NATIONAL SEMINAR ON MANAGING LAKES AND
THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
1. INTRODUCTION
2. DESCRIPTION OF THE LAK E3. MANAGEMENT OF THE LAK E AND ITS BASIN
4. MAJ OR IMPACT STORIES OF THE LAK E
5. MAJ OR LAKE BASIN GOVERNANCE ISSUES
6. K EY CHALLENGES TO LAK E GOVERNANCE
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
DID, KERIAN
CONTENT OF PRESENTATION
BUK IT MERAH LAK E BRIEF
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 3/90
Located in Kerian District.
Northern Perak State, Adjacent to PLUS.95km From Ipoh – 1 hr drive60km From Penang – 45 min drivePenang Airport
NATIONAL SEMINAR ON MANAGING LAKES AND
THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010DID, KERIAN
1.0 INTRODUCTION
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 4/90
• Oldest Manmade Lake – Reservoir – 1906- RM 1.6m
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKES AND
THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 5/90
Main Purpose Of The Bukit MerahLake/Reservoir1.0 To provide irrigation water to
Kerian Irrigation Scheme - 23,560
hectares, for rice cultivation.The largest granary area operatedand maintained by DID in Malaysia
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKES ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENT
STATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 6/90
2. To provide Domestic Water Supply for Kerian District& Larut Matang District- estimated 200,000 people
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKES ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 7/90DID, KERIAN
3. Known as Malaysia's premiernorthern lakefront 4 star resort-Bukit Merah Lake Town Resort
NATIONAL SEMINAR ON MANAGING LAKES ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23
FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 8/90
4. Known for the original sanctuary for the Arowana Malayan Gold- the high quality fresh water fish in the world .
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23
FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 9/90
• The railway line have been constructed by Keretapi Tanah
Melayu Berhad across Bukit Merah Dam for 4 km length
DID, KERIAN
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
No exact historical data
– lake or the train track .
NATIONAL SEMINAR ON MANAGING LAKES AND THEIR BASIN FOR SUSTAINABLE
USE:CURRENT STATUS OF SELECTED LAKESIN MALAYSIA 22-23 FEB 2010
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 10/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
2.0 Description Of The Lake
Lake Volume km3=0.083
Watershed km2 =33 at WL =RL+8.5m =28.5ftLake Length and Width = 13.8km(L) 4.5km(W)
Length of shoreline (km)= 61 at WL+RL8.5mMax Depth(m) = 5.3
Mean Depth(m) = 2.5
Lowest bed level(m) = RL +3.5
NATIONAL SEMINAR ON MANAGING LAKES AND THEIR BASIN FOR SUSTAINABLEUSE:CURRENT STATUS OF SELECTED LAKESIN MALAYSIA 22-23 FEB 2010
DID, KERIAN
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
Physical Parameters
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 11/90
Bukit Merah Dam comprises a main dam, 2 saddle dams, a gated service spillway,
a gated auxiliary spillway and an intake structure
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
The main dam’s location near upstream
of the Kurau and Merah River’confluence
Saddle Dam 1
Main Dam – Earth Embk
In take and
Saddle Dam 2
Main Canal
Selinsing Canal
2 Description Of The Lake
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 12/90
DID, KERIAN
• The dam was constructed in 1906 and its embankment wasraised from RL8.08m to RL 10.67m in the 2nd Malaysia Plan (1961to 1965) and again in 1984 to its present level at RL11.28m.
NATIONAL SEMINAR ON MANAGING LAKE S AND
THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
2. Description Of The Lake
Main Dam – modified homogeneous earth filled embankment
Main Infrastructures
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 13/90
• Spillways
• To safely conveydischarge past the damwithout unacceptabledamage at RL +30.00 ft
DID, KERIAN
North Spillway(max discharge 5,000 ft3/s)
South Spillway
(max discharge 15,000 ft
3
/s)
NATIONAL SEMINAR ON MANAGING LAKE S AND
THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 14/90
DID, KERIAN
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
The Intake Head Work Structure
NATIONAL SEMINAR ON MANAGING LAKE S AND
THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 15/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN
Dow nst ream v iew o f t he intake s t ruc t u re tha t conveys i r ri ga t i on and domest i c
w ate r supp ly to the ma in c onveyances
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 16/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Dam – gazzeted as National Security Area
As No Trespassing Zone
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 17/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
It is drained by an area of about408sq.km, covered by two district,Kerian District and Larut, Matangand Selama District
Kurau River Catchment = 360km2
Merah River Catchment =48km2
Ara River
Bukit Merah Lake Brief
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 18/90
Based on Malaysia Science University Research Study Team conducted in 2007 & 2008
has concluded the following the water balance parameters:-
Lake Volume = 83million m3 based on Bythemetric Survey conducted in 1998Annual inflow = Total flow volume in a year(ave 2007 & 2008) from Kurau & Merah River
Annual outflow = Total discharge volume from the lake in a year( ave 2007 & 2008)
thru the intake structures and the spillways.
Theoretical Filling Time = Lake Volume/annual inflow
= 83mil m3/2758670m3/day = 30 days
Average Evaporation Rate = 163mm-177mm/month from the lake
The surface water temperature measured ranges between 27.48 C – 29.9 C
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
Theoretical Flushing Time = Lake Volume/annual outflow
= 83mil m3/2498852m3/day = 33 days
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 19/90
Water Balance of BMR
0
100
200
300
400
500
600
700
800
J a n
F e b
M a c
A p r i l
M a y
J u n e
J u l y
A u g u s t
S e p t
O c t
N o v
D e c
Runoff(mm)
Rainfall (mm)
Evaporation (mm)
Based on 2008 USM’s studies the water balance inflow and outflow summarization can be tabulated as follows:-
Water Balance (Inflow & outflow ( monthly average- 2008)
DID’s daily average Q discharge requirement to the irrigation area = 1000 ft3/s or
= 28 m3/s for 24,000hectares
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
Retention TimeRETENTION TIME = Volume of lake / Outflow rate
RETENTION TIME = 83 million m3
/2498851.9m3
/day , (actual average supplied = 29m3/s /day)= 33 Days
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 20/90
Rainfall and water level Bukit Merah Reservoir,1998-2008
0
50
100
150
200
250
300
4 / 1 / 1 9 9 8
1 0 / 1 8 / 1 9 9 8
5 / 6 / 1 9 9 9
1 1 / 2 2 / 1 9 9 9
6 / 9 / 2 0 0 0
1 2 / 2 6 / 2 0 0 0
7 / 1 4 / 2 0 0 1
1 / 3 0 / 2 0 0 2
8 / 1 8 / 2 0 0 2
3 / 5 / 2 0 0 3
9 / 2 1 / 2 0 0 3
4 / 8 / 2 0 0 4
1 0 / 2 5 / 2 0 0 4
5 / 1 3 / 2 0 0 5
1 1 / 2 9 / 2 0 0 5
6 / 1 6 / 2 0 0 6
1 / 2 / 2 0 0 7
7 / 2 1 / 2 0 0 7
2 / 6 / 2 0 0 8
8 / 2 4 / 2 0 0 8
R a i n f a l l ( m m )
0123
45678910
w a t e
r l e v e l ( m )
R ain fa ll Wate r leve l
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
CLIMATE
Levels recorded higher in the months of March-Mei and Oct – Nov correlates
with higher precipitation during these period
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 21/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
Deeper in the westShallower in the east
RL =8.5mRL = 3.2m
Based on ba thym et r icSurvey conduct ed in
1964,1984 & 1998
Sedementat ion occupies 10-15%
of the lake ’s vo lume
SEDIMENTAT ION based on USM’s
2007 & 2008 s t ud ies
13.9ton/day
122ton/day
K urau River
Merah River
Est’d annual load /yr = 49,600ton/yr
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 22/90
Biotic Data – studies by USM in 2007 & 2008
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
Total 119 phytoplanktons species were identified include 6 major divisions: -
Straurastrum sp(Chlorophyta) is the most dominated species in Bukit Merah
Lake
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Chlorophyta
Euglenophyta
PrrrhophytaChrysophyta
Cynophyta
Chloromonadophyta
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 23/90
Biotic Data –
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
There are over 34 species of fish inclusive crabs and prawns, based
on Fisheries Department
Among major ones are : Lampam(P.gonionotus)
Patin (Pangasius sutchi)
Sebarau (Hampala macrolepidota)Jelawat(Leptobarbus hoevenii)
Kalui (Osphronemus goramy)
Keli (Clarias batrachus)Temakang (M.nigriceps)
Tilapia Hitam(Oreochromis mossambicus)
Toman ( C.micropeltes)
Numerous reports on crocodiles citing but none ever being caught in the net by the FisheriesAuthority to prove otherwise.
Kelisa or Arowana (Scleropages fsciatus) species are among the most exotic fish
found in BML. The only natural habitat found in the world for the Malayan Gold sp
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Fish
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 24/90
Management Of The Lake
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3.0 Managem ent Of The Lake And I t s Bas in
1. I r ri gat i on
2 . Dr ink ing Wa te r Wi thd raw a l
3 . Flood /Drough t Con t ro l Fac i l i tes
4 . Fi she r ies Fac i l it i e s
5 . Tour ism Fac i l i t ies
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 25/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
1.0 I r r igat ion Managem ent
Paramet ers to cons ider
24,000 hectares of rice cultivation area to be irrigatedOver 10,000 farmers involved, supporting = 50,000families members
Planting frequency = 2 times a year
No. of days to supply per season =100days/seasonAverage discharge requirement = 1000ft3/s = 28.3m3/s
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 26/90
Lake level to be maintained at RL+28.5ft(RL+8.6m) -85 % confidence level
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
KTMB’s track = +RL 33ft, spillway max storage level = RL 30.00ft
Lowest level to supply to the irrigation areas, ceases at RL20ft = RL 6.1m
Average daily discharge required to maintain 1000 ft3/s =28m3/s
are being adjusted by these intake gates
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Railway track’s level= RL+33ft = RL+10m
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 27/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
2.0 Dom est ic Wat er Supply Managem ent
BML is ma in source fo r raw w ate r supply fo r domest i cw a te r t rea tment p lan t - se rve to Ker ian and Larut Matang Dis t r i c t
– 200,000 users
There ar e 2 WTP – 1 along Main Canal 50k m dow n st ream of
the lake
1a long Se l ins ing Cana l 10km dow nst ream -
DID’s respons ibi l i ty - main t a in supply =60f t3 /s & leve l in conveyances
GSL Wat er Treat m ent Plant a t Gunong Sem anggol taps at Sel ins ing
Canal w h ich loca ted 10 km dow nst ream t o Buk i t Merah Lake .
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 28/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
South Spillway(max discharge 15,000 ft3/s)
View at the South Spilllway during
monsoon season when water fromreservoir have to discharge tomaintain the level below RL +30.0
3.0 Flood Cont ro l Managem ent
Spillway structures are being used tosafely convey discharge of excess water
to Kurau River downstream without
unacceptable damage
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Early release during monsoon to cater
high flow incoming from lake basin
Bukit Merah Lake Brief
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 29/90
Roads to villages upstream of the Bukit Merah Damwill be flooded if the levels hits above RL +29.0ft.
22 -23rd Febuary 2010 NRE Putrajaya
View of Selamat Village at level hits RL +29.7ft in Nov 2008
Villages platform level above RL+35ft (RL+ 10.5m)
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 30/90
22 -23rd Febuary 2010 NRE Putrajaya
4.0 Drought Control Management
Had experienced severe drought Jun 2009 levels hit lowest ever recorded
at RL 20.3ft.
Manage to maintain supply by rotational irrigation –structures downstream
need to be adjusted and regulated
No r ic e f ie ld area damaged – y ie ld increased –due to long sun l igh t
per iod – longer photosynt hes is process .
Manage to maintain domestic water supply without interrupting the
irrigation supply and schedule
View upst ream of the BM Lak e near Merah River Mout h
Bukit Merah Lake Brief d
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 31/90
22 -23rd Febuary 2010 NRE Putrajaya
5.0 Tour ism Managem ent
Lake level – maintained min RL+24ft - supportnavigation - BMLTR’s jetty to the Orangutan
Islands jetty. There are 23 indigenous
orangutans - 23 acres Islands – 11 adults + 12
youngs
Orangutan Island Jetty
BMLTR boat
Bukit Merah Lake Town Resort
Bukit Merah Lake Brief 22 23rd F b 2010 NRE P t j
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 32/90
22 -23rd Febuary 2010 NRE Putrajaya
Drought event in Jun 2009 had effected the tourism industry at
Bukit Merah Lake. Severe draw down to lake’ level had putboating activities on hold for a month. Tour trip to the Orangutan
Islands had been disrupted.
Tourism Management Cont’d
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief 22 23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 33/90
6.0 Fisheries Lake Management
22 -23rd Febuary 2010 NRE Putrajaya
Fisheries department- gazzeted lakenorthern area near Merah River mouth -
Arowana Sanctuary- comply theWestern Countries’ pre condition to
support the Arowanas’ breeding industry.
Arowana’s natural habitat
- Rasau Trees
Malayan Gold
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 34/90
22 -23rd Febuary 2010 NRE Putrajaya
Fisher ies Lake Managem ent Cont ’d
Dur ing DID remova l f loa t ing vegeta t ion programm es – area has tocare fu l ly se lec ted and be sens i t i ve w i th t he ir hab ita t s .
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Arowana’s natural habitat
- Rasau Trees
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 35/90
22 23 Febuary 2010 NRE Putrajaya
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Arowana Breeding Industries
Perak State’s Govt – Gazzeted -450 acres(180ha)
-Paddy land to be converted to Arowana’s Farming-- near BML
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 36/90
Arow ana Farm ing Gazzeted Area
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 37/90
Pekasam – Dried Pickled Fish Industry – mostly local consumption
y j y
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Local Banjar tribe Traditional Food
Ikan Sepat – Trichogaster, pectoralis
Lampam – P.eugrammus
6.0 Fisheries Lake Management-Cont’d
Main species involved
50 local fishermen – registered w State Fishery Department -operating - BML
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 38/90
4.0 MAJOR IMPACT STORIES
1.0 Threa ts f rom t he f loa t ing vege ta t ion g row th
of hanguana m alayana and w ater hyc in th
Endangering the structure’s stablity
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 39/90
Estimated 40% of the watershed area – Northern/Eastern portion covered by floating and aquatic
vegetation – especially near both Merah and Kurau River Mouth
No detail studies have been carried out to determine the rate of water useage/area by these so
called aquatic plants but it is believed to have an impact to the lake’s storage capacity. – over 104years of undisturbed growth
Fertilized from plantations fertilizer from the upper catchment
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 40/90
Current Condi t ion Of The Buk i t Merah LakeBythemetric Survey 1968,1984,1998
WATER SHED REDUCTION I N SIZ E
Kur au River
believed to
vegetation growthor sedimentation
area
Location where aquatic believe to grow
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 41/90
In the 90’s – clearing of aquatic
vegetation were being carried outdepartmentally. Machine brought in
from U.S – productivity = 1 acre/monthor 0.4ha/month
Aquatic Vegetation Clearing
Floating vegetation area covered over
= 4000 acres
A ti V t ti C tt &
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 42/90
• Maintenance machineriesused to remove the floatingvegetation
Aquatic Vegetation Cutter & Tug Boat
Aquatic Weeds Haverster
Excavator
DID, KERIAN
y j y
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 43/90
• Lately DID had out sourced the clearing work by open tender to
private contractors in phases2006-2007 - Phase I : RM 7,289,4002008-2009 Phase II : RM 5,521,500
• Scope of works : Removal of Floating Vegetation(pokok bakong/gambut)
• Average clearing area for Phase I & Phase II : 700,000 sq.m
in 3 years
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 44/90
LAND
COVER
AREA (SQ.KM) %
oil palm 48.3 12
rubber 98.9 24
forest 196.9 48
paddy 15.5 4
others 47.9 12
2nd Major Impact Stories
12% out of 36% belong to estates. Remaining 88% to private smallholders
Private
Ownership =36%
Some have been
alienated
Private Land Clearing –Replanting – surrounding and the lake basin
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 45/90
Major land clearing
on private alienated
land adjacent to thelake – one of DID
main challenges –
No legislatives norany environmentalProvision-can be
imposed to control
such practices.
Major Land Clearing For Replanting By
Privately Own Property
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 46/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Major private lands clearing adjacent to lake for replanting purposes which have
an impact to lake’s water quality and sedimentation problems.
2nd Major Impact Stories – Major Land Clearing By Privately Own Property
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 47/90
Clearing of planted areas for replanting by estates or
smallholders in big scales caused increase surface run
off with siltation and degrading water quality
Private land clearing in the lake basin area
2nd Major Impact Stories – Major Land Clearing By Privately Own Property
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Agencies responsibility – replanting – RISDA-rubber
FELCRA – palm oil
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 48/90
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN
Bukit Merah siltation from upper
basin
Siltation to Kurau River and water quality degradation that flowsdown to Bukit Merah lake
View s o f Kurau Rivers 10km upst ream o f the lake
Milky color
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 49/90
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN
Deforestation of Forest Reserves
Converted to animal breeding ground = 1000hectare
forest reserve
4800hectares
1000ha cleared
3rd Major Impact Stories
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 50/90
j p
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Nat iona l E lec t r i f ied Double Track ing
Pro ject
Existing track imposed constraint to
raise the lake level =RL+33 ft
Existing Sinaran Pagi Express KL /Butterworth
One of few lakes in the world where a traintrack running across the lake, caused the lake
to be separated to 2 parts, only connected by
a bridge about 20 meters span length
Water can only flow thru the small bridge,imposed threats when floating vegetation
stuck underneath the bridge - spillways are
under operation
No nav igat ion can pass
underneath
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 51/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
To ensure safety to the track, max spillway level is set =RL+30.00ft
Normal level stored for 85% confidence level to irrigation supply = RL+28.5ftcaused limitation to flood buffer storage (1.5 ft buffer)
Nat iona l Double Track ing Pro jec t
South spillway upstream view
Max spill level RL+30.00ft
South Spillway –downstream view
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 52/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Despite the problems faced by the existing track’s alignment, the train’sauthority still proceed with new NEDTP’s alignment following at the side ofthe existing track
Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 53/90
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Nat ional Elec t r i f ied Double Trac k ing Projec t NEDTP)
Under the NEDTP, level is raised to another 2 m-, DID plan to raise lake level in future planning.RM100m(USD 31m) budget bid for 10th Malaysia Plan for the upgrading of Bukit Merah Dam . New
double track build on concrete viaduct to promote free flow of water underneath
Construction of the NEDTP is still under way – to be completed in 2013
DID, KERIAN
4km of viaduct above the lake’s
watershed
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 54/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)
But in order to promote the free flow underneath the viaduct the existing trackhas to be removed which the KTMB’s consortium didn’t budget for in their initialtender. It is estimated another USD 1m required for the removal cost.
Discussions still underway on who and how the removal of these tracks need
to be carried out.
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 55/90
Nat iona l Elec t r i f ied Double Track ing Pro jec t NEDTP
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Construction problems and environmental issues concerned DID
Levels o f lake needs to mainta in above RL+28 f t in order for the p i l l ing pontoon to f loat
Water qual i t y degradat ion became c oncerned as the turb id i ty increased near the
const ruc t i on’ s it e
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 56/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Since level RL+28 is difficult to maintain at all times,
NEDTPs’ contractors decided to excavate trenches alongthe existing track for the pontoons to float – causing an
increase to lake’s turbidity water index.
Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 57/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Other than turbidity water quality index raising concerned, oil spill problems from
the pilling pontoons occasionally monitored in the lake, imposed certain threatsto the domestic and irrigation water supply downstream.
Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 58/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)
About 5 hectares of backfilling inside the lake were approved by the government
in order for the NEDTP’s contractor to have working space for the project
Backfilling inside the lake for casting yard and storage forconstructions materials
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
3rd Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 59/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR
BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)
Silt curtain and floating booms
are imposed to control/separatethe turbidity flow as well as the
oil spill near the construction site
Silt Curtain Control Measures
Booms to control and captures oil spill residue
Control Measures Taken
No major undesired incident monitored yet
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
4th Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 60/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Sand Mining Operators
Due to the NEDTP project- pressures
on sand applications requests for in
the lake as well as along the
Kurau River
The state government has
approved 7 operators to extractsand along the Kurau River but
only two are actually operatingdue access problems.
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
4th Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 61/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Sand mining operation areanear the Kurau River mouth
Sand Mining Operators
Based on studies – river mouth
area - most deposited
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
4th Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 62/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Sand Mining Operators
Since the location of the operation is too close to the lake , same environmental
control requirements are imposed to the sand operators such as installation of
silt curtain and oil residue traps within the operation vicinity. Occasional checkings
on the leakages along the curtain traps are done from time to time by bothparties(DID and sand operators)
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
4th Major Impact Stories
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 63/90
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Violation - improper practiced of using machinery in sand extraction
- distance of stock pilling from the river bank
- submission of repairing deposits
Kurau River Sand Extraction
violation
DID, KERIAN
Stockpilling violation
Too close to river bankUsing drageline instead of pumps
Sand Mining Operators
Issues on violation of permit condition
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5th Major Impact Stories Bukit Merah Lake Town Resort
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 64/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Perak State Gov – decided to alienate 1670 acres of government land and another
100 acres inside the lake to MK Land Properties developer to develop BMLTRin the 90s’
100 acres inside the lakefor water chalets development
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5th Major Impact Stories Bukit Merah Lake Town Resort
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 65/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Mix development – 4 star hotels, chalets, residential, resort
homes, higher learning institution, water theme parks – by
conversion from government land status to building and
residential area increase state land revenue from the land taxcollection and at same time promotes state tourism industry
Hotels and Water Theme Park Resort Homes
Water Chalets
Water cruises
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5th Major Impact Stories Bukit Merah Lake Town Resort
I iti l t DID & W t W k D t t d th j t d th
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 66/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Initial stage – DID & Water Works Department- opposed on the project- concerned on the
environmental effect. State Government persistent to go ahead with the approval – DID and Water Works Department to set conditions
Initial condition - no development within 100m buffer from the watershed @RL+28.5ft
to safe guard the riparian zones and filter layer
Levels of development must be above RL+35ft to cater future storage.
MK Land rejected the proposals and threatened to withdraw the projects
State government overuled DIDs’ conditions and gave greenlight to MK Land
to proceed
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5th Major Impact Stories Bukit Merah Lake Town Resort
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 67/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
No buffer of development allowed by MK Land for upgrading purposes and some
of the levels of development are below RL+35ft which imposed constraint for
future upgrading of the Bukit Merah Lake level.
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5th Major Impact Stories Bukit Merah Lake Town Resort
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 68/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
RL+28.5ft4 ft
Water Chalets soffit level are below RL +35ft- will cause
constraint for future upgrading Bukit Merah Lake level
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5.0 Major Lake Basin Governance Issues
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 69/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
5.1.1 Current Lake Bas in Management Ins t i t u t ionTwo separate and independent district managements – Kerian District
& Larut Matang District - no joint committee currently to discuss mutual
interest in lake basin management issues
Land matters – can be under jurisdiction of Land Office
or Forestry Department to enforce
Legally - both can alienate lands without consulting technical department
- can also approve any development project– state interest
Other main development agencies involved – RISDA – Rubber Industry Smallholders Development Authority-Rubber
FELCRA – Federal Land Consolidation And Rehabilitation Authority – P.Oil
DID has no authorities on the lake/ & the basin but given responsibilities
for lake/river maintenance and operation
5.1 Institution
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 70/90
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5.0 Major Lake Basin Governance Issues
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 71/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
1.0 Settlement hierarchy2.0 Urban concentration development area3.0 Controlled development area – concerned on the environmental impact
4.0 Conservation and sustainable areas
5.0 Main transportation and communication system
6.0 Public utility and infrastructure networking
On top of that the development working structure and state land used controlled
development have covered and touched six(6) focus areas till the year 2020 of
Planning strategies.They are:-
5.2 Policies-Cont’d
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 72/90
Rice field = maintained as food security purposes
Controlled Development in Highland Area Above 150m
Forest Reserve Area
Secondary Urban Development Area
Agricultural land inclusive semi settlement area
- Still remains largest area
Final Product of State Govt Planning til 2020
BML
BML Basin Area
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5.0 Major Lake Basin Governance Issues
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 73/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
5.3 STAKEHOLDER PARTICIPATION
1.0 JKKK – Village Action And Security Committee – one of most powerful
level of local participation = headed by village head(appointed by the state
highest representative political ruling party and co chaired
with Penghulus or Chieftains, a District Office representative
2.0 RISDA Smallholders Association –responsible for rubber replanting
3.0 FELCRA Smallholders Association – palm oil replanting
4.0 PPK – Local Farmers Organization = Community Based Organization(CBO)
5.0 Persatuan Nelayan – Fishermen Organization – can be refferred to.
Main target groups focus
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5.0 Major Lake Basin Governance Issues
5 4 K l d d i f i
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 74/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
5.4 Knowledge and information
Knowledge and information on related acts, legislatives and guidelines which can beregulated and related to lake basin management:-1) Irrigation Areas Act 1953(1989)2) Drainage Works Act 1954(1988)3) Third National Agricultural Policy(1998-2010)4) National Land Code 1965 and Waters5) Water Act 1920 (Cap 146)(1989)
6. Local Government Act (1976) Peninsular7. Earthwork Bylaw, Street Drainage And Building Act 1974 (1994)8. Town and Country Planning Act 19769. Environmental Quality Act 1874 (1985)10. Environmental Quality Regulations (Prescribed premises, Sewerage and Industrial
Effluent); Crude Palm Oil (1977), Sewerage And Industrial Effluent (1979) etc11. Environmental Quality Order 1987(Environmental Impact Assessment – Prescribed Activities)12. Land Conservation Act 196013. National Forestry Act 1984 (Forestry Rules 1986)14. Mining Enactment 193615. Fisheries Act 1963(1985)/ Inland Fisheries Act16. MASMA – URBAN STORM MANAGEMENT MANUAL
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5.0 Major Lake Basin Governance Issues
5 4 K l d d i f ti C t’d
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 75/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
5.4 Knowledge and information –Cont’d
17. Guidelines on processing on application of gas pipelines crossings at rivers,
drains and canals
18. Guidelines on processing on applications and conditions of rivers sand extraction19. Guidelines river corridors development
20. Guidelines on development on river reserves or involving rivers
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5.0 Major Lake Basin Governance Issues
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 76/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
5.5 Technological Opportunities And Limitations
DID had implemented MASMA – URBAN STORM MANAGEMENT MANUAL
implemented since 2001- approved by Prime Minister’s Cabinet
12% of the lake basin catchment – small urban development – MASMA can be
implemented – environmental friendly drainage design – control at source
5.5.1 MASMA
5.5.2 ESCP – Erosion and Sedimentation Control Plan
Also applies under MASMA requirement for urban development.
5.5.3 Sand Mining Guidelines
Present guideline – under DID revision – USM’s River Engineering Division – carrying studies – choose Kurau River as one of the case studies.
Limitations – can’t be applied to private land on land clearing for
replanting – not even any under DOEs legislations.
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
5 6 Sustainable Finance
5.0 Major Lake Basin Governance Issues
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 77/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
5.6 Sustainable Finance
Main revenue collected – land tax and Quit Rents - local town council area –
Pondok Tanjung Town & Batu Kurau Town. BMLTR – supposed to be the higest
land tax and quit rent payer to state in the region.
Sand mining dockets- increase collection as more sand can be extracted
No specific funding to lake basin management
Sust a inable Col lec t ion/Ret urn to St at e
Sust a inable Developm ent Grant
Rubber plantation- smallholder – land converted to rubber – able to get replanting grant
from RISDA – RM2500/acre -
Palm Oil replanting – land converted to palm oil – FELCRA – assist loan financing – Deduction in stages – small sum - in yearly dividends to the smallholders.
BM Lake basin area- covers > 40% by rubber and palm oil –projected by 2020
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 78/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.1 Developing Organization For Action
Forming Committees to develop organization for actions
1. District Action Committee – main district committee
2. One Stop Centre Committee
3. Zero Target Squatters Committee4. Poverty Eradication Committee5. Double Electrified Tracking Train Project Committee
6. Hardcore Poor Housing Programmes Committee
7. Focus Group Committee
8. State River Committee
9. Bukit Merah Development Committee
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 79/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.1 Developing Organization For Action – Cont’d
6.1.1 District Action Committee – highest level of committee meeting at a district
level recognized by the state authority – attended by head department of districtGovernment department and chaired by the District Officer acting as liaison officer
= meet once a month
6.1.2 One Stop Center Committee – each district has its own OSC Committee –
processing all development applications submitted by private developer todevelop an agricultural land to be converted to building purposes = MASMA
applies here.- only relevant technical department attending this OSC meetings –
DID, PWD, Fire and Rescue Department, Water Works, Town and Rural Planning
Department, Department of Environment. This committee was formed under theMinistry Of Housing and Local Government
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 80/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.1 Developing Organization For Action – Cont’d
6.1.3 Double Electrified Track Train Project Committee = monitor the project
progress and assists the consortium to avoid delays and negative impact to the
environment by giving comments and suggestions to the consortium
6.1.4 Poverty Eradication Committee, Hardcore Poor Housing Committee,Zero Squatters Committee and Focus Group Committee –
Focus on development of poor disadvantaged group of people living in the district
as well as in the lake basin by resettlement programmes and other means of
proposals. Changed the lively hood of the people living near the lake or rivers
especially those living in squatters areas.Housing programmes for these disadvantaged group need to be address proper
since limitation on the funding available – won’t compromise - environmental
minimum guidelines.
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 81/90
DID KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.2 Identifying Effective Actions
State Level – State River Committee has been formed – for a start
Chaired by an Executive State Councilor – politically appt
Committee – DID as secretariat
Members - DOE, Forestry Department, Land And Mining Department,Geoscience and Mineral Department
For a start to monitor and produce guidelines to river corridor development inline
with the state policies. To liaison powers and jurisdiction among enforcement
technical agencies on the authority and distribution of work task in river / lake basinmanagement. e.g – Rivers in Forest Reserve – jurisdiction of rivers and catchment
in the Forest Reserve under the forestry department, but they don’t have the
enough allocations and technical input for river improvement works.
Purpose :
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 82/90
DID KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.2 Identifying Effective Actions – Cont’d
State issued guidelines – district levels to form River Sand Extraction Permit Committee
Purpose – to process river sand permit by a committee – no longer by an individual
Land Office Officer – avoid misuse of powers and jurisdiction among the approvingofficers- promote transparency among the agencies and public knowledge based
To promote the implementation of MASMA and ESCP technology in urban developmen
project..
A task force on Ops Lumpur or Anti Siltation Flash Floods Ops – papers
drafted by this committee to present in the State Govt EXCO Meeting-highest level
of state approval authority – final draft preparation
6.0 Key Lake Basin Governance Challenges
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 83/90
6.2 Identifying Effective Actions – Cont’d
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Development Committee: formed by state – govt serious to developby pr iva te ent erpr ise funding
Chairperson: St at e Sec ret ary
Secre t ar ia te : UPEN – St a te Plann ing Economy Uni t
Mem bers : St at e DID represent at ive
Dis t r ic t and Land Of f ice representa t ive
Loca l Tow n Counci l
St a te Urban and Tow n Plann ing representa t ive
BMLTR – big investment project- US 1 billion – 20 years – agreement -
areas to be developed – 1670 acres – converted to tourism, industry and residential
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 84/90
DID KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.3 Involving People And Stakeholders
Minutes of Village Security Action Committee meetings to be circulated to relevant
Govt departments as references.- over 70 villages- not possible to attend all
Penghulus or the chieftains may bring matters pertaining complaints and grouses
from these VSAC to the DAC meetings if necessary
Govt officer may attend the VSAC if being invited to clarify certain issues or to
inform new procedures or regulations to be implemented in the basin which mayinvolve them directly or indirectly.
Related govt officials – can attend or invite – RISDA or FELCRA smallholders or the
officers concerned to discuss the concerned environmental issues which relate to
their actions if necessary – esp focus on replanting issues
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
6 4 Informing the process Scientific Info
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 85/90
DID KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22-23 FEB 2010
6.4 Informing the process – Scientific Info
University Science Of Malaysia Research Officers – assisted by DID’s personals-gathering some scientific data of the BML
– evaporation, chemicals, water balance studies – able to improve operation pros
DID had carried out Bythemetric survey – 1968, 1984 & 1998 – USM’s assisted on analysis of comparison made
– siltation status – 10%-15% of the lake’s total volume
-watershed area – before DID quoted – 48km2 –actually only 33km2
- vegetation cover analysis – 40%-45% of the watershed area.
Able to plan for future improvement of the storage capacity – knowing present
limitation and capacity – able to improve present operation prosedures
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
6.4 Informing the process – Scientific Info –Cont’d
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 86/90
Health Department carry out sample test on water quality ofthe lake periodically – to advice – WTP operators onchlorine treatment
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 87/90
DID KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22 23 FEB 2010
6.5 Responding With Technology
MASMA/ESCP – not widely accepted – govt projects but widely applied to privates.
Resettlement housing programmes for the hardcore poor- poor respond to MASMA
Due to limitation of area of development and funding – lake basin – upper catchment -
Sand mining guidelines – violations to the guidelines – sand operators
Lack of enforcement will – conducted by different agencies – not DID –
Sand operators – prominent figures – royal/political influence
Violation - improper practiced of using machinery in sand extraction
- distance of stock pilling from the river bank
- submission of repairing deposits
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 88/90
DID, KERIANNATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF
SELECTED LAKES IN MALAYSIA 22 23 FEB 2010
6.6 Mobilizing Sustainable Financing
As for the Pulau Orangutan development and maintenance program – financed
By Yayasan MK LAND
BMLTR development – once completed should generate revenue to state at least
RM6m/year = USD 2m/year
Unfortunately after 15 years since launched only 20% of the alienated area –developedoverdue tax collection =RM 6m.
Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya
6.0 Key Lake Basin Governance Challenges
6.6 Mobilizing Sustainable Financing – Cont’d
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 89/90
DID, KERIAN
NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010
g g
Maybe then a collaborative and sustainable financing resources can be established in
order to sustain and conserve the lake basin environmental resources for the better future
Replanting Sustainable Control FinancingReplanting agencies – RISDA & Felcra – both responsible financing – replanting
smallholders development – received Govt grant for implementation
Need a better & effective collaboration amongst these implementation agencies-
to be more sensitive towards environmental issues- esp involves 2 districts with
separate management
8/6/2019 01bukit Merah Lake Brief
http://slidepdf.com/reader/full/01bukit-merah-lake-brief 90/90
THANK YOUTHANK YOUFor Your Attention