  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No : 5887

    Project Document Number: T- 4.250.925 Project Rev.: B Page 2 of 22

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): FA-21,FB-21,FC-21 and FD-21 & GA-21,GB-21,GC-21 and GD-21

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    G B 17.09.08 Issued for Review SK EO AG IFR

    F A 31.08.08 Ready for Construction SK EO AG RFC

    E A 21.07.08 Ready for Construction SK EO AG RFC

    D O 15.06.08 Issued for Company Comments SK EO AG ICC

    C O 10.06.08 Issued for Company Comments SK EO AG ICC

    B 10.06.08 Issued for review SK EO AG IFR

    A 09.06.08 Issued for internal review SK EO AG IIR

    GAMA Rev.

    Project Rev Date Description

    Prepared By

    Checked By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    ITP FOR INSTALLATION OF COLD BOXES

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC470

    GAM ITP QAC GTL 038 G

    Org. Code

    Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.250.925

    Rev No: B

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Document No.: GAM-ITP-QAC-GTL-038

    ITP FOR INSTALLATION OF COLD BOXES DATE: 17.09.08 REV. G

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S X C A

    T-4.250.925 Rev. B Page 4 of 22

    1.0

    GENERAL

    1.1 Contractor drawings, project specifications, manuals, codes 100%

    TECHINICAL OFFICE H R R

    1.2 Lifting studies (For Heavy Equipments) 100%

    T.4.234.084; T-4.250.970 HSSE H R R

    R

    1.3 Paint /Galvanize touch up 100% Refer Painting ITP T.4.250.919/T.4.096.672 QCI GAM-QCR-QAC-GTL-056 I S S

    1.4 Procedures 100% T.4.250.947;T.4.258.501

    T-4.250.968 , T.4.096.711 - QCI Verify the documents R R R

    1.5 Foundations complete and accepted

    100% T-4.250.947 Approved drawing DEP

    34.19.20.31 T.13.376.359E;T.4.258.501

    QCI GAM-QCR-QAC-GTL-113 I W/R S

    1.6 Foundation chipping to sound metal

    100% T-4.250.968 T.13.377.803

    Approved drawing, DEP 34.19.20.31;

    T.13.376.358;T.4.258.501 QCI GAM-QCR-QAC-GTL-113 I S S

    1.7 Anchor bolts control & pocket cleaning

    100% T-4.250.968 ,T-4.250.970

    T.13.377.803

    Approved drawing DEP 34.19.20.31 T.13.376.358;

    T.4.258.501 QCI GAM-QCR-QAC-GTL-113 I S S

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Document No.: GAM-ITP-QAC-GTL-038

    ITP FOR INSTALLATION OF COLD BOXES DATE: 17.09.08 REV. G

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S X C A

    T-4.250.925 Rev. B Page 5 of 22

    2.0 EQUIPMENT

    2.1 Equipment identification and name plate verification 100%

    T-4.258.501 T-4.250.947

    Approved drawing DEP 31.10.03.10, DEP

    31.21.01.30,T.4.258.501 1.0

    STORE

    INCHARGE GAM-QCR-QAC-GTL-080 I S S

    2.2 Receiving inspection 100% T.4.258.501; T-4.258.501

    Approved drawing DEP 31.10.03.10,

    T.4.258.501

    STORE

    INCHARGE GAM-QCR-QAC-GTL-080 I S S

    2.3 Storage, preservation and documentation (FSI) 100%

    T.4.258.501; T.13.377.360.E, T.13.376.921G

    Approved drawing, DEP 70.10.70.11,

    T.4.258.501,Vendor instruction

    QCI GAM-QCR-QAC-GTL-069 I S S

    2.4

    Inspection measuring and test equipment calibration

    100% T-4.250.915, Valid Certificate QCI Calibration certificate H R R

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Document No.: GAM-ITP-QAC-GTL-038

    ITP FOR INSTALLATION OF COLD BOXES DATE: 17.09.08 REV. G

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S X C A

    T-4.250.925 Rev. B Page 6 of 22

    3.0 COLD BOX EQUIPMENTS

    3.1 HEX BOX

    3.1.1 Installation 100% T-4.250.947 T-4.258.501

    Approved Drawing; DEP 31.21.01.32; T.13.376.351G,

    T.4.121.350

    QCI GAM-QCR-QAC-GTL-148 I S W

    3.1.2 Alignment/Elevation 100% T-4.250.947 T.4.258.501

    DEP 31.21.01.32; T.13.377.803G,

    T.4.258.501 QCI GAM-QCR-QAC-GTL-115 I W/R I

    3.1.3 Welding 100% T.4.258.501 T.13.377.441;DEP

    61.40.20.30;T.13.376.796E;T.4.258.501

    QCI GAM-QCR-QAC-GTL-098 I S W

    3.1.4 Safety Valves (If any) 100% T.4.250.918 T.13.377.360

    DEP80.46.30.11 DEP 31.38.01.31 T.13.376.796E

    QCI GAM-QCR-QAC-GTL-091 I S S

    3.1.5 Final Bolting up / torque 100% T.4.250.897 Approved drawings; DEP

    31.29.00.10,Vendor SpecificationsT.4.121.350

    QCI GAM-QCR-QAC-GTL-041 I S/R S

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Document No.: GAM-ITP-QAC-GTL-038

    ITP FOR INSTALLATION OF COLD BOXES DATE: 17.09.08 REV. G

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S X C A

    T-4.250.925 Rev. B Page 7 of 22

    3.1.6 Grouting 100% T-4.250.970

    T.4.234.545 DEP 34.19.20.31

    T.13.376.358; T.4.258.501 QCI GAM-QCR-QAC-GTL-025 I S S

    3.2

    RECTIFICATION BOX

    3.2.1 Installation 100% T-4.250.947 T-4.258.501

    Approved Drawing DEP 31.21.01.32;T.13.376.351G,

    T.4.121.350 QCI GAM-QCR-QAC-GTL-148 I S W

    3.2.2 Alignment/Elevation (FSI) 100% T-4.250.947 T.4.258.501

    DEP 31.21.01.32; T.13.377.803G, T.4.258.501

    QCI GAM-QCR-QAC-GTL-115 I W/R I

    3.2.3 Welding 100% T.4.258.501 T.13.377.441;DEP

    61.40.20.30;T.13.376.796E;T.4.258.501

    QCI GAM-QCR-QAC-GTL-098 I S W

    3.2.4 Safety Valves 100% T.4.250.918 T.13.377.360

    DEP80.46.30.11 DEP 31.38.01.31 T.13.376.796E

    QCI GAM-QCR-QAC-GTL-091 I S S

    3.2.5 Final Bolting up / torque 100% T.4.250.897 Approved drawings; DEP

    31.29.00.10,Vendor SpecificationsT.4.121.350

    QCI GAM-QCR-QAC-GTL-041 I S/R S

    3.2.6 Grouting 100% T-4.250.970

    T.4.234.545 DEP 34.19.20.31

    T.13.376.358; T.4.258.501 QCI GAM-QCR-QAC-GTL-025 I S S

    3.3 Interconnecting Piping/Valves

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Document No.: GAM-ITP-QAC-GTL-038

    ITP FOR INSTALLATION OF COLD BOXES DATE: 17.09.08 REV. G

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S X C A

    T-4.250.925 Rev. B Page 8 of 22

    3.3 Valves/Strainers

    3.3.1 Installation of Valves 100% T.4.250.918 DEP 31.38.01.31,

    T.13.376.815E;Approved Drawings

    QCI GAM-QCR-QAC-GTL-091 I S S

    4.0 COLD BOXES

    4.1 Erection Damage(Equipments) 100% T-4.251.035 - QCI GAM-QCR-QAC-GTL-127 I I W

    4.2 Repair works 100% T-4.251.035 Method Statement QCI GAM-QCR-QAC-GTL-127 H R W

    4.3 General Punch List (Clearing) 100% T-4.250.947 - QCI GAM-QCR-QAC-GTL-128 H R S

    4.4 Equipment Box up 100% T-4.250.947 - QCI GAM-QCR-QAC-GTL-133 I W W

    4.5 Operation and maintenance Instructions

    100% O & M's Available for all Equipment QCI - R R R

    4.6 Equipment Manufacture Data Books

    100% Equipment Data Books Available for all Equipment QCI - R R R

    4.7 Quality Documents 100% Quality Documents T.13.377.555G QCI Inspection Reports R R R

  • C2-ASU PROJECT

    GAMA QATAR

    GROUT POUR CARD(PRE/POST POUR) Form No: GAM-QCR-QAC-GTL-025 Inspection Gr.:

    ITP No.: Laboratory:

    Record No: Date:

    TAG NO.: LOCATION:

    DESCRIPTION: DRAWING:

    TYPE OF GROUT: QUANTITY OF GROUT:

    Item

    No.

    TYPE OF ACTIVITY

    GAMA/T Const. GAMA/T - QC CONTRACTOR COMPANY REMARKS

    Signature Date Signature Date Signature Date Signature Date 1.0 Setting Out 2.0 Concrete Surface Preparation

    3.0 Equipment / Surface Alignment

    4.0 Formworks

    5.0 Isolation Joint

    6.0 Metal Surface Preparation

    7.0 Mixing / Placing / Finishing of Grout (1) 8.0 Curing of Grout (1)

    9.0 Removal of Shims

    10.0 Mixing / Placing / Finishing of Grout (2)

    11.0 Curing of Grout (2)

    12.0 Sealant to Isolation Joint

    13.0 Final Inspection

    Remarks:

    Full Name/Signature/Date

    GAMA QATAR CONTRACTOR COMPANY

  • GAM-QCR-QAC-GTL-041

    C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY

    BOLT TIGHTENING INSPECTION REPORT

    Subcontract Ref.: Report No.:

    Item Description: Inspection Date: Item Location / Area: Test Code No.:

    Subsystem: ITP No.:

    Ref. DWG / Docs:

    Used Measuring and test equipment ref. (if applicable):

    INSPECTIONS Bolting Item No/Spool

    No Mark No./Joint No

    Grade Size Bolt Tightening (Torque Value)

    Inspectors Signature

    ORGANIZATIONS DATE NAME SIGNATURE

    THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    Acce

    pted

    By

    QSGTL OR its PMC REP.

  • GAM-QCR-QAC-GTL-056

    C2 ASU PEARL GT PROJECT RAS LAFFAN INDUSTRIAL CITY

    REPAIR & TOUCHUP PAINTING INSPECTION REPORT

    Subcontract Ref.: Report No.: Item Description: Inspection Date: Item Location / Area: Test Code No.: 4.7 Subsystem: ITP No.: T-4-250-916 Ref. DWG / Documents: Paint Spec: Used Measuring and test equipment ref. (if applicable): Working Conditions Internal / External Insp. Equipment Used Identification #

    1. Hygrometer Time (hrs.) 2. DP / RH Calculator Air Temp

    WB 3. Temperature Gauge (O C) DB 4. WFT Gauge

    Dew Point (O C) 5. DFT Gauge Relative Humidity %

    Metal Temp. (O C)

    SURFACE PREPARATION

    From: ________________

    To: ________________

    Method of Cleaning

    PAINT APPLICATION

    From: ______________ hrs. To: _______________ hrs.

    Coating Manufacturer: Airless Spray Machine Sl. No. Paint: Product/Coat

    Batch No. Mix Ratio

    Application Methods

    Colour WFT DFT Total DFT

    Overcoat

    Time A. B. A. B. A. B. Remarks:

    ORGANIZATIONS DATE NAME SIGNATURE

    Acce

    pted

    By THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    QSGTL or its PMC REP.

    QQQ AAA TTT AAA RRR

  • PROJECT: C2 ASU PEARL GTL PROJECT, RAS LAFFAN INDUSTRIAL CITY

    EQUIP. TAG.NO.: DESCRIPTION: LOCATION:

    MANUFACTURER: DRG.NO.: RFI NO:

    MONTH

    1 2

    3 4 5 6

    7

    8

    9

    10

    11

    12

    ACTIVITY Month

    Date Checked

    Check all internal and accessories storage is acceptable

    Visual Check : Is there any damage

    Check for protective covers on all the openings

    Check all warning labels,like N2 warning plate are existent

    Check Purge Pressure level

    If Re-purge is required, indicate pressure level

    GAMA SIGN WITH DATE

    LINDE SIGN WITH DATE

    QSGTL or its PMC

    NOTE:

    GAM-QCR-QAC-GTL-069

    STORAGE, PRESERVATION AND NITROGEN PURGING REPORT

    FORM NO:

    SHT:

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    GAM-QCR-QAC-GTL-080

    EQUIPMENT RECEIPT CHECK SHEET

    ITEM No: PO No: REQ No:

    UNIT No: MANUFACTURER :

    ITEMS TO BE CHECKED INSPECTOR

    INITIAL REMARKS

    1 Name Plate

    2 Preparation and painting

    3 Desiccant installed

    4 Moisture present

    5 Nozzle flange faces acceptable

    6 Temporary nozzle protection acceptable

    7 Internals and accessories complete and storage acceptable

    8 Purge - pressure:

    Purge monitoring date: Pressure

    Date of initial inspection:

    Name and signature of Inspector:

  • Report No:

    PIPING FINAL INSPECTION REPORT Date:

    PROJECT: C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY

    TESTPACK NO SYSTEM AREA LINE NO DRG NO SHEET NO REV

    PIPE CLASS INSPN. CLASS MATERIAL

    Verified by (Signature) Sl. No. Inspection Description

    GAMA LINDE QSGTL Date

    1 Location & Orientation of Piping

    2 Elevation & Levelness of Piping

    3 Verticality (Plumb) of Piping

    4 Type and Location of Support Installed

    5 Type and Location of Valve Installed

    6 Flow direction of Valve Installed

    7 Vent hole location of Valve Installed

    8 Flange face Inspection

    9 Flange alignment to the Equipment

    10 Installation of inline items

    11 Installation of Gaskets

    12 Installation of correct Bolts and Nuts/studs

    Remarks

    THE ABOVE INSPECTIONS HAVE BEEN CARRIED OUT AND FOUND SATISFACTORY IN ACCORDANCE WITH THE ISOMETRIC DRAWING AND PROJECT SPECIFICATIONS/REQUIREMENTS.

    ORGANIZATIONS DATE NAME SIGNATURE GAMA QATAR REP

    LINDE REP

    QSGTL or its PMC

    GAM-QCR-QAC-GTL-091

    QQQ AAA TTT AA RRRA

  • PROJECT : C2 ASU PEARL GTL PROJECT-- RAS LAFFAN INDUSTRIAL CITY

    Date : Page :

    SHOP FIELDWeld Piping Insp. Welder Welder PWHT

    Area System Sheet DWG Rev. Sp'l No. Class Class 1 2 Req'd Req'd % Fit-up/Root Final

    Gama Qatar Rep

    Linde RepQSGTL or its PMC

    ORGANIZATIONS DATE NAME SIGNATURE

    REPORT No. :

    DAILY WELDING REPORT

    Mat'l Dia SchISOMETRIC NUMBER WPS No. RemarksInspection ResultNDE

    QQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-098

  • FOUNDATION INSPECTION REPORT

    Report No:

    Date:

    PROJECT: C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY

    Tag No: Drg. No:

    Area: Unit: Plot Plan:

    ELEVATION 0 90 180 270

    REQUIRED ACTUAL DEVIATION TOLERANCE REMARKS

    ORIENTATION ACCEPTED REJECTED POCKET CLEANING ACCEPTED REJECTED

    REQUIRED ACTUAL DEVIATION TOLERANCE REMARKS

    NO. OF ANCHOR BOLTS ANCHOR BOLT DIA ANCHOR BOLT LENGTH FOUNDATION POCKET POCKET DEPTH

    FOUNDATION CHIPPING REQUIRED NOT REQUIRED IF REQUIRED THICKNESS

    NOTE:

    THE ABOVE MENTIONED FOUNDATION IS ACCEPTED AND RELEASED FOR ERECTION ACTIVITIES

    GAMA LINDE QSGTL or its PMC

    Name

    Sign

    Date

    GAM-QCR-QAC-GTL-113

  • Report No:

    EQUIPMENT LEVELLING & ALIGNMENT REPORT Date:

    PROJECT: C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY

    Tag No: Manufacturer: Drg. No:

    Equip. Description

    No. of reading Orientation Elevation Plumpness Tolerance Remarks

    ORIENTATION : ACCEPTED REJECTED

    LEVELLING REQUIRED ACTUAL ACC REJECTED

    GRADIENT / SLOPE REQUIRED

    ACTUAL ACC REJECTED

    GAM-QCR-QAC-GTL-115 PAGE 1 OF 2

  • REMARKS: ..

    GAMA LINDE QSGTL or its PMC

    Name

    Sign

    Date

    GAM-QCR-QAC-GTL-115 PAGE 2 OF 2

  • PROJECT: C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY

    Originator Date of observation:

    Discipline:

    Location / Area:

    Unit No :

    SYSTEM NUMBER:

    Drawing / Specification Numbers Description of Discrepancy/Observation (Be specific, events, time, date, location, etc :)

    Corrective Action:

    Originator: Name: _____________________________Signature: _____________________Date: ________________ NCR Required YES NO (Circle one) CTQ to Contractor Required YES NO (Circle one) Remarks if any: Site Engineer: Name: _______________________ Signature: ________________ Date: ______________ QA/QC Manager: Name: _________________________ Signature: _______________ Date: ______________ Discrepancy Corrected/Remarks: GAMA Representative: Name: ____________________ Signature: ______________ Date: ________________ Close-out of Corrective Action - Remarks: NCR No.: ___________________ CTQ No: ______________ Site Engineer: Name: ___________________ Signature: __________________ Date: ___________ DISTRIBUTION (Original QA/QC file)

    QA/QC Manager Site Manager

    Site Engineer Project Manager

    Construction Manager Originator GAM-QCR-QAC-GTL-127

    REPORT NO.:

    SITE INSPECTION REPORT

    DATE:

  • Report No:Inspection Date:SYSTEM NUMBER:

    TAG NUMBER:

    LOOP FOLDER:

    (A,B,C,D,E) (X,Y,Z)

    GAMA REP

    LINDE REP

    QSGTL or its PMC

    SIGNATURE

    DESCRIPTION OF WORK QSGTL or its PMCGAMA LINDE

    COMPLETED(Date/Initials)

    DATE NAME

    C2 ASU PEARL GTL PROJECT

    GENERAL PUNCH LIST

    RAS LAFFAN INDUSTRIAL CITY

    Sub System:

    ITEM NO ISO or DWG NUMBER

    EQUIPMENT CIVIL STRUCTURAL PAINTING INSULATION

    Sub contractor Ref:Item Description:Item Location / Area:

    PRIORITY/ CATEGORY

    Ref Dwg/Documents:

    AC

    CE

    PTE

    D B

    Y

    ORGANIZATIONS

    ALL PRIORITY A ITEMS SHOWN ABOVE HAVE BEEN VERIFIED AND ARE COMPLETED .INCOMPLETE PRIORITY B ITEMS

    CATEGORY X: CONSTRUCTION GROUP IS RESPONSIBLE FOR COMPLETION OF ITEM. CATEGORY Y: ENGINEERING INPUT IS REQUIRED FOR COMPLETION OF ITEM.

    WILL BE TRANSFERRED TO THE MECHANICAL COMPLETION PUNCH LIST

    CATEGORY Z: COMMISSIONING GROUP IS RESPONSIBLE FOR COMPLETION OF ITEM.

    PRIORITY A : ITEMS SHALL BE COMPLETED BEFORE MECHANICAL COMPLETION (MC)PRIORITY B : ITEMS MAY BE COMPLETED AFTER MCPRIORITY C : ITEMS WILL BE COMPLETED BEFORE SYSTEM RFSU (READY FOR START UP UNIT) IS ACHIEVEDPRIORITY D : ITEMS SHALL BE COMPLETED BEFORE RFSU IS ACHIEVEDPRIORITY E : ITEMS SHALL BE COMPLETED BEFORE ACCEPTENCE IS ACHIEVED

    QQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-128

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Report No: Date: Area:

    Equipment Box-Up Acceptance Sheet

    QQQ AAA TTT AAA RRR

    It is hereby certified that the Equipment referenced has been mechanically completed in accordance with Drawings, Specifications, Inspection and Test Records. The referenced Equipment is ready for box-up. Equipment No

    Equipment Designation

    Vendor / Manufacturer

    PID No

    C h e c k l i s t Accepted

    GAMA Accepted VENDOR

    Accepted LINDE

    Accepted QSGTL

    1 Name Plate, CE-marking (if applicable)

    2 Internals installed 3 Internal piping installed

    4 Fillings completed 5 Refractory completed

    6 Internal transport protection removed

    7 Equipment internally clean and dry

    8 Nozzles / manholes closed acc. drawing

    9 Specified blind flanges installed

    10 Specified nozzle gaskets installed

    11 Specified bolts and nuts installed

    12 Specified torques applied

    13 Bolts lubricated (covers, manholes)

    14

    Remarks /

    ORGANIZATIONS

    NAME

    DATE

    SIGNATURE

    GAMA

    VENDOR

    LINDE

    QSGTL or its PMC

    GAM-QCR-QAC-GTL-133

  • C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY

    COLD BOX INSTALLATION PROCESS SHEET

    Item No: Report No: Item Description: Date: Drawing No: Area:

    Item No

    Description

    Signature & Date Gama Linde QSGTL

    1. Foundation, complete, level & accepted 2. Setting Plumb/ level Orientation correct Elevation correct Slide plate in place Anchor bolts tight Base plate grouted 3. Provision for expansion/ contraction checked 4. Piping Flanges aligned 5. Blind flanges on nozzles & plugs for couplings where required Remarks:

    The installation of the above equipment has been satisfactorily completed in accordance with the Drawings & Specifications. ORGANIZATIONS

    DATE NAME SIGNATURE

    GAMA QATAR REP

    LINDE REP

    QSGTL REP

    GAM-QCR-QAC-GTL-148

    QQQ AAA TTT AAA RRR

    091-PIPING FINAL INSPECTION REPORT.pdfPIPING FINAL INSPECTION REPORTReport No:Date:

    127-SITE INSPECTION REPORT.pdfSITE INSPECTION REPORTOriginatorDD

    091-PIPING FINAL INSPECTION REPORT.pdfPIPING FINAL INSPECTION REPORTReport No:Date:

    127-SITE INSPECTION REPORT.pdfSITE INSPECTION REPORTOriginatorDD


Recommended