North Los Angeles / Kern County Recycled Water Project ES-1 ESA / 206359 Final PEIR November 2008
EXECUTIVE SUMMARY
ES.1 Introduction The Los Angeles County Waterworks District No. 40, Antelope Valley (LACWWD40) as the Lead Agency has prepared this Final Program Environmental Impact Report (PEIR) in consultation with the following Responsible Agencies: the City of Lancaster, the City of Palmdale, the Rosamond Community Services District (RCSD), the County Sanitation Districts Nos. 14 and 20 of Los Angeles County (LACSD Nos. 14 and 20), Palmdale Water District (PWD), Antelope Valley-East Kern Water Agency (AVEK), and Quartz Hill Water District (QHWD). This Final PEIR has been prepared to provide information about the potential effects on the local and regional environment associated with the North Los Angeles/Kern County Regional Recycled Water Project (proposed project). The purpose of the proposed project is to construct a regional recycled water distribution system to help meet the growing demand for water in the region.
The proposed project would be located in the Antelope Valley, which encompasses approximately 2,400 square miles in northern Los Angeles County, southern Kern County, and western San Bernardino County. The proposed project would be located within several cities including the City of Palmdale, the City of Lancaster, the Town of Rosamond, and portions of unincorporated Los Angeles County including Quartz Hill.
This Final PEIR has been prepared in compliance with the California Environmental Quality Act (CEQA) of 1970 (as amended), codified at California Public Resources Code Sections 21000 et. seq.; the State CEQA Guidelines in the Code of Regulations, Title 14, Division 6, Chapter 3; and CEQA-Plus requirements of the State Water Resources Control Board.
Inquiries about the proposed project should be directed to:
Los Angeles County Waterworks District No. 40 Attn: Jonathan King 900 South Fremont Avenue Alhambra, CA 91803 FAX: (626) 300-3385
Executive Summary
North Los Angeles / Kern County Recycled Water Project ES-2 ESA / 206359 Final PEIR November 2008
ES.2 Background The Antelope Valley is faced with serious challenges with respect to management of water and wastewater resources in the region. The population in the Antelope Valley is expected to increase by 161 percent by 2035 (RWMG, 2007). Currently, the demand for potable water exceeds supply in the region, and by 2035 this demand is expected to double (RWMG, 2007). Wastewater discharges also will increase in the future as population increases.
The Regional Water Management Group (RWMG) is a collection of 11 local agencies that are working collectively to resolve the water management challenges in the Antelope Valley. LACWWD40 and the partner agencies that are sponsoring the proposed project are members of the RWMG. Currently, the demand for potable water in the region is met largely by water imported through the State Water Project and groundwater pumped from the Antelope Valley Groundwater Basin. Imported water supplies are becoming less reliable; the AV Groundwater Basin is facing overdraft conditions; and the water rights of overlying landowners of the AV Groundwater Basin have not yet been adjudicated (although this process is currently under way) (DWR, 2008; RWMG, 2007). Thus, under current conditions, imported water and groundwater can not be expected to accommodate the future water demands of a growing population in the Antelope Valley. As a result, the RWMG is tasked with finding creative solutions for finding new sources of water for Antelope Valley residents.
The RWMG has prepared the Integrated Regional Water Management Plan (IRWMP) for the Antelope Valley as a roadmap for resolving the water management challenges in the region. The proposed project is identified in the IRWMP as a project that addresses the need for both increased water supplies and wastewater effluent management. The proposed project would provide a backbone system for distribution of recycled water throughout the Antelope Valley.
ES.3 Project Objectives The objectives of the proposed project are as follows:
• Provide recycled water conveyance backbone infrastructure sufficient to accommodate planned regional recycled water demands;
• Integrate regional recycled water production, distribution, and re-use capabilities in the Antelope Valley;
• Provide conveyance, storage, and pumping capacity sufficient to accommodate peak future demands;
• Reduce the region’s dependency on imported water; • Augment local water supplies; • Promote the State’s policies for beneficial reuse of recycled water to replace potable water
where possible.
Executive Summary
North Los Angeles / Kern County Recycled Water Project ES-3 ESA / 206359 Final PEIR November 2008
ES.4 Project Description The proposed project would include the following components: approximately 70 miles of recycled water conveyance pipelines, four storage reservoirs, two distribution pump stations, and two booster pump stations (Figure ES-1). The proposed project would provide the primary backbone system for distribution of recycled water to end users in the Antelope Valley. The end users would include but would not be limited to the following:
• Municipal and industrial (M&I) applications; • Agricultural irrigation1; • Cooling water for power plants; and • Groundwater recharge.
For existing and future end users identified to-date, the annual demand for recycled water in the Antelope Valley is estimated at 21,210 afy at buildout. The system capacity of the proposed project would be designed to meet this demand. This demand includes 17,491 afy for M&I end uses in Los Angeles County (Kennedy/Jenks, 2006), plus 1,119 afy for M&I end uses in Kern County (Seal, 2008), and 2,600 afy for use as cooling water at the planned Palmdale Hybrid Power Plant.
Recycled water use would comply with the California Department of Public Health recycled water regulations contained in Title 22 of the California Code of Regulations (see Chapter 1, Introduction for additional information). In addition, the proposed project would be subject to conditions imposed by the Regional Water Quality Control Board (RWQCB) pursuant to Water Recycling Requirements (WRRs). The proposed project would be constructed in phases, subject to funding and the identification of recycled water users. Each component would be constructed by LACWWD40 or one of the Responsible Agencies as part of the regional backbone distribution system.
This PEIR provides project-level coverage for the following project components: construction and operation of the recycled water pipelines and M&I applications for recycled water. The analysis of these components is conducted at a sufficient level of detail such that additional environmental documentation is not necessary. In other words, these project components are evaluated at a level of detail that is typically provided for a project EIR (CEQA Guidelines §15161).
Program-level coverage is provided for the remaining components of the proposed project, which include the following: construction and operation of the proposed pump stations and storage reservoirs, and the use of recycled water for agricultural irrigation (agricultural reuse), cooling water at power plants, and groundwater recharge. Prior to implementation of these components, additional analysis is required to determine the need for subsequent environmental documentation.
1 The Facilities Plans for the PWRP and LWRP include agricultural effluent management sites for application of
recycled water produced at both reclamation plants (LACSD No. 14, 2004; LACSD No. 20, 2005). The environmental effects of using recycled water for agricultural irrigation at these effluent management sites have been evaluated pursuant to CEQA in previous environmental documents (see Chapter 1, Section 1.5.2). This proposed project does not include these agricultural effluent management areas.
Kern CountyLos Angeles County
North LA/Kern County Regional Recycled Water Project . 206359
Figure ES-1Existing and Proposed Facilities
SOURCE: Kennedy/Jenks Consultants; ESA
Rosamond WWTP
Lancaster WRP
PalmdaleWRP
Existing Reservoir
Proposed Reservoir
Existing Waste Water Treatment Plant
Existing Pump Station
Proposed Pump Station
Existing Recycled Water Pipeline
Proposed Recycled Water Pipeline
Ave E
Rosamond Blvd
Ave D
Ave F
Ave L
Ave G
Ave I
Ave J
Ave K
Ave L
Ave P
Palmdale Blvd
Ave S
Ave T
Ave M
50th St E
40th St E
30th St E
20th St E
10th St E
60th
St W
30th
St W
Div
isio
n S
t
Sierra H
wy
90th St E
14
14
138AREA OFDETAIL
Reservoir 4
Reservoir 3
Reservoir 1
Reservoir 2
Booster PS 1
Booster PS 2
Distribution PS 1
Distribution PS 2
0 4
Miles
Gaskell RdMoj
ave
Trop
ico
Rd
Distribution PS 1A
Executive Summary
North Los Angeles / Kern County Recycled Water Project ES-5 ESA / 206359 Final PEIR November 2008
ES.5 Project Alternatives An EIR must describe a range of reasonable alternatives to the proposed project or alternative project locations that could feasibly attain most of the basic project objectives and would avoid or substantially lessen any of the significant environmental impacts to the proposed project. The alternatives analysis must include the “No Project Alternative” as a point of comparison. The No Project Alternative includes existing conditions and reasonably foreseeable future conditions that would exist if the proposed project were not approved (CEQA Guidelines §15126.6). The following alternatives are discussed further in Chapter 6, Alternatives Analysis. CEQA also requires that an EIR identify an environmentally preferred alternative (CEQA Guidelines §15126.6[e][2]).
No-Project Alternative Under the No-Project Alternative, LACWWD40 and the partner agencies would not implement the Regional Recycled Water Project. The LWRP, PWRP, and RWWTP would be upgraded as planned to produce tertiary-treated effluent; however, there would be no integrated system to distribute this recycled water to end users in the Antelope Valley. LACSD Nos. 14 and 20 would manage recycled water with agricultural reuse only. RCSD would need to develop alternative measures for discharge or distribution of the recycled water produced at the RWWTP. Under the No-Project Alternative, future water demand in the Antelope Valley would continue to grow and would be met with increased quantities of groundwater, surface water, and imported water, and/or increased conservation measures.
Alternative 1: Non-Integrated System Under Alternative 1, instead of implementing the proposed project, LACWWD40, PWD, QHWD, and RCSD would design, construct, and operate their own recycled water systems. Alternative 1 would result in four separate recycled water systems in the Antelope Valley instead of one integrated regional system. LACWWD40 would construct recycled water pipelines, pump stations, and storage reservoirs within its service area. LACWWD40 would contract independently with LACSD No. 14, LACSD No. 20, and RCSD to purchase recycled water for the end users in its service area.
ES.6 Summary of Impacts Table ES-1, at the end of this chapter, presents a summary of the impacts and mitigation measures identified for the proposed project. The complete impact statements and mitigation measures are presented in Chapter 3, Environmental Setting, Impacts, and Mitigation Measures. The level of significance for each impact was determined using significance criteria (thresholds) developed for each category of impacts; these criteria are presented in the appropriate sections of Chapter 3. Significant impacts are those adverse environmental impacts that meet or exceed the significance thresholds; less-than-significant impacts would not exceed the thresholds. Table ES-
Executive Summary
North Los Angeles / Kern County Recycled Water Project ES-6 ESA / 206359 Final PEIR November 2008
1 indicates the measures that will be implemented to avoid, minimize, or otherwise reduce significant impacts to a less-than-significant level.
ES.7 Organization of this PEIR This Final PEIR has been organized into the following sections:
ES. Executive Summary. This chapter summarizes the contents of the Final PEIR.
1. Introduction and Project Background. This section discusses the CEQA process and the purpose of the PEIR.
2. Project Description. This section provides an overview of the proposed project, describes the need for and objectives of the proposed project, and provides detail on the characteristics of the proposed project.
3. Environmental Setting, Impacts and Mitigation Measures. This chapter describes the environmental setting and identifies impacts of the proposed project for each of the following environmental resource areas: Aesthetics; Air Quality; Biological Resources; Cultural Resources; Geology and Soils; Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Agriculture; Noise; Environmental Justice; Transportation and Traffic; and Utilities and Service Systems. Measures to mitigate the impacts of the proposed project are presented for each resource area.
4. Cumulative Impacts. This chapter describes the potential impacts of the proposed project when considered together with other related projects in the project area.
5. Growth Inducement. This chapter describes the potential for the proposed project to induce growth.
6. Alternatives Analysis. This chapter presents an overview of the alternatives development process and describes the alternatives to the proposed project that were considered.
7. References.
8. Report Preparers. This chapter identifies authors and consultants involved in preparing this Final PEIR, including persons and organizations consulted.
9. Acronyms.
10. Comment Letters. This chapter includes all comment letter received during the Draft PEIR public comment period.
11. Response to Comments. This chapter includes written responses to all comment letters received during the Draft PEIR public comment period (Chapter 10).
12. Lead Agency Revisions to Final PEIR: This chapter includes revisions to the Draft PEIR made by the Lead Agency in addition to those included in Chapter 11 as a result of responses to comments.
Exe
cutiv
e S
umm
ary
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-7
E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
TAB
LE E
S-1
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
Aest
hetic
s
3.1-
1: C
onst
ruct
ion
of th
e pr
opos
ed re
cycl
ed w
ater
pip
elin
e co
uld
gene
rate
sho
rt-te
rm im
pact
s to
aes
thet
ic re
sour
ces.
3.
1-1:
Fol
low
ing
cons
truct
ion
activ
ities
, the
impl
emen
ting
agen
cies
sha
ll re
stor
e di
stur
bed
area
s by
rees
tabl
ishi
ng p
re-e
xist
ing
cond
ition
s in
clud
ing
topo
grap
hy, r
epav
ing
road
way
s, re
plan
ting
trees
, and
/or
rese
edin
g w
ith a
nat
ive
seed
mix
typi
cal o
f the
imm
edia
te s
urro
undi
ng
area
. The
impl
emen
ting
agen
cies
sha
ll be
resp
onsi
ble
for m
onito
ring
the
repl
ante
d ar
eas
to e
nsur
e th
at re
vege
tatio
n is
suc
cess
ful.
Less
than
sig
nific
ant
3.1-
2: C
onst
ruct
ion
and
oper
atio
n of
the
prop
osed
sto
rage
rese
rvoi
rs
and
pum
p st
atio
ns c
ould
resu
lt in
sig
nific
ant i
mpa
cts
to a
esth
etic
re
sour
ces.
3.1-
2a: T
he im
plem
entin
g ag
enci
es s
hall
atte
mpt
to lo
cate
pum
p st
atio
ns a
nd re
serv
oirs
in a
reas
that
are
com
patib
le w
ith e
xist
ing
view
s an
d vi
stas
.
3.1-
2b: D
urin
g pr
ojec
t des
ign,
the
impl
emen
ting
agen
cies
sha
ll pr
epar
e a
land
scap
e pl
an fo
r eac
h ab
oveg
roun
d pr
ojec
t com
pone
nt. T
he
land
scap
e pl
an s
hall
incl
ude
mea
sure
s to
rest
ore
dist
urbe
d ar
eas
by
rees
tabl
ishi
ng e
xist
ing
topo
grap
hy, i
nclu
ding
repl
antin
g tre
es a
nd/o
r re
seed
ing
with
a n
ativ
e se
ed m
ix ty
pica
l of t
he im
med
iate
ly s
urro
undi
ng
area
. The
land
scap
e pl
an s
hall
incl
ude
a re
quire
d se
ed m
ix a
nd p
lant
pa
late
. Veg
etat
ion
scre
enin
g sh
all b
e in
clud
ed in
the
land
scap
e pl
an in
or
der t
o sh
ield
pro
pose
d ab
oveg
roun
d fa
cilit
ies
from
pub
lic v
iew
. The
la
ndsc
ape
plan
sha
ll in
clud
e a
mon
itorin
g pl
an to
ens
ure
that
the
site
re
stor
atio
n an
d th
e es
tabl
ishm
ent o
f veg
etat
ion
is s
ucce
ssfu
l.
3.1-
2c: T
he im
plem
entin
g ag
enci
es s
hall
ensu
re th
at s
tora
ge re
serv
oir
desi
gns
incl
ude
non-
glar
e ex
terio
r coa
tings
that
are
col
ored
an
earth
to
ne to
ble
nd in
with
the
surr
ound
ing
land
scap
e.
Less
than
sig
nific
ant
3.1-
3: O
pera
tion
of th
e pr
opos
ed s
tora
ge re
serv
oirs
and
pum
p st
atio
ns
coul
d re
sult
in a
dditi
onal
ligh
t and
gla
re im
pact
s du
e to
nig
httim
e se
curit
y lig
htin
g.
3.1-
3: T
he e
xter
ior l
ight
ing
inst
alle
d ar
ound
the
stor
age
rese
rvoi
rs a
nd
pum
p st
atio
ns s
hall
be o
f a m
inim
um s
tand
ard
requ
ired
to e
nsur
e sa
fe
visi
bilit
y. L
ight
ing
shal
l be
shie
lded
and
dire
cted
dow
nwar
d, a
way
from
ne
ighb
orin
g la
nd u
ses
to m
inim
ize
impa
cts
of li
ght a
nd g
lare
.
Less
than
sig
nific
ant
3.1-
4: A
pplic
atio
n of
recy
cled
wat
er fo
r gro
undw
ater
rech
arge
cou
ld
resu
lt in
sig
nific
ant i
mpa
cts
to a
esth
etic
reso
urce
s.
Impl
emen
t Miti
gatio
n M
easu
re 3
.1-2
b.
Less
than
sig
nific
ant
Air Q
ualit
y
3.2-
1: T
he p
ropo
sed
proj
ect c
ould
con
flict
with
or o
bstru
ct
impl
emen
tatio
n of
the
appl
icab
le a
ir qu
ality
pla
n.
3.2-
1a: T
he im
plem
entin
g ag
enci
es s
hall
incl
ude
in c
ontra
ctor
sp
ecifi
catio
ns th
e im
plem
enta
tion
of a
fugi
tive
dust
con
trol p
rogr
am
purs
uant
to th
e pr
ovis
ions
of A
VAQ
MD
Rul
e 40
3 or
KC
AP
CD
Rul
e 40
2.
3.2-
1b: A
ll co
nstru
ctio
n eq
uipm
ent s
hall
be p
rope
rly tu
ned
and
mai
ntai
ned
in a
ccor
danc
e w
ith m
anuf
actu
rer’s
spe
cific
atio
ns.
3.2-
1c: G
ener
al c
ontra
ctor
s sh
all m
aint
ain
and
oper
ate
cons
truct
ion
equi
pmen
t so
as to
min
imiz
e ex
haus
t em
issi
ons.
Dur
ing
cons
truct
ion,
tru
cks
and
vehi
cles
in lo
adin
g an
d un
load
ing
queu
es s
hall
turn
thei
r en
gine
s of
f whe
n no
t in
use
to re
duce
veh
icle
em
issi
ons.
Con
stru
ctio
n
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-8
E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
emis
sion
s sh
all b
e ph
ased
and
sch
edul
ed to
avo
id e
mis
sion
s pe
aks
and
disc
ontin
ued
durin
g se
cond
-sta
ge s
mog
ale
rts.
3.2-
1d: E
lect
ricity
from
pow
er p
oles
rath
er th
an te
mpo
rary
die
sel-
or
gaso
line-
pow
ered
gen
erat
ors
shal
l be
used
to th
e ex
tent
feas
ible
.
3.2-
1e: A
ll co
nstru
ctio
n ve
hicl
es s
hall
be p
rohi
bite
d fro
m id
ling
in
exce
ss o
f fiv
e m
inut
es, b
oth
on- a
nd o
ff-si
te.
3.2-
1f: T
he p
roje
ct a
pplic
ant s
hall
utili
ze c
oatin
gs a
nd s
olve
nts
that
are
co
nsis
tent
with
app
licab
le A
VA
QM
D o
r KC
AP
CD
rule
s an
d re
gula
tions
.
3.2-
2: C
onst
ruct
ion
activ
ities
ass
ocia
ted
with
pip
elin
e co
nstru
ctio
n co
uld
gene
rate
sub
stan
tial a
mou
nts
of d
ust a
nd o
ther
crit
eria
pol
luta
nt
emis
sion
s.
Impl
emen
t Miti
gatio
n M
easu
res
3.2-
1a th
roug
h 3.
2-1f
. Le
ss th
an s
igni
fican
t
3.2-
3: O
pera
tion
of th
e pi
pelin
es w
ould
resu
lt in
min
imal
em
issi
ons
of
crite
ria a
ir po
lluta
nts.
N
one
requ
ired.
Le
ss th
an s
igni
fican
t
3.2-
4: O
pera
tion
of th
e pi
pelin
e w
ould
not
cre
ate
obje
ctio
nabl
e od
ors
affe
ctin
g a
subs
tant
ial n
umbe
r of p
eopl
e.
Non
e re
quire
d.
Less
than
sig
nific
ant
3.2-
5: T
he p
ropo
sed
proj
ect w
ould
resu
lt in
few
er g
reen
hous
e ga
s em
issi
ons
than
wou
ld re
sult
from
impo
rting
a s
imila
r am
ount
of w
ater
. N
one
requ
ired.
Le
ss th
an s
igni
fican
t
3.2-
6: C
onst
ruct
ion
activ
ities
ass
ocia
ted
with
rese
rvoi
rs a
nd p
ump
stat
ions
cou
ld g
ener
ate
subs
tant
ial a
mou
nts
of d
ust a
nd o
ther
crit
eria
po
lluta
nt e
mis
sion
s.
Impl
emen
t Miti
gatio
n M
easu
res
3.2-
1a th
roug
h 3.
2-1f
. Le
ss th
an s
igni
fican
t
3.2-
7: O
pera
tion
of th
e re
serv
oirs
and
pum
p st
atio
ns w
ould
resu
lt in
m
inim
al o
pera
tiona
l em
issi
ons
of c
riter
ia a
ir po
lluta
nts.
N
one
requ
ired.
Le
ss th
an s
igni
fican
t
Biol
ogica
l Res
ourc
es
3.3-
1: C
onst
ruct
ion
of th
e pi
pelin
e co
uld
have
a s
ubst
antia
l adv
erse
ef
fect
on
liste
d, c
andi
date
or s
peci
al-s
tatu
s gr
ound
dw
ellin
g w
ildlif
e sp
ecie
s in
clud
ing
the
Cal
iforn
ia re
d-le
gged
frog
and
Moh
ave
grou
nd
squi
rrel
.
3.3-
1a: T
he im
plem
entin
g ag
enci
es s
hall
have
a q
ualif
ied
biol
ogis
t co
nduc
t a p
re-c
onst
ruct
ion
field
reco
nnai
ssan
ce s
urve
y fo
r spe
cial
-st
atus
gro
und-
dwel
ling
spec
ies
with
in th
e co
nstru
ctio
n rig
ht-o
f-way
. If
pote
ntia
l for
spe
cial
-sta
tus
grou
nd-d
wel
ling
spec
ies
is id
entif
ied
then
pr
esen
ce/a
bsen
ce p
roto
col s
urve
ys s
hall
be c
ondu
cted
. If p
roto
col
surv
eys
iden
tify
the
pres
ence
of s
peci
al-s
tatu
s gr
ound
-dw
ellin
g sp
ecie
s,
the
impl
emen
ting
agen
cies
sha
ll co
nsul
t with
CD
FG to
det
erm
ine
furth
er re
quire
d m
itiga
tion.
3.3-
1b: T
he im
plem
entin
g ag
enci
es s
hall
avoi
d im
pact
s on
Cal
iforn
ia
red-
legg
ed fr
og b
y el
imin
atin
g co
nstru
ctio
n ac
tiviti
es w
ithin
are
as w
here
th
e sp
ecie
s m
ay o
ccur
. Im
plem
entin
g ag
enci
es s
hall
empl
oy tu
nnel
ing
or ja
ck a
nd b
ore
cons
truct
ion
met
hods
und
er d
rain
ages
that
may
su
ppor
t Cal
iforn
ia re
d-le
gged
frog
in o
rder
to a
void
impa
ctin
g th
e sp
ecie
s.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-9
E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.3-
1c: T
he im
plem
entin
g ag
enci
es s
hall
stak
e, fl
ag, f
ence
, or
othe
rwis
e cl
early
del
inea
te th
e co
nstru
ctio
n rig
ht-o
f-way
that
rest
ricts
th
e lim
its o
f con
stru
ctio
n to
the
min
imum
nec
essa
ry to
impl
emen
t the
pr
ojec
t nea
r are
as th
at m
ay s
uppo
rt C
alifo
rnia
red-
legg
ed fr
ogs
as
dete
rmin
ed b
y a
qual
ified
bio
logi
st.
3.3-
1d: T
he im
plem
entin
g ag
enci
es s
hall
inst
all a
silt
fenc
e or
som
e ot
her i
mpe
rmea
ble
barr
ier t
o ex
clud
e sm
all w
ildlif
e sp
ecie
s fro
m
ente
ring
the
activ
e w
ork
area
s. E
xclu
sion
fenc
ing
can
be li
mite
d to
ar
eas
of d
ocum
ente
d oc
curr
ence
s of
spe
cial
-sta
tus
wild
life
as
dete
rmin
ed d
urin
g pr
e-co
nstru
ctio
n su
rvey
s by
a q
ualif
ied
biol
ogis
t.
3.3-
1e: P
rior t
o pr
ojec
t im
plem
enta
tion,
a h
abita
t ass
essm
ent w
ill b
e co
nduc
ted
by a
qua
lifie
d bi
olog
ist t
o de
term
ine
the
pote
ntia
l for
the
Moh
ave
grou
nd s
quirr
el to
occ
ur w
ithin
con
stru
ctio
n zo
nes.
If th
e ha
bita
t ass
essm
ent d
eter
min
es th
at p
oten
tial h
abita
t for
the
Moh
ave
grou
nd s
quirr
el is
pre
sent
in th
e im
pact
zon
e or
with
in 3
00 fe
et o
f the
co
nstru
ctio
n zo
ne, t
hen
the
impl
emen
ting
agen
cies
hav
e tw
o op
tions
: 1)
assu
me
the
Moh
ave
grou
nd s
quirr
el is
pre
sent
and
eith
er ta
ke th
e st
eps
nece
ssar
y to
avo
id a
ny p
oten
tial d
irect
or i
ndire
ct im
pact
s (i.
e.,
cons
truct
ion
nois
e an
d du
st) t
hat m
ay b
e in
curr
ed b
y th
e M
ohav
e gr
ound
squ
irrel
or 2
) arr
ange
for a
qua
lifie
d bi
olog
ist w
ith th
e ne
cess
ary
perm
its to
impl
emen
t a tr
appi
ng p
rogr
am to
det
erm
ine
the
pres
ence
or
abse
nce
of th
e M
ohav
e gr
ound
squ
irrel
. If M
ohav
e gr
ound
squ
irrel
is
iden
tifie
d as
pre
sent
or a
ssum
ed p
rese
nt, i
mpl
emen
ting
agen
cies
sha
ll ob
tain
an
inci
dent
al ta
ke p
erm
it fro
m C
DFG
pur
suan
t to
Sec
tion
2081
of
the
Cal
iforn
ia F
ish
and
Gam
e C
ode
and
prov
ide
com
pens
atio
n at
a
ratio
det
erm
ined
by
CD
FG.
3.3-
1f: P
rior t
o pr
ojec
t im
plem
enta
tion,
a b
urro
win
g ow
l pr
esen
ce/a
bsen
ce s
urve
y sh
all b
e co
nduc
ted
by a
qua
lifie
d bi
olog
ist i
n ac
cord
ance
with
CD
FG’s
199
5 S
taff
Rep
ort o
n B
urro
win
g O
wl
Miti
gatio
n an
d th
e B
urro
win
g O
wl C
onso
rtium
’s 1
992
Bur
row
ing
Ow
l P
roto
col a
nd M
itiga
tion
Gui
delin
es to
det
erm
ine
the
pote
ntia
l for
the
burr
owin
g ow
l to
occu
r with
in im
pact
ed a
reas
and
con
stru
ctio
n zo
nes.
If
the
surv
ey re
sults
in d
isco
very
of b
urro
win
g ow
l, si
gn, o
r pot
entia
l bu
rrow
site
s in
the
impa
ct z
one,
then
add
ition
al s
urve
ys s
hall
be
perfo
rmed
dur
ing
the
bree
ding
sea
son
(Apr
il 15
to J
uly
15) i
n ac
cord
ance
with
the
1992
Gui
delin
es to
det
erm
ine
use
of th
e si
te b
y bu
rrow
ing
owl.
Follo
win
g th
is s
urve
y, th
e im
plem
entin
g ag
enci
es s
hall
cons
ult w
ith C
DFG
to d
eter
min
e av
oida
nce
or m
itiga
tion
mea
sure
to
min
imiz
e pr
ojec
t im
pact
s to
bur
row
ing
owl.
3.3-
2: C
onst
ruct
ion
of th
e pi
pelin
e co
uld
have
a s
ubst
antia
l adv
erse
ef
fect
on
liste
d, c
andi
date
or s
peci
al-s
tatu
s ba
t and
avi
an s
peci
es
incl
udin
g th
e S
wai
nson
’s h
awk,
Am
eric
an p
ereg
rine
falc
on,
3.3-
2a: P
rior t
o an
y gr
ound
-dis
turb
ing
activ
ities
, the
impl
emen
ting
agen
cies
sha
ll ha
ve a
qua
lifie
d bi
olog
ist c
ondu
ct a
pre
-con
stru
ctio
n sp
ring/
sum
mer
act
ive
seas
on re
conn
aiss
ance
sur
vey
for
nest
ing/
roos
ting
spec
ial-s
tatu
s m
obile
bird
and
bat
spe
cies
, and
oth
er
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
0 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
sout
hwes
tern
will
ow fl
ycat
cher
, and
leas
t Bel
l’s v
ireo.
ne
stin
g bi
rds
with
in 3
00 fe
et (5
00 fe
et fo
r rap
tors
) of t
he c
onst
ruct
ion
limits
of e
ach
proj
ect e
lem
ent t
o de
term
ine
and
map
the
loca
tion
and
exte
nt o
f spe
cial
-sta
tus
spec
ies
occu
rren
ce(s
) tha
t cou
ld b
e af
fect
ed b
y th
e pr
ojec
t.
3.3-
2b: T
he im
plem
entin
g ag
enci
es s
hall
avoi
d di
rect
impa
cts
on a
ny
nest
ing
bird
s lo
cate
d w
ithin
the
limits
of c
onst
ruct
ion.
Thi
s co
uld
be
acco
mpl
ishe
d by
est
ablis
hing
the
cons
truct
ion
right
of w
ay a
nd re
mov
al
of p
lant
mat
eria
l out
side
of t
he ty
pica
l bre
edin
g se
ason
(Feb
ruar
y 1
thro
ugh
Aug
ust 3
1).
3.3-
2c: I
f con
stru
ctio
n an
d ve
geta
tion
rem
oval
is p
ropo
sed
for t
he b
ird
nest
ing
perio
d Fe
brua
ry 1
thro
ugh
Aug
ust 3
1, th
en p
reco
nstru
ctio
n su
rvey
s fo
r nes
ting/
roos
ting
bird
and
bat
s sp
ecie
s sh
all b
egin
30
days
pr
ior t
o co
nstru
ctio
n di
stur
banc
e w
ith s
ubse
quen
t wee
kly
surv
eys,
the
last
one
bei
ng n
o m
ore
than
thre
e da
ys p
rior t
o w
ork
initi
atio
n. T
he
surv
eys
shal
l inc
lude
hab
itat w
ithin
300
feet
(500
feet
for r
apto
rs) o
f the
co
nstru
ctio
n lim
its. A
ctiv
e ne
st s
ites
loca
ted
durin
g th
e pr
e-co
nstru
ctio
n su
rvey
s sh
all b
e av
oide
d an
d a
non-
dist
urba
nce
buffe
r zon
e es
tabl
ishe
d de
pend
ent o
n th
e sp
ecie
s an
d in
con
sulta
tion
with
the
US
FWS
and
C
DFG
. Thi
s bu
ffer z
one
shal
l be
delin
eate
d in
the
field
with
flag
ging
, st
akes
or c
onst
ruct
ion
fenc
ing.
Nes
t site
s sh
all b
e av
oide
d w
ith
appr
oved
non
-dis
turb
ance
buf
fer z
ones
unt
il th
e ad
ults
and
you
ng a
re
no lo
nger
relia
nt o
n th
e ne
st s
ite fo
r sur
viva
l as
dete
rmin
ed b
y a
qual
ified
bio
logi
st. F
or s
peci
es w
ith h
igh
site
fide
lity,
suc
h as
S
wai
nson
’s h
awk,
if d
irect
take
of n
ests
out
side
of t
he b
reed
ing
seas
ons
is re
quire
d, th
e im
plem
entin
g ag
ency
sha
ll co
ntac
t CD
FG to
de
term
ine
appr
opria
te m
itiga
tion
mea
sure
s.
3.3-
2d: I
f a n
atal
bat
roos
t site
is lo
cate
d w
ithin
the
limits
of c
onst
ruct
ion
durin
g pr
e-co
nstru
ctio
n su
rvey
s, it
sha
ll be
avo
ided
with
non
-di
stur
banc
e bu
ffer z
one
esta
blis
hed
by a
qua
lifie
d bi
olog
ist i
n co
nsul
tatio
n w
ith th
e U
SFW
S a
nd C
DFG
unt
il th
e si
te is
aba
ndon
ed.
3.3-
2e: T
he im
plem
entin
g ag
enci
es s
hall
min
imiz
e im
pact
s on
do
cum
ente
d lo
catio
ns o
f spe
cial
-sta
tus
spec
ies
and
any
nest
ing
bird
s to
th
e ex
tent
feas
ible
and
pra
ctic
able
by
redu
cing
the
cons
truct
ion
right
-of-
way
thro
ugh
area
s of
occ
urre
nces
to e
ither
avo
id th
e oc
curr
ence
or
redu
ce im
pact
s to
the
min
imum
nec
essa
ry to
com
plet
e th
e pr
ojec
t.
3.3-
2f: T
he im
plem
entin
g ag
enci
es s
hall
stak
e, fl
ag, f
ence
, or o
ther
wis
e cl
early
del
inea
te th
e co
nstru
ctio
n rig
ht-o
f-way
that
rest
ricts
the
limits
of
cons
truct
ion
to th
e m
inim
um n
eces
sary
to im
plem
ent t
he p
roje
ct th
at
also
wou
ld a
void
and
min
imiz
e im
pact
s on
spe
cial
-sta
tus
avia
n an
d ba
t sp
ecie
s.
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
1 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.
3-2g
: The
impl
emen
ting
agen
cies
sha
ll in
stru
ct c
onst
ruct
ion
pers
onne
l on
the
impo
rtanc
e of
buf
fer z
ones
and
sen
sitiv
ity o
f the
de
linea
ted
area
s.
3.3-
3: C
onst
ruct
ion
of th
e pi
pelin
e co
uld
have
a s
ubst
antia
l effe
ct o
n sp
ecia
l-sta
tus
plan
t spe
cies
and
hab
itat t
ypes
. 3.
3-3a
: The
impl
emen
ting
agen
cies
sha
ll ha
ve a
qua
lifie
d bi
olog
ist
cond
uct a
pre
-con
stru
ctio
n sp
ring/
sum
mer
flor
istic
inve
ntor
y an
d ra
re
plan
t sur
vey
of th
e pr
opos
ed p
roje
ct a
reas
in a
ccor
danc
e w
ith C
DFG
’s
Gui
delin
es fo
r Ass
essi
ng th
e E
ffect
s of
Pro
pose
d P
roje
cts
on R
are,
Th
reat
ened
, and
End
ange
red
Pla
nts
and
Nat
ural
Com
mun
ities
, (re
vise
d M
ay 8
, 200
0) to
det
erm
ine
and
map
the
loca
tion
and
exte
nt o
f spe
cial
-st
atus
pla
nt s
peci
es p
opul
atio
ns w
ithin
the
cons
truct
ion
right
-of-w
ay.
The
surv
ey s
hall
be c
ondu
cted
dur
ing
the
appr
opria
te fl
ower
ing
time
for
targ
et p
lant
spe
cies
.
3.3-
3b: I
f not
pos
sibl
e to
avo
id, t
he im
plem
entin
g ag
enci
es s
hall
min
imiz
e im
pact
s on
spe
cial
-sta
tus
plan
t spe
cies
by
redu
cing
the
cons
truct
ion
right
-of-w
ay th
roug
h ar
eas
with
pot
entia
l occ
urre
nces
of
spec
ial-s
tatu
s pl
ant s
peci
es. F
or u
navo
idab
le d
irect
impa
cts
to s
peci
al-
stat
us s
peci
es, c
onsu
ltatio
n w
ith C
DFG
sha
ll be
requ
ired
to d
eter
min
e th
e im
pact
are
a an
d fu
rther
miti
gatio
n, w
hich
cou
ld in
clud
e ac
quis
ition
of
hab
itat o
f equ
al o
r sup
erio
r val
ue a
t a ra
tio o
f at l
east
2:1
.
3.3-
3c: T
he im
plem
entin
g ag
enci
es s
hall
stak
e, fl
ag, f
ence
, or
othe
rwis
e cl
early
del
inea
te th
e co
nstru
ctio
n rig
ht-o
f-way
that
rest
ricts
th
e lim
its o
f con
stru
ctio
n to
the
min
imum
nec
essa
ry to
impl
emen
t the
pr
ojec
t tha
t als
o w
ould
avo
id a
nd m
inim
ize
impa
cts
on s
peci
al-s
tatu
s pl
ant s
peci
es.
3.3-
3d: T
he im
plem
entin
g ag
enci
es s
hall
rest
ore
all d
istu
rbed
are
as
back
to p
re-c
onst
ruct
ion
cond
ition
s an
d a
rest
orat
ion
plan
sha
ll be
de
velo
ped
and
impl
emen
ted
that
con
tain
s th
e fo
llow
ing
item
s:
resp
onsi
bilit
ies
and
qual
ifica
tions
of t
he p
erso
nnel
to im
plem
ent a
nd
supe
rvis
e th
e pl
an; s
ite p
repa
ratio
n an
d pl
antin
g im
plem
enta
tion;
sc
hedu
le; m
aint
enan
ce p
lan/
guid
elin
es; a
nd m
onito
ring
plan
.
3.3-
3e: E
arth
-mov
ing
equi
pmen
t will
avo
id m
aneu
verin
g in
are
as
outs
ide
the
iden
tifie
d lim
its o
f con
stru
ctio
n in
ord
er to
avo
id d
istu
rbin
g op
en s
pace
are
as th
at w
ill re
mai
n un
deve
lope
d. P
rior t
o co
nstru
ctio
n,
the
natu
ral o
pen
spac
e lim
its w
ill b
e m
arke
d by
the
cons
truct
ion
supe
rvis
or a
nd a
qua
lifie
d bi
olog
ist.
Thes
e lim
its w
ill b
e id
entif
ied
on th
e co
nstru
ctio
n dr
awin
gs. T
he im
plem
entin
g ag
enci
es w
ill s
ubm
it a
lette
r to
the
appr
opria
te a
genc
ies
verif
ying
that
con
stru
ctio
n lim
its h
ave
been
fla
gged
and
cle
arly
del
inea
ted
in th
e fie
ld. N
o ea
rth-m
ovin
g eq
uipm
ent
will
be
allo
wed
out
side
dem
arca
ted
cons
truct
ion
zone
s.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
2 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.3-
4: C
onst
ruct
ion
of th
e pi
pelin
e co
uld
conf
lict w
ith th
e Jo
shua
Tre
e an
d N
ativ
e D
eser
t Veg
etat
ion
Pre
serv
atio
n O
rdin
ance
. 3.
3-4a
: The
impl
emen
ting
agen
cies
sha
ll at
tem
pt to
pla
ce a
ll pr
ojec
t co
mpo
nent
s in
are
as e
xhib
iting
abs
ence
or a
low
den
sity
of J
oshu
a tre
es a
nd o
ther
nat
ive
dese
rt ve
geta
tion.
3.3-
4b: P
rior t
o th
e co
mm
ence
men
t of g
radi
ng a
ctiv
ities
for a
ny
com
pone
nt o
f the
pro
pose
d pr
ojec
t, w
ithin
the
City
of P
alm
dale
, a
qual
ified
bio
logi
st/a
rbor
ist s
hall
be c
onsu
lted
to d
eter
min
e th
e bi
olog
ical
/aes
thet
ic v
alue
of p
oten
tially
impa
cted
tree
s un
der t
he
juris
dict
ion
of th
e P
alm
dale
Nat
ive
Des
ert V
eget
atio
n O
rdin
ance
. For
pr
otec
ted
vege
tatio
n lo
cate
d w
ithin
the
final
impa
ct a
reas
, a p
ropo
sal
appl
icat
ion
wou
ld b
e ne
cess
ary,
incl
udin
g a
dese
rt ve
geta
tion
pres
erva
tion
plan
whi
ch d
epic
ts th
e lo
catio
n of
eac
h Jo
shua
tree
and
C
alifo
rnia
juni
per,
deta
ils tr
ee a
ge a
nd h
ealth
, and
des
crib
es w
hich
can
be
sav
ed a
nd m
aint
aine
d on
the
site
or r
eloc
ated
. A p
erm
it m
ust b
e ob
tain
ed fr
om th
e C
ity o
f Pal
mda
le’s
land
scap
e ar
chite
ct p
rior t
o re
mov
al o
f pro
tect
ed v
eget
atio
n in
Los
Ang
eles
Cou
nty,
whi
ch m
ay
requ
ire m
itiga
tion
in th
e fo
rm o
f rep
lace
men
t pla
ntin
gs o
f all
impa
cted
ve
geta
tion.
Prio
r to
the
rem
oval
of p
rote
cted
veg
etat
ion
in K
ern
Cou
nty,
th
e K
ern
Cou
nty
Env
ironm
enta
l Hea
lth S
ervi
ces
shal
l be
cont
acte
d.
3.3-
4c: I
f avo
idan
ce o
f Jos
hua
tree
woo
dlan
ds o
r oth
er s
peci
al-s
tatu
s ve
geta
tive
com
mun
ity is
not
feas
ible
, the
impl
emen
ting
agen
cies
sha
ll ac
quire
off-
site
hab
itat o
f equ
al o
r sup
erio
r qua
lity
at a
no
less
than
a
2:1
ratio
with
in re
mai
ning
hab
itat i
n th
e A
ntel
ope
Val
ley.
Loc
atio
n, te
rms
and
cond
ition
s fo
r hab
itat a
cqui
sitio
n, p
rote
ctio
n, a
nd m
aint
enan
ce s
hall
be d
eter
min
ed th
roug
h co
nsul
tatio
n w
ith re
sour
ce a
genc
ies,
incl
udin
g C
DFG
.
Less
than
sig
nific
ant
3.3-
5: C
onst
ruct
ion
of th
e pi
pelin
e co
uld
conf
lict w
ith d
esig
nate
d S
igni
fican
t Eco
logi
cal A
reas
. N
one
requ
ired.
Le
ss th
an s
igni
fican
t
3.3-
6: C
onst
ruct
ion
of th
e pi
pelin
e co
uld
have
a s
ubst
antia
l adv
erse
ef
fect
on
wet
land
s co
nsid
ered
wat
ers
of th
e st
ate.
3.
3-6:
Prio
r to
cons
truct
ion,
the
impl
emen
ting
agen
cies
sha
ll re
tain
a
qual
ified
bio
logi
st to
sur
vey
prop
osed
con
stru
ctio
n zo
nes
incl
udin
g st
agin
g ar
eas
and
acce
ss ro
ads.
If w
etla
nds
wou
ld b
e af
fect
ed b
y co
nstru
ctio
n, th
e qu
alifi
ed b
iolo
gist
wou
ld p
repa
re a
repo
rt ou
tlini
ng
miti
gatio
n an
d co
mpe
nsat
ion
requ
irem
ents
to b
e im
plem
ente
d pr
ior t
o co
nstru
ctio
n. T
he m
itiga
tion
requ
irem
ents
sha
ll in
clud
e th
e fo
llow
ing
at
a m
inim
um:
• Im
plem
entin
g ag
enci
es s
hall
avoi
d im
pact
ing
prev
ious
ly
undi
stur
bed
area
s w
here
pos
sibl
e. T
his
wou
ld in
clud
e em
ploy
ing
tunn
elin
g or
jack
and
bor
e m
etho
ds u
nder
dra
inag
es.
• If
avoi
danc
e is
not
feas
ible
for e
ngin
eerin
g or
cos
t rea
sons
, the
im
plem
entin
g ag
enci
es s
hall
cond
uct j
uris
dict
iona
l del
inea
tion
of
wet
land
feat
ures
.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
3 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
•
Impl
emen
ting
agen
cies
sha
ll ob
tain
WD
Rs
from
the
RW
QC
B fo
r im
pact
s to
wat
ers
of th
e st
ate
incl
udin
g w
etla
nd a
reas
.
3.3-
7: C
onst
ruct
ion
of th
e pu
mp
stat
ions
and
rese
rvoi
rs c
ould
hav
e a
subs
tant
ial e
ffect
on
spec
ial-s
tatu
s w
ildlif
e sp
ecie
s in
clud
ing
the
Cal
iforn
ia re
d-le
gged
frog
and
Moh
ave
grou
nd s
quirr
el.
Impl
emen
t Miti
gatio
n M
easu
res
3.3-
1a th
roug
h 3.
3-1f
. Le
ss th
an s
igni
fican
t
3.3-
8: C
onst
ruct
ion
of th
e pu
mp
stat
ions
and
rese
rvoi
rs c
ould
hav
e a
subs
tant
ial e
ffect
on
spec
ial-s
tatu
s ba
t and
avi
an s
peci
es in
clud
ing
the
Sw
ains
on’s
haw
k, A
mer
ican
per
egrin
e fa
lcon
, sou
thw
este
rn w
illow
fly
catc
her,
and
leas
t Bel
l’s v
ireo.
Impl
emen
t Miti
gatio
n M
easu
res
3.3-
2a th
roug
h 3.
3-2g
. Le
ss th
an s
igni
fican
t
3.3-
9: C
onst
ruct
ion
of th
e pu
mp
stat
ions
and
rese
rvoi
rs c
ould
hav
e a
subs
tant
ial e
ffect
on
spec
ial-s
tatu
s pl
ant s
peci
es.
Impl
emen
t Miti
gatio
n M
easu
res
3.3-
3a th
roug
h 3.
3-3e
. Le
ss th
an s
igni
fican
t
3.3-
10: C
onst
ruct
ion
of th
e pu
mp
stat
ions
and
rese
rvoi
rs c
ould
con
flict
w
ith th
e Jo
shua
Tre
e an
d N
ativ
e D
eser
t Veg
etat
ion
Pre
serv
atio
n O
rdin
ance
.
Impl
emen
t Miti
gatio
n M
easu
res
3.3-
4a th
roug
h 3.
3-4c
. Le
ss th
an s
igni
fican
t
3.3-
11: C
onst
ruct
ion
of th
e pu
mp
stat
ions
and
rese
rvoi
rs c
ould
con
flict
w
ith d
esig
nate
d S
igni
fican
t Eco
logi
cal A
reas
. N
one
requ
ired.
Le
ss th
an s
igni
fican
t
3.3-
12: C
onst
ruct
ion
of th
e pu
mp
stat
ions
and
rese
rvoi
rs c
ould
hav
e a
subs
tant
ial a
dver
se e
ffect
on
wet
land
s co
nsid
ered
wat
ers
of th
e st
ate.
Im
plem
ent M
itiga
tion
Mea
sure
3.3
-6.
Less
than
sig
nific
ant
Cultu
ral R
esou
rces
3.4-
1: G
roun
d-di
stur
bing
act
iviti
es d
urin
g pi
pelin
e in
stal
latio
n co
uld
unea
rth, e
xpos
e, o
r dis
turb
arc
haeo
logi
cal,
hist
oric
al, o
r Nat
ive
Am
eric
an re
sour
ces.
3.4-
1a: P
rior t
o in
itial
con
stru
ctio
n of
pip
elin
es, t
he im
plem
entin
g ag
ency
sha
ll re
tain
the
serv
ices
of a
qua
lifie
d ar
chae
olog
ist t
o pr
epar
e a
Cul
tura
l Res
ourc
es M
onito
ring
and
Miti
gatio
n P
lan
(CM
MP
) and
a
Trea
tmen
t Pla
n (T
P) i
n ac
cord
ance
with
CE
QA
Gui
delin
es S
ectio
ns
1506
4.5
and
1512
6.4.
The
CM
MP
sha
ll se
t for
th c
riter
ia fo
r eva
luat
ing
the
sign
ifica
nce
of re
sour
ces
disc
over
ed d
urin
g co
nstru
ctio
n an
d id
entif
y ap
prop
riate
dat
a re
cove
ry m
etho
ds a
nd p
roce
dure
s to
miti
gate
pr
ojec
t im
pact
s on
sig
nific
ant r
esou
rces
. At a
min
imum
, the
CM
MP
sha
ll in
clud
e a
sum
mar
y of
ava
ilabl
e in
form
atio
n on
kno
wn
site
s an
d se
nsiti
ve lo
catio
ns in
the
proj
ect a
rea;
a h
isto
rical
con
text
for t
he
eval
uatio
n of
reso
urce
s th
at m
ay b
e en
coun
tere
d du
ring
cons
truct
ion;
a
rese
arch
des
ign
outli
ning
impo
rtant
his
toric
al th
emes
and
rese
arch
qu
estio
ns re
leva
nt to
the
know
n si
tes
in th
e st
udy
area
; dat
a re
quire
men
ts a
nd th
e ap
prop
riate
fiel
d an
d la
bora
tory
met
hods
to b
e us
ed to
acq
uire
dat
a ne
eded
for s
igni
fican
ce e
valu
atio
n an
d im
pact
m
itiga
tion.
The
CM
MP
will
als
o id
entif
y sp
ecifi
c pi
pelin
e se
gmen
ts
whe
re c
ultu
ral r
esou
rces
mon
itors
wou
ld b
e re
quire
d du
ring
cons
truct
ion.
The
TP
will
iden
tify
repo
rting
and
cur
atin
g re
quire
men
ts
for a
rtifa
cts
unco
vere
d du
ring
cons
truct
ion.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
4 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
All
proj
ect a
ctiv
ities
with
in o
r adj
acen
t to
the
His
toric
al a
rea
of O
ld
Pal
mda
le a
nd O
ld L
anca
ster
and
Old
Ros
amon
d an
d Tr
opic
o M
ine
area
sh
all b
e m
onito
red
by a
pro
fess
iona
l arc
haeo
logi
st a
s th
ere
is a
hig
h pr
obab
ility
for s
ubsu
rface
feat
ure
disc
over
y, w
hich
incl
udes
(tho
ugh
is
not l
imite
d to
) fou
ndat
ions
, cis
tern
s, w
ells
, ces
spoo
ls, b
asem
ents
, or
asso
ciat
ed e
lem
ents
of t
he O
ld P
alm
dale
roun
dhou
se s
pur o
f the
S
outh
ern
Pac
ific
Rai
lroad
.
3.4-
1b: A
Pha
se I
cultu
ral r
esou
rces
sur
vey
shal
l be
cond
ucte
d fo
r the
se
gmen
ts o
f pip
elin
e no
t alre
ady
asse
ssed
in th
e Ph
ase
I Ass
essm
ent
cond
ucte
d fo
r the
pro
pose
d pr
ojec
t. Fo
llow
ing
com
plet
ion
of th
e P
hase
I cu
ltura
l res
ourc
e su
rvey
, the
CM
MP
and
TP
sha
ll be
upd
ated
to in
clud
e th
ese
segm
ents
.
3.4-
2: G
roun
d-di
stur
bing
act
iviti
es d
urin
g pi
pelin
e in
stal
latio
n co
uld
unea
rth, e
xpos
e, o
r dis
turb
hum
an re
mai
ns.
3.4-
2: If
hum
an s
kele
tal r
emai
ns a
re u
ncov
ered
dur
ing
proj
ect
cons
truct
ion,
the
impl
emen
ting
agen
cy s
hall
imm
edia
tely
hal
t wor
k,
cont
act t
he K
ern
Cou
nty
or th
e Lo
s A
ngel
es C
ount
y co
rone
r, de
pend
ing
upon
the
loca
tion
of th
e fin
d, to
eva
luat
e th
e re
mai
ns, a
nd fo
llow
the
proc
edur
es a
nd p
roto
cols
set
forth
in S
ectio
n 15
064.
5 (e
)(1)
of t
he
CE
QA
Gui
delin
es. I
f the
Cou
nty
coro
ner d
eter
min
es th
at th
e re
mai
ns
are
Nat
ive
Am
eric
an, t
he im
plem
entin
g ag
ency
sha
ll co
ntac
t the
NA
HC
, in
acc
orda
nce
with
Hea
lth a
nd S
afet
y C
ode
Sec
tion
7050
.5, s
ubdi
visi
on
(c),
and
Pub
lic R
esou
rces
Cod
e 50
97.9
8 (a
s am
ende
d by
AB
264
1).
Per
Pub
lic R
esou
rces
Cod
e 50
97.9
8, th
e la
ndow
ner s
hall
ensu
re th
at
the
imm
edia
te v
icin
ity w
here
the
Nat
ive
Am
eric
an h
uman
rem
ains
are
lo
cate
d is
not
dam
aged
or d
istu
rbed
by
furth
er d
evel
opm
ent a
ctiv
ity
until
the
land
owne
r has
dis
cuss
ed a
nd c
onfe
rred
, as
pres
crib
ed in
this
se
ctio
n (P
RC
509
7.98
), w
ith th
e m
ost l
ikel
y de
scen
dent
s re
gard
ing
thei
r re
com
men
datio
ns, i
f app
licab
le, t
akin
g in
to a
ccou
nt th
e po
ssib
ility
of
mul
tiple
hum
an re
mai
ns.
Less
than
sig
nific
ant
3.4-
3: In
stal
latio
n of
pip
elin
es c
ould
pot
entia
lly u
near
th, e
xpos
e, o
r di
stur
b pa
leon
tolo
gic
reso
urce
s in
clud
ing
foss
il re
mai
ns, l
ocal
ities
, or
know
n fo
ssil-
bear
ing
geol
ogic
hor
izon
s.
3.4-
3: T
he im
plem
entin
g ag
enci
es s
hall
deve
lop
and
impl
emen
t a
Pal
eont
olog
ical
Res
ourc
e M
onito
ring
and
Miti
gatio
n P
lan
(PR
MM
P)
prio
r to
the
onse
t of c
onst
ruct
ion-
rela
ted
earth
mov
ing
activ
ities
in o
rder
to
eith
er a
void
or m
itiga
te to
a le
ss-th
an-s
igni
fican
t lev
el th
e ef
fect
s on
pa
leon
tolo
gica
l res
ourc
es. D
urin
g ea
rth-m
ovin
g co
nstru
ctio
n-re
late
d ac
tiviti
es, a
dditi
onal
pre
viou
sly-
unkn
own
foss
il si
tes
may
be
unco
vere
d.
The
PR
MM
P m
ust i
nclu
de m
itiga
tion
prot
ocol
for d
isco
verie
s as
wel
l. Th
e P
RM
MP
sha
ll in
clud
e pr
ovis
ions
for t
he fo
llow
ing:
spe
cial
co
nsid
erat
ion
shal
l be
mad
e to
col
lect
sed
imen
t sam
ples
for p
oten
tial
foss
ilife
rous
loca
tions
as
per t
he S
ocie
ty o
f Ver
tebr
ate
Pal
eont
olog
y st
anda
rds;
stra
tigra
phic
cro
ss-s
ectio
ns s
hall
be re
cord
ed, m
appi
ng o
f th
e ge
olog
ic u
nits
gra
phed
, and
foss
il re
mai
ns, c
lean
ed, a
naly
zed,
and
ca
talo
gued
to b
e ac
cept
ed fo
r cur
atio
n at
a le
gal r
epos
itory
; all
wor
k m
ust b
e co
nduc
ted
by a
qua
lifie
d P
aleo
ntol
ogis
t and
a fi
nal R
epor
t of
Find
ings
mus
t be
subm
itted
upo
n co
mpl
etio
n of
labo
rato
ry a
naly
sis.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
5 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.4-
4: P
ropo
sed
grou
nd-d
istu
rbin
g ac
tiviti
es fo
r sto
rage
rese
rvoi
rs,
pum
p st
atio
ns a
nd g
roun
dwat
er re
char
ge fa
cilit
ies
coul
d un
earth
, ex
pose
, or d
istu
rb a
rcha
eolo
gica
l, hi
stor
ical
, or N
ativ
e A
mer
ican
re
sour
ces.
3.4-
4a: P
rior t
o in
itial
con
stru
ctio
n of
sto
rage
rese
rvoi
rs, p
ump
stat
ion,
an
d re
char
ge fa
cilit
ies,
the
impl
emen
ting
agen
cy s
hall
reta
in th
e se
rvic
es o
f a q
ualif
ied
arch
aeol
ogis
t to
prep
are
a C
ultu
ral R
esou
rces
M
onito
ring
and
Miti
gatio
n P
lan
(CM
MP
) and
a T
reat
men
t Pla
n (T
P) i
n ac
cord
ance
with
CE
QA
Gui
delin
es S
ectio
ns 1
5064
.5 a
nd 1
5126
.4. T
he
CM
MP
sha
ll se
t for
th c
riter
ia fo
r eva
luat
ing
the
sign
ifica
nce
of re
sour
ces
disc
over
ed d
urin
g co
nstru
ctio
n an
d id
entif
y ap
prop
riate
dat
a re
cove
ry
met
hods
and
pro
cedu
res
to m
itiga
te p
roje
ct im
pact
s on
sig
nific
ant
reso
urce
s. A
t a m
inim
um, t
he C
MM
P s
hall
incl
ude
a su
mm
ary
of
avai
labl
e in
form
atio
n on
kno
wn
site
s an
d se
nsiti
ve lo
catio
ns in
the
proj
ect a
rea;
a h
isto
rical
con
text
for t
he e
valu
atio
n of
reso
urce
s th
at
may
be
enco
unte
red
durin
g co
nstru
ctio
n; a
rese
arch
des
ign
outli
ning
im
porta
nt h
isto
rical
them
es a
nd re
sear
ch q
uest
ions
rele
vant
to th
e kn
own
site
s in
the
stud
y ar
ea; d
ata
requ
irem
ents
and
the
appr
opria
te
field
and
labo
rato
ry m
etho
ds to
be
used
to a
cqui
re d
ata
need
ed fo
r si
gnifi
canc
e ev
alua
tion
and
impa
ct m
itiga
tion.
The
CM
MP
will
als
o id
entif
y sp
ecifi
c lo
catio
ns w
here
cul
tura
l res
ourc
es m
onito
rs w
ould
be
requ
ired
durin
g co
nstru
ctio
n. T
he T
P w
ill id
entif
y re
porti
ng a
nd c
urat
ing
requ
irem
ents
for a
rtifa
cts
unco
vere
d du
ring
cons
truct
ion.
3.4-
4b: D
PS
1-H
ist1
and
BP
S1-
His
t1 w
ould
be
adve
rsel
y im
pact
ed b
y th
e pr
opos
ed c
onst
ruct
ion
activ
ities
and
, the
refo
re, s
hall
be s
ubje
cted
to
Pha
se II
test
ing
and
eval
uatio
n fo
r sig
nific
ance
und
er C
EQ
A a
nd N
HP
A
(see
Sec
tion
3.4.
2).
3.4-
4c: A
Pha
se I
cultu
ral r
esou
rces
sur
vey
shal
l be
cond
ucte
d w
ithin
ar
eas
affe
cted
by
stor
age
rese
rvoi
r, pu
mp
stat
ions
, and
rech
arge
fa
cilit
ies
not a
lread
y as
sess
ed in
the
Pha
se I
Ass
essm
ent c
ondu
cted
for
the
prop
osed
pro
ject
.
3.4-
4d: F
ollo
win
g co
mpl
etio
n of
add
ition
al P
hase
I cu
ltura
l res
ourc
e su
rvey
s fo
r site
s no
t alre
ady
surv
eyed
, the
CM
MP
and
TP
sha
ll be
up
date
d to
incl
ude
thes
e ad
ditio
nal s
ites.
3.4-
4e: A
ll pr
ojec
t act
iviti
es w
ithin
or a
djac
ent t
o th
e H
isto
rical
are
a of
O
ld P
alm
dale
and
Old
Lan
cast
er a
nd O
ld R
osam
ond
and
Trop
ico
Min
e ar
ea s
hall
be m
onito
red
by a
pro
fess
iona
l arc
haeo
logi
st a
s th
ere
is a
hi
gh p
roba
bilit
y fo
r sub
surfa
ce fe
atur
e di
scov
ery,
whi
ch in
clud
es
(thou
gh is
not
lim
ited
to) f
ound
atio
ns, c
iste
rns,
wel
ls, c
essp
ools
, ba
sem
ents
, or a
ssoc
iate
d el
emen
ts o
f the
Old
Pal
mda
le ro
undh
ouse
sp
ur o
f the
Sou
ther
n P
acifi
c R
ailro
ad. I
f the
se e
lem
ents
are
iden
tifie
d,
miti
gatio
n m
easu
res
shal
l be
empl
oyed
that
incl
ude
in-fi
eld
eval
uatio
n by
a p
rofe
ssio
nal a
rcha
eolo
gist
(per
Sec
reta
ry o
f the
Inte
rior S
tand
ards
) an
d po
ssib
le d
ata
reco
very
, as
need
ed, p
er a
miti
gatio
n tre
atm
ent p
lan.
3.4-
4f: I
f a p
rehi
stor
ic s
ite is
enc
ount
ered
in th
e vi
cini
ty o
f the
co
ncen
tratio
n of
isol
ated
pre
hist
oric
arti
fact
s w
ithin
the
north
ern
porti
on
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
6 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
of th
e w
este
rn p
arce
l of P
ropo
sed
Res
ervo
ir 3,
miti
gatio
n m
easu
res
shal
l be
empl
oyed
that
incl
ude
in-fi
eld
eval
uatio
n by
a p
rofe
ssio
nal
arch
aeol
ogis
t (pe
r Sec
reta
ry o
f the
Inte
rior S
tand
ards
) and
pos
sibl
e da
ta re
cove
ry, a
s ne
eded
, per
a m
itiga
tion
treat
men
t pla
n.
3.4-
4g: I
f hum
an s
kele
tal r
emai
ns a
re u
ncov
ered
dur
ing
proj
ect
cons
truct
ion,
the
impl
emen
ting
agen
cy s
hall
imm
edia
tely
hal
t wor
k,
cont
act t
he K
ern
Cou
nty
or th
e Lo
s A
ngel
es c
oron
er, d
epen
ding
upo
n th
e lo
catio
n of
the
find,
to e
valu
ate
the
rem
ains
, and
follo
w th
e pr
oced
ures
and
pro
toco
ls s
et fo
rth in
Sec
tion
1506
4.5
(e)(
1) o
f the
C
EQ
A G
uide
lines
. If t
he C
ount
y co
rone
r det
erm
ines
that
the
rem
ains
ar
e N
ativ
e A
mer
ican
, the
impl
emen
ting
agen
cy s
hall
cont
act t
he N
AH
C,
in a
ccor
danc
e w
ith H
ealth
and
Saf
ety
Cod
e S
ectio
n 70
50.5
, sub
divi
sion
(c
), an
d P
ublic
Res
ourc
es C
ode
5097
.98
(as
amen
ded
by A
B 2
641)
. P
er P
ublic
Res
ourc
es C
ode
5097
.98,
the
land
owne
r sha
ll en
sure
that
th
e im
med
iate
vic
inity
whe
re th
e N
ativ
e A
mer
ican
hum
an re
mai
ns a
re
loca
ted
is n
ot d
amag
ed o
r dis
turb
ed b
y fu
rther
dev
elop
men
t act
ivity
un
til th
e la
ndow
ner h
as d
iscu
ssed
and
con
ferr
ed, a
s pr
escr
ibed
in th
is
sect
ion
(PR
C 5
097.
98),
with
the
mos
t lik
ely
desc
ende
nts
rega
rdin
g th
eir
reco
mm
enda
tions
, if a
pplic
able
, tak
ing
into
acc
ount
the
poss
ibili
ty o
f m
ultip
le h
uman
rem
ains
.
3.4-
5: C
onst
ruct
ion
of s
tora
ge re
serv
oirs
, pum
p st
atio
ns, a
nd re
char
ge
faci
litie
s co
uld
pote
ntia
lly u
near
th, e
xpos
e, o
r dis
turb
pal
eont
olog
ic
reso
urce
s in
clud
ing
foss
il re
mai
ns, l
ocal
ities
, or k
now
n fo
ssil-
bear
ing
geol
ogic
hor
izon
s.
3.4-
5: T
he im
plem
entin
g ag
enci
es s
hall
deve
lop
and
impl
emen
t a
Pal
eont
olog
ical
Res
ourc
e M
onito
ring
and
Miti
gatio
n P
lan
(PR
MM
P)
prio
r to
the
onse
t of c
onst
ruct
ion-
rela
ted
earth
mov
ing
activ
ities
in o
rder
to
eith
er a
void
or m
itiga
te to
a le
ss-th
an-s
igni
fican
t lev
el th
e ef
fect
s on
pa
leon
tolo
gica
l res
ourc
es. D
urin
g ea
rth-m
ovin
g co
nstru
ctio
n-re
late
d ac
tiviti
es, a
dditi
onal
pre
viou
sly-
unkn
own
foss
il si
tes
may
be
unco
vere
d.
The
PR
MM
P m
ust i
nclu
de m
itiga
tion
prot
ocol
for d
isco
verie
s as
wel
l. Th
e P
RM
MP
sha
ll in
clud
e pr
ovis
ions
for t
he fo
llow
ing:
spe
cial
co
nsid
erat
ion
shal
l be
mad
e to
col
lect
sed
imen
t sam
ples
for p
oten
tial
foss
ilife
rous
loca
tions
as
per t
he S
ocie
ty o
f Ver
tebr
ate
Pal
eont
olog
y st
anda
rds;
stra
tigra
phic
cro
ss-s
ectio
ns s
hall
be re
cord
ed, m
appi
ng o
f th
e ge
olog
ic u
nits
gra
phed
, and
foss
il re
mai
ns, c
lean
ed, a
naly
zed,
and
ca
talo
gued
to b
e ac
cept
ed fo
r cur
atio
n at
a le
gal r
epos
itory
; all
wor
k m
ust b
e co
nduc
ted
by a
qua
lifie
d P
aleo
ntol
ogis
t and
a fi
nal R
epor
t of
Find
ings
mus
t be
subm
itted
upo
n co
mpl
etio
n of
labo
rato
ry a
naly
sis.
Less
than
sig
nific
ant
Geol
ogy a
nd S
oils
3.5-
1: In
the
even
t of a
maj
or e
arth
quak
e w
ithin
the
regi
on,
unde
rgro
und
pipe
lines
cou
ld b
e su
bjec
t to
seis
mic
haz
ards
incl
udin
g su
rface
rupt
ure,
liqu
efac
tion,
land
slid
e, a
nd g
roun
d sh
akin
g ca
pabl
e of
ca
usin
g lo
caliz
ed c
olla
pse
or d
amag
e of
eng
inee
red
fills
, stru
ctur
al
dam
age,
or p
ipel
ine
rupt
ure.
3.5-
1: P
rior t
o th
e ap
prov
al o
f con
stru
ctio
n pl
ans
for t
he p
roje
ct, a
de
sign
-leve
l geo
tech
nica
l inv
estig
atio
n, in
clud
ing
colle
ctio
n of
site
sp
ecifi
c su
bsur
face
dat
a sh
all b
e co
mpl
eted
by
the
impl
emen
ting
agen
cy. T
he g
eote
chni
cal e
valu
atio
n sh
all i
dent
ify d
ensi
ty p
rofil
es,
appr
oxim
ate
max
imum
sha
llow
gro
undw
ater
leve
ls, a
cha
ract
eriz
atio
n of
the
verti
cal a
nd la
tera
l ext
ent o
f the
sat
urat
ed s
and/
silt
laye
rs th
at
coul
d un
derg
o liq
uefa
ctio
n du
ring
stro
ng g
roun
d sh
akin
g, a
nd
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
7 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
deve
lopm
ent o
f site
-spe
cific
des
ign
crite
ria to
miti
gate
pot
entia
l ris
ks.
Rec
omm
enda
tions
mad
e as
a re
sult
of th
ese
inve
stig
atio
ns to
pro
tect
ne
w s
truct
ures
from
sei
smic
haz
ards
sha
ll be
com
e pa
rt of
the
prop
osed
pr
ojec
t.
3.5-
2: C
onst
ruct
ion
of th
e pr
opos
ed re
cycl
ed w
ater
pip
elin
es c
ould
re
sult
in s
ubst
antia
l soi
l ero
sion
or l
oss
of to
psoi
l, w
hich
wou
ld re
sult
in
a si
gnifi
cant
impa
ct.
3.5-
2: T
o co
ntro
l wat
er a
nd w
ind
eros
ion
durin
g co
nstru
ctio
n of
the
proj
ect,
the
impl
emen
ting
agen
cies
, sha
ll en
sure
that
con
tract
ors
impl
emen
t Bes
t Man
agem
ent P
ract
ices
(BM
Ps)
to c
ontro
l win
d an
d w
ater
ero
sion
dur
ing
and
shor
tly a
fter c
onst
ruct
ion
of th
e pr
ojec
t and
pe
rman
ent B
MP
s to
con
trol e
rosi
on a
nd s
edim
enta
tion
once
co
nstru
ctio
n is
com
plet
e. T
he B
MP
s co
uld
incl
ude,
but
wou
ld n
ot b
e lim
ited
to, s
edim
ent b
arrie
rs a
nd tr
aps,
silt
bas
ins,
and
silt
fenc
es.
Less
than
sig
nific
ant
3.5-
3: T
he p
rese
nce
of y
et u
ndet
erm
ined
loca
l exp
ansi
ve s
oils
in th
e pr
ojec
t are
a co
uld
resu
lt in
stru
ctur
al d
amag
e to
the
recy
cled
wat
er
pipe
lines
.
3.5-
3: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire th
e pr
epar
atio
n of
site
sp
ecifi
c ge
otec
hnic
al in
vest
igat
ions
alo
ng th
e pr
opos
ed p
ipel
ine
alig
nmen
ts. T
hese
inve
stig
atio
ns s
hall
iden
tify
appr
opria
te e
ngin
eerin
g co
nsid
erat
ions
, as
reco
mm
ende
d by
a c
ertif
ied
engi
neer
ing
geol
ogis
t or
regi
ster
ed g
eote
chni
cal e
ngin
eer f
or p
lann
ed fa
cilit
ies,
incl
udin
g en
gine
erin
g co
nsid
erat
ions
to m
itiga
te th
e ef
fect
s of
exp
ansi
ve s
oils
. R
ecom
men
datio
ns m
ade
as a
resu
lt of
thes
e in
vest
igat
ions
to p
rote
ct
new
stru
ctur
es fr
om e
xpan
sive
soi
ls s
hall
beco
me
part
of th
e pr
opos
ed
proj
ect.
Less
than
sig
nific
ant
3.5-
4: C
onst
ruct
ion
of th
e pr
opos
ed s
tora
ge re
serv
oirs
and
pum
p st
atio
ns c
ould
resu
lt in
sub
stan
tial s
oil e
rosi
on o
r los
s of
tops
oil,
whi
ch
wou
ld re
sult
in a
sig
nific
ant i
mpa
ct.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.5-2
. Le
ss th
an s
igni
fican
t
3.5-
5: In
the
even
t of a
maj
or e
arth
quak
e w
ithin
the
regi
on, s
tora
ge
rese
rvoi
rs a
nd p
ump
stat
ions
cou
ld b
e su
bjec
t to
seis
mic
haz
ards
in
clud
ing
surfa
ce ru
ptur
e, li
quef
actio
n, la
ndsl
ide,
and
gro
und
shak
ing
capa
ble
of c
ausi
ng lo
caliz
ed c
olla
pse
or d
amag
e of
eng
inee
red
fills
or
stru
ctur
al d
amag
e.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.5-
1 th
roug
h 3.
5-3.
Le
ss th
an s
igni
fican
t
3.5-
6: G
roun
d sh
akin
g, e
xpan
sive
soi
ls, l
ique
fact
ion,
set
tlem
ent,
eros
ion
and
corr
osiv
e so
ils c
ould
dam
age
recy
cled
wat
er e
nd u
ses
incl
udin
g th
e po
wer
pla
nt c
oolin
g w
ater
sys
tem
and
the
grou
ndw
ater
re
char
ge b
asin
s an
d ap
purte
nant
faci
litie
s.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.5-1
thro
ugh
3.5-
3.
Less
than
sig
nific
ant
Haza
rds a
nd H
azar
dous
Mat
erial
s
3.6-
1: D
urin
g co
nstru
ctio
n of
the
prop
osed
pro
ject
, con
tam
inat
ed s
oils
co
uld
be e
ncou
nter
ed d
urin
g ex
cava
tion
activ
ities
, cau
sing
a ri
sk o
f ex
posu
re to
haz
ardo
us m
ater
ials
.
3.6-
1: In
the
even
t tha
t evi
denc
e of
pot
entia
l soi
l con
tam
inat
ion,
in
clud
ing
soil
disc
olor
atio
n, n
oxio
us o
dors
, deb
ris, o
r bur
ied
stor
age
cont
aine
rs a
re e
ncou
nter
ed d
urin
g co
nstru
ctio
n, th
e im
plem
entin
g ag
enci
es s
hall
requ
ire th
e co
nstru
ctio
n co
ntra
ctor
(s) t
o ha
ve a
co
ntin
genc
y pl
an fo
r sam
plin
g an
d an
alys
is o
f pot
entia
lly h
azar
dous
su
bsta
nces
and
coo
rdin
atio
n w
ith th
e ap
prop
riate
regu
lato
ry a
genc
ies,
if
nece
ssar
y. T
he re
quire
d ha
ndlin
g, s
tora
ge, a
nd d
ispo
sal m
etho
ds
shal
l dep
end
on th
e ty
pes
and
conc
entra
tions
of c
hem
ical
s id
entif
ied
in
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
8 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
the
soil.
Any
site
inve
stig
atio
ns o
r rem
edia
l act
ions
sha
ll co
mpl
y w
ith
appl
icab
le la
ws.
3.6-
2: A
ccid
enta
l ups
et o
f haz
ardo
us m
ater
ials
use
d du
ring
proj
ect
cons
truct
ion
may
incr
ease
the
risk
of e
xpos
ure
to th
e en
viro
nmen
t, w
orke
rs, a
nd th
e pu
blic
.
3.6-
2a: C
onst
ruct
ion
cont
ract
or(s
) sha
ll be
requ
ired
to im
plem
ent b
est
man
agem
ent p
ract
ices
(BM
Ps)
for h
andl
ing
haza
rdou
s m
ater
ials
dur
ing
the
proj
ect.
The
use
of th
e co
nstru
ctio
n B
MP
s sh
all m
inim
ize
nega
tive
effe
cts
on g
roun
dwat
er a
nd s
oils
, and
will
incl
ude,
with
out l
imita
tion,
the
follo
win
g:
• Fo
llow
man
ufac
ture
rs’ r
ecom
men
datio
ns a
nd re
gula
tory
re
quire
men
ts fo
r use
, sto
rage
, and
dis
posa
l of c
hem
ical
pro
duct
s an
d ha
zard
ous
mat
eria
ls u
sed
in c
onst
ruct
ion.
• A
void
ove
rtopp
ing
cons
truct
ion
equi
pmen
t fue
l tan
ks.
• D
urin
g ro
utin
e m
aint
enan
ce o
f con
stru
ctio
n eq
uipm
ent,
prop
erly
co
ntai
n an
d re
mov
e gr
ease
and
oils
.
• P
rope
rly d
ispo
se o
f dis
card
ed c
onta
iner
s of
fuel
s an
d ot
her
chem
ical
s.
3.6-
2b: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire th
e co
nstru
ctio
n co
ntra
ctor
(s) t
o im
plem
ent s
afet
y m
easu
res
in a
ccor
danc
e w
ith G
ener
al
Indu
stry
Saf
ety
Ord
ers
for S
pill
and
Ove
rflow
Con
trol (
CC
R T
itle
8,
Sec
tions
516
3-51
67) t
o pr
otec
t the
pro
ject
are
a fro
m c
onta
min
atio
n du
e to
acc
iden
tal r
elea
se o
f haz
ardo
us m
ater
ials
. The
saf
ety
mea
sure
s sh
all
incl
ude,
but
not
be
limite
d to
, the
follo
win
g:
• S
pills
and
ove
rflow
s of
haz
ardo
us m
ater
ials
sha
ll be
neu
traliz
ed
and
disp
osed
of p
rom
ptly
.
• H
azar
dous
mat
eria
ls s
hall
be s
tore
d in
con
tain
ers
that
are
ch
emic
ally
iner
t to
and
appr
opria
te fo
r the
type
and
qua
ntity
of t
he
haza
rdou
s su
bsta
nce.
• C
onta
iner
s sh
all n
ot b
e st
ored
whe
re th
ey a
re e
xpos
ed to
hea
t su
ffici
ent e
noug
h to
rupt
ure
the
cont
aine
rs o
r cau
se le
akag
e.
• S
peci
fic in
form
atio
n sh
all b
e pr
ovid
ed re
gard
ing
safe
pro
cedu
res
and
othe
r pre
caut
ions
bef
ore
clea
ning
or s
ubse
quen
t use
or
disp
osal
of h
azar
dous
mat
eria
ls c
onta
iner
s.
Dis
posa
l of a
ll ha
zard
ous
mat
eria
ls s
hall
be in
com
plia
nce
with
ap
plic
able
Cal
iforn
ia h
azar
dous
was
te d
ispo
sal l
aws.
The
con
stru
ctio
n co
ntra
ctor
sha
ll co
ntac
t the
loca
l fire
age
ncy
and
the
Cou
nty
Dep
artm
ent o
f Pub
lic H
ealth
, Env
ironm
enta
l Hea
lth D
ivis
ion,
for a
ny
site
-spe
cific
requ
irem
ents
rega
rdin
g ha
zard
ous
mat
eria
ls o
r haz
ardo
us
was
te c
onta
inm
ent o
r han
dlin
g.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-1
9 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.6-
2c: I
n th
e ev
ent o
f an
acci
dent
al re
leas
e of
haz
ardo
us m
ater
ials
du
ring
cons
truct
ion,
con
tain
men
t and
cle
an u
p sh
all o
ccur
in
acco
rdan
ce w
ith a
pplic
able
regu
lato
ry re
quire
men
ts.
3.6-
2d: O
il an
d ot
her s
olve
nts
used
dur
ing
mai
nten
ance
of c
onst
ruct
ion
equi
pmen
t sha
ll be
recy
cled
or d
ispo
sed
of in
acc
orda
nce
with
ap
plic
able
regu
lato
ry re
quire
men
ts. A
ll ha
zard
ous
mat
eria
ls s
hall
be
trans
porte
d, h
andl
ed, a
nd d
ispo
sed
of in
acc
orda
nce
with
app
licab
le
regu
lato
ry re
quire
men
ts.
3.6-
2e: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire th
e co
nstru
ctio
n co
ntra
ctor
(s) t
o pr
epar
e a
Site
Saf
ety
Pla
n in
acc
orda
nce
with
ap
plic
able
regu
lato
ry re
quire
men
ts.
3.6-
2f: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire th
e co
nstru
ctio
n co
ntra
ctor
(s) t
o pr
epar
e an
d im
plem
ent a
Saf
ety
Pro
gram
to e
nsur
e th
e he
alth
and
saf
ety
of c
onst
ruct
ion
wor
kers
and
the
publ
ic d
urin
g pr
ojec
t co
nstru
ctio
n. T
he S
afet
y P
rogr
am s
hall
incl
ude
an in
jury
and
illn
ess
prev
entio
n pr
ogra
m, a
s si
te-s
peci
fic s
afet
y pl
an, a
nd in
form
atio
n on
the
appr
opria
te p
erso
nal p
rote
ctiv
e eq
uipm
ent t
o be
use
d du
ring
cons
truct
ion.
3.6-
3: T
he p
ropo
sed
proj
ect c
ould
resu
lt in
a s
afet
y ha
zard
for p
eopl
e re
sidi
ng o
r wor
king
in th
e pr
ojec
t are
a in
the
vici
nity
of a
irpor
ts.
3.6-
3: T
he im
plem
entin
g ag
enci
es s
hall
coor
dina
te w
ith a
ppro
pria
te
airp
ort a
genc
ies
(suc
h as
LA
WA
, Cal
trans
, and
FA
A) a
nd s
taff
to
ensu
re a
saf
ety
prog
ram
is d
evel
oped
and
impl
emen
ted
durin
g co
nstru
ctio
n of
the
prop
osed
pro
ject
.
Less
than
sig
nific
ant
3.6-
4: T
he p
ropo
sed
proj
ect c
ould
inte
rfere
with
em
erge
ncy
resp
onse
an
d ev
acua
tion
plan
s du
ring
proj
ect c
onst
ruct
ion.
Im
plem
enta
tion
of M
itiga
tion
Mea
sure
3.1
1-1a
. Le
ss th
an s
igni
fican
t
3.6-
5: C
onst
ruct
ion
activ
ities
in g
rass
land
are
as w
ould
hav
e th
e po
tent
ial t
o ex
pose
peo
ple
or e
quip
men
t to
risk
of lo
ss, i
njur
y, o
r dea
th
invo
lvin
g w
ildla
nd fi
res.
3.6-
5a: T
he im
plem
entin
g ag
enci
es s
hall
coor
dina
te w
ith lo
cal f
ire
agen
cies
to d
evel
op a
fire
saf
ety
plan
, whi
ch d
escr
ibes
var
ious
pot
entia
l sc
enar
ios
and
actio
n pl
ans
in th
e ev
ent o
f a fi
re.
3.6-
5b: D
urin
g co
nstru
ctio
n, a
ll st
agin
g ar
eas,
wel
ding
are
as, o
r are
as
slat
ed fo
r dev
elop
men
t usi
ng s
park
-pro
duci
ng e
quip
men
t sha
ll be
cl
eare
d of
drie
d ve
geta
tion
or o
ther
mat
eria
l tha
t cou
ld ig
nite
. Any
co
nstru
ctio
n eq
uipm
ent t
hat i
nclu
des
a sp
ark
arre
stor
sha
ll be
equ
ippe
d w
ith a
spa
rk a
rres
tor i
n go
od w
orki
ng o
rder
. Dur
ing
the
cons
truct
ion
of
the
recy
cled
wat
er b
ackb
one,
con
tract
ors
shal
l req
uire
all
vehi
cles
and
cr
ews
wor
king
at t
he p
roje
ct s
ite to
hav
e ac
cess
to fu
nctio
nal f
ire
extin
guis
hers
at a
ll tim
es. I
n ad
ditio
n, c
onst
ruct
ion
crew
s sh
all h
ave
a sp
otte
r dur
ing
wel
ding
act
iviti
es to
look
out
for p
oten
tially
dan
gero
us
situ
atio
ns, i
nclu
ding
acc
iden
tal s
park
s.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
0 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.6-
6: A
ccid
enta
l ups
et o
f haz
ardo
us m
ater
ials
use
d du
ring
cons
truct
ion
of th
e st
orag
e re
serv
oirs
and
pum
p st
atio
ns m
ay in
crea
se th
e ris
k of
ex
posu
re to
the
envi
ronm
ent,
wor
kers
, and
the
publ
ic, r
esul
ting
in a
si
gnifi
cant
impa
ct.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.6-
2a th
roug
h 3.
6-2f
. Le
ss th
an s
igni
fican
t
Hydr
olog
y and
Wat
er Q
ualit
y
3.7-
1: O
pera
tion
of th
e pr
opos
ed re
cycl
ed w
ater
pip
elin
es c
ould
resu
lt in
cro
ss c
onta
min
atio
n of
pot
able
wat
er p
ipel
ines
, whi
ch c
ould
resu
lt in
re
duce
d w
ater
qua
lity
and
pote
ntia
l pub
lic h
ealth
con
cern
s.
3.7-
1a: A
pplic
able
bac
kflo
w p
reve
ntio
n de
vice
s, a
s ou
tline
d in
Titl
e 17
an
d th
e P
urpl
e B
ook,
sha
ll be
inco
rpor
ated
into
pip
elin
e de
sign
to a
void
po
tent
ial f
or c
ross
con
tam
inat
ion.
3.7-
1b: A
pplic
able
min
imum
pip
elin
e se
para
tion
stan
dard
s fo
r pot
able
an
d no
n-po
tabl
e w
ater
pip
elin
es, a
s ou
tline
d in
Titl
e 22
, sha
ll be
in
corp
orat
ed in
to p
ipel
ine
desi
gn to
avo
id p
oten
tial f
or c
ross
co
ntam
inat
ion.
3.7-
1c: A
ll re
cycl
ed w
ater
pip
elin
es s
hall
be p
aint
ed p
urpl
e or
mar
ked
dist
inct
ly w
ith p
urpl
e ta
pe.
3.7-
1d: L
os A
ngel
es C
ount
y D
epar
tmen
t of P
ublic
Hea
lth (D
PH
), C
ross
C
onne
ctio
n C
ontro
l Pro
gram
for L
os A
ngel
es C
ount
y an
d th
e K
ern
Cou
nty
Dep
artm
ent o
f Pub
lic H
ealth
in B
aker
sfie
ld fo
r Ker
n C
ount
y sh
all b
e ad
vise
d of
eac
h ne
w s
ite w
here
recy
cled
wat
er is
to b
e us
ed
prio
r to
plac
ing
the
site
into
ser
vice
.
3.7-
1e: A
ll re
cycl
ed w
ater
site
s sh
all b
e in
spec
ted
and
test
ed fo
r po
ssib
le c
ross
con
nect
ions
with
the
pota
ble
wat
er s
yste
m, i
n ac
cord
ance
with
Sec
tions
603
14(3
) and
603
16(a
), Ti
tle 2
2, C
alifo
rnia
C
ode
of R
egul
atio
ns.
Less
than
sig
nific
ant
3.7-
2: C
onst
ruct
ion
of th
e pr
opos
ed re
cycl
ed w
ater
pip
elin
es c
ould
re
sult
in in
crea
sed
soil
eros
ion
and
trans
port
of s
ubse
quen
t co
ntam
inan
ts a
nd s
edim
enta
tion,
with
impa
cts
to w
ater
qua
lity.
A
dditi
onal
ly, a
ccid
enta
l rel
ease
of f
uels
and
oth
er h
azar
dous
mat
eria
ls
durin
g co
nstru
ctio
n co
uld
degr
ade
wat
er q
ualit
y.
3.7-
2: T
he im
plem
entin
g ag
enci
es s
hall
deve
lop
and
impl
emen
t BM
Ps
to m
inim
ize
eros
ion
and
sedi
men
tatio
n. T
he im
plem
entin
g ag
enci
es
shal
l inc
lude
in c
ontra
ctor
spe
cific
atio
ns th
at th
e co
ntra
ctor
is
resp
onsi
ble
for d
evel
opin
g an
d im
plem
entin
g th
e B
MP
s. T
he B
MP
s sh
all b
e m
aint
aine
d at
the
site
for t
he e
ntire
dur
atio
n of
con
stru
ctio
n.
The
obje
ctiv
es o
f the
BM
Ps
are
to id
entif
y po
lluta
nt s
ourc
es th
at m
ay
affe
ct th
e qu
ality
of s
torm
wat
er d
isch
arge
and
to im
plem
ent m
easu
res
to re
duce
pol
luta
nts
in s
torm
wat
er d
isch
arge
s. T
he B
MP
s fo
r the
pr
opos
ed p
roje
ct s
hall
incl
ude,
but
not
be
limite
d to
, the
impl
emen
tatio
n of
the
follo
win
g el
emen
ts:
• Id
entif
icat
ion
of a
ll po
lluta
nt s
ourc
es, i
nclu
ding
sou
rces
of s
edim
ent
that
may
affe
ct th
e qu
ality
of s
torm
wat
er d
isch
arge
s as
soci
ated
w
ith c
onst
ruct
ion
activ
ity fr
om th
e co
nstru
ctio
n si
te;
• Id
entif
icat
ion
of n
on-s
torm
wat
er d
isch
arge
s;
• E
stim
ate
of th
e co
nstru
ctio
n ar
ea a
nd im
perv
ious
sur
face
are
a;
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
1 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
• P
repa
ratio
n of
a s
ite m
ap a
nd m
aint
enan
ce s
ched
ule
for B
MP
s in
stal
led
durin
g co
nstru
ctio
n de
sign
ed to
redu
ce o
r el
imin
ate
pollu
tant
s af
ter c
onst
ruct
ion
is c
ompl
eted
(pos
t-co
nstru
ctio
n B
MP
s);
• Id
entif
icat
ion
of a
ll ap
plic
able
ero
sion
and
sed
imen
tatio
n co
ntro
l m
easu
res,
was
te m
anag
emen
t pra
ctic
es, a
nd s
pill
prev
entio
n an
d co
ntro
l mea
sure
s;
• M
aint
enan
ce a
nd tr
aini
ng p
ract
ices
; and
,
• A
sam
plin
g an
d an
alys
is s
trate
gy a
nd s
ampl
ing
sche
dule
for
disc
harg
es fr
om c
onst
ruct
ion
activ
ities
.
3.7-
3: C
onst
ruct
ion
activ
ities
ass
ocia
ted
with
the
recy
cled
wat
er
pipe
lines
cou
ld re
sult
in th
e de
wat
erin
g of
sha
llow
gro
undw
ater
re
sour
ces
and
cont
amin
atio
n of
sur
face
wat
er.
3.7-
3: T
he im
plem
entin
g ag
enci
es s
hall
obta
in a
nd c
ompl
y w
ith th
e re
quire
men
ts o
f dew
ater
ing
perm
its is
sued
by
the
Laho
ntan
RW
QC
B
for d
ewat
erin
g ac
tiviti
es. P
rovi
sion
s of
the
perm
it m
ay in
clud
e tre
atm
ent
of fl
ows
prio
r to
disc
harg
e.
Less
than
sig
nific
ant
3.7-
4: C
onst
ruct
ion
of th
e re
cycl
ed w
ater
pip
elin
es c
ould
tem
pora
rily
alte
r dra
inag
e pa
ttern
s at
the
cons
truct
ion
site
s, w
hich
cou
ld c
ause
lo
caliz
ed fl
oodi
ng.
3.7-
4: T
he im
plem
entin
g ag
enci
es s
hall
incl
ude
in c
ontra
ctor
sp
ecifi
catio
ns th
at a
ll di
stur
bed
area
s ar
e to
be
rest
ored
bac
k to
pre
-co
nstru
ctio
n co
nditi
ons.
Less
than
sig
nific
ant
3.7-
5: O
pera
tion
of th
e pi
pelin
es w
ould
resu
lt in
the
use
of re
cycl
ed
wat
er fo
r mun
icip
al a
nd in
dust
rial (
M&
I) ap
plic
atio
ns, w
hich
cou
ld a
ffect
su
rface
and
gro
undw
ater
qua
lity.
Thi
s co
uld
be a
pot
entia
l pub
lic h
ealth
im
pact
.
3.7-
5a: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire th
e de
velo
pmen
t and
im
plem
enta
tion
of R
ecyc
led
Wat
er U
ser A
gree
men
ts w
ith e
ach
recy
cled
w
ater
end
use
r. Th
e A
gree
men
ts s
hall
incl
ude
prov
isio
ns th
at p
rohi
bit
over
-app
licat
ion
of re
cycl
ed w
ater
and
ferti
lizer
, suc
h as
requ
iring
irr
igat
ion
at a
gron
omic
rate
s to
redu
ce th
e po
tent
ial f
or ru
noff
and
incr
ease
d nu
trien
ts in
to th
e gr
ound
wat
er b
asin
.
3.7-
5b: T
he im
plem
entin
g ag
enci
es, i
n co
nsul
tatio
n w
ith th
e La
hont
an
RW
QC
B, s
hall
deve
lop
and
impl
emen
t a s
alt m
anag
emen
t pla
n, if
ne
eded
in th
e fu
ture
, to
redu
ce th
e po
tent
ial f
or s
alt a
nd n
utrie
nt lo
adin
g an
d m
inim
ize
impa
cts
to w
ater
qua
lity
in th
e A
ntel
ope
Val
ley
grou
ndw
ater
bas
in.
Less
than
sig
nific
ant
3.7-
6: T
he u
se o
f rec
ycle
d w
ater
for M
&I a
pplic
atio
ns c
ould
alte
r dr
aina
ge p
atte
rns
or in
crea
se lo
cal s
torm
wat
er ru
noff
durin
g st
orm
ev
ents
resu
lting
in lo
caliz
ed fl
oodi
ng.
3.7-
6: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire re
cycl
ed w
ater
end
us
ers
to c
ease
all
irrig
atio
n ac
tiviti
es d
urin
g ra
in e
vent
s, th
ereb
y m
inim
izin
g of
f-site
runo
ff.
Less
than
sig
nific
ant
3.7-
7: C
onst
ruct
ion
of th
e pr
opos
ed s
tora
ge re
serv
oirs
and
pum
p st
atio
ns c
ould
resu
lt in
incr
ease
d so
il er
osio
n an
d tra
nspo
rt of
co
ntam
inan
ts, w
ith im
pact
s to
wat
er q
ualit
y. A
dditi
onal
ly, r
elea
se o
f fu
els
or o
ther
haz
ardo
us m
ater
ials
ass
ocia
ted
with
con
stru
ctio
n ac
tiviti
es c
ould
deg
rade
wat
er q
ualit
y.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.7-2
. Le
ss th
an s
igni
fican
t
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
2 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.7-
8: C
onst
ruct
ion
and
oper
atio
n of
the
prop
osed
sto
rage
rese
rvoi
rs
and
pum
p st
atio
ns w
ould
incr
ease
the
amou
nt o
f im
perv
ious
sur
face
s at
ea
ch s
ite, a
lterin
g th
e dr
aina
ge p
atte
rns
at e
ach
site
and
resu
lting
in
incr
ease
d lo
cal s
torm
wat
er ru
noff.
Thi
s co
uld
caus
e lo
caliz
ed fl
oodi
ng
or c
ontri
bute
to a
cum
ulat
ive
flood
ing
impa
ct.
3.7-
7: T
he im
plem
entin
g ag
enci
es s
hall
ensu
re a
dequ
atel
y si
zed
and
loca
ted
stor
m w
ater
cap
ture
faci
litie
s ar
e in
corp
orat
ed in
to th
e fin
al
desi
gn fo
r eac
h st
orag
e re
serv
oir a
nd p
ump
stat
ion
faci
lity.
Less
than
sig
nific
ant
3.7-
9: P
lace
men
t of s
tora
ge re
serv
oirs
and
pum
p st
atio
ns w
ithin
a 1
00-
year
floo
d zo
ne c
ould
exp
ose
peop
le o
r pro
perty
to ri
sks
rela
ted
to
flood
ing.
3.7-
8: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire fl
ood
dive
rsio
n fa
cilit
ies
to b
e in
corp
orat
ed in
to e
ach
stor
age
rese
rvoi
r and
pum
p st
atio
n si
te
and
faci
lity
desi
gn th
at w
ould
not
incr
ease
floo
d ris
k in
oth
er a
reas
.
Less
than
sig
nific
ant
3.7-
10: U
se o
f rec
ycle
d w
ater
for a
gric
ultu
ral i
rrig
atio
n co
uld
pote
ntia
lly
affe
ct s
urfa
ce a
nd g
roun
dwat
er q
ualit
y.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.7-5
a an
d 3.
7-5b
. Le
ss th
an s
igni
fican
t
3.7-
11: T
he u
se o
f rec
ycle
d w
ater
for g
roun
dwat
er re
char
ge c
ould
resu
lt in
sig
nific
ant w
ater
qua
lity
impa
cts
if th
e na
tive
grou
ndw
ater
is
degr
aded
bel
ow e
xist
ing
or a
ccep
tabl
e co
nditi
ons.
3.7-
9a: T
he im
plem
entin
g ag
enci
es s
hall
oper
ate
rech
arge
pro
ject
s in
co
mpl
ianc
e w
ith C
DP
H T
itle
22 re
gula
tions
as
wel
l as
in c
oord
inat
ion
with
the
RW
QC
B. T
he re
char
ge w
ater
sha
ll be
a b
lend
of r
ecyc
led
wat
er a
nd d
iluen
t wat
er a
t a ra
tio c
onsi
sten
t with
Titl
e 22
regu
latio
ns
and
CD
PH
crit
eria
.
3.7-
9b: T
he im
plem
entin
g ag
enci
es s
hall
deve
lop
and
impl
emen
t a
mon
itorin
g pr
ogra
m o
f the
pro
pose
d re
char
ge a
rea
in c
ompl
ianc
e w
ith
Title
22
regu
latio
ns a
nd C
DP
H c
riter
ia. A
s pa
rt of
this
pro
gram
, som
e m
onito
ring
wel
ls s
hall
be p
lace
d be
twee
n th
e pr
opos
ed re
char
ge a
rea
and
dow
n gr
adie
nt d
rinki
ng w
ater
sup
ply
wel
ls.
3.7-
9c: T
he im
plem
entin
g ag
enci
es s
hall
requ
ire re
char
ged
recy
cled
w
ater
via
sur
face
spr
eadi
ng to
rem
ain
in g
roun
dwat
er s
tora
ge fo
r the
m
inim
um ti
me
perio
d st
ipul
ated
by
CD
PH
Titl
e 22
Wat
er R
ecyc
ling
Crit
eria
prio
r to
extra
ctio
n.
Less
than
sig
nific
ant
Land
Use
and
Agric
ultu
re
3.8-
1: T
he p
ropo
sed
pipe
line
coul
d tra
vers
e th
roug
h la
nd c
ontro
lled
by
othe
r age
ncie
s.
Non
e re
quire
d.
Less
than
sig
nific
ant
3.8-
2: T
he p
ropo
sed
pipe
line
wou
ld b
e co
nstru
cted
with
in th
e A
IA fo
r P
alm
dale
Reg
iona
l Airp
ort,
Gen
eral
Will
iam
J. F
ox A
irfie
ld, a
nd
Ros
amon
d S
kypa
rk A
irpor
t.
3.8-
1a: F
or p
roje
ct c
ompo
nent
s oc
curr
ing
with
in a
n A
IA, a
s id
entif
ied
by
the
ALU
P, t
he im
plem
entin
g ag
enci
es s
hall
subm
it th
eir p
ropo
sed
proj
ect p
lans
to th
e Lo
s A
ngel
es C
ount
y A
LUC
for r
evie
w a
nd c
omm
ent
prio
r to
final
des
ign.
3.8-
1b: P
rior t
o co
nduc
ting
cons
truct
ion
activ
ities
with
in a
n A
IA, t
he
impl
emen
ting
agen
cies
sha
ll pr
epar
e an
airp
ort c
onst
ruct
ion
safe
ty p
lan
that
wou
ld id
entif
y be
st m
anag
emen
t pra
ctic
es. T
he p
lan
wou
ld in
clud
e,
at a
min
imum
, con
stru
ctio
n tim
efra
mes
and
hou
rs, l
ight
ing
and
flagg
ing
requ
irem
ents
, air
traffi
c co
ntro
l com
mun
icat
ion
requ
irem
ents
, acc
ess
and
egre
ss re
stric
tions
, equ
ipm
ent s
tagi
ng a
rea
requ
irem
ents
, and
pe
rson
al s
afet
y eq
uipm
ent r
equi
rem
ents
for c
onst
ruct
ion
wor
kers
, and
ap
prop
riate
not
ifica
tion
to a
viat
ors.
The
pla
n w
ould
be
revi
ewed
and
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
3 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
appr
oved
by
airp
ort s
taff
and
impl
emen
ted
by b
oth
the
airp
ort a
nd
proj
ect c
onst
ruct
ion
staf
f and
FA
A.
3.8-
1c: P
rior t
o fin
al d
esig
n of
pro
ject
com
pone
nts
with
in a
n A
IA, t
he
impl
emen
ting
agen
cies
sha
ll id
entif
y th
e gr
ound
ele
vatio
n as
soci
ated
w
ith e
ach
proj
ect c
ompo
nent
and
sub
mit
thei
r pro
ject
pla
ns to
airp
ort
staf
f for
revi
ew a
nd c
omm
ent.
Wor
king
with
airp
ort s
taff,
the
impl
emen
ting
agen
cies
sha
ll su
bmit
thei
r des
ign
plan
s fo
r airs
pace
an
alys
is (F
AA
Par
t 746
0 re
view
) to
dete
rmin
e w
heth
er a
ny o
f the
pr
opos
ed p
roje
ct c
ompo
nent
s or
pro
pose
d co
nstru
ctio
n eq
uipm
ent
wou
ld p
rotru
de in
to p
rote
cted
airs
pace
. If s
uch
obje
cts
are
iden
tifie
d,
the
impl
emen
ting
agen
cies
, airp
ort s
taff,
and
FA
A w
ill id
entif
y ap
prop
riate
ste
ps to
adj
ust p
roje
ct p
lans
or i
nclu
de a
ppro
pria
te
mar
king
s to
iden
tify
haza
rds
to a
viat
ors
purs
uant
to F
AA
Par
t 746
0.
3.8-
1d: T
o pr
even
t the
cre
atio
n of
wild
life
attra
ctan
ts, t
he im
plem
entin
g ag
ency
sho
uld
coor
dina
te w
ith c
onst
ruct
ion
cont
ract
ors
to e
nsur
e th
at
neith
er p
roje
ct d
esig
n no
r con
stru
ctio
n pl
ans
crea
te te
mpo
rary
or
perm
anen
t sou
rces
of o
pen
wat
er, i
napp
ropr
iate
see
d m
ixtu
res,
or
inap
prop
riate
land
scap
ing
desi
gns.
Not
es s
houl
d be
inco
rpor
ated
on
cons
truct
ion
plan
s to
war
n ag
ains
t the
cre
atio
n of
pot
entia
l wild
life
haza
rds.
3.8-
3: T
he p
ropo
sed
pipe
line
wou
ld b
e co
nstru
cted
in th
e vi
cini
ty o
f th
ree
publ
ic u
se a
irpor
ts a
nd p
oten
tially
affe
ct n
avig
able
airs
pace
as
defin
ed b
y FA
R P
art 7
7.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.8-1
c.
Less
than
sig
nific
ant
3.8-
4: C
onst
ruct
ion
and
oper
atio
n of
the
prop
osed
sto
rage
rese
rvoi
rs
and
pum
p st
atio
ns c
ould
resu
lt in
sho
rt-te
rm d
istu
rban
ce to
som
e ad
jace
nt la
nd u
ses
or re
sult
in lo
ng-te
rm e
ffect
s to
exi
stin
g la
nd u
ses.
3.8-
2: T
he im
plem
entin
g ag
enci
es s
hall
obta
in c
ondi
tiona
l use
per
mits
an
d co
mpl
ete
site
pla
n re
view
s fro
m th
e ap
prop
riate
juris
dict
ion,
as
nece
ssar
y, p
rior t
o co
nstru
ctio
n of
pro
ject
faci
litie
s. T
he im
plem
entin
g ag
enci
es s
hall
also
coo
rdin
ate
with
FA
A re
gard
ing
the
loca
tions
and
de
sign
of p
ropo
sed
rese
rvoi
rs a
nd p
ump
stat
ions
.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.2-1
a th
roug
h 3.
2-1f
and
M
itiga
tion
Mea
sure
3.1
1-1a
.
Less
than
sig
nific
ant
3.8-
5: C
onst
ruct
ion
and
oper
atio
n of
the
prop
osed
gro
undw
ater
re
char
ge b
asin
s co
uld
resu
lt in
sho
rt-te
rm d
istu
rban
ce to
som
e ad
jace
nt
land
use
s or
resu
lt in
long
-term
effe
cts
to e
xist
ing
land
use
s.
3.8-
3: T
he im
plem
entin
g ag
enci
es s
hall
obta
in a
con
ditio
nal u
se p
erm
it or
a g
ener
al p
lan
amen
dmen
t if n
eces
sary
from
the
appr
opria
te
juris
dict
ion
prio
r to
cons
truct
ion
of g
roun
dwat
er re
char
ge fa
cilit
ies.
The
im
plem
entin
g ag
enci
es s
hall
also
coo
rdin
ate
with
FA
A re
gard
ing
the
loca
tions
and
des
ign
of fu
ture
rech
arge
bas
ins.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
re 3
.2-1
a th
roug
h 3.
2-1f
and
M
itiga
tion
Mea
sure
3.1
1-1a
.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
4 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
Noise
3.9-
1: C
onst
ruct
ion
of th
e pr
opos
ed re
cycl
ed w
ater
pip
elin
e w
ould
in
term
itten
tly a
nd te
mpo
raril
y ge
nera
te n
oise
leve
ls a
bove
exi
stin
g am
bien
t lev
els
in th
e vi
cini
ty o
f tho
se p
roje
ct e
lem
ents
.
3.9-
1a: T
he im
plem
entin
g ag
enci
es s
hall
impl
emen
t pro
cedu
res
to
redu
ce n
oise
gen
erat
ion
from
pro
ject
con
stru
ctio
n ac
tiviti
es. T
ypic
al
nois
e co
ntro
l pro
cedu
res
incl
ude
the
follo
win
g:
• R
equi
re c
onst
ruct
ion
cont
ract
ors
to c
ompl
y w
ith th
e co
nstru
ctio
n ho
urs
and
days
lim
itatio
ns e
stab
lishe
d in
loca
l noi
se o
rdin
ance
s.
Nig
ht-ti
me
cons
truct
ion
wou
ld re
quire
app
rova
l fro
m lo
cal
juris
dict
ions
.
• R
equi
re a
ll co
nstru
ctio
n co
ntra
ctor
s to
loca
te fi
xed
cons
truct
ion
equi
pmen
t (e.
g., c
ompr
esso
rs a
nd g
ener
ator
s) a
s fa
r as
poss
ible
fro
m n
oise
-sen
sitiv
e re
cept
ors.
• E
quip
men
t use
d in
the
cons
truct
ion
of in
divi
dual
pro
ject
co
mpo
nent
s sh
all b
e m
uffle
d an
d m
aint
aine
d in
goo
d op
erat
ing
cond
ition
. Int
erna
l com
bust
ion
engi
ne-d
riven
equ
ipm
ent s
hall
be
fitte
d w
ith in
take
and
exh
aust
muf
flers
that
are
in g
ood
cond
ition
.
• If
pile
driv
ing
is re
quire
d fo
r fac
ility
con
stru
ctio
n, th
e co
ntra
ct
spec
ifica
tions
for t
hose
pro
ject
s sh
all i
ncor
pora
te th
e fo
llow
ing
requ
irem
ents
:
– W
here
ver p
ossi
ble,
son
ic o
r vib
rato
ry p
ile d
river
s w
ill b
e us
ed
lieu
of im
pact
pile
driv
ers.
– W
here
ver f
easi
ble,
pile
hol
es w
ill b
e pr
e-dr
illed
to re
duce
po
tent
ial n
oise
and
vib
ratio
n im
pact
s.
Add
ition
al n
oise
atte
nuat
ing
mea
sure
s in
clud
e ch
angi
ng th
e lo
catio
n of
st
atio
nary
con
stru
ctio
n eq
uipm
ent a
nd/o
r sta
ging
are
as; n
otify
ing
adja
cent
resi
denc
es a
nd n
earb
y se
nsiti
ve re
cept
ors
in a
dvan
ce o
f co
nstru
ctio
n w
ork;
shu
tting
off
idlin
g eq
uipm
ent;
resc
hedu
ling
cons
truct
ion
activ
ities
; req
uirin
g on
-goi
ng c
onst
ruct
ion
nois
e m
onito
ring
to a
ssur
e ad
here
nce
to C
ity/C
ount
y co
nstru
ctio
n eq
uipm
ent s
tand
ards
; an
d/or
inst
allin
g te
mpo
rary
bar
riers
aro
und
stat
iona
ry c
onst
ruct
ion
nois
e so
urce
s.
3.9-
1b: T
o fu
rther
add
ress
the
nuis
ance
impa
ct o
f pro
ject
con
stru
ctio
n,
cons
truct
ion
cont
ract
ors
shal
l im
plem
ent t
he fo
llow
ing:
• S
igns
will
be
post
ed a
t the
con
stru
ctio
n si
te th
at in
clud
e pe
rmitt
ed
cons
truct
ion
days
and
hou
rs, a
day
and
eve
ning
con
tact
num
ber
for t
he jo
b si
te, a
nd a
con
tact
num
ber f
or th
e ap
plic
able
juris
dict
ion
agen
cy in
the
even
t of p
robl
ems.
Sig
nific
ant a
nd u
navo
idab
le
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
5 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
• A
n on
site
com
plai
nt a
nd e
nfor
cem
ent m
anag
er s
hall
track
and
re
spon
d to
noi
se c
ompl
aint
s.
3.9-
2: C
onst
ruct
ion
of th
e pr
opos
ed re
cycl
ed w
ater
pip
elin
e w
ould
ex
pose
per
sons
to o
r gen
erat
e ex
cess
ive
grou
nd-b
orne
vib
ratio
n or
gr
ound
-bor
ne n
oise
leve
ls.
3.9-
2: W
hen
drill
ing
or b
orin
g w
ithin
25
feet
of a
ny b
uild
ing
or 5
0-10
0 fe
et o
f a h
isto
rical
bui
ldin
g, a
“cra
ck s
urve
y” s
hall
be u
nder
take
n. T
he
crac
k su
rvey
mus
t be
take
n be
fore
the
star
t of c
onst
ruct
ion
with
pho
to,
vide
o, o
r vis
ual i
nven
tory
of a
ll ex
istin
g cr
acks
insi
de a
nd o
utsi
de
build
ings
with
suf
ficie
nt d
etai
l for
com
paris
on a
fter c
onst
ruct
ion
to
dete
rmin
e w
heth
er a
ctua
l vib
ratio
n da
mag
e oc
curr
ed. T
he
impl
emen
ting
agen
cies
sha
ll be
resp
onsi
ble
for t
he c
osts
of a
ny
dam
age
caus
ed b
y co
nstru
ctio
n vi
brat
ion.
Sig
nific
ant a
nd u
navo
idab
le
3.9-
3: C
onst
ruct
ion
of th
e pr
opos
ed s
tora
ge re
serv
oirs
and
pum
p st
atio
ns w
ould
inte
rmitt
ently
and
tem
pora
rily
gene
rate
noi
se le
vels
ab
ove
exis
ting
ambi
ent l
evel
s in
the
vici
nity
of t
hose
pro
ject
ele
men
ts.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.9-
1a a
nd 3
.9-1
b.
Sig
nific
ant a
nd u
navo
idab
le
3.9-
4: O
pera
tion
of th
e pr
opos
ed s
tora
ge re
serv
oirs
and
pum
p st
atio
ns
coul
d re
sult
in s
ubst
antia
l noi
se in
crea
ses
in th
e vi
cini
ty o
f pro
ject
fa
cilit
ies.
3.9-
4: T
he im
plem
entin
g ag
enci
es s
hall
com
ply
with
loca
l noi
se
ordi
nanc
es. I
n ar
eas
whe
re p
ump
and/
or s
tatio
nary
equ
ipm
ent
oper
atio
n w
ould
cau
se n
oise
leve
ls to
exc
eed
the
norm
ally
acc
epta
ble
rang
e fo
r a g
iven
land
use
, the
ope
ratio
n of
suc
h eq
uipm
ent s
hall
not
caus
e no
ise
leve
ls to
incr
ease
by
5 dB
A C
NE
L or
mor
e. In
are
as w
here
no
ise
leve
ls a
lread
y ex
ceed
the
norm
ally
acc
epta
ble
rang
e fo
r a g
iven
la
nd u
se, t
he o
pera
tion
of s
uch
equi
pmen
t sha
ll no
t cau
se n
oise
leve
ls
to in
crea
se b
y 3
dBA
CN
EL
or m
ore.
To
acco
mpl
ish
thes
e pe
rform
ance
st
anda
rds,
the
impl
emen
ting
agen
cy s
hall
cons
ider
the
follo
win
g:
• M
axim
ize
the
buffe
r are
a or
set
back
dis
tanc
e be
twee
n pu
mp
faci
litie
s an
d no
ise-
sens
itive
land
use
s;
• D
esig
n st
atio
nary
equ
ipm
ent a
nd p
ump
encl
osur
es s
uch
that
bu
ildin
g ex
haus
t fan
s an
d lo
uver
s ar
e or
ient
ed a
way
from
noi
se-
sens
itive
use
s. T
o th
e ex
tent
feas
ible
, con
figur
e th
e fa
cilit
y la
yout
su
ch th
at n
oise
-gen
erat
ing
equi
pmen
t is
setb
ack
from
noi
se-
sens
itive
land
use
s;
• In
corp
orat
e eq
uipm
ent e
nclo
sure
s, fa
n si
lenc
ers,
muf
flers
, ac
oust
ical
trea
tmen
ts a
t ven
t ope
ning
s, a
cous
tical
pan
els,
etc
.
• C
onst
ruct
a p
erim
eter
wal
l at t
he s
ite s
uch
that
the
line
of s
ite
betw
een
the
build
ing
open
ings
(exh
aust
fans
and
louv
ers)
at t
he
pum
p fa
cilit
ies
and
near
by s
ensi
tive
rece
ptor
s is
effe
ctiv
ely
bloc
ked.
Effe
ctiv
e sh
ield
ing
can
sign
ifica
ntly
redu
ce n
oise
.
Less
than
sig
nific
ant
Envir
onm
enta
l Jus
tice
3.10
-1: T
he p
ropo
sed
stor
age
rese
rvoi
rs a
nd p
ump
stat
ions
cou
ld
caus
e di
spro
porti
onat
e im
pact
s to
min
ority
or l
ow in
com
e po
pula
tions
. N
one
requ
ired.
Le
ss th
an s
igni
fican
t
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
6 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
Tran
spor
tatio
n an
d Tr
affic
3.11
-1: C
onst
ruct
ion
of th
e pr
opos
ed p
ipel
ines
cou
ld a
dver
sely
affe
ct
traffi
c an
d tra
nspo
rtatio
n co
nditi
ons
in th
e pr
ojec
t are
a.
3.11
-1a:
The
impl
emen
ting
agen
cies
’ con
stru
ctio
n co
ntra
ctor
sha
ll pr
epar
e an
d im
plem
ent a
Tra
ffic
Con
trol/T
raffi
c M
anag
emen
t Pla
n su
bjec
t to
appr
oval
by
the
appr
opria
te lo
cal j
uris
dict
ion
prio
r to
cons
truct
ion.
The
pla
n sh
all:
• Id
entif
y ho
urs
of c
onst
ruct
ion
and
hour
s fo
r del
iver
ies;
• In
clud
e a
disc
ussi
on o
f hau
l rou
tes,
lim
its o
n th
e le
ngth
of o
pen
trenc
h, w
ork
area
del
inea
tion,
traf
fic c
ontro
l and
flag
ging
;
• Id
entif
y al
l acc
ess
and
park
ing
rest
rictio
ns, p
avem
ent m
arki
ngs
and
sign
age
requ
irem
ents
(e.g
., sp
eed
limit,
tem
pora
ry lo
adin
g zo
nes)
;
• M
aint
ain
acce
ss to
resi
denc
e an
d bu
sine
ss d
rivew
ays
at a
ll tim
es
to th
e ex
tent
feas
ible
; Min
imiz
e ac
cess
dis
rupt
ions
to b
usin
esse
s an
d re
side
nces
;
• La
yout
a p
lan
for n
otifi
catio
ns a
nd a
pro
cess
for c
omm
unic
atio
n w
ith a
ffect
ed re
side
nts
and
busi
ness
es p
rior t
o th
e st
art o
f co
nstru
ctio
n. A
dvan
ce p
ublic
not
ifica
tion
shal
l inc
lude
pos
ting
of
notic
es a
nd a
ppro
pria
te s
igna
ge o
f con
stru
ctio
n ac
tiviti
es. T
he
writ
ten
notif
icat
ion
shal
l inc
lude
the
cons
truct
ion
sche
dule
, the
ex
act l
ocat
ion
and
dura
tion
of a
ctiv
ities
with
in e
ach
stre
et (i
.e.,
whi
ch la
nes
and
acce
ss p
oint
/driv
eway
s w
ould
be
bloc
ked
on
whi
ch d
ays
and
for h
ow lo
ng),
and
a to
ll-fre
e te
leph
one
num
ber f
or
rece
ivin
g qu
estio
ns o
r com
plai
nts;
• In
clud
e a
plan
to c
oord
inat
e al
l con
stru
ctio
n ac
tiviti
es w
ith
emer
genc
y se
rvic
e pr
ovid
ers
in th
e ar
ea a
t lea
st o
ne m
onth
in
adva
nce.
Em
erge
ncy
serv
ice
prov
ider
s sh
all b
e no
tifie
d of
the
timin
g, lo
catio
n, a
nd d
urat
ion
of c
onst
ruct
ion
activ
ities
. All
road
s sh
all r
emai
n pa
ssab
le to
em
erge
ncy
serv
ice
vehi
cles
at a
ll tim
es;
• In
clud
e a
plan
to c
oord
inat
e al
l con
stru
ctio
n ac
tiviti
es w
ith th
e A
ntel
ope
Val
ley
Uni
on H
igh
Sch
ool D
istri
ct a
nd S
outh
ern
Ker
n U
nifie
d S
choo
l Dis
trict
at l
east
two
mon
ths
in a
dvan
ce. T
he
Ant
elop
e V
alle
y U
nion
Hig
h S
choo
l Dis
trict
and
Sou
ther
n K
ern
Uni
fied
Sch
ool D
istri
ct s
hall
be n
otifi
ed o
f the
tim
ing,
loca
tion,
and
du
ratio
n of
con
stru
ctio
n ac
tiviti
es. T
he im
plem
entin
g ag
enci
es s
hall
requ
ire it
s co
ntra
ctor
to m
aint
ain
vehi
cle,
ped
estri
an, a
nd s
choo
l bu
s se
rvic
e du
ring
cons
truct
ion
thro
ugh
incl
usio
n of
suc
h pr
ovis
ions
in th
e co
nstru
ctio
n co
ntra
ct. T
he a
ssig
nmen
t of
tem
pora
ry c
ross
ing
guar
ds a
t des
igna
ted
inte
rsec
tions
may
be
need
ed to
enh
ance
ped
estri
an s
afet
y du
ring
proj
ect c
onst
ruct
ion.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
7 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
Also
the
follo
win
g pr
ovis
ions
sha
ll be
met
:
– P
ipel
ine
cons
truct
ion
near
sch
ools
sha
ll oc
cur w
hen
scho
ol is
no
t in
sess
ion
(i.e.
, sum
mer
or h
olid
ay b
reak
s). I
f thi
s is
not
fe
asib
le, a
min
imum
of t
wo
mon
ths
prio
r to
proj
ect
cons
truct
ion,
the
impl
emen
ting
agen
cies
sha
ll co
ordi
nate
with
th
e A
ntel
ope
Val
ley
Uni
on H
igh
Sch
ool D
istri
ct a
nd S
outh
ern
Ker
n U
nifie
d S
choo
l Dis
trict
to id
entif
y pe
ak c
ircul
atio
n pe
riods
at s
choo
ls a
long
the
alig
nmen
t(s) (
i.e.,
the
arriv
al a
nd
depa
rture
of s
tude
nts)
, and
requ
ire th
eir c
ontra
ctor
to a
void
co
nstru
ctio
n an
d la
ne c
losu
res
durin
g th
ose
perio
ds;
– A
min
imum
of t
wo
mon
ths
prio
r to
proj
ect c
onst
ruct
ion,
the
impl
emen
ting
agen
cies
sha
ll co
ordi
nate
with
the
Ant
elop
e V
alle
y U
nion
Hig
h S
choo
l Dis
trict
and
Sou
ther
n K
ern
Uni
fied
Sch
ool D
istri
ct to
iden
tify
alte
rnat
ives
to th
eir S
afe
Rou
tes
to
Sch
ool p
rogr
am, a
ltern
ativ
es fo
r the
sch
ool b
usin
g ro
utes
and
st
op lo
catio
ns, a
nd o
ther
circ
ulat
ion
prov
isio
ns, a
s pa
rt of
the
Traf
fic C
ontro
l/Tra
ffic
Man
agem
ent P
lan;
• In
clud
e th
e re
quire
men
t tha
t all
open
tren
ches
be
cove
red
with
m
etal
pla
tes
at th
e en
d of
eac
h w
orkd
ay to
acc
omm
odat
e tra
ffic
and
acce
ss; a
nd
• S
peci
fy th
e st
reet
rest
orat
ion
requ
irem
ents
pur
suan
t to
agre
emen
ts
with
the
loca
l jur
isdi
ctio
ns.
3.11
-1b:
The
impl
emen
ting
agen
cies
sha
ll id
entif
y al
l roa
dway
loca
tions
w
here
spe
cial
con
stru
ctio
n te
chni
ques
(e.g
., ho
rizon
tal b
orin
g,
dire
ctio
nal d
rillin
g or
nig
ht c
onst
ruct
ion)
will
be
used
to m
inim
ize
impa
cts
to tr
affic
flow
.
3.11
-1c:
The
impl
emen
ting
agen
cies
sha
ll de
velo
p ci
rcul
atio
n an
d de
tour
pla
ns to
min
imiz
e im
pact
to lo
cal s
treet
circ
ulat
ion,
incl
udin
g bi
kew
ays.
Thi
s m
ay in
clud
e th
e us
e of
sig
ning
and
flag
ging
to g
uide
ve
hicl
es a
nd c
yclis
ts th
roug
h an
d/or
aro
und
the
cons
truct
ion
zone
.
3.11
-1d:
The
impl
emen
ting
agen
cies
sha
ll en
cour
age
cons
truct
ion
crew
s to
par
k at
sta
ging
are
as to
lim
it la
ne c
losu
res
in th
e pu
blic
righ
t-of
-way
.
3.11
-1e:
Pea
k tra
vel p
erio
ds s
hall
be a
void
ed w
hen
cons
ider
ing
parti
al
road
clo
sure
s.
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
8 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.
11-1
f: Th
e im
plem
entin
g ag
enci
es s
hall
cons
ult w
ith th
e A
ntel
ope
Val
ley
Tran
sit A
utho
rity
and
the
Eas
t Ker
n R
egio
nal T
rans
it E
xpre
ss
that
con
nect
s to
Lan
cast
er a
t lea
st o
ne m
onth
prio
r to
cons
truct
ion
to
coor
dina
te b
us s
top
relo
catio
ns (i
f nec
essa
ry) a
nd to
redu
ce p
oten
tial
inte
rrup
tion
of tr
ansi
t ser
vice
.
3.11
-2: C
onst
ruct
ion
of th
e pr
opos
ed p
ipel
ine
wou
ld h
ave
tem
pora
ry
effe
cts
on a
ltern
ativ
e tra
nspo
rtatio
n or
alte
rnat
ive
trans
porta
tion
faci
litie
s.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.11
-1c
and
3.11
-1f.
Less
than
sig
nific
ant
3.11
-3: P
arki
ng d
eman
d w
ould
tem
pora
rily
incr
ease
dur
ing
cons
truct
ion
of th
e pr
opos
ed p
ipel
ine.
N
one
requ
ired.
Le
ss th
an s
igni
fican
t
3.11
-4: C
onst
ruct
ion
and
oper
atio
n of
the
prop
osed
pum
p st
atio
ns,
stor
age
rese
rvoi
rs, a
nd g
roun
dwat
er re
char
ge b
asin
s co
uld
adve
rsel
y af
fect
traf
fic a
nd tr
ansp
orta
tion
cond
ition
s in
the
proj
ect a
rea.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.11
-1a
thro
ugh
3.11
-1f.
Less
than
sig
nific
ant
Utilit
ies an
d Se
rvice
Sys
tem
s
3.12
-1: C
onst
ruct
ion
of th
e pi
pelin
es c
ould
resu
lt in
tem
pora
rily,
pl
anne
d or
acc
iden
tal d
isru
ptio
n to
util
ity s
ervi
ces.
3.
12-1
a: T
he lo
catio
ns o
f ove
rhea
d an
d un
derg
roun
d ut
ility
line
s, s
uch
as n
atur
al g
as, e
lect
ricity
, sew
age,
sto
rm d
rain
s, te
leph
one,
fuel
, and
w
ater
line
s, s
hall
be v
erifi
ed b
y co
ntra
ctor
s th
roug
h fie
ld s
urve
ys a
nd
othe
r met
hods
prio
r to
cons
truct
ion.
In a
reas
whe
re u
nant
icip
ated
un
derg
roun
d ut
ilitie
s ar
e fo
und,
pla
ns to
min
imiz
e se
rvic
e im
pact
s sh
all
be d
evel
oped
and
wor
ked
out w
ith th
e af
fect
ed u
tiliti
es.
3.12
-1b:
As
nece
ssar
y, d
etai
led
spec
ifica
tions
sha
ll be
pre
pare
d as
par
t of
the
desi
gn a
nd e
ngin
eerin
g pl
ans
to in
clud
e pr
oced
ures
for t
he
exca
vatio
n, s
uppo
rt, a
nd fi
ll of
are
as a
roun
d ut
ility
cab
les
and
pipe
s.
Affe
cted
util
ity s
ervi
ces
shal
l be
notif
ied
of c
onst
ruct
ion
plan
s an
d sc
hedu
le. A
rran
gem
ents
sha
ll be
mad
e w
ith th
ese
entit
ies
rega
rdin
g pr
otec
tion,
relo
catio
n, o
r tem
pora
ry d
isco
nnec
tion
of s
ervi
ces.
3.12
-1c:
Res
iden
ts a
nd b
usin
esse
s in
the
proj
ect a
rea
shal
l be
notif
ied
of a
ny p
lann
ed u
tility
ser
vice
dis
rupt
ion,
in c
onfo
rman
ce w
ith c
ount
y an
d st
ate
stan
dard
s.
Less
than
sig
nific
ant
3.12
-2: C
onst
ruct
ion
activ
ities
ass
ocia
ted
with
the
pipe
lines
wou
ld
gene
rate
sol
id w
aste
that
wou
ld in
crea
se th
e de
man
d fo
r lan
dfill
ca
paci
ty.
3.12
-2a:
Pro
ject
faci
lity
desi
gn a
nd c
onst
ruct
ion
met
hods
that
pro
duce
le
ss w
aste
, or t
hat p
rodu
ce w
aste
that
cou
ld m
ore
read
ily b
e re
cycl
ed o
r re
used
sha
ll be
enc
oura
ged.
3.12
-2b:
A re
quire
men
t for
the
cont
ract
or to
des
crib
e pl
ans
for
reco
verin
g, re
usin
g, a
nd re
cycl
ing
was
tes
prod
uced
thro
ugh
cons
truct
ion,
dem
oliti
on, a
nd e
xcav
atio
n ac
tiviti
es s
hall
be in
clud
ed in
co
nstru
ctio
n sp
ecifi
catio
ns.
Less
than
sig
nific
ant
Exe
cutiv
e S
umm
ary
TAB
LE E
S-1
(con
tinue
d)
SUM
MA
RY
OF
IMPA
CTS
AN
D M
ITIG
ATI
ON
MEA
SUR
ES F
OR
TH
E N
OR
TH L
OS
AN
GEL
ES /
KER
N C
OU
NTY
REC
YCLE
D W
ATE
R P
RO
JEC
T
Impa
cts
Miti
gatio
n M
easu
res
Sign
ifica
nce
afte
r M
itiga
tion
3.12
-3: I
mpl
emen
tatio
n of
the
stor
age
rese
rvoi
rs a
nd p
ump
stat
ions
co
uld
resu
lt in
the
need
for n
ew s
torm
wat
er d
rain
age
faci
litie
s or
ex
pans
ion
of e
xist
ing
faci
litie
s.
Non
e re
quire
d.
Less
than
sig
nific
ant
3.12
-4: O
pera
tion
of th
e st
orag
e re
serv
oirs
and
pum
p st
atio
ns c
ould
re
sult
in e
ffect
s to
loca
l and
regi
onal
ene
rgy
supp
lies.
3.
12-3
: Dur
ing
proj
ect d
esig
n, L
AC
WW
D40
and
the
impl
emen
ting
agen
cies
sha
ll re
quire
the
use
of e
nerg
y ef
ficie
nt e
quip
men
t, in
clud
ing
pum
ps a
nd li
ghtin
g. P
roje
ct fa
cilit
y de
sign
and
con
stru
ctio
n m
etho
ds
that
pro
duce
less
was
te, o
r tha
t pro
duce
was
te th
at c
ould
mor
e re
adily
be
recy
cled
or r
euse
d sh
all b
e en
cour
aged
.
Less
than
sig
nific
ant
Cum
ulat
ive Im
pact
s
4-1:
Con
curr
ent c
onst
ruct
ion
of s
ever
al p
roje
cts
in th
e A
ntel
ope
Val
ley
coul
d re
sult
in c
umul
ativ
e sh
ort-t
erm
impa
cts
to a
ir qu
ality
and
wat
er
qual
ity.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.2-
1a th
roug
h 3.
2-1f
, 3.7
-2,
and
3.7-
3.
Less
than
sig
nific
ant
4-2:
Con
curr
ent c
onst
ruct
ion
of s
ever
al p
roje
cts
in th
e A
ntel
ope
Val
ley
coul
d re
sult
in c
umul
ativ
e sh
ort-t
erm
impa
cts
to n
oise
. Im
plem
enta
tion
of M
itiga
tion
Mea
sure
s 3.
9-1a
, 3.9
-1b
and
3.9-
2.
Sig
nific
ant a
nd u
navo
idab
le
4-3:
Con
curr
ent c
onst
ruct
ion
of s
ever
al p
roje
cts
in th
e A
ntel
ope
Val
ley
coul
d re
sult
in c
umul
ativ
e sh
ort-t
erm
impa
cts
to tr
affic
. 4-
3: T
he im
plem
entin
g ag
enci
es, s
hall
com
mun
icat
e an
d co
ordi
nate
pr
ojec
t con
stru
ctio
n ac
tiviti
es w
ith o
ther
mun
icip
aliti
es (e
.g.,
Pal
mda
le,
Lanc
aste
r, an
d R
osam
ond
CS
D) a
nd a
genc
ies
(e.g
., C
altra
ns, L
A
Cou
nty
DP
W) i
n th
e A
ntel
ope
Val
ley.
Pha
sing
of p
roje
ct c
onst
ruct
ion
shal
l be
coor
dina
ted
to m
inim
ize
cum
ulat
ive
impa
cts
to tr
affic
and
ci
rcul
atio
n.
Less
than
sig
nific
ant
4-4:
Con
curr
ent c
onst
ruct
ion
of s
ever
al p
roje
cts
in th
e A
ntel
ope
Val
ley
coul
d re
sult
in c
umul
ativ
e sh
ort-t
erm
impa
cts
to b
iolo
gica
l res
ourc
es.
Impl
emen
tatio
n of
Miti
gatio
n M
easu
res
3.3-
1a-f,
3.3
-2a-
g, 3
.3-3
a-e,
3.3
-4a
-c a
nd 3
.3-6
. Le
ss th
an s
igni
fican
t
4-5:
The
pro
pose
d pr
ojec
t and
rela
ted
proj
ects
cou
ld re
sult
in
cum
ulat
ive
long
-term
impa
cts
to g
roun
dwat
er re
sour
ces.
Im
plem
enta
tion
of M
itiga
tion
Mea
sure
s 3.
7-5a
, 3.7
-5b,
and
3.7
-9a
thro
ugh
3.7-
9c.
Less
than
sig
nific
ant
Nor
th L
os A
ngel
es /
Kern
Cou
nty
Rec
ycle
d W
ater
Pro
ject
E
S-2
9 E
SA
/ 20
6359
Fi
nal P
EIR
N
ovem
ber 2
008