BUKIT MERAH LAKE BRIEF BUKIT MERAH LAKE BRIEF NATIONAL SEMINAR ON MANAGING LAKES AND THEIR BASIN FOR SUSTAINABLE USE :CURRENT STATUS OF SELECTED LAKE IN MALAYSIA DEWAN BAIDURI WISMA SUMBER AIR KEMENTERIAN SUMBER ASLI DAN ALAM SEKITAR PUTRAJAYA 22 & 23 FEB 2010 PRESENTED BY TN. HJ. HIDZRAMI BIN HJ. SHAMSUL ANWAR DISTRICT ENGINEER DEPARTMENT OF IRRIGATION AND DRAINAGE, KERIAN Bukit Merah Lake Brief 22 -23 rd Febuary 2010 NRE Putrajaya
Transcript
Page 1: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 1/90

Page 2: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 2/90

NATIONAL SEMINAR ON MANAGING LAKES AND

THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

1. INTRODUCTION

2. DESCRIPTION OF THE LAK E3. MANAGEMENT OF THE LAK E AND ITS BASIN

4. MAJ OR IMPACT STORIES OF THE LAK E

5. MAJ OR LAKE BASIN GOVERNANCE ISSUES

6. K EY CHALLENGES TO LAK E GOVERNANCE

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

DID, KERIAN

CONTENT OF PRESENTATION

BUK IT MERAH LAK E BRIEF

Page 3: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 3/90

Located in Kerian District.

Northern Perak State, Adjacent to PLUS.95km From Ipoh – 1 hr drive60km From Penang – 45 min drivePenang Airport

NATIONAL SEMINAR ON MANAGING LAKES AND

THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010DID, KERIAN

1.0 INTRODUCTION

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 4: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 4/90

• Oldest Manmade Lake – Reservoir – 1906- RM 1.6m

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKES AND

THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 5: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 5/90

Main Purpose Of The Bukit MerahLake/Reservoir1.0 To provide irrigation water to

Kerian Irrigation Scheme - 23,560

hectares, for rice cultivation.The largest granary area operatedand maintained by DID in Malaysia

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKES ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENT

STATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

Page 6: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 6/90

2. To provide Domestic Water Supply for Kerian District& Larut Matang District- estimated 200,000 people

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKES ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 7: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 7/90DID, KERIAN

3. Known as Malaysia's premiernorthern lakefront 4 star resort-Bukit Merah Lake Town Resort

NATIONAL SEMINAR ON MANAGING LAKES ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23

FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 8: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 8/90

4. Known for the original sanctuary for the Arowana Malayan Gold- the high quality fresh water fish in the world .

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S ANDTHEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23

FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 9: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 9/90

• The railway line have been constructed by Keretapi Tanah

Melayu Berhad across Bukit Merah Dam for 4 km length

DID, KERIAN

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

No exact historical data

 – lake or the train track .

NATIONAL SEMINAR ON MANAGING LAKES AND THEIR BASIN FOR SUSTAINABLE

USE:CURRENT STATUS OF SELECTED LAKESIN MALAYSIA 22-23 FEB 2010

Page 10: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 10/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

2.0 Description Of The Lake

Lake Volume km3=0.083

Watershed km2 =33 at WL =RL+8.5m =28.5ftLake Length and Width = 13.8km(L) 4.5km(W)

Length of shoreline (km)= 61 at WL+RL8.5mMax Depth(m) = 5.3

Mean Depth(m) = 2.5

Lowest bed level(m) = RL +3.5

NATIONAL SEMINAR ON MANAGING LAKES AND THEIR BASIN FOR SUSTAINABLEUSE:CURRENT STATUS OF SELECTED LAKESIN MALAYSIA 22-23 FEB 2010

DID, KERIAN

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Physical Parameters

Page 11: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 11/90

Bukit Merah Dam comprises a main dam, 2 saddle dams, a gated service spillway,

a gated auxiliary spillway and an intake structure

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

The main dam’s location near upstream

of the Kurau and Merah River’confluence

Saddle Dam 1

Main Dam – Earth Embk

In take and

Saddle Dam 2

Main Canal

Selinsing Canal

2 Description Of The Lake

Page 12: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 12/90

DID, KERIAN

• The dam was constructed in 1906 and its embankment wasraised from RL8.08m to RL 10.67m in the 2nd Malaysia Plan (1961to 1965) and again in 1984 to its present level at RL11.28m.

NATIONAL SEMINAR ON MANAGING LAKE S AND

THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

2. Description Of The Lake

Main Dam – modified homogeneous earth filled embankment

Main Infrastructures

Page 13: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 13/90

• Spillways

• To safely conveydischarge past the damwithout unacceptabledamage at RL +30.00 ft

DID, KERIAN

North Spillway(max discharge 5,000 ft3/s)

South Spillway

(max discharge 15,000 ft

3

/s)

NATIONAL SEMINAR ON MANAGING LAKE S AND

THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 14: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 14/90

DID, KERIAN

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

The Intake Head Work Structure

NATIONAL SEMINAR ON MANAGING LAKE S AND

THEIR BASIN FOR SUSTAINABLE USE:CURRENTSTATUS OF SELECTED LAKES IN MALAYSIA 22-23FEB 2010

Page 15: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 15/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN

Dow nst ream v iew o f t he intake s t ruc t u re tha t conveys i r ri ga t i on and domest i c

w ate r supp ly to the ma in c onveyances

Page 16: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 16/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Dam – gazzeted as National Security Area

As No Trespassing Zone

Page 17: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 17/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

It is drained by an area of about408sq.km, covered by two district,Kerian District and Larut, Matangand Selama District

Kurau River Catchment = 360km2

Merah River Catchment =48km2

Ara River

Bukit Merah Lake Brief

Page 18: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 18/90

Based on Malaysia Science University Research Study Team conducted in 2007 & 2008

has concluded the following the water balance parameters:-

Lake Volume = 83million m3 based on Bythemetric Survey conducted in 1998Annual inflow = Total flow volume in a year(ave 2007 & 2008) from Kurau & Merah River

Annual outflow = Total discharge volume from the lake in a year( ave 2007 & 2008)

thru the intake structures and the spillways.

Theoretical Filling Time = Lake Volume/annual inflow

= 83mil m3/2758670m3/day = 30 days

Average Evaporation Rate = 163mm-177mm/month from the lake

The surface water temperature measured ranges between 27.48 C – 29.9 C

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Theoretical Flushing Time = Lake Volume/annual outflow

= 83mil m3/2498852m3/day = 33 days

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Page 19: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 19/90

Water Balance of BMR

0

100

200

300

400

500

600

700

800

      J    a    n

      F    e      b

      M    a    c

      A    p    r      i      l

      M    a    y

      J    u    n    e

      J    u      l    y

      A    u    g    u    s     t

      S    e    p     t

      O    c     t

      N    o    v

      D    e    c

Runoff(mm)

Rainfall (mm)

Evaporation (mm)

Based on 2008 USM’s studies the water balance inflow and outflow summarization can be tabulated as follows:-

Water Balance (Inflow & outflow ( monthly average- 2008)

DID’s daily average Q discharge requirement to the irrigation area = 1000 ft3/s or

= 28 m3/s for 24,000hectares

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Retention TimeRETENTION TIME = Volume of lake / Outflow rate

RETENTION TIME = 83 million m3

 /2498851.9m3

 /day , (actual average supplied = 29m3/s /day)= 33 Days

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Page 20: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 20/90

Rainfall and water level Bukit Merah Reservoir,1998-2008

0

50

100

150

200

250

300

     4      /     1      /     1     9     9     8

     1     0      /     1     8      /     1     9     9     8

     5      /     6      /     1     9     9     9

     1     1      /     2     2      /     1     9     9     9

     6      /     9      /     2     0     0     0

     1     2      /     2     6      /     2     0     0     0

     7      /     1     4      /     2     0     0     1

     1      /     3     0      /     2     0     0     2

     8      /     1     8      /     2     0     0     2

     3      /     5      /     2     0     0     3

     9      /     2     1      /     2     0     0     3

     4      /     8      /     2     0     0     4

     1     0      /     2     5      /     2     0     0     4

     5      /     1     3      /     2     0     0     5

     1     1      /     2     9      /     2     0     0     5

     6      /     1     6      /     2     0     0     6

     1      /     2      /     2     0     0     7

     7      /     2     1      /     2     0     0     7

     2      /     6      /     2     0     0     8

     8      /     2     4      /     2     0     0     8

   R   a   i   n   f   a   l   l   (   m   m   )

0123

45678910

  w   a   t   e

   r   l   e  v   e   l   (   m   )

R ain fa ll Wate r leve l

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

CLIMATE

Levels recorded higher in the months of March-Mei and Oct – Nov correlates

with higher precipitation during these period

Page 21: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 21/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Deeper in the westShallower in the east

RL =8.5mRL = 3.2m

Based on ba thym et r icSurvey conduct ed in

1964,1984 & 1998

Sedementat ion occupies 10-15%

of the lake ’s vo lume

SEDIMENTAT ION based on USM’s

2007 & 2008 s t ud ies

13.9ton/day

122ton/day

K urau River 

Merah River 

Est’d annual load /yr = 49,600ton/yr

Page 22: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 22/90

Biotic Data  – studies by USM in 2007 & 2008

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Total 119 phytoplanktons species were identified include 6 major divisions: -

Straurastrum sp(Chlorophyta) is the most dominated species in Bukit Merah

Lake

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Chlorophyta

Euglenophyta

PrrrhophytaChrysophyta

Cynophyta

Chloromonadophyta

Page 23: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 23/90

Biotic Data  – 

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

There are over 34 species of fish inclusive crabs and prawns, based

on Fisheries Department

Among major ones are : Lampam(P.gonionotus)

Patin (Pangasius sutchi)

Sebarau (Hampala macrolepidota)Jelawat(Leptobarbus hoevenii)

Kalui (Osphronemus goramy)

Keli (Clarias batrachus)Temakang (M.nigriceps)

Tilapia Hitam(Oreochromis mossambicus)

Toman ( C.micropeltes)

Numerous reports on crocodiles citing but none ever being caught in the net by the FisheriesAuthority to prove otherwise.

Kelisa or Arowana (Scleropages fsciatus) species are among the most exotic fish

found in BML. The only natural habitat found in the world for the Malayan Gold sp

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Fish

Page 24: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 24/90

Management Of The Lake

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3.0 Managem ent Of The Lake And I t s Bas in

1. I r ri gat i on

2 . Dr ink ing Wa te r Wi thd raw a l

3 . Flood /Drough t Con t ro l Fac i l i tes

4 . Fi she r ies Fac i l it i e s

5 . Tour ism Fac i l i t ies

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN

Page 25: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 25/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

1.0 I r r igat ion Managem ent

Paramet ers to cons ider  

24,000 hectares of rice cultivation area to be irrigatedOver 10,000 farmers involved, supporting = 50,000families members

Planting frequency = 2 times a year

No. of days to supply per season =100days/seasonAverage discharge requirement = 1000ft3/s = 28.3m3/s

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN

Page 26: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 26/90

Lake level to be maintained at RL+28.5ft(RL+8.6m) -85 % confidence level

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

KTMB’s track = +RL 33ft, spillway max storage level = RL 30.00ft

Lowest level to supply to the irrigation areas, ceases at RL20ft = RL 6.1m

Average daily discharge required to maintain 1000 ft3/s =28m3/s

are being adjusted by these intake gates

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Railway track’s level= RL+33ft = RL+10m

Page 27: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 27/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

2.0 Dom est ic Wat er Supply Managem ent

BML is ma in source fo r raw w ate r supply fo r domest i cw a te r t rea tment p lan t - se rve to Ker ian and Larut Matang Dis t r i c t

 – 200,000 users

There ar e 2 WTP – 1 along Main Canal 50k m dow n st ream of  

the lake

1a long Se l ins ing Cana l 10km dow nst ream -

DID’s respons ibi l i ty - main t a in supply =60f t3 /s & leve l in conveyances

GSL Wat er Treat m ent Plant a t Gunong Sem anggol taps at Sel ins ing

Canal w h ich loca ted 10 km dow nst ream t o Buk i t Merah Lake .

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief

Page 28: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 28/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

South Spillway(max discharge 15,000 ft3/s)

 View at the South Spilllway during

monsoon season when water fromreservoir have to discharge tomaintain the level below RL +30.0

3.0 Flood Cont ro l Managem ent

Spillway structures are being used tosafely convey discharge of excess water

to Kurau River downstream without

unacceptable damage

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Early release during monsoon to cater

high flow incoming from lake basin

Bukit Merah Lake Brief 

Page 29: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 29/90

Roads to villages upstream of the Bukit Merah Damwill be flooded if the levels hits above RL +29.0ft.

22 -23rd Febuary 2010 NRE Putrajaya

View of Selamat Village at level hits RL +29.7ft in Nov 2008

Villages platform level above RL+35ft (RL+ 10.5m)

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 

Page 30: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 30/90

22 -23rd Febuary 2010 NRE Putrajaya

4.0 Drought Control Management

Had experienced severe drought Jun 2009 levels hit lowest ever recorded

at RL 20.3ft.

Manage to maintain supply by rotational irrigation –structures downstream

need to be adjusted and regulated

No r ic e f ie ld area damaged – y ie ld increased –due to long sun l igh t

per iod – longer photosynt hes is process .

Manage to maintain domestic water supply without interrupting the

irrigation supply and schedule

View upst ream of the BM Lak e near Merah River Mout h

Bukit Merah Lake Brief d

Page 31: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 31/90

22 -23rd Febuary 2010 NRE Putrajaya

5.0 Tour ism Managem ent

Lake level – maintained min RL+24ft - supportnavigation - BMLTR’s jetty to the Orangutan

Islands jetty. There are 23 indigenous

orangutans - 23 acres Islands – 11 adults + 12

youngs

Orangutan Island Jetty

BMLTR boat

Bukit Merah Lake Town Resort

Bukit Merah Lake Brief 22 23rd F b 2010 NRE P t j

Page 32: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 32/90

22 -23rd Febuary 2010 NRE Putrajaya

Drought event in Jun 2009 had effected the tourism industry at

Bukit Merah Lake. Severe draw down to lake’ level had putboating activities on hold for a month. Tour trip to the Orangutan

Islands had been disrupted.

Tourism Management Cont’d

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 22 23rd Febuary 2010 NRE Putrajaya

Page 33: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 33/90

6.0 Fisheries Lake Management

22 -23rd Febuary 2010 NRE Putrajaya

Fisheries department- gazzeted lakenorthern area near Merah River mouth -

Arowana Sanctuary- comply theWestern Countries’ pre condition to

support the Arowanas’ breeding industry.

Arowana’s natural habitat

- Rasau Trees

Malayan Gold

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 34: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 34/90

22 -23rd Febuary 2010 NRE Putrajaya

Fisher ies Lake Managem ent Cont ’d

Dur ing DID remova l f loa t ing vegeta t ion programm es – area has tocare fu l ly se lec ted and be sens i t i ve w i th t he ir hab ita t s .

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Arowana’s natural habitat

- Rasau Trees

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 35: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 35/90

22 23 Febuary 2010 NRE Putrajaya

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Arowana Breeding Industries

Perak State’s Govt – Gazzeted -450 acres(180ha)

-Paddy land to be converted to Arowana’s Farming-- near BML

Page 36: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 36/90

Arow ana Farm ing Gazzeted Area

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 37: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 37/90

Pekasam – Dried Pickled Fish Industry – mostly local consumption

y j y

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Local Banjar tribe Traditional Food

Ikan Sepat – Trichogaster, pectoralis

Lampam – P.eugrammus

6.0 Fisheries Lake Management-Cont’d

Main species involved

50 local fishermen – registered w State Fishery Department -operating - BML

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 38: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 38/90

4.0 MAJOR IMPACT STORIES

1.0 Threa ts f rom t he f loa t ing vege ta t ion g row th

of hanguana m alayana and w ater hyc in th

Endangering the structure’s stablity

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 39: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 39/90

Estimated 40% of the watershed area – Northern/Eastern portion covered by floating and aquatic

vegetation – especially near both Merah and Kurau River Mouth

No detail studies have been carried out to determine the rate of water useage/area by these so

called aquatic plants but it is believed to have an impact to the lake’s storage capacity. – over 104years of undisturbed growth

Fertilized from plantations fertilizer from the upper catchment

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 40: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 40/90

Current Condi t ion Of The Buk i t Merah LakeBythemetric Survey 1968,1984,1998

WATER SHED REDUCTION I N SIZ E

Kur au River 

believed to

vegetation growthor sedimentation

area

Location where aquatic believe to grow

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 41: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 41/90

In the 90’s – clearing of aquatic

vegetation were being carried outdepartmentally. Machine brought in

from U.S – productivity = 1 acre/monthor 0.4ha/month

Aquatic Vegetation Clearing

Floating vegetation area covered over

= 4000 acres

A ti V t ti C tt &

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 42: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 42/90

• Maintenance machineriesused to remove the floatingvegetation

 Aquatic Vegetation Cutter & Tug Boat

  Aquatic Weeds Haverster

Excavator

DID, KERIAN

y j y

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 43: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 43/90

• Lately DID had out sourced the clearing work by open tender to

private contractors in phases2006-2007 - Phase I : RM 7,289,4002008-2009 Phase II : RM 5,521,500

• Scope of works : Removal of Floating Vegetation(pokok bakong/gambut)

• Average clearing area for Phase I & Phase II : 700,000 sq.m

in 3 years

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 44: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 44/90

 LAND

COVER

 AREA (SQ.KM) %

oil palm 48.3 12

rubber 98.9 24

forest 196.9 48

paddy 15.5 4

others 47.9 12

2nd Major Impact Stories

12% out of 36% belong to estates. Remaining 88% to private smallholders

Private

Ownership =36%

Some have been

alienated

Private Land Clearing –Replanting – surrounding and the lake basin

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 45: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 45/90

Major land clearing

on private alienated

land adjacent to thelake – one of DID

main challenges – 

No legislatives norany environmentalProvision-can be

imposed to control

such practices.

Major Land Clearing For Replanting By

Privately Own Property

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 46: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 46/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Major private lands clearing adjacent to lake for replanting purposes which have

an impact to lake’s water quality and sedimentation problems.

2nd Major Impact Stories – Major Land Clearing By Privately Own Property

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 47: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 47/90

Clearing of planted areas for replanting by estates or

smallholders in big scales caused increase surface run

off with siltation and degrading water quality

Private land clearing in the lake basin area

2nd Major Impact Stories – Major Land Clearing By Privately Own Property

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Agencies responsibility – replanting – RISDA-rubber

FELCRA – palm oil

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 48: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 48/90

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN

Bukit Merah siltation from upper

basin

Siltation to Kurau River and water quality degradation that flowsdown to Bukit Merah lake

View s o f Kurau Rivers 10km upst ream o f the lake

Milky color

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 49: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 49/90

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010DID, KERIAN

Deforestation of Forest Reserves

Converted to animal breeding ground = 1000hectare

forest reserve

4800hectares

1000ha cleared

3rd Major Impact Stories

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 50: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 50/90

j p

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Nat iona l E lec t r i f ied Double Track ing

Pro ject

Existing track imposed constraint to

raise the lake level =RL+33 ft

Existing Sinaran Pagi Express KL /Butterworth

One of few lakes in the world where a traintrack running across the lake, caused the lake

to be separated to 2 parts, only connected by

a bridge about 20 meters span length

Water can only flow thru the small bridge,imposed threats when floating vegetation

stuck underneath the bridge - spillways are

under operation

No nav igat ion can pass

underneath

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 51: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 51/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

To ensure safety to the track, max spillway level is set =RL+30.00ft

Normal level stored for 85% confidence level to irrigation supply = RL+28.5ftcaused limitation to flood buffer storage (1.5 ft buffer)

Nat iona l Double Track ing Pro jec t

South spillway upstream view

Max spill level RL+30.00ft

South Spillway –downstream view

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 52: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 52/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Despite the problems faced by the existing track’s alignment, the train’sauthority still proceed with new NEDTP’s alignment following at the side ofthe existing track

Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 53: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 53/90

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Nat ional Elec t r i f ied Double Trac k ing Projec t NEDTP)

Under the NEDTP, level is raised to another 2 m-, DID plan to raise lake level in future planning.RM100m(USD 31m) budget bid for 10th Malaysia Plan for the upgrading of Bukit Merah Dam . New

double track build on concrete viaduct to promote free flow of water underneath

Construction of the NEDTP is still under way – to be completed in 2013

DID, KERIAN

4km of viaduct above the lake’s

watershed

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 54: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 54/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)

But in order to promote the free flow underneath the viaduct the existing trackhas to be removed which the KTMB’s consortium didn’t budget for in their initialtender. It is estimated another USD 1m required for the removal cost.

Discussions still underway on who and how the removal of these tracks need

to be carried out.

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 55: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 55/90

Nat iona l Elec t r i f ied Double Track ing Pro jec t NEDTP

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Construction problems and environmental issues concerned DID

Levels o f lake needs to mainta in above RL+28 f t in order for  the p i l l ing pontoon to f loat

Water qual i t y degradat ion became c oncerned as the turb id i ty increased near the

const ruc t i on’ s it e

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 56: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 56/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Since level RL+28 is difficult to maintain at all times,

NEDTPs’ contractors decided to excavate trenches alongthe existing track for the pontoons to float – causing an

increase to lake’s turbidity water index.

Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 57: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 57/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Other than turbidity water quality index raising concerned, oil spill problems from

the pilling pontoons occasionally monitored in the lake, imposed certain threatsto the domestic and irrigation water supply downstream.

Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 58: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 58/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)

About 5 hectares of backfilling inside the lake were approved by the government

in order for the NEDTP’s contractor to have working space for the project

Backfilling inside the lake for casting yard and storage forconstructions materials

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

3rd Major Impact Stories

Page 59: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 59/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR 

BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Nat ional Elec t r i f ied Double Trac k ing Projec t (NEDTP)

Silt curtain and floating booms

are imposed to control/separatethe turbidity flow as well as the

oil spill near the construction site

Silt Curtain Control Measures

Booms to control and captures oil spill residue

Control Measures Taken

No major undesired incident monitored yet

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

4th Major Impact Stories

Page 60: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 60/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Sand Mining Operators

Due to the NEDTP project- pressures

on sand applications requests for in

the lake as well as along the

Kurau River

The state government has

approved 7 operators to extractsand along the Kurau River but

only two are actually operatingdue access problems.

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

4th Major Impact Stories

Page 61: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 61/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Sand mining operation areanear the Kurau River mouth

Sand Mining Operators

Based on studies – river mouth

area - most deposited

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

4th Major Impact Stories

Page 62: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 62/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Sand Mining Operators

Since the location of the operation is too close to the lake , same environmental

control requirements are imposed to the sand operators such as installation of

silt curtain and oil residue traps within the operation vicinity. Occasional checkings

on the leakages along the curtain traps are done from time to time by bothparties(DID and sand operators)

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

4th Major Impact Stories

Page 63: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 63/90

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Violation - improper practiced of using machinery in sand extraction

- distance of stock pilling from the river bank

- submission of repairing deposits

Kurau River Sand Extraction

violation

DID, KERIAN

Stockpilling violation

Too close to river bankUsing drageline instead of pumps

Sand Mining Operators

Issues on violation of permit condition

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5th Major Impact Stories Bukit Merah Lake Town Resort

Page 64: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 64/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Perak State Gov – decided to alienate 1670 acres of government land and another

100 acres inside the lake to MK Land Properties developer to develop BMLTRin the 90s’

100 acres inside the lakefor water chalets development

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5th Major Impact Stories Bukit Merah Lake Town Resort

Page 65: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 65/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Mix development – 4 star hotels, chalets, residential, resort

homes, higher learning institution, water theme parks – by

conversion from government land status to building and

residential area increase state land revenue from the land taxcollection and at same time promotes state tourism industry

Hotels and Water Theme Park Resort Homes

Water Chalets

Water cruises

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5th Major Impact Stories Bukit Merah Lake Town Resort

I iti l t DID & W t W k D t t d th j t d th

Page 66: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 66/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Initial stage – DID & Water Works Department- opposed on the project- concerned on the

environmental effect. State Government persistent to go ahead with the approval – DID and Water Works Department to set conditions

Initial condition - no development within 100m buffer from the watershed @RL+28.5ft

to safe guard the riparian zones and filter layer

Levels of development must be above RL+35ft to cater future storage.

MK Land rejected the proposals and threatened to withdraw the projects

State government overuled DIDs’ conditions and gave greenlight to MK Land

to proceed

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5th Major Impact Stories Bukit Merah Lake Town Resort

Page 67: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 67/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

No buffer of development allowed by MK Land for upgrading purposes and some

of the levels of development are below RL+35ft which imposed constraint for

future upgrading of the Bukit Merah Lake level.

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5th Major Impact Stories Bukit Merah Lake Town Resort

Page 68: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 68/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

RL+28.5ft4 ft

Water Chalets soffit level are below RL +35ft- will cause

constraint for future upgrading Bukit Merah Lake level

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5.0 Major Lake Basin Governance Issues

Page 69: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 69/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

5.1.1 Current Lake Bas in Management Ins t i t u t ionTwo separate and independent district managements – Kerian District

& Larut Matang District - no joint committee currently to discuss mutual

interest in lake basin management issues

Land matters – can be under jurisdiction of Land Office

or Forestry Department to enforce

Legally - both can alienate lands without consulting technical department

- can also approve any development project– state interest

Other main development agencies involved – RISDA – Rubber Industry Smallholders Development Authority-Rubber

FELCRA – Federal Land Consolidation And Rehabilitation Authority – P.Oil

DID has no authorities on the lake/ & the basin but given responsibilities

for lake/river maintenance and operation

5.1 Institution

Page 70: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 70/90

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5.0 Major Lake Basin Governance Issues

Page 71: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 71/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

1.0 Settlement hierarchy2.0 Urban concentration development area3.0 Controlled development area – concerned on the environmental impact

4.0 Conservation and sustainable areas

5.0 Main transportation and communication system

6.0 Public utility and infrastructure networking

On top of that the development working structure and state land used controlled

development have covered and touched six(6) focus areas till the year 2020 of

Planning strategies.They are:-

5.2 Policies-Cont’d

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 72: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 72/90

Rice field = maintained as food security purposes

Controlled Development in Highland Area Above 150m

Forest Reserve Area

Secondary Urban Development Area

Agricultural land inclusive semi settlement area

- Still remains largest area

Final Product of State Govt Planning til 2020

BML

BML Basin Area

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5.0 Major Lake Basin Governance Issues

Page 73: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 73/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

5.3 STAKEHOLDER PARTICIPATION

1.0 JKKK – Village Action And Security Committee – one of most powerful

level of local participation = headed by village head(appointed by the state

highest representative political ruling party and co chaired

with Penghulus or Chieftains, a District Office representative

2.0 RISDA Smallholders Association –responsible for rubber replanting

3.0 FELCRA Smallholders Association – palm oil replanting

4.0 PPK – Local Farmers Organization = Community Based Organization(CBO)

5.0 Persatuan Nelayan – Fishermen Organization – can be refferred to.

Main target groups focus

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5.0 Major Lake Basin Governance Issues

5 4 K l d d i f i

Page 74: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 74/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

5.4 Knowledge and information

Knowledge and information on related acts, legislatives and guidelines which can beregulated and related to lake basin management:-1) Irrigation Areas Act 1953(1989)2) Drainage Works Act 1954(1988)3) Third National Agricultural Policy(1998-2010)4) National Land Code 1965 and Waters5) Water Act 1920 (Cap 146)(1989)

6. Local Government Act (1976) Peninsular7. Earthwork Bylaw, Street Drainage And Building Act 1974 (1994)8. Town and Country Planning Act 19769. Environmental Quality Act 1874 (1985)10. Environmental Quality Regulations (Prescribed premises, Sewerage and Industrial

Effluent); Crude Palm Oil (1977), Sewerage And Industrial Effluent (1979) etc11. Environmental Quality Order 1987(Environmental Impact Assessment – Prescribed Activities)12. Land Conservation Act 196013. National Forestry Act 1984 (Forestry Rules 1986)14. Mining Enactment 193615. Fisheries Act 1963(1985)/ Inland Fisheries Act16. MASMA – URBAN STORM MANAGEMENT MANUAL

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5.0 Major Lake Basin Governance Issues

5 4 K l d d i f ti C t’d

Page 75: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 75/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

5.4 Knowledge and information –Cont’d

17. Guidelines on processing on application of gas pipelines crossings at rivers,

drains and canals

18. Guidelines on processing on applications and conditions of rivers sand extraction19. Guidelines river corridors development

20. Guidelines on development on river reserves or involving rivers

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5.0 Major Lake Basin Governance Issues

Page 76: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 76/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

5.5 Technological Opportunities And Limitations

DID had implemented MASMA – URBAN STORM MANAGEMENT MANUAL

implemented since 2001- approved by Prime Minister’s Cabinet

12% of the lake basin catchment – small urban development – MASMA can be

implemented – environmental friendly drainage design – control at source

5.5.1 MASMA

5.5.2 ESCP – Erosion and Sedimentation Control Plan

Also applies under MASMA requirement for urban development.

5.5.3 Sand Mining Guidelines

Present guideline – under DID revision – USM’s River Engineering Division – carrying studies – choose Kurau River as one of the case studies.

Limitations – can’t be applied to private land on land clearing for

replanting – not even any under DOEs legislations.

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

5 6 Sustainable Finance

5.0 Major Lake Basin Governance Issues

Page 77: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 77/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

5.6 Sustainable Finance

Main revenue collected – land tax and Quit Rents - local town council area – 

Pondok Tanjung Town & Batu Kurau Town. BMLTR – supposed to be the higest

land tax and quit rent payer to state in the region.

Sand mining dockets- increase collection as more sand can be extracted

No specific funding to lake basin management

Sust a inable Col lec t ion/Ret urn to St at e

Sust a inable Developm ent Grant

Rubber plantation- smallholder – land converted to rubber – able to get replanting grant

from RISDA – RM2500/acre -

Palm Oil replanting – land converted to palm oil – FELCRA – assist loan financing – Deduction in stages – small sum - in yearly dividends to the smallholders.

BM Lake basin area- covers > 40% by rubber and palm oil –projected by 2020

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 78: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 78/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.1 Developing Organization For Action

Forming Committees to develop organization for actions

1. District Action Committee – main district committee

2. One Stop Centre Committee

3. Zero Target Squatters Committee4. Poverty Eradication Committee5. Double Electrified Tracking Train Project Committee

6. Hardcore Poor Housing Programmes Committee

7. Focus Group Committee

8. State River Committee

9. Bukit Merah Development Committee

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 79: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 79/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.1 Developing Organization For Action – Cont’d

6.1.1 District Action Committee – highest level of committee meeting at a district

level recognized by the state authority – attended by head department of districtGovernment department and chaired by the District Officer acting as liaison officer

= meet once a month

6.1.2 One Stop Center Committee – each district has its own OSC Committee – 

processing all development applications submitted by private developer todevelop an agricultural land to be converted to building purposes = MASMA

applies here.- only relevant technical department attending this OSC meetings – 

DID, PWD, Fire and Rescue Department, Water Works, Town and Rural Planning

Department, Department of Environment. This committee was formed under theMinistry Of Housing and Local Government

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 80: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 80/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.1 Developing Organization For Action – Cont’d

6.1.3 Double Electrified Track Train Project Committee = monitor the project

progress and assists the consortium to avoid delays and negative impact to the

environment by giving comments and suggestions to the consortium

6.1.4 Poverty Eradication Committee, Hardcore Poor Housing Committee,Zero Squatters Committee and Focus Group Committee –

Focus on development of poor disadvantaged group of people living in the district

as well as in the lake basin by resettlement programmes and other means of

proposals. Changed the lively hood of the people living near the lake or rivers

especially those living in squatters areas.Housing programmes for these disadvantaged group need to be address proper

since limitation on the funding available – won’t compromise - environmental

minimum guidelines.

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 81: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 81/90

DID KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.2 Identifying Effective Actions

State Level –  State River Committee has been formed – for a start

Chaired by an Executive State Councilor – politically appt

Committee – DID as secretariat

Members - DOE, Forestry Department, Land And Mining Department,Geoscience and Mineral Department

For a start to monitor and produce guidelines to river corridor development inline

with the state policies. To liaison powers and jurisdiction among enforcement

technical agencies on the authority and distribution of work task in river / lake basinmanagement. e.g – Rivers in Forest Reserve – jurisdiction of rivers and catchment

in the Forest Reserve under the forestry department, but they don’t have the

enough allocations and technical input for river improvement works.

Purpose :

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 82: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 82/90

DID KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.2 Identifying Effective Actions – Cont’d

State issued guidelines – district levels to form River Sand Extraction Permit Committee

Purpose – to process river sand permit by a committee – no longer by an individual

Land Office Officer – avoid misuse of powers and jurisdiction among the approvingofficers- promote transparency among the agencies and public knowledge based

To promote the implementation of MASMA and ESCP technology in urban developmen

project..

A task force on Ops Lumpur or Anti Siltation Flash Floods Ops – papers

drafted by this committee to present in the State Govt EXCO Meeting-highest level

of state approval authority – final draft preparation

6.0 Key Lake Basin Governance Challenges

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

Page 83: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 83/90

6.2 Identifying Effective Actions – Cont’d

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Development Committee: formed by state – govt serious to developby pr iva te ent erpr ise funding

Chairperson: St at e Sec ret ary

Secre t ar ia te : UPEN – St a te Plann ing Economy Uni t

Mem bers : St at e DID represent at ive

Dis t r ic t and Land Of f ice representa t ive

Loca l Tow n Counci l

St a te Urban and Tow n Plann ing representa t ive

BMLTR – big investment project- US 1 billion – 20 years – agreement -

areas to be developed – 1670 acres – converted to tourism, industry and residential

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 84: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 84/90

DID KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.3 Involving People And Stakeholders

Minutes of Village Security Action Committee meetings to be circulated to relevant

Govt departments as references.- over 70 villages- not possible to attend all

Penghulus or the chieftains may bring matters pertaining complaints and grouses

from these VSAC to the DAC meetings if necessary

Govt officer may attend the VSAC if being invited to clarify certain issues or to

inform new procedures or regulations to be implemented in the basin which mayinvolve them directly or indirectly.

Related govt officials – can attend or invite – RISDA or FELCRA smallholders or the

officers concerned to discuss the concerned environmental issues which relate to

their actions if necessary – esp focus on replanting issues

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

6 4 Informing the process Scientific Info

Page 85: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 85/90

DID KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22-23 FEB 2010

6.4 Informing the process – Scientific Info

University Science Of Malaysia Research Officers – assisted by DID’s personals-gathering some scientific data of the BML

 – evaporation, chemicals, water balance studies – able to improve operation pros

DID had carried out Bythemetric survey – 1968, 1984 & 1998 – USM’s assisted on analysis of comparison made

 – siltation status – 10%-15% of the lake’s total volume

-watershed area – before DID quoted – 48km2 –actually only 33km2

- vegetation cover analysis – 40%-45% of the watershed area.

Able to plan for future improvement of the storage capacity – knowing present

limitation and capacity – able to improve present operation prosedures

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

6.4 Informing the process – Scientific Info –Cont’d

Page 86: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 86/90

Health Department carry out sample test on water quality ofthe lake periodically – to advice – WTP operators onchlorine treatment

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 87: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 87/90

DID KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22 23 FEB 2010

6.5 Responding With Technology

MASMA/ESCP – not widely accepted – govt projects but widely applied to privates.

Resettlement housing programmes for the hardcore poor- poor respond to MASMA

Due to limitation of area of development and funding – lake basin – upper catchment -

Sand mining guidelines – violations to the guidelines – sand operators

Lack of enforcement will – conducted by different agencies – not DID – 

Sand operators – prominent figures – royal/political influence

Violation - improper practiced of using machinery in sand extraction

- distance of stock pilling from the river bank

- submission of repairing deposits

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

Page 88: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 88/90

DID, KERIANNATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OF

SELECTED LAKES IN MALAYSIA 22 23 FEB 2010

6.6 Mobilizing Sustainable Financing

As for the Pulau Orangutan development and maintenance program – financed

By Yayasan MK LAND

BMLTR development – once completed should generate revenue to state at least

RM6m/year = USD 2m/year

Unfortunately after 15 years since launched only 20% of the alienated area –developedoverdue tax collection =RM 6m.

Bukit Merah Lake Brief 22 -23rd Febuary 2010 NRE Putrajaya

6.0 Key Lake Basin Governance Challenges

6.6 Mobilizing Sustainable Financing – Cont’d

Page 89: 01bukit Merah Lake Brief

8/6/2019 01bukit Merah Lake Brief

http://slidepdf.com/reader/full/01bukit-merah-lake-brief 89/90

DID, KERIAN

NATIONAL SEMINAR ON MANAGING LAKE S AND THEIR BASIN FOR SUSTAINABLE USE:CURRENT STATUS OFSELECTED LAKES IN MALAYSIA 22-23 FEB 2010

g g

Maybe then a collaborative and sustainable financing resources can be established in

order to sustain and conserve the lake basin environmental resources for the better future

Replanting Sustainable Control FinancingReplanting agencies – RISDA & Felcra – both responsible financing – replanting

smallholders development – received Govt grant for implementation

Need a better & effective collaboration amongst these implementation agencies-

to be more sensitive towards environmental issues- esp involves 2 districts with

separate management