    Materials Handling Projects in the 3D world

    Barry Woodin

    Product Owner SP3D Materials Handling Edition (MHE)

    11/16/2010

  • 7/29/2019 04 - Sisgraph Mhe

    2/21

    SP3D Materials Handling Edition

    History

    Technology Partnering Memoranda Jan 2008

    Sinclair Knight Merz, United Group Limited Resources and Intergraph

    POC Completed July 2008 Perth WA

    Requirements Defined August 2008 Perth WA

    MHE development Sept 2008 Perth WA

    SCRUM Team Established March 2009 India/Australia

    First SCRUM Sprint August 2009 India/Australia

    MHE BETA Version on SP3D MHE Nov 2009 India/Australia

    SP3D MHE 2009.1 HF 6 Official launch Perth Western Australia 30th

    September 2010

    2010 Intergraph Corporation. All

    Rights Reserved! 2

  • 7/29/2019 04 - Sisgraph Mhe

    3/21

    Materials Handling Industry

    Business Challenges/Opportunities

    Demand for mining of resource

    material driven by China and Indiainfrastructure expansion

    Mining production output, limited by

    timeframe to bring new projects

    online.

    Currently materials handling project

    deliverer is driven by outdated

    document centric technology.

    Availability of highly experienced

    engineering and designprofessionals will become more of a

    resource issue over the next 5 to 10

    years as the Baby Boomers retire.

    2010 Intergraph Corporation. All

    Rights Reserved! 3

  • 7/29/2019 04 - Sisgraph Mhe

    4/21

    Global Metals Demand Forecast

    11/16/2010 SP3D Materials Handling Edition 4

    Order of Magnitude Impact:

    Iron Ore One Pilbara production everyfive years [approx. 200 MT / Annum]

    Aluminum One Saguenay productionevery nine months [approx 1.4 M tons ofalumina / annum]

    Copper One Escondida productionevery year [approx 1.0 M MT of copper]

    Source: Rio Tinto Macquarie Global Metals & Mining

    Conference Nov 2009

    What is driving the forecast?

    Source: Reuters Ecowin, Consensus Economics

    India is right behind in demand

  • 7/29/2019 04 - Sisgraph Mhe

    5/21

    Steel Demand in Developing Nations

    11/16/2010 SP3D Materials Handling Edition 5

  • 7/29/2019 04 - Sisgraph Mhe

    6/21

    Materials Handling Solution

    11/16/2010 SP3D Materials Handling Edition 6

  • 7/29/2019 04 - Sisgraph Mhe

    7/21

    Faster and safer

    commissioning andramp-up due to

    integrated engineering

    design supported by

    3D model

    Commissioning

    Minimize construction errors

    and rework

    Real time response to field

    demands

    Construction Decision-making on multidisciplinary issues 3D model real time access and usage by site contractors

    EDMS on-line access by suppliers and field contractors

    Engineering systems fully integrated to Alunortes ERP

    (purchasing, materials control)

    Integration

    Operations training

    Total project life cycle support

    Integrated operation, maintenance

    and EHS design review

    Operation & Maintenance

    Detailed design documentation automatically

    generated from 3D database

    Consistency and reliability of 3D database

    Digitalized document transmittal and

    processing (paperless engineering design)

    Technology

    3D Model Benefits in Mining & Metals Projects

    Correctness of engineering design

    Accuracy of materials take-offs

    Quality

    Shortened project

    implementation

    Optimized engineering

    effort and resources

    Schedule

    3D modelling increased job

    site safety due to anticipated

    review and validation of

    construction methods and

    safety issues

    Safety

  • 7/29/2019 04 - Sisgraph Mhe

    8/21

    Functionality Breakdown

    SmartPlant 3D

    SmartMarineSmartPlant 3D for

    plant layout

    structural, piping,mechanical, Hvac and

    electrical design

    SmartMarine 3D

    plate work

    functionality for

    designing the

    conveyor chute

    SmartPlant Materials

    HandlingEdition for conveyor

    and chute design

    functionality

    SmartPlantMHE

    8SP3D Materials Handling Edition

    11/16/2010

    http://localhost/var/www/apps/conversion/tmp/scratch_4/Marketing/SmartPlant%20Materials%20Handling%20POC.m2v
  • 7/29/2019 04 - Sisgraph Mhe

    9/21

    Conveyor Layout

    Conveyor belt line

    layout is managed

    easier in the 2D

    environment, similar to

    how Plant projects use

    P&ID

    The industry Profile and

    Data sheet, is one of

    the major deliverable

    for conveyor layout

    projects .

    The Profile and Data

    Sheets contains

    geometrical data that is

    used . to drive the 3D

    model design

    2010 Intergraph Corporation. All

    Rights Reserved! 9

  • 7/29/2019 04 - Sisgraph Mhe

    10/21

    Chute Design

    Chute Design

    Typical Conveyor Head Chute with Transfer

    Chute.

    Chute Wizard would be used for starting

    point for parametric driven Designs.

    Chutes can be detailed to manufacturingstandards.

    Chute outputs, are manufacturing drawings

    and output to CNC machines.

    Chute Linear plate can be exported to

    detailing package via CIS/2 interface

    2010 Intergraph Corporation. All

    Rights Reserved! 10

  • 7/29/2019 04 - Sisgraph Mhe

    11/21

    MHE Workflow Truss Placement Example

    2010 Intergraph Corporation. All

    Rights Reserved! 11

    Layout is made easy in theSmart 2D environment

    The 2D TRUSS Placementlayout is populated to the 3D

    Model

  • 7/29/2019 04 - Sisgraph Mhe

    12/21

    SmartSketch

    SmartSketch is a premium tool

    for 2D drawing generation.

    SmartSketch's underlying

    technology and user interface

    make it easy to use and integrate

    with data-centric products

    SmartSketch provides powerfulfeatures such as parametric and

    relationships that enable

    execution of design changes

    quickly and efficiently. These

    changes are then populated to the

    S3D Model.

    2010 Intergraph Corporation. All

    Rights Reserved! 12

    http://localhost/var/www/apps/conversion/tmp/scratch_4/SmartSketch.avi
  • 7/29/2019 04 - Sisgraph Mhe

    13/21

    Conveyor Design in Mining

    11/16/2010 SP3D Materials Handling Edition 13

    Bulk Materials Handling

    In Plant Design

    Vertical Radius Conveyors

    Incline

    Decline

  • 7/29/2019 04 - Sisgraph Mhe

    14/21

    Concept / Workflow

    11/16/2010 SP3D Materials Handling Edition 14

    Concept

    2D Drives 3D Placement

    User can re-visit 2D design

    Workflow (Standard 3D Project)

    Plan high level Plant system breakdown

    Plan and create initial coordinate systems (CS)

    Plan initial work assignments

    Establishment of Site Plan

  • 7/29/2019 04 - Sisgraph Mhe

    15/21

    Workflow (MHE Specific)

    11/16/2010 SP3D Materials Handling Edition 15

    Import major equipment

    Define major conveyor systems

    Create Coordinate System for Conveyor

    Create Belt

    Copy the Coordinate information to SmartSketch

    Create trusses via truss wizard Use SmartSketch to place conveyor equipment

    Complete Project as per standard SmartPlant 3D

    http://localhost/var/www/apps/conversion/tmp/scratch_4/Belt%20layout.avi
  • 7/29/2019 04 - Sisgraph Mhe

    16/21

    Workflow (MHE Specific)

    11/16/2010SP3D Materials Handling Edition

    16

    Truss/Gantry 2D Layout

    Populated to 3D

    http://localhost/var/www/apps/conversion/tmp/scratch_4/Truss%20Placement.avi
  • 7/29/2019 04 - Sisgraph Mhe

    17/21

    Workflow (MHE Specific)

    11/16/2010SP3D Materials Handling Edition

    17

    Use SmartSketch to place conveyor associated equipment

    Complete Project as per standard SmartPlant 3D

    http://localhost/var/www/apps/conversion/tmp/scratch_4/Idler%20Placement%20and%20update.avi
  • 7/29/2019 04 - Sisgraph Mhe

    18/21

    Examples of SP3D MHE Automation Wizards

    11/16/2010 SP3D Materials Handling Edition 18

    Truss/Gantry Wizard

    Chute Wizard

    http://localhost/var/www/apps/conversion/tmp/scratch_4/Chute%20Detail%20and%20Parametric.avihttp://localhost/var/www/apps/conversion/tmp/scratch_4/Truss%20Gantry%20avi.avi
  • 7/29/2019 04 - Sisgraph Mhe

    19/21

    SP3D MHE Deliverables

    11/16/2010 SP3D Materials Handling Edition 19

    SP3D Standard Deliverables

    PLUS MHE Specific Deliverables

    Chute Plate Standard MHE

    Industry Drawing Templates

    Linear Chute Plate export via

    CIS/2 to detailing

    applications.

    Chute Plate work output to

    CNC fabrication machines

    Profile and Data Template to

    enable BOM embedded

    reports

  • 7/29/2019 04 - Sisgraph Mhe

    20/21

    Benefits and Enablers Summary

    Benefits

    Access to Smart 3D Technology

    Gives the ability to Front End Load (FEL) data to enable estimation of

    Preliminary Equipment Design , Layout , Schedule and Estimate

    Drive Standardisation and Modulation

    Reduce manufacturing costs

    Leverage off each project for future projects ( Build organisation catalog database)

    Reduce onsite construction cost

    Drawing Generation

    Reduced costs of drawing generation

    Enabled through

    Smart 3D technology

    Rules and relationship based architecture

    Automation and re-use approach

    11/16/2010 SP3D Materials Handling Edition 20

  • 7/29/2019 04 - Sisgraph Mhe

    21/21

    SmartPlant 3D Materials Handling

    Summary

    11/16/2010 SP3D Materials Handling Edition 21

    Global demand for MHE

    projects

    Current technology is not

    keeping up with demand

    Simple 2D to 3D workflow

    Conveyor layout

    Chute Plate Design

    Deliverables

    MHE based on proven S3D

    technology