WCM GmbH Order Processing with Valuation Release R/3 Enterprise September 2008
Transcript
Page 1: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 1/20

WCM GmbH

Order Processing with ValuationRelease R/3 Enterprise

September 2008

Page 2: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 2/20

Motivation

Maintenance works in complex installations often require high levelsecurity measurements.

However, there are also maintenance works without securitymeasurements.

Valuation gives to the maintenance-planner the possibility to decidehimself about the necessary security measurements.

Furthermore the necessary security measurements shall be createdautomatically.

 © WCM GmbH 2008 / Page 2

Page 3: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 3/20

Process Description

The feed water pump needs maintenance. The necessity of a lockout/tagout islinked to the respective object.

The person in charge for maintenance plans an order.

On the basis of the respective technical object, the system realizes that additionalsecurity measurements are necessary.

Valuation is active.

The maintenance- lanner decides that a lockout/ta out is necessar . Fire protection measurements are not necessary.

A working plan will be allocated to the maintenance order. A work processcontains a WCD template.

When WCM objects are created automatically the system proposes a choiceaccording to the valuation. At the same time an Operational WCD is created from

the WCD template. The WCM objects are linked with the order.

 © WCM GmbH 2008 / Page 3

Page 4: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 4/20

Model

We use the enhanced model for this process.

Order Order Order

 © WCM GmbH 2008 / Page 4

WorkApproval

WorkClearance

Application

OperationalWCD

OperationalWCD

Applicationfor Radiation

Protection

Page 5: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 5/20

Roles

These user roles are involved in this process:

Maintenance planner

Safety planner

 © WCM GmbH 2008 / Page 5

Page 6: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 6/20

Detailed Process

Customizing Setup „Valuation active“

In the customizing the valuation for the planning plant 1200 is activated.

 © WCM GmbH 2008 / Page 6

Page 7: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 7/20

Detailed Process

Create an Order 

For the feed water pump system 1 an order is created.

 © WCM GmbH 2008 / Page 7

Page 8: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 8/20

Detailed Process

Valuation Required

Due to the activated valuation the button „valuation“ is shown in the order.

 © WCM GmbH 2008 / Page 8

Page 9: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 9/20

Detailed Process

Order - Valuation

The security planner is shown the possible security measurements.

He has to define which security measurements are needed (Yes or No).This will be filed in the system.

 © WCM GmbH 2008 / Page 9

Page 10: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 10/20

Detailed Process

Valuation – Lockout/Tagout Necessary

The safety planner decides that a lockout/tagout (work clearance application)is necessary.

 © WCM GmbH 2008 / Page 10

Page 11: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 11/20

Detailed Process

aluation – Fire Protection Certificate not Necessary

A fire protection certificate is not necessary for the operations.

 © WCM GmbH 2008 / Page 11

Page 12: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 12/20

Detailed Process

Save Order 

The order is saved.

 © WCM GmbH 2008 / Page 12

Page 13: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 13/20

Detailed Process

llocate Task List

A working plan is allocated to the maintenance order. For the feed water pump there arealready ready-made task lists which can be chosen.

 © WCM GmbH 2008 / Page 13

Page 14: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 14/20

Detailed Process

Choose Task List

The maintenance planner chooses the desired task list. The task list contains

a working process with the control key “WCM“ (conduct lockout/tagout).

 © WCM GmbH 2008 / Page 14

Page 15: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 15/20

Detailed Process

Task List – Enhancement/User Data

In the user data of the work process it is possible to allocate a WCM template if the key

„WCM“ is used. This WCD template is used later during the automatic creation of WCMobjects.

 © WCM GmbH 2008 / Page 15

Page 16: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 16/20

Detailed Processutomatic creation of WCM objects

The maintenance planner chooses the allocation of a work permit. With the button

an automatic creation of the WCM objects is started. The system proposes WCM objectswhich are necessary on the base of the valuation.

 © WCM GmbH 2008 / Page 16

Page 17: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 17/20

Detailed Process

 WCM Objects have been Created

The system has now created a work approval, a work clearance application and anOperational WCD and has linked these to the order.

 © WCM GmbH 2008 / Page 17

Page 18: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 18/20

Detailed Process

Overview with Multilevel Lists

The further process is equivalent to the standard process.

 © WCM GmbH 2008 / Page 18

Page 19: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 19/20

Questions and Answers

 © WCM GmbH 2008 / Page 19

Page 20: 0102 Process Order With Valuation En

8/4/2019 0102 Process Order With Valuation En

http://slidepdf.com/reader/full/0102-process-order-with-valuation-en 20/20

Copyright 2008 WCM GmbH

You are not authorized to copy or pass on this publication or parts from this

publication no matter in which form or purpose, without prior written authorizationfrom WCM GmbH.

All content and information in this publication can be changed by WCM GmbHwithout prior notice.

SAP, R/3, mySAP, SAP NetWeaver and other mentioned SAP-Products andServices as well as the mentioned logos are brands or registered trademarks of

, . All other mentioned product or services names or related logos are brands of the

according companies.

 © WCM GmbH 2008 / Page 20


Recommended