

act

ive

seas

on re

conn

aiss

ance

sur

vey

for

nest

ing/

roos

ting

spec

ial-s

tatu

s m

obile

bird

and

bat

spe

cies

, and

oth

er

Less

than

sig

nific

ant

Page 10: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

0 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

sout

hwes

tern

will

ow fl

ycat

cher

, and

leas

t Bel

l’s v

ireo.

ne

stin

g bi

rds

with

in 3

00 fe

et (5

00 fe

et fo

r rap

tors

) of t

he c

onst

ruct

ion

limits

of e

ach

proj

ect e

lem

ent t

o de

term

ine

and

map

the

loca

tion

and

exte

nt o

f spe

cial

-sta

tus

spec

ies

occu

rren

ce(s

) tha

t cou

ld b

e af

fect

ed b

y th

e pr

ojec

t.

3.3-

2b: T

he im

plem

entin

g ag

enci

es s

hall

avoi

d di

rect

impa

cts

on a

ny

nest

ing

bird

s lo

cate

d w

ithin

the

limits

of c

onst

ruct

ion.

Thi

s co

uld

be

acco

mpl

ishe

d by

est

ablis

hing

the

cons

truct

ion

right

of w

ay a

nd re

mov

al

of p

lant

mat

eria

l out

side

of t

he ty

pica

l bre

edin

g se

ason

(Feb

ruar

y 1

thro

ugh

Aug

ust 3

1).

3.3-

2c: I

f con

stru

ctio

n an

d ve

geta

tion

rem

oval

is p

ropo

sed

for t

he b

ird

nest

ing

perio

d Fe

brua

ry 1

thro

ugh

Aug

ust 3

1, th

en p

reco

nstru

ctio

n su

rvey

s fo

r nes

ting/

roos

ting

bird

and

bat

s sp

ecie

s sh

all b

egin

30

days

pr

ior t

o co

nstru

ctio

n di

stur

banc

e w

ith s

ubse

quen

t wee

kly

surv

eys,

the

last

one

bei

ng n

o m

ore

than

thre

e da

ys p

rior t

o w

ork

initi

atio

n. T

he

surv

eys

shal

l inc

lude

hab

itat w

ithin

300

feet

(500

feet

for r

apto

rs) o

f the

co

nstru

ctio

n lim

its. A

ctiv

e ne

st s

ites

loca

ted

durin

g th

e pr

e-co

nstru

ctio

n su

rvey

s sh

all b

e av

oide

d an

d a

non-

dist

urba

nce

buffe

r zon

e es

tabl

ishe

d de

pend

ent o

n th

e sp

ecie

s an

d in

con

sulta

tion

with

the

US

FWS

and

C

DFG

. Thi

s bu

ffer z

one

shal

l be

delin

eate

d in

the

field

with

flag

ging

, st

akes

or c

onst

ruct

ion

fenc

ing.

Nes

t site

s sh

all b

e av

oide

d w

ith

appr

oved

non

-dis

turb

ance

buf

fer z

ones

unt

il th

e ad

ults

and

you

ng a

re

no lo

nger

relia

nt o

n th

e ne

st s

ite fo

r sur

viva

l as

dete

rmin

ed b

y a

qual

ified

bio

logi

st. F

or s

peci

es w

ith h

igh

site

fide

lity,

suc

h as

S

wai

nson

’s h

awk,

if d

irect

take

of n

ests

out

side

of t

he b

reed

ing

seas

ons

is re

quire

d, th

e im

plem

entin

g ag

ency

sha

ll co

ntac

t CD

FG to

de

term

ine

appr

opria

te m

itiga

tion

mea

sure

s.

3.3-

2d: I

f a n

atal

bat

roos

t site

is lo

cate

d w

ithin

the

limits

of c

onst

ruct

ion

durin

g pr

e-co

nstru

ctio

n su

rvey

s, it

sha

ll be

avo

ided

with

non

-di

stur

banc

e bu

ffer z

one

esta

blis

hed

by a

qua

lifie

d bi

olog

ist i

n co

nsul

tatio

n w

ith th

e U

SFW

S a

nd C

DFG

unt

il th

e si

te is

aba

ndon

ed.

3.3-

2e: T

he im

plem

entin

g ag

enci

es s

hall

min

imiz

e im

pact

s on

do

cum

ente

d lo

catio

ns o

f spe

cial

-sta

tus

spec

ies

and

any

nest

ing

bird

s to

th

e ex

tent

feas

ible

and

pra

ctic

able

by

redu

cing

the

cons

truct

ion

right

-of-

way

thro

ugh

area

s of

occ

urre

nces

to e

ither

avo

id th

e oc

curr

ence

or

redu

ce im

pact

s to

the

min

imum

nec

essa

ry to

com

plet

e th

e pr

ojec

t.

3.3-

2f: T

he im

plem

entin

g ag

enci

es s

hall

stak

e, fl

ag, f

ence

, or o

ther

wis

e cl

early

del

inea

te th

e co

nstru

ctio

n rig

ht-o

f-way

that

rest

ricts

the

limits

of

cons

truct

ion

to th

e m

inim

um n

eces

sary

to im

plem

ent t

he p

roje

ct th

at

also

wou

ld a

void

and

min

imiz

e im

pact

s on

spe

cial

-sta

tus

avia

n an

d ba

t sp

ecie

s.

Page 11: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

1 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.

3-2g

: The

impl

emen

ting

agen

cies

sha

ll in

stru

ct c

onst

ruct

ion

pers

onne

l on

the

impo

rtanc

e of

buf

fer z

ones

and

sen

sitiv

ity o

f the

de

linea

ted

area

s.

3.3-

3: C

onst

ruct

ion

of th

e pi

pelin

e co

uld

have

a s

ubst

antia

l effe

ct o

n sp

ecia

l-sta

tus

plan

t spe

cies

and

hab

itat t

ypes

. 3.

3-3a

: The

impl

emen

ting

agen

cies

sha

ll ha

ve a

qua

lifie

d bi

olog

ist

cond

uct a

pre

-con

stru

ctio

n sp

ring/

sum

mer

flor

istic

inve

ntor

y an

d ra

re

plan

t sur

vey

of th

e pr

opos

ed p

roje

ct a

reas

in a

ccor

danc

e w

ith C

DFG

’s

Gui

delin

es fo

r Ass

essi

ng th

e E

ffect

s of

Pro

pose

d P

roje

cts

on R

are,

Th

reat

ened

, and

End

ange

red

Pla

nts

and

Nat

ural

Com

mun

ities

, (re

vise

d M

ay 8

, 200

0) to

det

erm

ine

and

map

the

loca

tion

and

exte

nt o

f spe

cial

-st

atus

pla

nt s

peci

es p

opul

atio

ns w

ithin

the

cons

truct

ion

right

-of-w

ay.

The

surv

ey s

hall

be c

ondu

cted

dur

ing

the

appr

opria

te fl

ower

ing

time

for

targ

et p

lant

spe

cies

.

3.3-

3b: I

f not

pos

sibl

e to

avo

id, t

he im

plem

entin

g ag

enci

es s

hall

min

imiz

e im

pact

s on

spe

cial

-sta

tus

plan

t spe

cies

by

redu

cing

the

cons

truct

ion

right

-of-w

ay th

roug

h ar

eas

with

pot

entia

l occ

urre

nces

of

spec

ial-s

tatu

s pl

ant s

peci

es. F

or u

navo

idab

le d

irect

impa

cts

to s

peci

al-

stat

us s

peci

es, c

onsu

ltatio

n w

ith C

DFG

sha

ll be

requ

ired

to d

eter

min

e th

e im

pact

are

a an

d fu

rther

miti

gatio

n, w

hich

cou

ld in

clud

e ac

quis

ition

of

hab

itat o

f equ

al o

r sup

erio

r val

ue a

t a ra

tio o

f at l

east

2:1

.

3.3-

3c: T

he im

plem

entin

g ag

enci

es s

hall

stak

e, fl

ag, f

ence

, or

othe

rwis

e cl

early

del

inea

te th

e co

nstru

ctio

n rig

ht-o

f-way

that

rest

ricts

th

e lim

its o

f con

stru

ctio

n to

the

min

imum

nec

essa

ry to

impl

emen

t the

pr

ojec

t tha

t als

o w

ould

avo

id a

nd m

inim

ize

impa

cts

on s

peci

al-s

tatu

s pl

ant s

peci

es.

3.3-

3d: T

he im

plem

entin

g ag

enci

es s

hall

rest

ore

all d

istu

rbed

are

as

back

to p

re-c

onst

ruct

ion

cond

ition

s an

d a

rest

orat

ion

plan

sha

ll be

de

velo

ped

and

impl

emen

ted

that

con

tain

s th

e fo

llow

ing

item

s:

resp

onsi

bilit

ies

and

qual

ifica

tions

of t

he p

erso

nnel

to im

plem

ent a

nd

supe

rvis

e th

e pl

an; s

ite p

repa

ratio

n an

d pl

antin

g im

plem

enta

tion;

sc

hedu

le; m

aint

enan

ce p

lan/

guid

elin

es; a

nd m

onito

ring

plan

.

3.3-

3e: E

arth

-mov

ing

equi

pmen

t will

avo

id m

aneu

verin

g in

are

as

outs

ide

the

iden

tifie

d lim

its o

f con

stru

ctio

n in

ord

er to

avo

id d

istu

rbin

g op

en s

pace

are

as th

at w

ill re

mai

n un

deve

lope

d. P

rior t

o co

nstru

ctio

n,

the

natu

ral o

pen

spac

e lim

its w

ill b

e m

arke

d by

the

cons

truct

ion

supe

rvis

or a

nd a

qua

lifie

d bi

olog

ist.

Thes

e lim

its w

ill b

e id

entif

ied

on th

e co

nstru

ctio

n dr

awin

gs. T

he im

plem

entin

g ag

enci

es w

ill s

ubm

it a

lette

r to

the

appr

opria

te a

genc

ies

verif

ying

that

con

stru

ctio

n lim

its h

ave

been

fla

gged

and

cle

arly

del

inea

ted

in th

e fie

ld. N

o ea

rth-m

ovin

g eq

uipm

ent

will

be

allo

wed

out

side

dem

arca

ted

cons

truct

ion

zone

s.

Less

than

sig

nific

ant

Page 12: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

2 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.3-

4: C

onst

ruct

ion

of th

e pi

pelin

e co

uld

conf

lict w

ith th

e Jo

shua

Tre

e an

d N

ativ

e D

eser

t Veg

etat

ion

Pre

serv

atio

n O

rdin

ance

. 3.

3-4a

: The

impl

emen

ting

agen

cies

sha

ll at

tem

pt to

pla

ce a

ll pr

ojec

t co

mpo

nent

s in

are

as e

xhib

iting

abs

ence

or a

low

den

sity

of J

oshu

a tre

es a

nd o

ther

nat

ive

dese

rt ve

geta

tion.

3.3-

4b: P

rior t

o th

e co

mm

ence

men

t of g

radi

ng a

ctiv

ities

for a

ny

com

pone

nt o

f the

pro

pose

d pr

ojec

t, w

ithin

the

City

of P

alm

dale

, a

qual

ified

bio

logi

st/a

rbor

ist s

hall

be c

onsu

lted

to d

eter

min

e th

e bi

olog

ical

/aes

thet

ic v

alue

of p

oten

tially

impa

cted

tree

s un

der t

he

juris

dict

ion

of th

e P

alm

dale

Nat

ive

Des

ert V

eget

atio

n O

rdin

ance

. For

pr

otec

ted

vege

tatio

n lo

cate

d w

ithin

the

final

impa

ct a

reas

, a p

ropo

sal

appl

icat

ion

wou

ld b

e ne

cess

ary,

incl

udin

g a

dese

rt ve

geta

tion

pres

erva

tion

plan

whi

ch d

epic

ts th

e lo

catio

n of

eac

h Jo

shua

tree

and

C

alifo

rnia

juni

per,

deta

ils tr

ee a

ge a

nd h

ealth

, and

des

crib

es w

hich

can

be

sav

ed a

nd m

aint

aine

d on

the

site

or r

eloc

ated

. A p

erm

it m

ust b

e ob

tain

ed fr

om th

e C

ity o

f Pal

mda

le’s

land

scap

e ar

chite

ct p

rior t

o re

mov

al o

f pro

tect

ed v

eget

atio

n in

Los

Ang

eles

Cou

nty,

whi

ch m

ay

requ

ire m

itiga

tion

in th

e fo

rm o

f rep

lace

men

t pla

ntin

gs o

f all

impa

cted

ve

geta

tion.

Prio

r to

the

rem

oval

of p

rote

cted

veg

etat

ion

in K

ern

Cou

nty,

th

e K

ern

Cou

nty

Env

ironm

enta

l Hea

lth S

ervi

ces

shal

l be

cont

acte

d.

3.3-

4c: I

f avo

idan

ce o

f Jos

hua

tree

woo

dlan

ds o

r oth

er s

peci

al-s

tatu

s ve

geta

tive

com

mun

ity is

not

feas

ible

, the

impl

emen

ting

agen

cies

sha

ll ac

quire

off-

site

hab

itat o

f equ

al o

r sup

erio

r qua

lity

at a

no

less

than

a

2:1

ratio

with

in re

mai

ning

hab

itat i

n th

e A

ntel

ope

Val

ley.

Loc

atio

n, te

rms

and

cond

ition

s fo

r hab

itat a

cqui

sitio

n, p

rote

ctio

n, a

nd m

aint

enan

ce s

hall

be d

eter

min

ed th

roug

h co

nsul

tatio

n w

ith re

sour

ce a

genc

ies,

incl

udin

g C

DFG

.

Less

than

sig

nific

ant

3.3-

5: C

onst

ruct

ion

of th

e pi

pelin

e co

uld

conf

lict w

ith d

esig

nate

d S

igni

fican

t Eco

logi

cal A

reas

. N

one

requ

ired.

Le

ss th

an s

igni

fican

t

3.3-

6: C

onst

ruct

ion

of th

e pi

pelin

e co

uld

have

a s

ubst

antia

l adv

erse

ef

fect

on

wet

land

s co

nsid

ered

wat

ers

of th

e st

ate.

3.

3-6:

Prio

r to

cons

truct

ion,

the

impl

emen

ting

agen

cies

sha

ll re

tain

a

qual

ified

bio

logi

st to

sur

vey

prop

osed

con

stru

ctio

n zo

nes

incl

udin

g st

agin

g ar

eas

and

acce

ss ro

ads.

If w

etla

nds

wou

ld b

e af

fect

ed b

y co

nstru

ctio

n, th

e qu

alifi

ed b

iolo

gist

wou

ld p

repa

re a

repo

rt ou

tlini

ng

miti

gatio

n an

d co

mpe

nsat

ion

requ

irem

ents

to b

e im

plem

ente

d pr

ior t

o co

nstru

ctio

n. T

he m

itiga

tion

requ

irem

ents

sha

ll in

clud

e th

e fo

llow

ing

at

a m

inim

um:

• Im

plem

entin

g ag

enci

es s

hall

avoi

d im

pact

ing

prev

ious

ly

undi

stur

bed

area

s w

here

pos

sibl

e. T

his

wou

ld in

clud

e em

ploy

ing

tunn

elin

g or

jack

and

bor

e m

etho

ds u

nder

dra

inag

es.

• If

avoi

danc

e is

not

feas

ible

for e

ngin

eerin

g or

cos

t rea

sons

, the

im

plem

entin

g ag

enci

es s

hall

cond

uct j

uris

dict

iona

l del

inea

tion

of

wet

land

feat

ures

.

Less

than

sig

nific

ant

Page 13: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

3 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

Impl

emen

ting

agen

cies

sha

ll ob

tain

WD

Rs

from

the

RW

QC

B fo

r im

pact

s to

wat

ers

of th

e st

ate

incl

udin

g w

etla

nd a

reas

.

3.3-

7: C

onst

ruct

ion

of th

e pu

mp

stat

ions

and

rese

rvoi

rs c

ould

hav

e a

subs

tant

ial e

ffect

on

spec

ial-s

tatu

s w

ildlif

e sp

ecie

s in

clud

ing

the

Cal

iforn

ia re

d-le

gged

frog

and

Moh

ave

grou

nd s

quirr

el.

Impl

emen

t Miti

gatio

n M

easu

res

3.3-

1a th

roug

h 3.

3-1f

. Le

ss th

an s

igni

fican

t

3.3-

8: C

onst

ruct

ion

of th

e pu

mp

stat

ions

and

rese

rvoi

rs c

ould

hav

e a

subs

tant

ial e

ffect

on

spec

ial-s

tatu

s ba

t and

avi

an s

peci

es in

clud

ing

the

Sw

ains

on’s

haw

k, A

mer

ican

per

egrin

e fa

lcon

, sou

thw

este

rn w

illow

fly

catc

her,

and

leas

t Bel

l’s v

ireo.

Impl

emen

t Miti

gatio

n M

easu

res

3.3-

2a th

roug

h 3.

3-2g

. Le

ss th

an s

igni

fican

t

3.3-

9: C

onst

ruct

ion

of th

e pu

mp

stat

ions

and

rese

rvoi

rs c

ould

hav

e a

subs

tant

ial e

ffect

on

spec

ial-s

tatu

s pl

ant s

peci

es.

Impl

emen

t Miti

gatio

n M

easu

res

3.3-

3a th

roug

h 3.

3-3e

. Le

ss th

an s

igni

fican

t

3.3-

10: C

onst

ruct

ion

of th

e pu

mp

stat

ions

and

rese

rvoi

rs c

ould

con

flict

w

ith th

e Jo

shua

Tre

e an

d N

ativ

e D

eser

t Veg

etat

ion

Pre

serv

atio

n O

rdin

ance

.

Impl

emen

t Miti

gatio

n M

easu

res

3.3-

4a th

roug

h 3.

3-4c

. Le

ss th

an s

igni

fican

t

3.3-

11: C

onst

ruct

ion

of th

e pu

mp

stat

ions

and

rese

rvoi

rs c

ould

con

flict

w

ith d

esig

nate

d S

igni

fican

t Eco

logi

cal A

reas

. N

one

requ

ired.

Le

ss th

an s

igni

fican

t

3.3-

12: C

onst

ruct

ion

of th

e pu

mp

stat

ions

and

rese

rvoi

rs c

ould

hav

e a

subs

tant

ial a

dver

se e

ffect

on

wet

land

s co

nsid

ered

wat

ers

of th

e st

ate.

Im

plem

ent M

itiga

tion

Mea

sure

3.3

-6.

Less

than

sig

nific

ant

Cultu

ral R

esou

rces

3.4-

1: G

roun

d-di

stur

bing

act

iviti

es d

urin

g pi

pelin

e in

stal

latio

n co

uld

unea

rth, e

xpos

e, o

r dis

turb

arc

haeo

logi

cal,

hist

oric

al, o

r Nat

ive

Am

eric

an re

sour

ces.

3.4-

1a: P

rior t

o in

itial

con

stru

ctio

n of

pip

elin

es, t

he im

plem

entin

g ag

ency

sha

ll re

tain

the

serv

ices

of a

qua

lifie

d ar

chae

olog

ist t

o pr

epar

e a

Cul

tura

l Res

ourc

es M

onito

ring

and

Miti

gatio

n P

lan

(CM

MP

) and

a

Trea

tmen

t Pla

n (T

P) i

n ac

cord

ance

with

CE

QA

Gui

delin

es S

ectio

ns

1506

4.5

and

1512

6.4.

The

CM

MP

sha

ll se

t for

th c

riter

ia fo

r eva

luat

ing

the

sign

ifica

nce

of re

sour

ces

disc

over

ed d

urin

g co

nstru

ctio

n an

d id

entif

y ap

prop

riate

dat

a re

cove

ry m

etho

ds a

nd p

roce

dure

s to

miti

gate

pr

ojec

t im

pact

s on

sig

nific

ant r

esou

rces

. At a

min

imum

, the

CM

MP

sha

ll in

clud

e a

sum

mar

y of

ava

ilabl

e in

form

atio

n on

kno

wn

site

s an

d se

nsiti

ve lo

catio

ns in

the

proj

ect a

rea;

a h

isto

rical

con

text

for t

he

eval

uatio

n of

reso

urce

s th

at m

ay b

e en

coun

tere

d du

ring

cons

truct

ion;

a

rese

arch

des

ign

outli

ning

impo

rtant

his

toric

al th

emes

and

rese

arch

qu

estio

ns re

leva

nt to

the

know

n si

tes

in th

e st

udy

area

; dat

a re

quire

men

ts a

nd th

e ap

prop

riate

fiel

d an

d la

bora

tory

met

hods

to b

e us

ed to

acq

uire

dat

a ne

eded

for s

igni

fican

ce e

valu

atio

n an

d im

pact

m

itiga

tion.

The

CM

MP

will

als

o id

entif

y sp

ecifi

c pi

pelin

e se

gmen

ts

whe

re c

ultu

ral r

esou

rces

mon

itors

wou

ld b

e re

quire

d du

ring

cons

truct

ion.

The

TP

will

iden

tify

repo

rting

and

cur

atin

g re

quire

men

ts

for a

rtifa

cts

unco

vere

d du

ring

cons

truct

ion.

Less

than

sig

nific

ant

Page 14: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

4 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

All

proj

ect a

ctiv

ities

with

in o

r adj

acen

t to

the

His

toric

al a

rea

of O

ld

Pal

mda

le a

nd O

ld L

anca

ster

and

Old

Ros

amon

d an

d Tr

opic

o M

ine

area

sh

all b

e m

onito

red

by a

pro

fess

iona

l arc

haeo

logi

st a

s th

ere

is a

hig

h pr

obab

ility

for s

ubsu

rface

feat

ure

disc

over

y, w

hich

incl

udes

(tho

ugh

is

not l

imite

d to

) fou

ndat

ions

, cis

tern

s, w

ells

, ces

spoo

ls, b

asem

ents

, or

asso

ciat

ed e

lem

ents

of t

he O

ld P

alm

dale

roun

dhou

se s

pur o

f the

S

outh

ern

Pac

ific

Rai

lroad

.

3.4-

1b: A

Pha

se I

cultu

ral r

esou

rces

sur

vey

shal

l be

cond

ucte

d fo

r the

se

gmen

ts o

f pip

elin

e no

t alre

ady

asse

ssed

in th

e Ph

ase

I Ass

essm

ent

cond

ucte

d fo

r the

pro

pose

d pr

ojec

t. Fo

llow

ing

com

plet

ion

of th

e P

hase

I cu

ltura

l res

ourc

e su

rvey

, the

CM

MP

and

TP

sha

ll be

upd

ated

to in

clud

e th

ese

segm

ents

.

3.4-

2: G

roun

d-di

stur

bing

act

iviti

es d

urin

g pi

pelin

e in

stal

latio

n co

uld

unea

rth, e

xpos

e, o

r dis

turb

hum

an re

mai

ns.

3.4-

2: If

hum

an s

kele

tal r

emai

ns a

re u

ncov

ered

dur

ing

proj

ect

cons

truct

ion,

the

impl

emen

ting

agen

cy s

hall

imm

edia

tely

hal

t wor

k,

cont

act t

he K

ern

Cou

nty

or th

e Lo

s A

ngel

es C

ount

y co

rone

r, de

pend

ing

upon

the

loca

tion

of th

e fin

d, to

eva

luat

e th

e re

mai

ns, a

nd fo

llow

the

proc

edur

es a

nd p

roto

cols

set

forth

in S

ectio

n 15

064.

5 (e

)(1)

of t

he

CE

QA

Gui

delin

es. I

f the

Cou

nty

coro

ner d

eter

min

es th

at th

e re

mai

ns

are

Nat

ive

Am

eric

an, t

he im

plem

entin

g ag

ency

sha

ll co

ntac

t the

NA

HC

, in

acc

orda

nce

with

Hea

lth a

nd S

afet

y C

ode

Sec

tion

7050

.5, s

ubdi

visi

on

(c),

and

Pub

lic R

esou

rces

Cod

e 50

97.9

8 (a

s am

ende

d by

AB

264

1).

Per

Pub

lic R

esou

rces

Cod

e 50

97.9

8, th

e la

ndow

ner s

hall

ensu

re th

at

the

imm

edia

te v

icin

ity w

here

the

Nat

ive

Am

eric

an h

uman

rem

ains

are

lo

cate

d is

not

dam

aged

or d

istu

rbed

by

furth

er d

evel

opm

ent a

ctiv

ity

until

the

land

owne

r has

dis

cuss

ed a

nd c

onfe

rred

, as

pres

crib

ed in

this

se

ctio

n (P

RC

509

7.98

), w

ith th

e m

ost l

ikel

y de

scen

dent

s re

gard

ing

thei

r re

com

men

datio

ns, i

f app

licab

le, t

akin

g in

to a

ccou

nt th

e po

ssib

ility

of

mul

tiple

hum

an re

mai

ns.

Less

than

sig

nific

ant

3.4-

3: In

stal

latio

n of

pip

elin

es c

ould

pot

entia

lly u

near

th, e

xpos

e, o

r di

stur

b pa

leon

tolo

gic

reso

urce

s in

clud

ing

foss

il re

mai

ns, l

ocal

ities

, or

know

n fo

ssil-

bear

ing

geol

ogic

hor

izon

s.

3.4-

3: T

he im

plem

entin

g ag

enci

es s

hall

deve

lop

and

impl

emen

t a

Pal

eont

olog

ical

Res

ourc

e M

onito

ring

and

Miti

gatio

n P

lan

(PR

MM

P)

prio

r to

the

onse

t of c

onst

ruct

ion-

rela

ted

earth

mov

ing

activ

ities

in o

rder

to

eith

er a

void

or m

itiga

te to

a le

ss-th

an-s

igni

fican

t lev

el th

e ef

fect

s on

pa

leon

tolo

gica

l res

ourc

es. D

urin

g ea

rth-m

ovin

g co

nstru

ctio

n-re

late

d ac

tiviti

es, a

dditi

onal

pre

viou

sly-

unkn

own

foss

il si

tes

may

be

unco

vere

d.

The

PR

MM

P m

ust i

nclu

de m

itiga

tion

prot

ocol

for d

isco

verie

s as

wel

l. Th

e P

RM

MP

sha

ll in

clud

e pr

ovis

ions

for t

he fo

llow

ing:

spe

cial

co

nsid

erat

ion

shal

l be

mad

e to

col

lect

sed

imen

t sam

ples

for p

oten

tial

foss

ilife

rous

loca

tions

as

per t

he S

ocie

ty o

f Ver

tebr

ate

Pal

eont

olog

y st

anda

rds;

stra

tigra

phic

cro

ss-s

ectio

ns s

hall

be re

cord

ed, m

appi

ng o

f th

e ge

olog

ic u

nits

gra

phed

, and

foss

il re

mai

ns, c

lean

ed, a

naly

zed,

and

ca

talo

gued

to b

e ac

cept

ed fo

r cur

atio

n at

a le

gal r

epos

itory

; all

wor

k m

ust b

e co

nduc

ted

by a

qua

lifie

d P

aleo

ntol

ogis

t and

a fi

nal R

epor

t of

Find

ings

mus

t be

subm

itted

upo

n co

mpl

etio

n of

labo

rato

ry a

naly

sis.

Less

than

sig

nific

ant

Page 15: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

5 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.4-

4: P

ropo

sed

grou

nd-d

istu

rbin

g ac

tiviti

es fo

r sto

rage

rese

rvoi

rs,

pum

p st

atio

ns a

nd g

roun

dwat

er re

char

ge fa

cilit

ies

coul

d un

earth

, ex

pose

, or d

istu

rb a

rcha

eolo

gica

l, hi

stor

ical

, or N

ativ

e A

mer

ican

re

sour

ces.

3.4-

4a: P

rior t

o in

itial

con

stru

ctio

n of

sto

rage

rese

rvoi

rs, p

ump

stat

ion,

an

d re

char

ge fa

cilit

ies,

the

impl

emen

ting

agen

cy s

hall

reta

in th

e se

rvic

es o

f a q

ualif

ied

arch

aeol

ogis

t to

prep

are

a C

ultu

ral R

esou

rces

M

onito

ring

and

Miti

gatio

n P

lan

(CM

MP

) and

a T

reat

men

t Pla

n (T

P) i

n ac

cord

ance

with

CE

QA

Gui

delin

es S

ectio

ns 1

5064

.5 a

nd 1

5126

.4. T

he

CM

MP

sha

ll se

t for

th c

riter

ia fo

r eva

luat

ing

the

sign

ifica

nce

of re

sour

ces

disc

over

ed d

urin

g co

nstru

ctio

n an

d id

entif

y ap

prop

riate

dat

a re

cove

ry

met

hods

and

pro

cedu

res

to m

itiga

te p

roje

ct im

pact

s on

sig

nific

ant

reso

urce

s. A

t a m

inim

um, t

he C

MM

P s

hall

incl

ude

a su

mm

ary

of

avai

labl

e in

form

atio

n on

kno

wn

site

s an

d se

nsiti

ve lo

catio

ns in

the

proj

ect a

rea;

a h

isto

rical

con

text

for t

he e

valu

atio

n of

reso

urce

s th

at

may

be

enco

unte

red

durin

g co

nstru

ctio

n; a

rese

arch

des

ign

outli

ning

im

porta

nt h

isto

rical

them

es a

nd re

sear

ch q

uest

ions

rele

vant

to th

e kn

own

site

s in

the

stud

y ar

ea; d

ata

requ

irem

ents

and

the

appr

opria

te

field

and

labo

rato

ry m

etho

ds to

be

used

to a

cqui

re d

ata

need

ed fo

r si

gnifi

canc

e ev

alua

tion

and

impa

ct m

itiga

tion.

The

CM

MP

will

als

o id

entif

y sp

ecifi

c lo

catio

ns w

here

cul

tura

l res

ourc

es m

onito

rs w

ould

be

requ

ired

durin

g co

nstru

ctio

n. T

he T

P w

ill id

entif

y re

porti

ng a

nd c

urat

ing

requ

irem

ents

for a

rtifa

cts

unco

vere

d du

ring

cons

truct

ion.

3.4-

4b: D

PS

1-H

ist1

and

BP

S1-

His

t1 w

ould

be

adve

rsel

y im

pact

ed b

y th

e pr

opos

ed c

onst

ruct

ion

activ

ities

and

, the

refo

re, s

hall

be s

ubje

cted

to

Pha

se II

test

ing

and

eval

uatio

n fo

r sig

nific

ance

und

er C

EQ

A a

nd N

HP

A

(see

Sec

tion

3.4.

2).

3.4-

4c: A

Pha

se I

cultu

ral r

esou

rces

sur

vey

shal

l be

cond

ucte

d w

ithin

ar

eas

affe

cted

by

stor

age

rese

rvoi

r, pu

mp

stat

ions

, and

rech

arge

fa

cilit

ies

not a

lread

y as

sess

ed in

the

Pha

se I

Ass

essm

ent c

ondu

cted

for

the

prop

osed

pro

ject

.

3.4-

4d: F

ollo

win

g co

mpl

etio

n of

add

ition

al P

hase

I cu

ltura

l res

ourc

e su

rvey

s fo

r site

s no

t alre

ady

surv

eyed

, the

CM

MP

and

TP

sha

ll be

up

date

d to

incl

ude

thes

e ad

ditio

nal s

ites.

3.4-

4e: A

ll pr

ojec

t act

iviti

es w

ithin

or a

djac

ent t

o th

e H

isto

rical

are

a of

O

ld P

alm

dale

and

Old

Lan

cast

er a

nd O

ld R

osam

ond

and

Trop

ico

Min

e ar

ea s

hall

be m

onito

red

by a

pro

fess

iona

l arc

haeo

logi

st a

s th

ere

is a

hi

gh p

roba

bilit

y fo

r sub

surfa

ce fe

atur

e di

scov

ery,

whi

ch in

clud

es

(thou

gh is

not

lim

ited

to) f

ound

atio

ns, c

iste

rns,

wel

ls, c

essp

ools

, ba

sem

ents

, or a

ssoc

iate

d el

emen

ts o

f the

Old

Pal

mda

le ro

undh

ouse

sp

ur o

f the

Sou

ther

n P

acifi

c R

ailro

ad. I

f the

se e

lem

ents

are

iden

tifie

d,

miti

gatio

n m

easu

res

shal

l be

empl

oyed

that

incl

ude

in-fi

eld

eval

uatio

n by

a p

rofe

ssio

nal a

rcha

eolo

gist

(per

Sec

reta

ry o

f the

Inte

rior S

tand

ards

) an

d po

ssib

le d

ata

reco

very

, as

need

ed, p

er a

miti

gatio

n tre

atm

ent p

lan.

3.4-

4f: I

f a p

rehi

stor

ic s

ite is

enc

ount

ered

in th

e vi

cini

ty o

f the

co

ncen

tratio

n of

isol

ated

pre

hist

oric

arti

fact

s w

ithin

the

north

ern

porti

on

Less

than

sig

nific

ant

Page 16: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

6 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

of th

e w

este

rn p

arce

l of P

ropo

sed

Res

ervo

ir 3,

miti

gatio

n m

easu

res

shal

l be

empl

oyed

that

incl

ude

in-fi

eld

eval

uatio

n by

a p

rofe

ssio

nal

arch

aeol

ogis

t (pe

r Sec

reta

ry o

f the

Inte

rior S

tand

ards

) and

pos

sibl

e da

ta re

cove

ry, a

s ne

eded

, per

a m

itiga

tion

treat

men

t pla

n.

3.4-

4g: I

f hum

an s

kele

tal r

emai

ns a

re u

ncov

ered

dur

ing

proj

ect

cons

truct

ion,

the

impl

emen

ting

agen

cy s

hall

imm

edia

tely

hal

t wor

k,

cont

act t

he K

ern

Cou

nty

or th

e Lo

s A

ngel

es c

oron

er, d

epen

ding

upo

n th

e lo

catio

n of

the

find,

to e

valu

ate

the

rem

ains

, and

follo

w th

e pr

oced

ures

and

pro

toco

ls s

et fo

rth in

Sec

tion

1506

4.5

(e)(

1) o

f the

C

EQ

A G

uide

lines

. If t

he C

ount

y co

rone

r det

erm

ines

that

the

rem

ains

ar

e N

ativ

e A

mer

ican

, the

impl

emen

ting

agen

cy s

hall

cont

act t

he N

AH

C,

in a

ccor

danc

e w

ith H

ealth

and

Saf

ety

Cod

e S

ectio

n 70

50.5

, sub

divi

sion

(c

), an

d P

ublic

Res

ourc

es C

ode

5097

.98

(as

amen

ded

by A

B 2

641)

. P

er P

ublic

Res

ourc

es C

ode

5097

.98,

the

land

owne

r sha

ll en

sure

that

th

e im

med

iate

vic

inity

whe

re th

e N

ativ

e A

mer

ican

hum

an re

mai

ns a

re

loca

ted

is n

ot d

amag

ed o

r dis

turb

ed b

y fu

rther

dev

elop

men

t act

ivity

un

til th

e la

ndow

ner h

as d

iscu

ssed

and

con

ferr

ed, a

s pr

escr

ibed

in th

is

sect

ion

(PR

C 5

097.

98),

with

the

mos

t lik

ely

desc

ende

nts

rega

rdin

g th

eir

reco

mm

enda

tions

, if a

pplic

able

, tak

ing

into

acc

ount

the

poss

ibili

ty o

f m

ultip

le h

uman

rem

ains

.

3.4-

5: C

onst

ruct

ion

of s

tora

ge re

serv

oirs

, pum

p st

atio

ns, a

nd re

char

ge

faci

litie

s co

uld

pote

ntia

lly u

near

th, e

xpos

e, o

r dis

turb

pal

eont

olog

ic

reso

urce

s in

clud

ing

foss

il re

mai

ns, l

ocal

ities

, or k

now

n fo

ssil-

bear

ing

geol

ogic

hor

izon

s.

3.4-

5: T

he im

plem

entin

g ag

enci

es s

hall

deve

lop

and

impl

emen

t a

Pal

eont

olog

ical

Res

ourc

e M

onito

ring

and

Miti

gatio

n P

lan

(PR

MM

P)

prio

r to

the

onse

t of c

onst

ruct

ion-

rela

ted

earth

mov

ing

activ

ities

in o

rder

to

eith

er a

void

or m

itiga

te to

a le

ss-th

an-s

igni

fican

t lev

el th

e ef

fect

s on

pa

leon

tolo

gica

l res

ourc

es. D

urin

g ea

rth-m

ovin

g co

nstru

ctio

n-re

late

d ac

tiviti

es, a

dditi

onal

pre

viou

sly-

unkn

own

foss

il si

tes

may

be

unco

vere

d.

The

PR

MM

P m

ust i

nclu

de m

itiga

tion

prot

ocol

for d

isco

verie

s as

wel

l. Th

e P

RM

MP

sha

ll in

clud

e pr

ovis

ions

for t

he fo

llow

ing:

spe

cial

co

nsid

erat

ion

shal

l be

mad

e to

col

lect

sed

imen

t sam

ples

for p

oten

tial

foss

ilife

rous

loca

tions

as

per t

he S

ocie

ty o

f Ver

tebr

ate

Pal

eont

olog

y st

anda

rds;

stra

tigra

phic

cro

ss-s

ectio

ns s

hall

be re

cord

ed, m

appi

ng o

f th

e ge

olog

ic u

nits

gra

phed

, and

foss

il re

mai

ns, c

lean

ed, a

naly

zed,

and

ca

talo

gued

to b

e ac

cept

ed fo

r cur

atio

n at

a le

gal r

epos

itory

; all

wor

k m

ust b

e co

nduc

ted

by a

qua

lifie

d P

aleo

ntol

ogis

t and

a fi

nal R

epor

t of

Find

ings

mus

t be

subm

itted

upo

n co

mpl

etio

n of

labo

rato

ry a

naly

sis.

Less

than

sig

nific

ant

Geol

ogy a

nd S

oils

3.5-

1: In

the

even

t of a

maj

or e

arth

quak

e w

ithin

the

regi

on,

unde

rgro

und

pipe

lines

cou

ld b

e su

bjec

t to

seis

mic

haz

ards

incl

udin

g su

rface

rupt

ure,

liqu

efac

tion,

land

slid

e, a

nd g

roun

d sh

akin

g ca

pabl

e of

ca

usin

g lo

caliz

ed c

olla

pse

or d

amag

e of

eng

inee

red

fills

, stru

ctur

al

dam

age,

or p

ipel

ine

rupt

ure.

3.5-

1: P

rior t

o th

e ap

prov

al o

f con

stru

ctio

n pl

ans

for t

he p

roje

ct, a

de

sign

-leve

l geo

tech

nica

l inv

estig

atio

n, in

clud

ing

colle

ctio

n of

site

sp

ecifi

c su

bsur

face

dat

a sh

all b

e co

mpl

eted

by

the

impl

emen

ting

agen

cy. T

he g

eote

chni

cal e

valu

atio

n sh

all i

dent

ify d

ensi

ty p

rofil

es,

appr

oxim

ate

max

imum

sha

llow

gro

undw

ater

leve

ls, a

cha

ract

eriz

atio

n of

the

verti

cal a

nd la

tera

l ext

ent o

f the

sat

urat

ed s

and/

silt

laye

rs th

at

coul

d un

derg

o liq

uefa

ctio

n du

ring

stro

ng g

roun

d sh

akin

g, a

nd

Less

than

sig

nific

ant

Page 17: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

7 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

deve

lopm

ent o

f site

-spe

cific

des

ign

crite

ria to

miti

gate

pot

entia

l ris

ks.

Rec

omm

enda

tions

mad

e as

a re

sult

of th

ese

inve

stig

atio

ns to

pro

tect

ne

w s

truct

ures

from

sei

smic

haz

ards

sha

ll be

com

e pa

rt of

the

prop

osed

pr

ojec

t.

3.5-

2: C

onst

ruct

ion

of th

e pr

opos

ed re

cycl

ed w

ater

pip

elin

es c

ould

re

sult

in s

ubst

antia

l soi

l ero

sion

or l

oss

of to

psoi

l, w

hich

wou

ld re

sult

in

a si

gnifi

cant

impa

ct.

3.5-

2: T

o co

ntro

l wat

er a

nd w

ind

eros

ion

durin

g co

nstru

ctio

n of

the

proj

ect,

the

impl

emen

ting

agen

cies

, sha

ll en

sure

that

con

tract

ors

impl

emen

t Bes

t Man

agem

ent P

ract

ices

(BM

Ps)

to c

ontro

l win

d an

d w

ater

ero

sion

dur

ing

and

shor

tly a

fter c

onst

ruct

ion

of th

e pr

ojec

t and

pe

rman

ent B

MP

s to

con

trol e

rosi

on a

nd s

edim

enta

tion

once

co

nstru

ctio

n is

com

plet

e. T

he B

MP

s co

uld

incl

ude,

but

wou

ld n

ot b

e lim

ited

to, s

edim

ent b

arrie

rs a

nd tr

aps,

silt

bas

ins,

and

silt

fenc

es.

Less

than

sig

nific

ant

3.5-

3: T

he p

rese

nce

of y

et u

ndet

erm

ined

loca

l exp

ansi

ve s

oils

in th

e pr

ojec

t are

a co

uld

resu

lt in

stru

ctur

al d

amag

e to

the

recy

cled

wat

er

pipe

lines

.

3.5-

3: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire th

e pr

epar

atio

n of

site

sp

ecifi

c ge

otec

hnic

al in

vest

igat

ions

alo

ng th

e pr

opos

ed p

ipel

ine

alig

nmen

ts. T

hese

inve

stig

atio

ns s

hall

iden

tify

appr

opria

te e

ngin

eerin

g co

nsid

erat

ions

, as

reco

mm

ende

d by

a c

ertif

ied

engi

neer

ing

geol

ogis

t or

regi

ster

ed g

eote

chni

cal e

ngin

eer f

or p

lann

ed fa

cilit

ies,

incl

udin

g en

gine

erin

g co

nsid

erat

ions

to m

itiga

te th

e ef

fect

s of

exp

ansi

ve s

oils

. R

ecom

men

datio

ns m

ade

as a

resu

lt of

thes

e in

vest

igat

ions

to p

rote

ct

new

stru

ctur

es fr

om e

xpan

sive

soi

ls s

hall

beco

me

part

of th

e pr

opos

ed

proj

ect.

Less

than

sig

nific

ant

3.5-

4: C

onst

ruct

ion

of th

e pr

opos

ed s

tora

ge re

serv

oirs

and

pum

p st

atio

ns c

ould

resu

lt in

sub

stan

tial s

oil e

rosi

on o

r los

s of

tops

oil,

whi

ch

wou

ld re

sult

in a

sig

nific

ant i

mpa

ct.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.5-2

. Le

ss th

an s

igni

fican

t

3.5-

5: In

the

even

t of a

maj

or e

arth

quak

e w

ithin

the

regi

on, s

tora

ge

rese

rvoi

rs a

nd p

ump

stat

ions

cou

ld b

e su

bjec

t to

seis

mic

haz

ards

in

clud

ing

surfa

ce ru

ptur

e, li

quef

actio

n, la

ndsl

ide,

and

gro

und

shak

ing

capa

ble

of c

ausi

ng lo

caliz

ed c

olla

pse

or d

amag

e of

eng

inee

red

fills

or

stru

ctur

al d

amag

e.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.5-

1 th

roug

h 3.

5-3.

Le

ss th

an s

igni

fican

t

3.5-

6: G

roun

d sh

akin

g, e

xpan

sive

soi

ls, l

ique

fact

ion,

set

tlem

ent,

eros

ion

and

corr

osiv

e so

ils c

ould

dam

age

recy

cled

wat

er e

nd u

ses

incl

udin

g th

e po

wer

pla

nt c

oolin

g w

ater

sys

tem

and

the

grou

ndw

ater

re

char

ge b

asin

s an

d ap

purte

nant

faci

litie

s.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.5-1

thro

ugh

3.5-

3.

Less

than

sig

nific

ant

Haza

rds a

nd H

azar

dous

Mat

erial

s

3.6-

1: D

urin

g co

nstru

ctio

n of

the

prop

osed

pro

ject

, con

tam

inat

ed s

oils

co

uld

be e

ncou

nter

ed d

urin

g ex

cava

tion

activ

ities

, cau

sing

a ri

sk o

f ex

posu

re to

haz

ardo

us m

ater

ials

.

3.6-

1: In

the

even

t tha

t evi

denc

e of

pot

entia

l soi

l con

tam

inat

ion,

in

clud

ing

soil

disc

olor

atio

n, n

oxio

us o

dors

, deb

ris, o

r bur

ied

stor

age

cont

aine

rs a

re e

ncou

nter

ed d

urin

g co

nstru

ctio

n, th

e im

plem

entin

g ag

enci

es s

hall

requ

ire th

e co

nstru

ctio

n co

ntra

ctor

(s) t

o ha

ve a

co

ntin

genc

y pl

an fo

r sam

plin

g an

d an

alys

is o

f pot

entia

lly h

azar

dous

su

bsta

nces

and

coo

rdin

atio

n w

ith th

e ap

prop

riate

regu

lato

ry a

genc

ies,

if

nece

ssar

y. T

he re

quire

d ha

ndlin

g, s

tora

ge, a

nd d

ispo

sal m

etho

ds

shal

l dep

end

on th

e ty

pes

and

conc

entra

tions

of c

hem

ical

s id

entif

ied

in

Less

than

sig

nific

ant

Page 18: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

8 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

the

soil.

Any

site

inve

stig

atio

ns o

r rem

edia

l act

ions

sha

ll co

mpl

y w

ith

appl

icab

le la

ws.

3.6-

2: A

ccid

enta

l ups

et o

f haz

ardo

us m

ater

ials

use

d du

ring

proj

ect

cons

truct

ion

may

incr

ease

the

risk

of e

xpos

ure

to th

e en

viro

nmen

t, w

orke

rs, a

nd th

e pu

blic

.

3.6-

2a: C

onst

ruct

ion

cont

ract

or(s

) sha

ll be

requ

ired

to im

plem

ent b

est

man

agem

ent p

ract

ices

(BM

Ps)

for h

andl

ing

haza

rdou

s m

ater

ials

dur

ing

the

proj

ect.

The

use

of th

e co

nstru

ctio

n B

MP

s sh

all m

inim

ize

nega

tive

effe

cts

on g

roun

dwat

er a

nd s

oils

, and

will

incl

ude,

with

out l

imita

tion,

the

follo

win

g:

• Fo

llow

man

ufac

ture

rs’ r

ecom

men

datio

ns a

nd re

gula

tory

re

quire

men

ts fo

r use

, sto

rage

, and

dis

posa

l of c

hem

ical

pro

duct

s an

d ha

zard

ous

mat

eria

ls u

sed

in c

onst

ruct

ion.

• A

void

ove

rtopp

ing

cons

truct

ion

equi

pmen

t fue

l tan

ks.

• D

urin

g ro

utin

e m

aint

enan

ce o

f con

stru

ctio

n eq

uipm

ent,

prop

erly

co

ntai

n an

d re

mov

e gr

ease

and

oils

.

• P

rope

rly d

ispo

se o

f dis

card

ed c

onta

iner

s of

fuel

s an

d ot

her

chem

ical

s.

3.6-

2b: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire th

e co

nstru

ctio

n co

ntra

ctor

(s) t

o im

plem

ent s

afet

y m

easu

res

in a

ccor

danc

e w

ith G

ener

al

Indu

stry

Saf

ety

Ord

ers

for S

pill

and

Ove

rflow

Con

trol (

CC

R T

itle

8,

Sec

tions

516

3-51

67) t

o pr

otec

t the

pro

ject

are

a fro

m c

onta

min

atio

n du

e to

acc

iden

tal r

elea

se o

f haz

ardo

us m

ater

ials

. The

saf

ety

mea

sure

s sh

all

incl

ude,

but

not

be

limite

d to

, the

follo

win

g:

• S

pills

and

ove

rflow

s of

haz

ardo

us m

ater

ials

sha

ll be

neu

traliz

ed

and

disp

osed

of p

rom

ptly

.

• H

azar

dous

mat

eria

ls s

hall

be s

tore

d in

con

tain

ers

that

are

ch

emic

ally

iner

t to

and

appr

opria

te fo

r the

type

and

qua

ntity

of t

he

haza

rdou

s su

bsta

nce.

• C

onta

iner

s sh

all n

ot b

e st

ored

whe

re th

ey a

re e

xpos

ed to

hea

t su

ffici

ent e

noug

h to

rupt

ure

the

cont

aine

rs o

r cau

se le

akag

e.

• S

peci

fic in

form

atio

n sh

all b

e pr

ovid

ed re

gard

ing

safe

pro

cedu

res

and

othe

r pre

caut

ions

bef

ore

clea

ning

or s

ubse

quen

t use

or

disp

osal

of h

azar

dous

mat

eria

ls c

onta

iner

s.

Dis

posa

l of a

ll ha

zard

ous

mat

eria

ls s

hall

be in

com

plia

nce

with

ap

plic

able

Cal

iforn

ia h

azar

dous

was

te d

ispo

sal l

aws.

The

con

stru

ctio

n co

ntra

ctor

sha

ll co

ntac

t the

loca

l fire

age

ncy

and

the

Cou

nty

Dep

artm

ent o

f Pub

lic H

ealth

, Env

ironm

enta

l Hea

lth D

ivis

ion,

for a

ny

site

-spe

cific

requ

irem

ents

rega

rdin

g ha

zard

ous

mat

eria

ls o

r haz

ardo

us

was

te c

onta

inm

ent o

r han

dlin

g.

Less

than

sig

nific

ant

Page 19: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-1

9 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.6-

2c: I

n th

e ev

ent o

f an

acci

dent

al re

leas

e of

haz

ardo

us m

ater

ials

du

ring

cons

truct

ion,

con

tain

men

t and

cle

an u

p sh

all o

ccur

in

acco

rdan

ce w

ith a

pplic

able

regu

lato

ry re

quire

men

ts.

3.6-

2d: O

il an

d ot

her s

olve

nts

used

dur

ing

mai

nten

ance

of c

onst

ruct

ion

equi

pmen

t sha

ll be

recy

cled

or d

ispo

sed

of in

acc

orda

nce

with

ap

plic

able

regu

lato

ry re

quire

men

ts. A

ll ha

zard

ous

mat

eria

ls s

hall

be

trans

porte

d, h

andl

ed, a

nd d

ispo

sed

of in

acc

orda

nce

with

app

licab

le

regu

lato

ry re

quire

men

ts.

3.6-

2e: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire th

e co

nstru

ctio

n co

ntra

ctor

(s) t

o pr

epar

e a

Site

Saf

ety

Pla

n in

acc

orda

nce

with

ap

plic

able

regu

lato

ry re

quire

men

ts.

3.6-

2f: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire th

e co

nstru

ctio

n co

ntra

ctor

(s) t

o pr

epar

e an

d im

plem

ent a

Saf

ety

Pro

gram

to e

nsur

e th

e he

alth

and

saf

ety

of c

onst

ruct

ion

wor

kers

and

the

publ

ic d

urin

g pr

ojec

t co

nstru

ctio

n. T

he S

afet

y P

rogr

am s

hall

incl

ude

an in

jury

and

illn

ess

prev

entio

n pr

ogra

m, a

s si

te-s

peci

fic s

afet

y pl

an, a

nd in

form

atio

n on

the

appr

opria

te p

erso

nal p

rote

ctiv

e eq

uipm

ent t

o be

use

d du

ring

cons

truct

ion.

3.6-

3: T

he p

ropo

sed

proj

ect c

ould

resu

lt in

a s

afet

y ha

zard

for p

eopl

e re

sidi

ng o

r wor

king

in th

e pr

ojec

t are

a in

the

vici

nity

of a

irpor

ts.

3.6-

3: T

he im

plem

entin

g ag

enci

es s

hall

coor

dina

te w

ith a

ppro

pria

te

airp

ort a

genc

ies

(suc

h as

LA

WA

, Cal

trans

, and

FA

A) a

nd s

taff

to

ensu

re a

saf

ety

prog

ram

is d

evel

oped

and

impl

emen

ted

durin

g co

nstru

ctio

n of

the

prop

osed

pro

ject

.

Less

than

sig

nific

ant

3.6-

4: T

he p

ropo

sed

proj

ect c

ould

inte

rfere

with

em

erge

ncy

resp

onse

an

d ev

acua

tion

plan

s du

ring

proj

ect c

onst

ruct

ion.

Im

plem

enta

tion

of M

itiga

tion

Mea

sure

3.1

1-1a

. Le

ss th

an s

igni

fican

t

3.6-

5: C

onst

ruct

ion

activ

ities

in g

rass

land

are

as w

ould

hav

e th

e po

tent

ial t

o ex

pose

peo

ple

or e

quip

men

t to

risk

of lo

ss, i

njur

y, o

r dea

th

invo

lvin

g w

ildla

nd fi

res.

3.6-

5a: T

he im

plem

entin

g ag

enci

es s

hall

coor

dina

te w

ith lo

cal f

ire

agen

cies

to d

evel

op a

fire

saf

ety

plan

, whi

ch d

escr

ibes

var

ious

pot

entia

l sc

enar

ios

and

actio

n pl

ans

in th

e ev

ent o

f a fi

re.

3.6-

5b: D

urin

g co

nstru

ctio

n, a

ll st

agin

g ar

eas,

wel

ding

are

as, o

r are

as

slat

ed fo

r dev

elop

men

t usi

ng s

park

-pro

duci

ng e

quip

men

t sha

ll be

cl

eare

d of

drie

d ve

geta

tion

or o

ther

mat

eria

l tha

t cou

ld ig

nite

. Any

co

nstru

ctio

n eq

uipm

ent t

hat i

nclu

des

a sp

ark

arre

stor

sha

ll be

equ

ippe

d w

ith a

spa

rk a

rres

tor i

n go

od w

orki

ng o

rder

. Dur

ing

the

cons

truct

ion

of

the

recy

cled

wat

er b

ackb

one,

con

tract

ors

shal

l req

uire

all

vehi

cles

and

cr

ews

wor

king

at t

he p

roje

ct s

ite to

hav

e ac

cess

to fu

nctio

nal f

ire

extin

guis

hers

at a

ll tim

es. I

n ad

ditio

n, c

onst

ruct

ion

crew

s sh

all h

ave

a sp

otte

r dur

ing

wel

ding

act

iviti

es to

look

out

for p

oten

tially

dan

gero

us

situ

atio

ns, i

nclu

ding

acc

iden

tal s

park

s.

Less

than

sig

nific

ant

Page 20: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

0 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.6-

6: A

ccid

enta

l ups

et o

f haz

ardo

us m

ater

ials

use

d du

ring

cons

truct

ion

of th

e st

orag

e re

serv

oirs

and

pum

p st

atio

ns m

ay in

crea

se th

e ris

k of

ex

posu

re to

the

envi

ronm

ent,

wor

kers

, and

the

publ

ic, r

esul

ting

in a

si

gnifi

cant

impa

ct.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.6-

2a th

roug

h 3.

6-2f

. Le

ss th

an s

igni

fican

t

Hydr

olog

y and

Wat

er Q

ualit

y

3.7-

1: O

pera

tion

of th

e pr

opos

ed re

cycl

ed w

ater

pip

elin

es c

ould

resu

lt in

cro

ss c

onta

min

atio

n of

pot

able

wat

er p

ipel

ines

, whi

ch c

ould

resu

lt in

re

duce

d w

ater

qua

lity

and

pote

ntia

l pub

lic h

ealth

con

cern

s.

3.7-

1a: A

pplic

able

bac

kflo

w p

reve

ntio

n de

vice

s, a

s ou

tline

d in

Titl

e 17

an

d th

e P

urpl

e B

ook,

sha

ll be

inco

rpor

ated

into

pip

elin

e de

sign

to a

void

po

tent

ial f

or c

ross

con

tam

inat

ion.

3.7-

1b: A

pplic

able

min

imum

pip

elin

e se

para

tion

stan

dard

s fo

r pot

able

an

d no

n-po

tabl

e w

ater

pip

elin

es, a

s ou

tline

d in

Titl

e 22

, sha

ll be

in

corp

orat

ed in

to p

ipel

ine

desi

gn to

avo

id p

oten

tial f

or c

ross

co

ntam

inat

ion.

3.7-

1c: A

ll re

cycl

ed w

ater

pip

elin

es s

hall

be p

aint

ed p

urpl

e or

mar

ked

dist

inct

ly w

ith p

urpl

e ta

pe.

3.7-

1d: L

os A

ngel

es C

ount

y D

epar

tmen

t of P

ublic

Hea

lth (D

PH

), C

ross

C

onne

ctio

n C

ontro

l Pro

gram

for L

os A

ngel

es C

ount

y an

d th

e K

ern

Cou

nty

Dep

artm

ent o

f Pub

lic H

ealth

in B

aker

sfie

ld fo

r Ker

n C

ount

y sh

all b

e ad

vise

d of

eac

h ne

w s

ite w

here

recy

cled

wat

er is

to b

e us

ed

prio

r to

plac

ing

the

site

into

ser

vice

.

3.7-

1e: A

ll re

cycl

ed w

ater

site

s sh

all b

e in

spec

ted

and

test

ed fo

r po

ssib

le c

ross

con

nect

ions

with

the

pota

ble

wat

er s

yste

m, i

n ac

cord

ance

with

Sec

tions

603

14(3

) and

603

16(a

), Ti

tle 2

2, C

alifo

rnia

C

ode

of R

egul

atio

ns.

Less

than

sig

nific

ant

3.7-

2: C

onst

ruct

ion

of th

e pr

opos

ed re

cycl

ed w

ater

pip

elin

es c

ould

re

sult

in in

crea

sed

soil

eros

ion

and

trans

port

of s

ubse

quen

t co

ntam

inan

ts a

nd s

edim

enta

tion,

with

impa

cts

to w

ater

qua

lity.

A

dditi

onal

ly, a

ccid

enta

l rel

ease

of f

uels

and

oth

er h

azar

dous

mat

eria

ls

durin

g co

nstru

ctio

n co

uld

degr

ade

wat

er q

ualit

y.

3.7-

2: T

he im

plem

entin

g ag

enci

es s

hall

deve

lop

and

impl

emen

t BM

Ps

to m

inim

ize

eros

ion

and

sedi

men

tatio

n. T

he im

plem

entin

g ag

enci

es

shal

l inc

lude

in c

ontra

ctor

spe

cific

atio

ns th

at th

e co

ntra

ctor

is

resp

onsi

ble

for d

evel

opin

g an

d im

plem

entin

g th

e B

MP

s. T

he B

MP

s sh

all b

e m

aint

aine

d at

the

site

for t

he e

ntire

dur

atio

n of

con

stru

ctio

n.

The

obje

ctiv

es o

f the

BM

Ps

are

to id

entif

y po

lluta

nt s

ourc

es th

at m

ay

affe

ct th

e qu

ality

of s

torm

wat

er d

isch

arge

and

to im

plem

ent m

easu

res

to re

duce

pol

luta

nts

in s

torm

wat

er d

isch

arge

s. T

he B

MP

s fo

r the

pr

opos

ed p

roje

ct s

hall

incl

ude,

but

not

be

limite

d to

, the

impl

emen

tatio

n of

the

follo

win

g el

emen

ts:

• Id

entif

icat

ion

of a

ll po

lluta

nt s

ourc

es, i

nclu

ding

sou

rces

of s

edim

ent

that

may

affe

ct th

e qu

ality

of s

torm

wat

er d

isch

arge

s as

soci

ated

w

ith c

onst

ruct

ion

activ

ity fr

om th

e co

nstru

ctio

n si

te;

• Id

entif

icat

ion

of n

on-s

torm

wat

er d

isch

arge

s;

• E

stim

ate

of th

e co

nstru

ctio

n ar

ea a

nd im

perv

ious

sur

face

are

a;

Less

than

sig

nific

ant

Page 21: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

1 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

• P

repa

ratio

n of

a s

ite m

ap a

nd m

aint

enan

ce s

ched

ule

for B

MP

s in

stal

led

durin

g co

nstru

ctio

n de

sign

ed to

redu

ce o

r el

imin

ate

pollu

tant

s af

ter c

onst

ruct

ion

is c

ompl

eted

(pos

t-co

nstru

ctio

n B

MP

s);

• Id

entif

icat

ion

of a

ll ap

plic

able

ero

sion

and

sed

imen

tatio

n co

ntro

l m

easu

res,

was

te m

anag

emen

t pra

ctic

es, a

nd s

pill

prev

entio

n an

d co

ntro

l mea

sure

s;

• M

aint

enan

ce a

nd tr

aini

ng p

ract

ices

; and

,

• A

sam

plin

g an

d an

alys

is s

trate

gy a

nd s

ampl

ing

sche

dule

for

disc

harg

es fr

om c

onst

ruct

ion

activ

ities

.

3.7-

3: C

onst

ruct

ion

activ

ities

ass

ocia

ted

with

the

recy

cled

wat

er

pipe

lines

cou

ld re

sult

in th

e de

wat

erin

g of

sha

llow

gro

undw

ater

re

sour

ces

and

cont

amin

atio

n of

sur

face

wat

er.

3.7-

3: T

he im

plem

entin

g ag

enci

es s

hall

obta

in a

nd c

ompl

y w

ith th

e re

quire

men

ts o

f dew

ater

ing

perm

its is

sued

by

the

Laho

ntan

RW

QC

B

for d

ewat

erin

g ac

tiviti

es. P

rovi

sion

s of

the

perm

it m

ay in

clud

e tre

atm

ent

of fl

ows

prio

r to

disc

harg

e.

Less

than

sig

nific

ant

3.7-

4: C

onst

ruct

ion

of th

e re

cycl

ed w

ater

pip

elin

es c

ould

tem

pora

rily

alte

r dra

inag

e pa

ttern

s at

the

cons

truct

ion

site

s, w

hich

cou

ld c

ause

lo

caliz

ed fl

oodi

ng.

3.7-

4: T

he im

plem

entin

g ag

enci

es s

hall

incl

ude

in c

ontra

ctor

sp

ecifi

catio

ns th

at a

ll di

stur

bed

area

s ar

e to

be

rest

ored

bac

k to

pre

-co

nstru

ctio

n co

nditi

ons.

Less

than

sig

nific

ant

3.7-

5: O

pera

tion

of th

e pi

pelin

es w

ould

resu

lt in

the

use

of re

cycl

ed

wat

er fo

r mun

icip

al a

nd in

dust

rial (

M&

I) ap

plic

atio

ns, w

hich

cou

ld a

ffect

su

rface

and

gro

undw

ater

qua

lity.

Thi

s co

uld

be a

pot

entia

l pub

lic h

ealth

im

pact

.

3.7-

5a: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire th

e de

velo

pmen

t and

im

plem

enta

tion

of R

ecyc

led

Wat

er U

ser A

gree

men

ts w

ith e

ach

recy

cled

w

ater

end

use

r. Th

e A

gree

men

ts s

hall

incl

ude

prov

isio

ns th

at p

rohi

bit

over

-app

licat

ion

of re

cycl

ed w

ater

and

ferti

lizer

, suc

h as

requ

iring

irr

igat

ion

at a

gron

omic

rate

s to

redu

ce th

e po

tent

ial f

or ru

noff

and

incr

ease

d nu

trien

ts in

to th

e gr

ound

wat

er b

asin

.

3.7-

5b: T

he im

plem

entin

g ag

enci

es, i

n co

nsul

tatio

n w

ith th

e La

hont

an

RW

QC

B, s

hall

deve

lop

and

impl

emen

t a s

alt m

anag

emen

t pla

n, if

ne

eded

in th

e fu

ture

, to

redu

ce th

e po

tent

ial f

or s

alt a

nd n

utrie

nt lo

adin

g an

d m

inim

ize

impa

cts

to w

ater

qua

lity

in th

e A

ntel

ope

Val

ley

grou

ndw

ater

bas

in.

Less

than

sig

nific

ant

3.7-

6: T

he u

se o

f rec

ycle

d w

ater

for M

&I a

pplic

atio

ns c

ould

alte

r dr

aina

ge p

atte

rns

or in

crea

se lo

cal s

torm

wat

er ru

noff

durin

g st

orm

ev

ents

resu

lting

in lo

caliz

ed fl

oodi

ng.

3.7-

6: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire re

cycl

ed w

ater

end

us

ers

to c

ease

all

irrig

atio

n ac

tiviti

es d

urin

g ra

in e

vent

s, th

ereb

y m

inim

izin

g of

f-site

runo

ff.

Less

than

sig

nific

ant

3.7-

7: C

onst

ruct

ion

of th

e pr

opos

ed s

tora

ge re

serv

oirs

and

pum

p st

atio

ns c

ould

resu

lt in

incr

ease

d so

il er

osio

n an

d tra

nspo

rt of

co

ntam

inan

ts, w

ith im

pact

s to

wat

er q

ualit

y. A

dditi

onal

ly, r

elea

se o

f fu

els

or o

ther

haz

ardo

us m

ater

ials

ass

ocia

ted

with

con

stru

ctio

n ac

tiviti

es c

ould

deg

rade

wat

er q

ualit

y.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.7-2

. Le

ss th

an s

igni

fican

t

Page 22: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

2 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.7-

8: C

onst

ruct

ion

and

oper

atio

n of

the

prop

osed

sto

rage

rese

rvoi

rs

and

pum

p st

atio

ns w

ould

incr

ease

the

amou

nt o

f im

perv

ious

sur

face

s at

ea

ch s

ite, a

lterin

g th

e dr

aina

ge p

atte

rns

at e

ach

site

and

resu

lting

in

incr

ease

d lo

cal s

torm

wat

er ru

noff.

Thi

s co

uld

caus

e lo

caliz

ed fl

oodi

ng

or c

ontri

bute

to a

cum

ulat

ive

flood

ing

impa

ct.

3.7-

7: T

he im

plem

entin

g ag

enci

es s

hall

ensu

re a

dequ

atel

y si

zed

and

loca

ted

stor

m w

ater

cap

ture

faci

litie

s ar

e in

corp

orat

ed in

to th

e fin

al

desi

gn fo

r eac

h st

orag

e re

serv

oir a

nd p

ump

stat

ion

faci

lity.

Less

than

sig

nific

ant

3.7-

9: P

lace

men

t of s

tora

ge re

serv

oirs

and

pum

p st

atio

ns w

ithin

a 1

00-

year

floo

d zo

ne c

ould

exp

ose

peop

le o

r pro

perty

to ri

sks

rela

ted

to

flood

ing.

3.7-

8: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire fl

ood

dive

rsio

n fa

cilit

ies

to b

e in

corp

orat

ed in

to e

ach

stor

age

rese

rvoi

r and

pum

p st

atio

n si

te

and

faci

lity

desi

gn th

at w

ould

not

incr

ease

floo

d ris

k in

oth

er a

reas

.

Less

than

sig

nific

ant

3.7-

10: U

se o

f rec

ycle

d w

ater

for a

gric

ultu

ral i

rrig

atio

n co

uld

pote

ntia

lly

affe

ct s

urfa

ce a

nd g

roun

dwat

er q

ualit

y.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.7-5

a an

d 3.

7-5b

. Le

ss th

an s

igni

fican

t

3.7-

11: T

he u

se o

f rec

ycle

d w

ater

for g

roun

dwat

er re

char

ge c

ould

resu

lt in

sig

nific

ant w

ater

qua

lity

impa

cts

if th

e na

tive

grou

ndw

ater

is

degr

aded

bel

ow e

xist

ing

or a

ccep

tabl

e co

nditi

ons.

3.7-

9a: T

he im

plem

entin

g ag

enci

es s

hall

oper

ate

rech

arge

pro

ject

s in

co

mpl

ianc

e w

ith C

DP

H T

itle

22 re

gula

tions

as

wel

l as

in c

oord

inat

ion

with

the

RW

QC

B. T

he re

char

ge w

ater

sha

ll be

a b

lend

of r

ecyc

led

wat

er a

nd d

iluen

t wat

er a

t a ra

tio c

onsi

sten

t with

Titl

e 22

regu

latio

ns

and

CD

PH

crit

eria

.

3.7-

9b: T

he im

plem

entin

g ag

enci

es s

hall

deve

lop

and

impl

emen

t a

mon

itorin

g pr

ogra

m o

f the

pro

pose

d re

char

ge a

rea

in c

ompl

ianc

e w

ith

Title

22

regu

latio

ns a

nd C

DP

H c

riter

ia. A

s pa

rt of

this

pro

gram

, som

e m

onito

ring

wel

ls s

hall

be p

lace

d be

twee

n th

e pr

opos

ed re

char

ge a

rea

and

dow

n gr

adie

nt d

rinki

ng w

ater

sup

ply

wel

ls.

3.7-

9c: T

he im

plem

entin

g ag

enci

es s

hall

requ

ire re

char

ged

recy

cled

w

ater

via

sur

face

spr

eadi

ng to

rem

ain

in g

roun

dwat

er s

tora

ge fo

r the

m

inim

um ti

me

perio

d st

ipul

ated

by

CD

PH

Titl

e 22

Wat

er R

ecyc

ling

Crit

eria

prio

r to

extra

ctio

n.

Less

than

sig

nific

ant

Land

Use

and

Agric

ultu

re

3.8-

1: T

he p

ropo

sed

pipe

line

coul

d tra

vers

e th

roug

h la

nd c

ontro

lled

by

othe

r age

ncie

s.

Non

e re

quire

d.

Less

than

sig

nific

ant

3.8-

2: T

he p

ropo

sed

pipe

line

wou

ld b

e co

nstru

cted

with

in th

e A

IA fo

r P

alm

dale

Reg

iona

l Airp

ort,

Gen

eral

Will

iam

J. F

ox A

irfie

ld, a

nd

Ros

amon

d S

kypa

rk A

irpor

t.

3.8-

1a: F

or p

roje

ct c

ompo

nent

s oc

curr

ing

with

in a

n A

IA, a

s id

entif

ied

by

the

ALU

P, t

he im

plem

entin

g ag

enci

es s

hall

subm

it th

eir p

ropo

sed

proj

ect p

lans

to th

e Lo

s A

ngel

es C

ount

y A

LUC

for r

evie

w a

nd c

omm

ent

prio

r to

final

des

ign.

3.8-

1b: P

rior t

o co

nduc

ting

cons

truct

ion

activ

ities

with

in a

n A

IA, t

he

impl

emen

ting

agen

cies

sha

ll pr

epar

e an

airp

ort c

onst

ruct

ion

safe

ty p

lan

that

wou

ld id

entif

y be

st m

anag

emen

t pra

ctic

es. T

he p

lan

wou

ld in

clud

e,

at a

min

imum

, con

stru

ctio

n tim

efra

mes

and

hou

rs, l

ight

ing

and

flagg

ing

requ

irem

ents

, air

traffi

c co

ntro

l com

mun

icat

ion

requ

irem

ents

, acc

ess

and

egre

ss re

stric

tions

, equ

ipm

ent s

tagi

ng a

rea

requ

irem

ents

, and

pe

rson

al s

afet

y eq

uipm

ent r

equi

rem

ents

for c

onst

ruct

ion

wor

kers

, and

ap

prop

riate

not

ifica

tion

to a

viat

ors.

The

pla

n w

ould

be

revi

ewed

and

Less

than

sig

nific

ant

Page 23: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

3 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

appr

oved

by

airp

ort s

taff

and

impl

emen

ted

by b

oth

the

airp

ort a

nd

proj

ect c

onst

ruct

ion

staf

f and

FA

A.

3.8-

1c: P

rior t

o fin

al d

esig

n of

pro

ject

com

pone

nts

with

in a

n A

IA, t

he

impl

emen

ting

agen

cies

sha

ll id

entif

y th

e gr

ound

ele

vatio

n as

soci

ated

w

ith e

ach

proj

ect c

ompo

nent

and

sub

mit

thei

r pro

ject

pla

ns to

airp

ort

staf

f for

revi

ew a

nd c

omm

ent.

Wor

king

with

airp

ort s

taff,

the

impl

emen

ting

agen

cies

sha

ll su

bmit

thei

r des

ign

plan

s fo

r airs

pace

an

alys

is (F

AA

Par

t 746

0 re

view

) to

dete

rmin

e w

heth

er a

ny o

f the

pr

opos

ed p

roje

ct c

ompo

nent

s or

pro

pose

d co

nstru

ctio

n eq

uipm

ent

wou

ld p

rotru

de in

to p

rote

cted

airs

pace

. If s

uch

obje

cts

are

iden

tifie

d,

the

impl

emen

ting

agen

cies

, airp

ort s

taff,

and

FA

A w

ill id

entif

y ap

prop

riate

ste

ps to

adj

ust p

roje

ct p

lans

or i

nclu

de a

ppro

pria

te

mar

king

s to

iden

tify

haza

rds

to a

viat

ors

purs

uant

to F

AA

Par

t 746

0.

3.8-

1d: T

o pr

even

t the

cre

atio

n of

wild

life

attra

ctan

ts, t

he im

plem

entin

g ag

ency

sho

uld

coor

dina

te w

ith c

onst

ruct

ion

cont

ract

ors

to e

nsur

e th

at

neith

er p

roje

ct d

esig

n no

r con

stru

ctio

n pl

ans

crea

te te

mpo

rary

or

perm

anen

t sou

rces

of o

pen

wat

er, i

napp

ropr

iate

see

d m

ixtu

res,

or

inap

prop

riate

land

scap

ing

desi

gns.

Not

es s

houl

d be

inco

rpor

ated

on

cons

truct

ion

plan

s to

war

n ag

ains

t the

cre

atio

n of

pot

entia

l wild

life

haza

rds.

3.8-

3: T

he p

ropo

sed

pipe

line

wou

ld b

e co

nstru

cted

in th

e vi

cini

ty o

f th

ree

publ

ic u

se a

irpor

ts a

nd p

oten

tially

affe

ct n

avig

able

airs

pace

as

defin

ed b

y FA

R P

art 7

7.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.8-1

c.

Less

than

sig

nific

ant

3.8-

4: C

onst

ruct

ion

and

oper

atio

n of

the

prop

osed

sto

rage

rese

rvoi

rs

and

pum

p st

atio

ns c

ould

resu

lt in

sho

rt-te

rm d

istu

rban

ce to

som

e ad

jace

nt la

nd u

ses

or re

sult

in lo

ng-te

rm e

ffect

s to

exi

stin

g la

nd u

ses.

3.8-

2: T

he im

plem

entin

g ag

enci

es s

hall

obta

in c

ondi

tiona

l use

per

mits

an

d co

mpl

ete

site

pla

n re

view

s fro

m th

e ap

prop

riate

juris

dict

ion,

as

nece

ssar

y, p

rior t

o co

nstru

ctio

n of

pro

ject

faci

litie

s. T

he im

plem

entin

g ag

enci

es s

hall

also

coo

rdin

ate

with

FA

A re

gard

ing

the

loca

tions

and

de

sign

of p

ropo

sed

rese

rvoi

rs a

nd p

ump

stat

ions

.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.2-1

a th

roug

h 3.

2-1f

and

M

itiga

tion

Mea

sure

3.1

1-1a

.

Less

than

sig

nific

ant

3.8-

5: C

onst

ruct

ion

and

oper

atio

n of

the

prop

osed

gro

undw

ater

re

char

ge b

asin

s co

uld

resu

lt in

sho

rt-te

rm d

istu

rban

ce to

som

e ad

jace

nt

land

use

s or

resu

lt in

long

-term

effe

cts

to e

xist

ing

land

use

s.

3.8-

3: T

he im

plem

entin

g ag

enci

es s

hall

obta

in a

con

ditio

nal u

se p

erm

it or

a g

ener

al p

lan

amen

dmen

t if n

eces

sary

from

the

appr

opria

te

juris

dict

ion

prio

r to

cons

truct

ion

of g

roun

dwat

er re

char

ge fa

cilit

ies.

The

im

plem

entin

g ag

enci

es s

hall

also

coo

rdin

ate

with

FA

A re

gard

ing

the

loca

tions

and

des

ign

of fu

ture

rech

arge

bas

ins.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

re 3

.2-1

a th

roug

h 3.

2-1f

and

M

itiga

tion

Mea

sure

3.1

1-1a

.

Less

than

sig

nific

ant

Page 24: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

4 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

Noise

3.9-

1: C

onst

ruct

ion

of th

e pr

opos

ed re

cycl

ed w

ater

pip

elin

e w

ould

in

term

itten

tly a

nd te

mpo

raril

y ge

nera

te n

oise

leve

ls a

bove

exi

stin

g am

bien

t lev

els

in th

e vi

cini

ty o

f tho

se p

roje

ct e

lem

ents

.

3.9-

1a: T

he im

plem

entin

g ag

enci

es s

hall

impl

emen

t pro

cedu

res

to

redu

ce n

oise

gen

erat

ion

from

pro

ject

con

stru

ctio

n ac

tiviti

es. T

ypic

al

nois

e co

ntro

l pro

cedu

res

incl

ude

the

follo

win

g:

• R

equi

re c

onst

ruct

ion

cont

ract

ors

to c

ompl

y w

ith th

e co

nstru

ctio

n ho

urs

and

days

lim

itatio

ns e

stab

lishe

d in

loca

l noi

se o

rdin

ance

s.

Nig

ht-ti

me

cons

truct

ion

wou

ld re

quire

app

rova

l fro

m lo

cal

juris

dict

ions

.

• R

equi

re a

ll co

nstru

ctio

n co

ntra

ctor

s to

loca

te fi

xed

cons

truct

ion

equi

pmen

t (e.

g., c

ompr

esso

rs a

nd g

ener

ator

s) a

s fa

r as

poss

ible

fro

m n

oise

-sen

sitiv

e re

cept

ors.

• E

quip

men

t use

d in

the

cons

truct

ion

of in

divi

dual

pro

ject

co

mpo

nent

s sh

all b

e m

uffle

d an

d m

aint

aine

d in

goo

d op

erat

ing

cond

ition

. Int

erna

l com

bust

ion

engi

ne-d

riven

equ

ipm

ent s

hall

be

fitte

d w

ith in

take

and

exh

aust

muf

flers

that

are

in g

ood

cond

ition

.

• If

pile

driv

ing

is re

quire

d fo

r fac

ility

con

stru

ctio

n, th

e co

ntra

ct

spec

ifica

tions

for t

hose

pro

ject

s sh

all i

ncor

pora

te th

e fo

llow

ing

requ

irem

ents

:

– W

here

ver p

ossi

ble,

son

ic o

r vib

rato

ry p

ile d

river

s w

ill b

e us

ed

lieu

of im

pact

pile

driv

ers.

– W

here

ver f

easi

ble,

pile

hol

es w

ill b

e pr

e-dr

illed

to re

duce

po

tent

ial n

oise

and

vib

ratio

n im

pact

s.

Add

ition

al n

oise

atte

nuat

ing

mea

sure

s in

clud

e ch

angi

ng th

e lo

catio

n of

st

atio

nary

con

stru

ctio

n eq

uipm

ent a

nd/o

r sta

ging

are

as; n

otify

ing

adja

cent

resi

denc

es a

nd n

earb

y se

nsiti

ve re

cept

ors

in a

dvan

ce o

f co

nstru

ctio

n w

ork;

shu

tting

off

idlin

g eq

uipm

ent;

resc

hedu

ling

cons

truct

ion

activ

ities

; req

uirin

g on

-goi

ng c

onst

ruct

ion

nois

e m

onito

ring

to a

ssur

e ad

here

nce

to C

ity/C

ount

y co

nstru

ctio

n eq

uipm

ent s

tand

ards

; an

d/or

inst

allin

g te

mpo

rary

bar

riers

aro

und

stat

iona

ry c

onst

ruct

ion

nois

e so

urce

s.

3.9-

1b: T

o fu

rther

add

ress

the

nuis

ance

impa

ct o

f pro

ject

con

stru

ctio

n,

cons

truct

ion

cont

ract

ors

shal

l im

plem

ent t

he fo

llow

ing:

• S

igns

will

be

post

ed a

t the

con

stru

ctio

n si

te th

at in

clud

e pe

rmitt

ed

cons

truct

ion

days

and

hou

rs, a

day

and

eve

ning

con

tact

num

ber

for t

he jo

b si

te, a

nd a

con

tact

num

ber f

or th

e ap

plic

able

juris

dict

ion

agen

cy in

the

even

t of p

robl

ems.

Sig

nific

ant a

nd u

navo

idab

le

Page 25: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

5 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

• A

n on

site

com

plai

nt a

nd e

nfor

cem

ent m

anag

er s

hall

track

and

re

spon

d to

noi

se c

ompl

aint

s.

3.9-

2: C

onst

ruct

ion

of th

e pr

opos

ed re

cycl

ed w

ater

pip

elin

e w

ould

ex

pose

per

sons

to o

r gen

erat

e ex

cess

ive

grou

nd-b

orne

vib

ratio

n or

gr

ound

-bor

ne n

oise

leve

ls.

3.9-

2: W

hen

drill

ing

or b

orin

g w

ithin

25

feet

of a

ny b

uild

ing

or 5

0-10

0 fe

et o

f a h

isto

rical

bui

ldin

g, a

“cra

ck s

urve

y” s

hall

be u

nder

take

n. T

he

crac

k su

rvey

mus

t be

take

n be

fore

the

star

t of c

onst

ruct

ion

with

pho

to,

vide

o, o

r vis

ual i

nven

tory

of a

ll ex

istin

g cr

acks

insi

de a

nd o

utsi

de

build

ings

with

suf

ficie

nt d

etai

l for

com

paris

on a

fter c

onst

ruct

ion

to

dete

rmin

e w

heth

er a

ctua

l vib

ratio

n da

mag

e oc

curr

ed. T

he

impl

emen

ting

agen

cies

sha

ll be

resp

onsi

ble

for t

he c

osts

of a

ny

dam

age

caus

ed b

y co

nstru

ctio

n vi

brat

ion.

Sig

nific

ant a

nd u

navo

idab

le

3.9-

3: C

onst

ruct

ion

of th

e pr

opos

ed s

tora

ge re

serv

oirs

and

pum

p st

atio

ns w

ould

inte

rmitt

ently

and

tem

pora

rily

gene

rate

noi

se le

vels

ab

ove

exis

ting

ambi

ent l

evel

s in

the

vici

nity

of t

hose

pro

ject

ele

men

ts.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.9-

1a a

nd 3

.9-1

b.

Sig

nific

ant a

nd u

navo

idab

le

3.9-

4: O

pera

tion

of th

e pr

opos

ed s

tora

ge re

serv

oirs

and

pum

p st

atio

ns

coul

d re

sult

in s

ubst

antia

l noi

se in

crea

ses

in th

e vi

cini

ty o

f pro

ject

fa

cilit

ies.

3.9-

4: T

he im

plem

entin

g ag

enci

es s

hall

com

ply

with

loca

l noi

se

ordi

nanc

es. I

n ar

eas

whe

re p

ump

and/

or s

tatio

nary

equ

ipm

ent

oper

atio

n w

ould

cau

se n

oise

leve

ls to

exc

eed

the

norm

ally

acc

epta

ble

rang

e fo

r a g

iven

land

use

, the

ope

ratio

n of

suc

h eq

uipm

ent s

hall

not

caus

e no

ise

leve

ls to

incr

ease

by

5 dB

A C

NE

L or

mor

e. In

are

as w

here

no

ise

leve

ls a

lread

y ex

ceed

the

norm

ally

acc

epta

ble

rang

e fo

r a g

iven

la

nd u

se, t

he o

pera

tion

of s

uch

equi

pmen

t sha

ll no

t cau

se n

oise

leve

ls

to in

crea

se b

y 3

dBA

CN

EL

or m

ore.

To

acco

mpl

ish

thes

e pe

rform

ance

st

anda

rds,

the

impl

emen

ting

agen

cy s

hall

cons

ider

the

follo

win

g:

• M

axim

ize

the

buffe

r are

a or

set

back

dis

tanc

e be

twee

n pu

mp

faci

litie

s an

d no

ise-

sens

itive

land

use

s;

• D

esig

n st

atio

nary

equ

ipm

ent a

nd p

ump

encl

osur

es s

uch

that

bu

ildin

g ex

haus

t fan

s an

d lo

uver

s ar

e or

ient

ed a

way

from

noi

se-

sens

itive

use

s. T

o th

e ex

tent

feas

ible

, con

figur

e th

e fa

cilit

y la

yout

su

ch th

at n

oise

-gen

erat

ing

equi

pmen

t is

setb

ack

from

noi

se-

sens

itive

land

use

s;

• In

corp

orat

e eq

uipm

ent e

nclo

sure

s, fa

n si

lenc

ers,

muf

flers

, ac

oust

ical

trea

tmen

ts a

t ven

t ope

ning

s, a

cous

tical

pan

els,

etc

.

• C

onst

ruct

a p

erim

eter

wal

l at t

he s

ite s

uch

that

the

line

of s

ite

betw

een

the

build

ing

open

ings

(exh

aust

fans

and

louv

ers)

at t

he

pum

p fa

cilit

ies

and

near

by s

ensi

tive

rece

ptor

s is

effe

ctiv

ely

bloc

ked.

Effe

ctiv

e sh

ield

ing

can

sign

ifica

ntly

redu

ce n

oise

.

Less

than

sig

nific

ant

Envir

onm

enta

l Jus

tice

3.10

-1: T

he p

ropo

sed

stor

age

rese

rvoi

rs a

nd p

ump

stat

ions

cou

ld

caus

e di

spro

porti

onat

e im

pact

s to

min

ority

or l

ow in

com

e po

pula

tions

. N

one

requ

ired.

Le

ss th

an s

igni

fican

t

Page 26: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

6 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

Tran

spor

tatio

n an

d Tr

affic

3.11

-1: C

onst

ruct

ion

of th

e pr

opos

ed p

ipel

ines

cou

ld a

dver

sely

affe

ct

traffi

c an

d tra

nspo

rtatio

n co

nditi

ons

in th

e pr

ojec

t are

a.

3.11

-1a:

The

impl

emen

ting

agen

cies

’ con

stru

ctio

n co

ntra

ctor

sha

ll pr

epar

e an

d im

plem

ent a

Tra

ffic

Con

trol/T

raffi

c M

anag

emen

t Pla

n su

bjec

t to

appr

oval

by

the

appr

opria

te lo

cal j

uris

dict

ion

prio

r to

cons

truct

ion.

The

pla

n sh

all:

• Id

entif

y ho

urs

of c

onst

ruct

ion

and

hour

s fo

r del

iver

ies;

• In

clud

e a

disc

ussi

on o

f hau

l rou

tes,

lim

its o

n th

e le

ngth

of o

pen

trenc

h, w

ork

area

del

inea

tion,

traf

fic c

ontro

l and

flag

ging

;

• Id

entif

y al

l acc

ess

and

park

ing

rest

rictio

ns, p

avem

ent m

arki

ngs

and

sign

age

requ

irem

ents

(e.g

., sp

eed

limit,

tem

pora

ry lo

adin

g zo

nes)

;

• M

aint

ain

acce

ss to

resi

denc

e an

d bu

sine

ss d

rivew

ays

at a

ll tim

es

to th

e ex

tent

feas

ible

; Min

imiz

e ac

cess

dis

rupt

ions

to b

usin

esse

s an

d re

side

nces

;

• La

yout

a p

lan

for n

otifi

catio

ns a

nd a

pro

cess

for c

omm

unic

atio

n w

ith a

ffect

ed re

side

nts

and

busi

ness

es p

rior t

o th

e st

art o

f co

nstru

ctio

n. A

dvan

ce p

ublic

not

ifica

tion

shal

l inc

lude

pos

ting

of

notic

es a

nd a

ppro

pria

te s

igna

ge o

f con

stru

ctio

n ac

tiviti

es. T

he

writ

ten

notif

icat

ion

shal

l inc

lude

the

cons

truct

ion

sche

dule

, the

ex

act l

ocat

ion

and

dura

tion

of a

ctiv

ities

with

in e

ach

stre

et (i

.e.,

whi

ch la

nes

and

acce

ss p

oint

/driv

eway

s w

ould

be

bloc

ked

on

whi

ch d

ays

and

for h

ow lo

ng),

and

a to

ll-fre

e te

leph

one

num

ber f

or

rece

ivin

g qu

estio

ns o

r com

plai

nts;

• In

clud

e a

plan

to c

oord

inat

e al

l con

stru

ctio

n ac

tiviti

es w

ith

emer

genc

y se

rvic

e pr

ovid

ers

in th

e ar

ea a

t lea

st o

ne m

onth

in

adva

nce.

Em

erge

ncy

serv

ice

prov

ider

s sh

all b

e no

tifie

d of

the

timin

g, lo

catio

n, a

nd d

urat

ion

of c

onst

ruct

ion

activ

ities

. All

road

s sh

all r

emai

n pa

ssab

le to

em

erge

ncy

serv

ice

vehi

cles

at a

ll tim

es;

• In

clud

e a

plan

to c

oord

inat

e al

l con

stru

ctio

n ac

tiviti

es w

ith th

e A

ntel

ope

Val

ley

Uni

on H

igh

Sch

ool D

istri

ct a

nd S

outh

ern

Ker

n U

nifie

d S

choo

l Dis

trict

at l

east

two

mon

ths

in a

dvan

ce. T

he

Ant

elop

e V

alle

y U

nion

Hig

h S

choo

l Dis

trict

and

Sou

ther

n K

ern

Uni

fied

Sch

ool D

istri

ct s

hall

be n

otifi

ed o

f the

tim

ing,

loca

tion,

and

du

ratio

n of

con

stru

ctio

n ac

tiviti

es. T

he im

plem

entin

g ag

enci

es s

hall

requ

ire it

s co

ntra

ctor

to m

aint

ain

vehi

cle,

ped

estri

an, a

nd s

choo

l bu

s se

rvic

e du

ring

cons

truct

ion

thro

ugh

incl

usio

n of

suc

h pr

ovis

ions

in th

e co

nstru

ctio

n co

ntra

ct. T

he a

ssig

nmen

t of

tem

pora

ry c

ross

ing

guar

ds a

t des

igna

ted

inte

rsec

tions

may

be

need

ed to

enh

ance

ped

estri

an s

afet

y du

ring

proj

ect c

onst

ruct

ion.

Less

than

sig

nific

ant

Page 27: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

7 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

Also

the

follo

win

g pr

ovis

ions

sha

ll be

met

:

– P

ipel

ine

cons

truct

ion

near

sch

ools

sha

ll oc

cur w

hen

scho

ol is

no

t in

sess

ion

(i.e.

, sum

mer

or h

olid

ay b

reak

s). I

f thi

s is

not

fe

asib

le, a

min

imum

of t

wo

mon

ths

prio

r to

proj

ect

cons

truct

ion,

the

impl

emen

ting

agen

cies

sha

ll co

ordi

nate

with

th

e A

ntel

ope

Val

ley

Uni

on H

igh

Sch

ool D

istri

ct a

nd S

outh

ern

Ker

n U

nifie

d S

choo

l Dis

trict

to id

entif

y pe

ak c

ircul

atio

n pe

riods

at s

choo

ls a

long

the

alig

nmen

t(s) (

i.e.,

the

arriv

al a

nd

depa

rture

of s

tude

nts)

, and

requ

ire th

eir c

ontra

ctor

to a

void

co

nstru

ctio

n an

d la

ne c

losu

res

durin

g th

ose

perio

ds;

– A

min

imum

of t

wo

mon

ths

prio

r to

proj

ect c

onst

ruct

ion,

the

impl

emen

ting

agen

cies

sha

ll co

ordi

nate

with

the

Ant

elop

e V

alle

y U

nion

Hig

h S

choo

l Dis

trict

and

Sou

ther

n K

ern

Uni

fied

Sch

ool D

istri

ct to

iden

tify

alte

rnat

ives

to th

eir S

afe

Rou

tes

to

Sch

ool p

rogr

am, a

ltern

ativ

es fo

r the

sch

ool b

usin

g ro

utes

and

st

op lo

catio

ns, a

nd o

ther

circ

ulat

ion

prov

isio

ns, a

s pa

rt of

the

Traf

fic C

ontro

l/Tra

ffic

Man

agem

ent P

lan;

• In

clud

e th

e re

quire

men

t tha

t all

open

tren

ches

be

cove

red

with

m

etal

pla

tes

at th

e en

d of

eac

h w

orkd

ay to

acc

omm

odat

e tra

ffic

and

acce

ss; a

nd

• S

peci

fy th

e st

reet

rest

orat

ion

requ

irem

ents

pur

suan

t to

agre

emen

ts

with

the

loca

l jur

isdi

ctio

ns.

3.11

-1b:

The

impl

emen

ting

agen

cies

sha

ll id

entif

y al

l roa

dway

loca

tions

w

here

spe

cial

con

stru

ctio

n te

chni

ques

(e.g

., ho

rizon

tal b

orin

g,

dire

ctio

nal d

rillin

g or

nig

ht c

onst

ruct

ion)

will

be

used

to m

inim

ize

impa

cts

to tr

affic

flow

.

3.11

-1c:

The

impl

emen

ting

agen

cies

sha

ll de

velo

p ci

rcul

atio

n an

d de

tour

pla

ns to

min

imiz

e im

pact

to lo

cal s

treet

circ

ulat

ion,

incl

udin

g bi

kew

ays.

Thi

s m

ay in

clud

e th

e us

e of

sig

ning

and

flag

ging

to g

uide

ve

hicl

es a

nd c

yclis

ts th

roug

h an

d/or

aro

und

the

cons

truct

ion

zone

.

3.11

-1d:

The

impl

emen

ting

agen

cies

sha

ll en

cour

age

cons

truct

ion

crew

s to

par

k at

sta

ging

are

as to

lim

it la

ne c

losu

res

in th

e pu

blic

righ

t-of

-way

.

3.11

-1e:

Pea

k tra

vel p

erio

ds s

hall

be a

void

ed w

hen

cons

ider

ing

parti

al

road

clo

sure

s.

Page 28: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

8 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.

11-1

f: Th

e im

plem

entin

g ag

enci

es s

hall

cons

ult w

ith th

e A

ntel

ope

Val

ley

Tran

sit A

utho

rity

and

the

Eas

t Ker

n R

egio

nal T

rans

it E

xpre

ss

that

con

nect

s to

Lan

cast

er a

t lea

st o

ne m

onth

prio

r to

cons

truct

ion

to

coor

dina

te b

us s

top

relo

catio

ns (i

f nec

essa

ry) a

nd to

redu

ce p

oten

tial

inte

rrup

tion

of tr

ansi

t ser

vice

.

3.11

-2: C

onst

ruct

ion

of th

e pr

opos

ed p

ipel

ine

wou

ld h

ave

tem

pora

ry

effe

cts

on a

ltern

ativ

e tra

nspo

rtatio

n or

alte

rnat

ive

trans

porta

tion

faci

litie

s.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.11

-1c

and

3.11

-1f.

Less

than

sig

nific

ant

3.11

-3: P

arki

ng d

eman

d w

ould

tem

pora

rily

incr

ease

dur

ing

cons

truct

ion

of th

e pr

opos

ed p

ipel

ine.

N

one

requ

ired.

Le

ss th

an s

igni

fican

t

3.11

-4: C

onst

ruct

ion

and

oper

atio

n of

the

prop

osed

pum

p st

atio

ns,

stor

age

rese

rvoi

rs, a

nd g

roun

dwat

er re

char

ge b

asin

s co

uld

adve

rsel

y af

fect

traf

fic a

nd tr

ansp

orta

tion

cond

ition

s in

the

proj

ect a

rea.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.11

-1a

thro

ugh

3.11

-1f.

Less

than

sig

nific

ant

Utilit

ies an

d Se

rvice

Sys

tem

s

3.12

-1: C

onst

ruct

ion

of th

e pi

pelin

es c

ould

resu

lt in

tem

pora

rily,

pl

anne

d or

acc

iden

tal d

isru

ptio

n to

util

ity s

ervi

ces.

3.

12-1

a: T

he lo

catio

ns o

f ove

rhea

d an

d un

derg

roun

d ut

ility

line

s, s

uch

as n

atur

al g

as, e

lect

ricity

, sew

age,

sto

rm d

rain

s, te

leph

one,

fuel

, and

w

ater

line

s, s

hall

be v

erifi

ed b

y co

ntra

ctor

s th

roug

h fie

ld s

urve

ys a

nd

othe

r met

hods

prio

r to

cons

truct

ion.

In a

reas

whe

re u

nant

icip

ated

un

derg

roun

d ut

ilitie

s ar

e fo

und,

pla

ns to

min

imiz

e se

rvic

e im

pact

s sh

all

be d

evel

oped

and

wor

ked

out w

ith th

e af

fect

ed u

tiliti

es.

3.12

-1b:

As

nece

ssar

y, d

etai

led

spec

ifica

tions

sha

ll be

pre

pare

d as

par

t of

the

desi

gn a

nd e

ngin

eerin

g pl

ans

to in

clud

e pr

oced

ures

for t

he

exca

vatio

n, s

uppo

rt, a

nd fi

ll of

are

as a

roun

d ut

ility

cab

les

and

pipe

s.

Affe

cted

util

ity s

ervi

ces

shal

l be

notif

ied

of c

onst

ruct

ion

plan

s an

d sc

hedu

le. A

rran

gem

ents

sha

ll be

mad

e w

ith th

ese

entit

ies

rega

rdin

g pr

otec

tion,

relo

catio

n, o

r tem

pora

ry d

isco

nnec

tion

of s

ervi

ces.

3.12

-1c:

Res

iden

ts a

nd b

usin

esse

s in

the

proj

ect a

rea

shal

l be

notif

ied

of a

ny p

lann

ed u

tility

ser

vice

dis

rupt

ion,

in c

onfo

rman

ce w

ith c

ount

y an

d st

ate

stan

dard

s.

Less

than

sig

nific

ant

3.12

-2: C

onst

ruct

ion

activ

ities

ass

ocia

ted

with

the

pipe

lines

wou

ld

gene

rate

sol

id w

aste

that

wou

ld in

crea

se th

e de

man

d fo

r lan

dfill

ca

paci

ty.

3.12

-2a:

Pro

ject

faci

lity

desi

gn a

nd c

onst

ruct

ion

met

hods

that

pro

duce

le

ss w

aste

, or t

hat p

rodu

ce w

aste

that

cou

ld m

ore

read

ily b

e re

cycl

ed o

r re

used

sha

ll be

enc

oura

ged.

3.12

-2b:

A re

quire

men

t for

the

cont

ract

or to

des

crib

e pl

ans

for

reco

verin

g, re

usin

g, a

nd re

cycl

ing

was

tes

prod

uced

thro

ugh

cons

truct

ion,

dem

oliti

on, a

nd e

xcav

atio

n ac

tiviti

es s

hall

be in

clud

ed in

co

nstru

ctio

n sp

ecifi

catio

ns.

Less

than

sig

nific

ant

Page 29: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Exe

cutiv

e S

umm

ary

TAB

LE E

S-1

(con

tinue

d)

SUM

MA

RY

OF

IMPA

CTS

AN

D M

ITIG

ATI

ON

MEA

SUR

ES F

OR

TH

E N

OR

TH L

OS

AN

GEL

ES /

KER

N C

OU

NTY

REC

YCLE

D W

ATE

R P

RO

JEC

T

Impa

cts

Miti

gatio

n M

easu

res

Sign

ifica

nce

afte

r M

itiga

tion

3.12

-3: I

mpl

emen

tatio

n of

the

stor

age

rese

rvoi

rs a

nd p

ump

stat

ions

co

uld

resu

lt in

the

need

for n

ew s

torm

wat

er d

rain

age

faci

litie

s or

ex

pans

ion

of e

xist

ing

faci

litie

s.

Non

e re

quire

d.

Less

than

sig

nific

ant

3.12

-4: O

pera

tion

of th

e st

orag

e re

serv

oirs

and

pum

p st

atio

ns c

ould

re

sult

in e

ffect

s to

loca

l and

regi

onal

ene

rgy

supp

lies.

3.

12-3

: Dur

ing

proj

ect d

esig

n, L

AC

WW

D40

and

the

impl

emen

ting

agen

cies

sha

ll re

quire

the

use

of e

nerg

y ef

ficie

nt e

quip

men

t, in

clud

ing

pum

ps a

nd li

ghtin

g. P

roje

ct fa

cilit

y de

sign

and

con

stru

ctio

n m

etho

ds

that

pro

duce

less

was

te, o

r tha

t pro

duce

was

te th

at c

ould

mor

e re

adily

be

recy

cled

or r

euse

d sh

all b

e en

cour

aged

.

Less

than

sig

nific

ant

Cum

ulat

ive Im

pact

s

4-1:

Con

curr

ent c

onst

ruct

ion

of s

ever

al p

roje

cts

in th

e A

ntel

ope

Val

ley

coul

d re

sult

in c

umul

ativ

e sh

ort-t

erm

impa

cts

to a

ir qu

ality

and

wat

er

qual

ity.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.2-

1a th

roug

h 3.

2-1f

, 3.7

-2,

and

3.7-

3.

Less

than

sig

nific

ant

4-2:

Con

curr

ent c

onst

ruct

ion

of s

ever

al p

roje

cts

in th

e A

ntel

ope

Val

ley

coul

d re

sult

in c

umul

ativ

e sh

ort-t

erm

impa

cts

to n

oise

. Im

plem

enta

tion

of M

itiga

tion

Mea

sure

s 3.

9-1a

, 3.9

-1b

and

3.9-

2.

Sig

nific

ant a

nd u

navo

idab

le

4-3:

Con

curr

ent c

onst

ruct

ion

of s

ever

al p

roje

cts

in th

e A

ntel

ope

Val

ley

coul

d re

sult

in c

umul

ativ

e sh

ort-t

erm

impa

cts

to tr

affic

. 4-

3: T

he im

plem

entin

g ag

enci

es, s

hall

com

mun

icat

e an

d co

ordi

nate

pr

ojec

t con

stru

ctio

n ac

tiviti

es w

ith o

ther

mun

icip

aliti

es (e

.g.,

Pal

mda

le,

Lanc

aste

r, an

d R

osam

ond

CS

D) a

nd a

genc

ies

(e.g

., C

altra

ns, L

A

Cou

nty

DP

W) i

n th

e A

ntel

ope

Val

ley.

Pha

sing

of p

roje

ct c

onst

ruct

ion

shal

l be

coor

dina

ted

to m

inim

ize

cum

ulat

ive

impa

cts

to tr

affic

and

ci

rcul

atio

n.

Less

than

sig

nific

ant

4-4:

Con

curr

ent c

onst

ruct

ion

of s

ever

al p

roje

cts

in th

e A

ntel

ope

Val

ley

coul

d re

sult

in c

umul

ativ

e sh

ort-t

erm

impa

cts

to b

iolo

gica

l res

ourc

es.

Impl

emen

tatio

n of

Miti

gatio

n M

easu

res

3.3-

1a-f,

3.3

-2a-

g, 3

.3-3

a-e,

3.3

-4a

-c a

nd 3

.3-6

. Le

ss th

an s

igni

fican

t

4-5:

The

pro

pose

d pr

ojec

t and

rela

ted

proj

ects

cou

ld re

sult

in

cum

ulat

ive

long

-term

impa

cts

to g

roun

dwat

er re

sour

ces.

Im

plem

enta

tion

of M

itiga

tion

Mea

sure

s 3.

7-5a

, 3.7

-5b,

and

3.7

-9a

thro

ugh

3.7-

9c.

Less

than

sig

nific

ant

Nor

th L

os A

ngel

es /

Kern

Cou

nty

Rec

ycle

d W

ater

Pro

ject

E

S-2

9 E

SA

/ 20

6359

Fi

nal P

EIR

N

ovem

ber 2

008

Page 30: 0.1 Executive Summary FEIR · Executive Summary North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008 ES.4 Project Description The proposed

Recommended