    Informatik

    DIUS Kick-Off Meeting

    Management Aspects

    Prof. Dr. Serge Chernyshenko

    Prof. Dr. Klaus G. Troitzsch

    Universitt Koblenz-Landau

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    2/12

    2/8

    Informatik

    DIUS: DEVELOPMENT AND INTEGRATION

    OF UNIVERSITY SELF-ASSESSMENT SYSTEMSUniversity of Koblenz-Landau, GermanyASIIN e.V., Germany

    Campus University of Malta - Italy

    Wroclav University of Technology - Poland

    Universit du Maine (Le Mans University) - France

    Yerevan State University (YSU)

    State Engineering University of Armenia (SEUA)

    Vanadzor branch of State Engineering University (VbSEUA)

    Yerevan State Academy of Fine Arts (YSAFA)

    Yerevan State Medical University (YSMU)

    Gyumri State Pedagogical Institute (GSPI)

    National Center For Professional Education Quality Assurance (ANQA)

    Republic of Armenia Ministry of Education and Science (AMES)

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    3/12

    3/8

    Informatik

    Work packages

    WP 1 Fact-finding at partner institutions 15/10/2010-14/02/2011

    WP 2 Development of self-assessment methods and tools 15/02/2011-14/10/2011

    WP 3 University quality assurance infrastructure 15/08/2011-14/10/2011

    WP 4 Training materials 15/10/2011-14/01/2012

    WP 5 Trainings 15/01/2012-14/02/2012

    WP 6 Integration of the newly developed self-assessment

    system

    15/02/2012-14/10/2012

    WP 7 Quality plan 15/07/2011-14/08/2011

    WP 8 Dissemination 15/04/2011-14/10/2012WP 9 Sustainability 15/08/2011-14/10/2012

    WP 10 Quality control and monitoring 15/10/2010-14/10/2012

    WP 11 Project Management 15/10/2010-14/10/2012

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    4/12

    4/8

    Informatik

    Workplan and Timeline

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    5/12

    5/8

    Informatik

    Workplan and Timeline First Year

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    6/12

    6/8

    Informatik

    Deliverables (of WP 1-3)

    1.1 Kick-off meeting EN 2011-01-17 Intl

    1.2 Assessment of extant mechanisms HY, EN 2011-02-01 Inst

    1.3 Results analysed, benchmarking planned EN 2011-04-25 Intl

    1.4 Project website EN 2011-03-01 Loc

    2.1 Tools and methodology developed HY, EN 2011-05-02 Inst

    2.2 Self-assessment conducted EN, HY 2011-08-01 Inst

    2.3 Site visit by ANQA and EU partners HY, EN 2011-10-03 Inst

    2.4 Gap analysis, final benchmarking HY, EN 2011-10-24 Inst

    2.5 Redevelopment of standards, tools etc. HY, EN 2011-11-14 Inst

    3.1 Recruiting necessary staff HY, EN 2011-12-12 Inst

    3.2 Providing legitimate background HY, EN 2011-12-26 Inst

    3.3 Purchasing the equipment HY, EN 2011-11-15 Inst

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    7/12

    7/8

    Informatik

    Immediate tasks WP 1

    fact-finding at the target universities through self-

    assessment of their extant mechanisms.

    the project work group (WG: KLU, ASIIN and ANQA)

    and local management groups (LMG) are formed at thekick-off meeting

    fact-finding will be conducted through document

    analyses and questionnaire based on which partner

    country (PC) universities will conduct a survey.

    The results will be analyzed by the work group (now

    including MoES) and the areas in need of improvement

    will be identified.

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    8/12

    8/8

    Informatik

    Deliverables (of WP 4-7)

    4.1 Designing the training EN, HY 2012-01-05 Inst

    4.2 Preparing teaching material EN, HY 2012-02-06 Inst

    5.1 Training the newly recruited QA staff EN 2012-04-09 Inst

    5.2 Training local staff and students EN 2012-04-23 Inst

    6.1 Developing individual integration plans HY, EN 2012-05-07 Inst

    6.2 Implementing individual work plans EN 2012-06-01 Inst

    6.3 Pilotoning the newly established model EN 2012-06-18 Inst

    6.4 Analysis and refinement of the meodel EN 2012-08-14 Inst

    7.1 Design of audit by ANQA and EU experts EN 2012-09-10 Inst

    7.2 Conducting the audit EN 2012-10-22 Inst

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    9/12

    9/8

    Informatik

    Deliverables (of WP 8-11)

    8.1 Final conference HY, EN 2012-08-27 Natl

    8.2 Final report HY, EN 2013-01-16 Natl

    8.3 Publication of brochure HY, EN 2012-10-14 Natl

    8.4 In-house conferences at partner institutions EN 2012-10-14 Natl

    9.1 Establishment of the Natl HE QA network HY 2011-11-01 Natl

    9.2 Validation of the network by the Ministry HY 2012-03-05 Natl

    9.3 Formalisation of Ministry regulation HY 2012-05-15 Natl

    9.4 Establishing formal relations w/ organisations EN, HY 2012-08-05 Intl

    10.1 Internal monitoring EN 2011-08-15 Inst

    10.2 Financial audit EN 2012-10-24 Dept

    11.1 Local management group meetings EN 2011-02-01 Inst

    11.2 Co-ordination of the project EN 2011-01-17 Inst

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    10/12

    10/8

    Informatik

    Reports due

    Intermediate

    Report

    Report on implementation of the project 2011-10-14 (or when

    70 per cent of the

    prefinancing =

    309,694.87 has

    been disbursed)

    Summary report for publication

    Statement of the costs incurred and

    request for payment

    Final Report Final report on implementation of the

    project

    2012-12-14

    Summary report for publication

    Financial statement and request for

    payment

    No external audit, as grant is below

    750,000

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    11/12

    11/8

    Informatik

    Budget

    I. PROJECT COSTS CONDITIONS

    Direct costs

    1 Staff costs 210,971.00 Cannot exceed 40% of the total eligible direct costs 307,304.20

    2 Travel costs and Costs of Stay 387,119.50

    3 Equipment 132,050.00 Cannot exceed 30% of the total eligible direct costs 230,478.15

    4 Printing and Publishing 21,550.00

    5 Other costs 16,570.00

    Total Eligible Direct Costs 768,260.50

    Indirect Costs 53,778.23 Flat rate funding of 7% of the total eligible direct

    costs.53,778.24

    TOTAL ELIGIBLE COSTS 822,038.73

    II. PROJECT FINANCE

    Tempus Grant Requested 737,368.74 Cannot exceed 90% of the total eligible costs 739,834.86

    Co-financing 84,669.99 Must be at least 10% of the total eligible costs 82,203.87

    TOTAL PROJECT FINANCE (A+B) 822,038.73

  • 8/4/2019 01-Koblenz DIUS Kick-Off Meeting Mgmt

    12/12

    12/8

    Informatik

    Travel costs and costs of stay

    Travel costs are reimbursed at full scale, given

    the travel documents can be produced (all travel

    documents must be made available for the

    financial report, including boarding passes)

    Cost of stay covers accommodation, meals, local

    travel, visa and insurance; part of these costs will

    be incurred by the hosting institution, only the

    rest is paid to the travelling persons (into their

    bank accounts or, exceptionally, in cash)


Recommended