Materials Handling Projects in the 3D world
Barry Woodin
Product Owner SP3D Materials Handling Edition (MHE)
11/16/2010
7/29/2019 04 - Sisgraph Mhe
2/21
SP3D Materials Handling Edition
History
Technology Partnering Memoranda Jan 2008
Sinclair Knight Merz, United Group Limited Resources and Intergraph
POC Completed July 2008 Perth WA
Requirements Defined August 2008 Perth WA
MHE development Sept 2008 Perth WA
SCRUM Team Established March 2009 India/Australia
First SCRUM Sprint August 2009 India/Australia
MHE BETA Version on SP3D MHE Nov 2009 India/Australia
SP3D MHE 2009.1 HF 6 Official launch Perth Western Australia 30th
September 2010
2010 Intergraph Corporation. All
Rights Reserved! 2
7/29/2019 04 - Sisgraph Mhe
3/21
Materials Handling Industry
Business Challenges/Opportunities
Demand for mining of resource
material driven by China and Indiainfrastructure expansion
Mining production output, limited by
timeframe to bring new projects
online.
Currently materials handling project
deliverer is driven by outdated
document centric technology.
Availability of highly experienced
engineering and designprofessionals will become more of a
resource issue over the next 5 to 10
years as the Baby Boomers retire.
2010 Intergraph Corporation. All
Rights Reserved! 3
7/29/2019 04 - Sisgraph Mhe
4/21
Global Metals Demand Forecast
11/16/2010 SP3D Materials Handling Edition 4
Order of Magnitude Impact:
Iron Ore One Pilbara production everyfive years [approx. 200 MT / Annum]
Aluminum One Saguenay productionevery nine months [approx 1.4 M tons ofalumina / annum]
Copper One Escondida productionevery year [approx 1.0 M MT of copper]
Source: Rio Tinto Macquarie Global Metals & Mining
Conference Nov 2009
What is driving the forecast?
Source: Reuters Ecowin, Consensus Economics
India is right behind in demand
7/29/2019 04 - Sisgraph Mhe
5/21
Steel Demand in Developing Nations
11/16/2010 SP3D Materials Handling Edition 5
7/29/2019 04 - Sisgraph Mhe
6/21
Materials Handling Solution
11/16/2010 SP3D Materials Handling Edition 6
7/29/2019 04 - Sisgraph Mhe
7/21
Faster and safer
commissioning andramp-up due to
integrated engineering
design supported by
3D model
Commissioning
Minimize construction errors
and rework
Real time response to field
demands
Construction Decision-making on multidisciplinary issues 3D model real time access and usage by site contractors
EDMS on-line access by suppliers and field contractors
Engineering systems fully integrated to Alunortes ERP
(purchasing, materials control)
Integration
Operations training
Total project life cycle support
Integrated operation, maintenance
and EHS design review
Operation & Maintenance
Detailed design documentation automatically
generated from 3D database
Consistency and reliability of 3D database
Digitalized document transmittal and
processing (paperless engineering design)
Technology
3D Model Benefits in Mining & Metals Projects
Correctness of engineering design
Accuracy of materials take-offs
Quality
Shortened project
implementation
Optimized engineering
effort and resources
Schedule
3D modelling increased job
site safety due to anticipated
review and validation of
construction methods and
safety issues
Safety
7/29/2019 04 - Sisgraph Mhe
8/21
Functionality Breakdown
SmartPlant 3D
SmartMarineSmartPlant 3D for
plant layout
structural, piping,mechanical, Hvac and
electrical design
SmartMarine 3D
plate work
functionality for
designing the
conveyor chute
SmartPlant Materials
HandlingEdition for conveyor
and chute design
functionality
SmartPlantMHE
8SP3D Materials Handling Edition
11/16/2010
http://localhost/var/www/apps/conversion/tmp/scratch_4/Marketing/SmartPlant%20Materials%20Handling%20POC.m2v7/29/2019 04 - Sisgraph Mhe
9/21
Conveyor Layout
Conveyor belt line
layout is managed
easier in the 2D
environment, similar to
how Plant projects use
P&ID
The industry Profile and
Data sheet, is one of
the major deliverable
for conveyor layout
projects .
The Profile and Data
Sheets contains
geometrical data that is
used . to drive the 3D
model design
2010 Intergraph Corporation. All
Rights Reserved! 9
7/29/2019 04 - Sisgraph Mhe
10/21
Chute Design
Chute Design
Typical Conveyor Head Chute with Transfer
Chute.
Chute Wizard would be used for starting
point for parametric driven Designs.
Chutes can be detailed to manufacturingstandards.
Chute outputs, are manufacturing drawings
and output to CNC machines.
Chute Linear plate can be exported to
detailing package via CIS/2 interface
2010 Intergraph Corporation. All
Rights Reserved! 10
7/29/2019 04 - Sisgraph Mhe
11/21
MHE Workflow Truss Placement Example
2010 Intergraph Corporation. All
Rights Reserved! 11
Layout is made easy in theSmart 2D environment
The 2D TRUSS Placementlayout is populated to the 3D
Model
7/29/2019 04 - Sisgraph Mhe
12/21
SmartSketch
SmartSketch is a premium tool
for 2D drawing generation.
SmartSketch's underlying
technology and user interface
make it easy to use and integrate
with data-centric products
SmartSketch provides powerfulfeatures such as parametric and
relationships that enable
execution of design changes
quickly and efficiently. These
changes are then populated to the
S3D Model.
2010 Intergraph Corporation. All
Rights Reserved! 12
http://localhost/var/www/apps/conversion/tmp/scratch_4/SmartSketch.avi7/29/2019 04 - Sisgraph Mhe
13/21
Conveyor Design in Mining
11/16/2010 SP3D Materials Handling Edition 13
Bulk Materials Handling
In Plant Design
Vertical Radius Conveyors
Incline
Decline
7/29/2019 04 - Sisgraph Mhe
14/21
Concept / Workflow
11/16/2010 SP3D Materials Handling Edition 14
Concept
2D Drives 3D Placement
User can re-visit 2D design
Workflow (Standard 3D Project)
Plan high level Plant system breakdown
Plan and create initial coordinate systems (CS)
Plan initial work assignments
Establishment of Site Plan
7/29/2019 04 - Sisgraph Mhe
15/21
Workflow (MHE Specific)
11/16/2010 SP3D Materials Handling Edition 15
Import major equipment
Define major conveyor systems
Create Coordinate System for Conveyor
Create Belt
Copy the Coordinate information to SmartSketch
Create trusses via truss wizard Use SmartSketch to place conveyor equipment
Complete Project as per standard SmartPlant 3D
http://localhost/var/www/apps/conversion/tmp/scratch_4/Belt%20layout.avi7/29/2019 04 - Sisgraph Mhe
16/21
Workflow (MHE Specific)
11/16/2010SP3D Materials Handling Edition
16
Truss/Gantry 2D Layout
Populated to 3D
http://localhost/var/www/apps/conversion/tmp/scratch_4/Truss%20Placement.avi7/29/2019 04 - Sisgraph Mhe
17/21
Workflow (MHE Specific)
11/16/2010SP3D Materials Handling Edition
17
Use SmartSketch to place conveyor associated equipment
Complete Project as per standard SmartPlant 3D
http://localhost/var/www/apps/conversion/tmp/scratch_4/Idler%20Placement%20and%20update.avi7/29/2019 04 - Sisgraph Mhe
18/21
Examples of SP3D MHE Automation Wizards
11/16/2010 SP3D Materials Handling Edition 18
Truss/Gantry Wizard
Chute Wizard
http://localhost/var/www/apps/conversion/tmp/scratch_4/Chute%20Detail%20and%20Parametric.avihttp://localhost/var/www/apps/conversion/tmp/scratch_4/Truss%20Gantry%20avi.avi7/29/2019 04 - Sisgraph Mhe
19/21
SP3D MHE Deliverables
11/16/2010 SP3D Materials Handling Edition 19
SP3D Standard Deliverables
PLUS MHE Specific Deliverables
Chute Plate Standard MHE
Industry Drawing Templates
Linear Chute Plate export via
CIS/2 to detailing
applications.
Chute Plate work output to
CNC fabrication machines
Profile and Data Template to
enable BOM embedded
reports
7/29/2019 04 - Sisgraph Mhe
20/21
Benefits and Enablers Summary
Benefits
Access to Smart 3D Technology
Gives the ability to Front End Load (FEL) data to enable estimation of
Preliminary Equipment Design , Layout , Schedule and Estimate
Drive Standardisation and Modulation
Reduce manufacturing costs
Leverage off each project for future projects ( Build organisation catalog database)
Reduce onsite construction cost
Drawing Generation
Reduced costs of drawing generation
Enabled through
Smart 3D technology
Rules and relationship based architecture
Automation and re-use approach
11/16/2010 SP3D Materials Handling Edition 20
7/29/2019 04 - Sisgraph Mhe
21/21
SmartPlant 3D Materials Handling
Summary
11/16/2010 SP3D Materials Handling Edition 21
Global demand for MHE
projects
Current technology is not
keeping up with demand
Simple 2D to 3D workflow
Conveyor layout
Chute Plate Design
Deliverables
MHE based on proven S3D