06-X-37945 Emergency Services Term Contract
Attachment #10 - Price Schedule - Index Page
Personnel - Daily Mobilization/Demobilization 1 Personnel - Hourly Rates - Monday-Friday 2 Personnel - Hourly Rates - Saturday 3 Personnel - Hourly Rates - Sunday and Holidays 4 Trucks 5 Utility Vehicles 6 Heavy Equipment 7 Backhoe/Sweeper 8 Pumps 9 Equipment 10 Oil Spill Containment Boom and Rope 11 Rolloffs and Miscellaneous 12 Rolloffs and Miscellaneous 13 Portable Holding Tanks and Sanitation Unit 14 Separators, Washers and Carbon Units 15 Field Analytical Equipment 16 Air Drill, Bonding Equipment, Fans 17 Drums 18 Miscellaneous and Sorbents (not used in water) 19 Sorbents (for spills in water) 20 Drum and Rolloff Storage 21 Waste Disposal 22 Waste Disposal 23 Material Recycling 24 Explosives, Related Equipment 25 Price Summary Sheet 26 Price Summary Sheet, Total Bid Price 27
1
Attachment #10 Emergency Response Services - Price Schedule - Labor
Contractor: ___________________________ Personnel Daily Mobilization/Demobilization * Mob/Demob 1-1/2 Hour Response Cost x # of Mobs = Total Supervisor $__________ x 100 = $__________ 2 Hour Response Chemist $__________ x 1 = $__________ Foreman $__________ x 1 = $__________ Heavy Equipment Operator $__________ x 53 = $__________ General Laborer $__________ x 420 = $__________ Truck Driver $__________ x 100 = $__________ Forklift Operator $__________ x 1 = $__________ Licensed Blaster $__________ x 1 = $__________ Total Mobilization/Demobilization for Personnel $__________ * Maximum Mobilization/Demobilization Charge allowed is 3 times maximum hourly rate for that personnel’s classification. Note: This contract also includes Guards, Asbestos Laborer and Radiation Laborer. Contractors must mobilize these workers, but no mobilization
payment will be made. The cost of mobilization for these workers is included in their hourly rates.
2
Attachment #10 Emergency Response Services - Price Schedule - Labor
Contractor: ____________________________
Hourly Rates - Monday Through Friday Shift 1 Shift 2 Shift 3 12 A.M./8 A.M. 8 A.M./4 P.M. 4 P.M./12 P.M. Rate x Hours = Total Rate x Hours = Total Rate x Hours = Total Supervisor $_________ x 117 = $_________ $_________ x 550 = $_________ $_________ x 117 = $_________ Chemist $_________ x 1 = $_________ $_________ x 1 = $_________ $_________ x 1 = $_________ Foreman $_________ x 1 = $_________ $_________ x 1 = $_________ $_________ x 1 = $_________ Heavy Equipment $_________ x 45 = $_________ $_________ x 208 = $_________ $_________ x 45 = $_________ Operator Laborer $_________ x 284 = $_________ $_________ x 1325 =$_________ $_________ x 284 = $_________ Truck Driver $_________ x 25 = $_________ $_________ x 125 = $_________ $_________ x 25 = $_________ Forklift Operator $_________ x 1 = $_________ $_________ x 1 = $_________ $_________ x 1 = $_________ Unarmed Guard $_________ x 70 = $_________ $_________ x 330 = $_________ $_________ x 70 = $_________ Armed Guard $_________ x 16 = $_________ $_________ x 75 = $_________ $_________ x 16 = $_________ Asbestos Laborer $_________ x 6 = $_________ $_________ x 25 = $_________ $_________ x 6 = $_________ Radiation Laborer $_________ x 1 = $_________ $_________ x 5 = $_________ $_________ x 1 = $_________ Licensed Blaster $_________ x 1 = $_________ $_________ x 1 = $_________ $_________ x 1 = $_________ Shift Totals $_________ $_________ $_________ Total Monday - Friday, All Shifts $_________
3
Attachment #10 Emergency Response Services - Price Schedule - Labor
Contractor: ____________________________
Hourly Rates - Saturday Shift 1 Shift 2 Shift 3 12 A.M. 8 A.M. 4 P.M. 8 A.M. 4 P.M. 12 P.M. Rate x Hours = Total Rate x Hours = Total Rate x Hours = Total Supervisor $_________ x 25 = $_________ $_________ x 117 = $_________ $_________ x 25 = $________ Chemist $_________ x 1 = $_________ $_________ x 1 = $_________ $_________ x 1 = $_________ Foreman $_________ x 1 = $_________ $_________ x 1 = $_________ $_________ x 1 = $_________ Heavy Equipment Operator $_________ x 10 = $_________ $_________ x 45 = $_________ $_________ x 10 = $_________ Laborer $_________ x 60 = $_________ $_________ x 284 = $_________ $_________ x 60 = $_________ Truck Driver $_________ x 6 = $_________ $_________ x 25 = $________ $_________ x 6 = $_________ Forklift Operator $_________ x 1 = $_________ $_________ x 1 = $________ $_________ x 1 = $_________ Unarmed Guard $_________ x 15 = $_________ $_________ x 70 = $________ $_________ x 15 = $_________ Armed Guard $_________ x 3 = $_________ $_________ x 16 = $________ $_________ x 3 = $_________ Asbestos Laborer $_________ x 1 = $_________ $_________ x 6 = $________ $_________ x 1 = $_________ Radiation Laborer $_________ x 1 = $_________ $_________ x 1 = $________ $_________ x 1 = $_________ Licensed Blaster $_________ x 1 = $_________ $_________ x 1 = $________ $_________ x 1 = $_________ Shift Totals $_________ $________ $_________ Total Saturday, All Shifts $_________
4
Attachment #10 Emergency Response Services - Price Schedule - Labor
Contractor: ____________________________
Hourly Rates - Sunday and Holidays Shift 1 Shift 2 Shift 3 12 A.M. 8 A.M. 4 P.M. 8 A.M. 4 P.M. 12 P.M. Rate x Hours = Total Rate x Hours = Total Rate x Hours = Total Supervisor $_________ x 25 = $________ $________ x 117 = $________ $________ x 25 = $________ Chemist $_________ x 1 = $________ $________ x 1 = $________ $________ x 1 = $________ Foreman $_________ x 1 = $________ $________ x 1 = $________ $________ x 1 = $________ Heavy Equipment Operator $_________ x 10 = $________ $________ x 45 = $________ $________ x 10 = $________ Laborer $_________ x 60 = $_________ $________ x 284 = $________ $________ x 60 = $________ Truck Driver $_________ x 6 = $_________ $________ x 25 = $________ $________ x 6 = $________ Forklift Operator $_________ x 1 = $_________ $________ x 1 = $________ $________ x 1 = $________ Unarmed Guard $_________ x 15 = $_________ $________ x 70 = $________ $________ x 15 = $________ Armed Guard $_________ x 3 = $_________ $________ x 16 = $________ $________ x 3 = $________ Asbestos Laborer $_________ x 1 = $_________ $________ x 6 = $________ $________ x 1 = $________ Radiation Laborer $_________ x 1 = $_________ $________ x 1 = $________ $________ x 1 = $________ Licensed Blaster $_________ x 1 = $_________ $________ x 1 = $________ $________ x 1 = $________ Shift Totals $_________ $________ $________ Total Sunday and Holidays, All Shifts $________
5
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Trucks Hourly Rate Daily Rate Mobilization/Demobilization Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total Vacuum Trucks * 1000-2500 Gal. $_________ x 1 = $__________ $_________ x 1 = $__________ $_________ x 2 = $_________ 3000-4000 Gal. $_________ x 15 = $__________ $_________ x 2 = $__________ $_________ x 10 = $_________ 5000-6000 Gal. $_________ x 7 = $__________ $_________ x 1 = $__________ $_________ x 6 = $_________ Tank Trucks 3000-4000 Gal. $_________ x 7 = $__________ $_________ x 1 = $__________ $_________ x 6 = $_________ 5000-6000 Gal. $_________ x 4 = $__________ $_________ x 1 = $__________ $_________ x 3 = $_________ Dump Trucks (Capacity) 8-10 Cu. Yds. $_________ x 1 = $__________ $_________ x 1 = $__________ $_________ x 1 = $_________ 12-18 Cu. Yds. $_________ x 1 = $__________ $_________ x 1 = $__________ $_________ x 1 = $_________ 20 - 24 Cu. Yds. $_________ x 1 = $__________ $_________ x 1 = $__________ $_________ x 1 = $_________ Subtotals $__________ $__________ $_________ Total for Trucks $_________ * Vacuum Trucks must come with oil skimmer head for suction line (Applies to first three trucks)
6
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Utility Vehicles Hourly Rate Daily Rate Mobilization/Demobilization Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total All Terrain Vehicle, 4 Wheel Drive $__________ x 1 = $________ $_________ x 1 = $________ $_________ x 1 = $_______ Flat Bed Stake Body Rack Truck, 2 Ton $_________ x 1 = $________ $_________ x 1 = $________ $_________ x 1 = $_______ Flat Bed Stake Body Rack Truck, Lift Gate, 2 Ton $_________ x 175 = $________ $_________ x 1 = $________ $_________ x 70 = $_______ Box Truck, 600 Cu. Ft. with Lift Gate * $_________ x 75 = $________ $_________ x 1 = $________ $_________ x 30 = $_______ Subtotals $________ $_______ $_______ Total for Utility Vehicles $_______ * Hazardous Waste Permitted Vehicle
7
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Heavy Equipment Hourly Rate Daily Rate Mobilization/Demobilization Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total Skid Steer Loader, Bobcat 753* $_________ x 33 = $________ $_________ x 1 = $__________ $_________ x 5 = $_________ Tractor, Loader, Backhoe-1 Cu. Yd. Bucket - Backhoe, 14 ft. digging depth $_________ x 52 = $_________ $_________ x 2 = $__________ $_________ x 10 = $_________ Front End Loader -2 Cu. Yd. Bucket $_________ x 1 = $_________ $_________ x 4 = $__________ $_________ x 4 = $_________ Forklift, Rough Terrain -6000-lb. lift capacity $_________ x 1 = $_________ $_________ x 1 = $__________ $_________ x 1 = $_________ Forklift, Rough Terrain -6000 lb. lift capacity - Drum Grappler Attachment $_________ x 1 = $_________ $_________ x 1 = $__________ $_________ x 1 = $_________ Subtotals $_________ $__________ $_________ Total for Heavy Equipment $_________ * or equivalent
8
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Backhoe/Sweeper Hourly Rate Daily Rate Mobilization/Demobilization 4 Hour Response Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total Backhoe, Diesel, Hydraulic, Crawler Mounted, 1 cu. yd. Bucket $_______ x 8 = $_______ $_______ x 1 = $_______ $_______ x 1 = $_______ Road Sweeper,Self-propelled, 8 ft. Wide, 90 HP $_______ x 8 = $_______ $_______ x 1 = $_______ $_______ x 1 = $_______ Subtotals $_______ $_______ $_______ Total for Backhoe/Sweeper $_______
9
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Pumps Daily Rate * Rate x Days = Total Electric/Explosion Proof/Portable 2 inch $_________ x 4 = $__________ 3 inch $_________ x 2 = $_________
Fuel/Explosion Proof/Portable 2 inch $_________ x 4 = $__________ 3 inch $_________ x 2 = $__________ Subtotals $_________ Total for Pumps $_________ * Daily rate includes cost of mobilizing pumps.
10
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Equipment Hourly Rate * Daily Rate * Rate x Hours = Total Rate x Days = Total Generators -2-5 KW $_______ x 130 = $________ $_______ x 1 = $________ -6-10 KW $_______ x 32 = $________ $_______ x 1 = $________ Portable Air Compressor -85-150 CFM $_______ x 1 = $________ $_______ x 1 = $________ Floodlights -Towable Light Towers with diesel generator - 1000 Watt $_______ x 12 = $________ $_______ x 1 = $________ - 2000 Watt $_______ x 12 = $________ $_______ x 1 = $________ Subtotals $________ $________ Total for Equipment $________ * Hourly and Daily rate includes mobilization to the site.
11
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: ____________________________ Oil Spill Rental Per Week Purchase PriceContainment Boom and Rope Rate x Weeks = Total Price x Units Purchased = Total 2 Hour Response Required Containment Boom 18 inch 50 foot length $________ x 2 = $________ $________ x 1 = $________ Containment Boom Greater than 18 inch 50 foot length $________ x 2 = $________ $________ x 1 = $________ 3/8 Inch Polyethylene RopePrice per 300 ft. length $________ x 5 = $________ Subtotal $________ $________ Total for Containment Boom and Rope $________
12
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Rolloffs and Miscellaneous Mobilization/Demobilization Decontamination ** 4 Hour Response Required * Rate x Mobs = Total Water Tight Trash Dumpster 3 yds. *** $________ x 1 = $________
Water Tight Rolloffs *** 10 yds. $________ x 1 = $________ 20 yds. $________ x 10 = $________ 30 yds. $________ x 1 = $________ Guard Office Trailer $________ x 3 = $________ Personnel Decontamination Shower Unit $________ x 1 = $________ Small Boat (2 Hour Response Required) Less than or equal to 19 ft. with motor $________ x 2 = $________ $________ x 2 = $________ Small Boat (2 Hour Response Required) Less than or equal to 19 ft. without motor (i.e. John Boat) with oars $________ x 2 = $________ $________ x 2 = $________ Subtotals $________ $________ Total for Rolloffs and Miscellaneous $________ * except small boats ** Decontamination Rate only applies if items must be decontaminated off site. Decontamination on site will be paid on a time and material basis. *** Dumpster/Rolloffs must be water tight or must include a water tight liner.
13
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Rolloffs Daily Rate Weekly Rate And Miscellaneous Rate x Days = Total Rate x Weeks = Total Water Tight Trash Dumpster 3 yd.³ * $_________ x 1 = $__________ $________ x 1 = $_________ Water Tight Rolloffs * 10 yds. $_________ x 1 = $__________ $_________ x 1 = $_________ 20 yds. $_________ x 5 = $__________ $_________ x 30 = $_________ 30 yds. $_________ x 1 = $_________ $_________ x 1 = $_________ Guard Office Trailer $_________ x 1 = $__________ $_________ x 3 = $_________ Personnel Decontamination Shower Unit $_________ x 1 = $__________ $_________ x 1 = $_________ Small Boat Less than or equal to 19 ft. with motor $_________ x 1 = $__________ $_________ x 1 = $_________ Small Boat Less than or equal to 19 ft. without motor (i.e. John Boat) with oars $________ x 1 = $________ $________ x 1 = $_________ Subtotals $__________ $_________ Total Daily and Weekly Rates for Rolloffs and Miscellaneous $_________ * Dumpster/Rolloffs must be water tight or must include a water tight liner.
14
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Portable Holding Tanks, and Daily Rate Weekly Rate Mobilization/DemobilizationSanitation Unit Rate x Days = Total Rate x Weeks = Total Rate x Mobs = Total Portable Holding Tanks 550 gallon $_________ x 1 = $_________ $________ x 1 = $_________ $________ x 1 = $_________ 1000 gallon $_________ x 1 = $_________ $________ x 1 = $_________ $________ x 1 = $_________ Portable Handicapped Sanitation Unit - ADA compliant $_________ x 1 = $________ $________ x 1 = $________ $________ x 1 = $_________ h 90” x w 77” x d 77” Subtotals $________ $________ $_________ Total for Portable Holding Tanks, Pools and Sanitation Unit $_________
15
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Separators, Washers Daily Rate Weekly Rate Mobilization/Demobilization and Carbon Units Rate x Days = Total Rate x Weeks = Total Rate x Mobs = Total Oil/Water Separator 55 Gallon $________ x 1 = $________ $________ x 1 = $________ 500 Gallon $________ x 1 = $________ $________ x 1 = $________ High Pressure Washer 1000 PSI or greater $_________ x 1 = $_________ $________ x 1 = $________ $________ x 1 = $________ Steam Vapor Cleaner 90 PSI or greater $_________ x 1 = $_________ $________ x 1 = $________ $________ x 1 = $________ 90 lb. Aqueous Phase Activated Carbon Unit * $ ________ x 1 = $ ________ $________ x 1 = $________ 175 lb. Aqueous Phase Activated Carbon Unit * $ ________ x 1 = $ ________ $________ x 1 = $________ Subtotals $_________ $_________ $________ Total for Separators, Washers and Carbon Units $________ * For use in treating water decanted from tanker trucks. Cost includes unit, one carbon charge installed, and all piping, hoses and connectors needed to hookup to a tanker truck and discharge treated water.
16
Attachment #10 Emergency Response Services - Price Schedule - Equipment
Contractor: _____________________________ Field Analytical Hourly Rate Daily Rate Mobilization/Demobilization Equipment Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total 4 Hour Response Required Mercury Vapor $________ x 1 = $________ $_______ x 1 = $________ Analyzer Mercury Vacuum With HEPA Filter $ _______ x 1 = $ ________ $ _______ x 1 = $ _______ Beta/Gamma-GM Detector and Meter $_______ x 1 = $________ $_______ x 1 = $________ $_______ x 1 = $_______ “Pancake” GM Detector and Meter $_______ x 1 = $________ $_______ x 1 = $________ $_______ x 1 = $_______ Alpha Scintillation Detector and Meter $_______ x 1 = $________ $_______ x 1 = $________ $_______ x 1 = $_______ Micro R. Meter $_______ x 1 = $________ $_______ x 1 = $________ $_______ x 1 = $_______ Gamma-Ray Spectrometry System (Portable Field Unit $_______ x 1 = $________ $_______ x 1 = $________ $_______ x 1 = $_______ Subtotals $________ $________ $_______ Total for Field Analytical Equipment $_______
17
Attachment #10 Emergency Response Services - Price Schedule - Materials
Contractor: _____________________________ Air Drill, Bonding Equipment, Fans 2 Hour Response Hours Days Mobilization/Demobilization Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total Air Powered Drill, 2 Gas Cylinders For power, 2 5/8 inch Arbor and 4- ½ inch Arbor, 2 inch Stinger, 4 inch Stinger $_______ x 5 = $________ $______ x 1 = $________ $_______ x 1 = $_______ Grounding and Bonding Equipment To Ground and Bond at least 3 Articulated Tankers $________ x 1 = $________ $_______ x 1 = $________ $_______ x 1 = $_______ Explosion-Proof Exhaust Fan, 16 inch $________ x 1 = $________ $_______ x 1 = $________ $_______ x 2 = $_______ Explosion-Proof Exhaust Fan, 20 inch $________ x 1 = $________ $_______ x 1 = $_______ $_______ x 2 = $________ Subtotals $________ $________ $________ Total for Air Drill, Bonding Equipment and Fans $________
18
Attachment #10 Emergency Response Services - Price Schedule - Materials
Contractor: _____________________________ Drums Unit Price x Units = Total 4 Hour Response Required 55 Gallon Drum Liners $_________ x 20 = $_________ Stainless Steel Drums 85 Gallon Salvage, UN1A2/X400/5 $_________ x 1 = $_________
55 Gallon, UN1A1/Y1.8/300 $_________ x 1 = $_________ Steel Drums 85 Gallon Salvage, UN1A2/X400/S $_________ x 190 = $_________ DOT 17E 55 Gal., UN1A1/Y1.8/300 $_________ x 5 = $_________ DOT 17H 55 Gal., UN1A2/Y300/S $_________ x 20 = $_________ 6E 55 Gal. Lined, UN6HA/Y1.8/100 $_________ x 1 = $_________ DOT 17e 30Gal., UN1A1/Y1.4/100 $_________ x 1 = $_________ DOT 17h 30 Gal., UN1A2/Y100/S $_________ x 5 = $_________ 15 Gallon, UN1A1/Y1.2/100 $_________ x 1 = $_________ Poly Drums Price includes delivery 85 Gallon, UN1H2/Y318/S $_________ x 60 = $_________ to the site. 55 Gallon, UN1H2/Y1.5/100 $_________ x 15 = $_________ 30 Gallon, UN1H2/Y1.5/100 $_________ x 2 = $_________ 15 Gallon, UN1H2/Y1.8/100 $_________ x 1 = $_________ 5 Gallon Bucket $_________ x 1 = $_________ Total for Drums $_________
19
Attachment #10 Emergency Response Services - Price Schedule - Materials
Contractor: _______________________________ Miscellaneous and Sorbents Not used in Water 2 Hour Response Required Unit Price x Units = Total Soda Ash (Sodium Bicarbonate) Price Per 50 lb. Bag. $_________ x 40 = $_________ Plastic Sheeting, Price Per Sheet Sheet equals 6 mil, 200 sq. yd. $_________ x 60 = $__________ Garbage Bags 55 Gallon 48 bags/box, Price Per Box $_________ x 5 = $_________ 100 bags/case, Price Per Case $_________ x 5 = $_________ Inert Gas Cylinder, Price Per Cylinder (used to create blanket atmosphere for torch cutting metal containers) $_________ x 4 = $__________ Extra Gas Cylinder For Air Drill, Price Per Cylinder $_________ x 1 = $__________ Disposable Drum Pumps Price per drum pump $_________ x 10 = $__________ Sorbents (Not for Spills into Water) Sol-Speed Dri (or other Sorbent Clay like Kitty Litter, Dri-Zorb) Price Per Bag. Bag equals 40 to 50 lbs. $_________ x 20 = $__________ Sorbent Blanket Roll (Perforated), Price Per Roll 30” x 150’, 40 gallon plus Absorbing Capacity $_________ x 15 = $_________ Vermiculite (Industrial Grade #3) (Or other Expanded Mineral like Perlite and Micafil). Price per bag. Bag = 16 to 20 lbs. $________ x 15 = $__________ Total for Miscellaneous and Sorbents (not used in water) $__________
Price includes delivery to the site.
20
Attachment #10 Emergency Response Services - Price Schedule - Materials
Contractor: _______________________________ Sorbents (For Spills in Water) Unit Price x Units = Total 2 Hour Response Required Polypropylene Sorbents (ie 3M sorbent pads, ARG-Dri, SPC Products) - Bulk Particulate, price per pound $__________ x 500 = $_________ - Sorbent Pads, Price per bale, 18 inch x 18 inch x 3/8 inch pads, $__________ x 100 = $_________ 50 pads per bale - 5 inch Sorbent Boom, price per foot $__________ x 1000 = $_________ - 8 inch Sorbent Boom, price per foot $__________ x 1000 = $_________ - Sorbent Sweeps, Price per sweep, Sweep is 19 in. wide by 100 ft. long $__________ x 100 = $_________ Total for Sorbents used in Water $_________ Price includes delivery to the site.
21
Attachment #10 Emergency Response Services - Price Schedule - Services
Contractor: _______________________________ Drum and Rolloff Storage Unit Price x Units = Total Drum Storage Storage per day per drum $_________ x 1200 = $_________ Storage per week per drum $_________ x 3200 = $_________ Rolloff Storage Storage per day per rolloff for 10 yd. rolloff $_________ x 50 = $_________ 20 yd. rolloff $_________ x 20 = $_________ 30 yd. rolloff $_________ x 10 = $_________ Rolloff Storage Storage per week per rolloff for 10 yd. rolloff $_________ x 20 = $_________ 20 yd. rolloff $_________ x 10 = $_________ 30 yd. rolloff $_________ x 5 = $_________ Emergency Opening of Storage Facility During non-business hours (per opening) $_________ x 50 = $_________ Total for Drum and Rolloff Storage $_________
22
Attachment #10 Emergency Response Services -Price Schedule - Services
Contractor: _____________________________ Non RCRA and RCRA Waste Disposal Waste Type Units Quantity x Unit Price * = Total For Disposal Non-RCRA waste with Drums 200 x $_______ = $_______ Petroleum Hydrocarbons (55 gal.) Rolloffs (20 cu. yd) 10 x $_______ = $_______ ________________________________________ Non-RCRA Drums 25 x $_______ = $_______ Combustible Liquids/ (55 gal.) Non-RCRA Petroleum Oils **
Gallons 1250 x $_______ = $_______ _________________________________________ RCRA D001-Liquids Drums 30 x $_______ = $_______ (55 gal.) Gallons 1000 x $_______ = $_______ _________________________________________ Solids Drums 60 x $_______ = $_______ Contaminated with RCRA D001 Liquids Gallons 200 x $_______ = $_______ Total for Non-RCRA and RCRA Waste Disposal $_______ Unit price includes transportation, interim storage, disposal, disposal facility fees, demurrage, state taxes, inspection fees, labor, equipment and materials. Once waste is fully identified, the State will not pay any additional costs for disposal. Price includes disposal of the container in which waste is shipped. ** These are Non Aqeous liquids with a Flash Point less than 140°F by ASTM A-93-79 or D-3278
23
Attachment #10 Emergency Response Services -Price Schedule - Services
Contractor: _____________________________ D002 and Empty Drum Waste Disposal Waste Type Units Quantity x Unit Price * = Total For Disposal RCRA D002-Liquids Drums 20 x $_______ = $_______ (55 gal.) Gallons 1000 x $_______ = $_______ ____________________________________________ Disposal of Empty Drums 100 x $_______ = $_______ Drums (55gal.) Total for D002, and Empty Drum Disposal $_______ * Unit price includes transportation, interim storage, disposal, disposal facility, fees, demurrage, state taxes, inspection fees, labor, equipment and materials. Once waste is fully identified, the State will not pay any additional costs for disposal. Price includes disposal of the container in which waste is shipped. Disposal of empty drums is only for drums that are empty when removed from the site unless otherwise specified by the OSC.
24
Attachment #10 Emergency Response Services - Price Schedule
Contractor: _________________________________ Material Recycling Material Type Units Quantity x Unit Price = Total For Reuse Soil contaminated with Non-RCRA Petroleum Hydrocarbons, Drums 100 x $________ = $________ Recycling (55 gal.) Rolloffs 10 x $________ = $________ (20 cu. yd.) Tons 200 x $________ = $________ This reuse method will be available during the period *______________ to _______________. (month) (month) _________________________________________ Non-RCRA Liquid Drums 100 x $________ = $________ Petroleum Oils, Recycling (55 gal.) Gallons 1250 x $________ = $________ This reuse method will be available during the period *______________ to ______________. (month) (month) Total for Material Recycling $_________ * Note: Method must be available for at least 5 months. May 1 to September 30 will be default time if no dates are given. Longer time frames will
have no effect on contract award.
25
Attachment #10 Emergency Response Services - Price Schedule - Explosives
Contractor: _____________________________
Hourly Rate Daily Rate Mobilization/Demobilization Equipment Rate x Hours = Total Rate x Days = Total Rate x Mobs = Total 4 Hour Response Required Explosives, Related Material Explosive Vehicle/ Trailer $_________ x 2 = $_________ $_________ x 1 = $__________ $________ x 1 = $_________ Bomb Blanket $_________ x 1 = $_________ $________ x 1 = $_________ $________ x 1 = $_________ Bomb Suits $_________ x 13 = $_________ $________ x 1 = $_________ $________ x 2 = $_________ Remote Small Container Open/Penetrator $_________ x 1 = $________ $________ x 1 = $_________ $________ x 1 = $_________ Blaster Unit $_________ x 1 = $________ $________ x 1 = $_________ $________ x 1 = $_________ Subtotals $_________ $_________ $_________ Total Explosive Related Material Rates $_________
26
Attachment #10 Emergency Response Services - Price Schedule
Contractor: ______________________________ Price Summary Sheet Totals 1. Total Mobilization/Demobilization for Personnel (Page 1) $__________ 2. Total Monday-Friday, All Shifts (Page 2) $__________ 3. Total Saturday - All Shifts (Page 3) $__________ 4. Total Sundays and Holidays, All Shifts (Page 4) $__________ 5. Total for Trucks (Page 5) $__________ 6. Total for Utility Vehicles (Page 6) $__________ 7. Total for Heavy Equipment (Page 7) $__________ 8. Total for Backhoe/Sweeper (Page 8) $__________ 9. Total for Pumps (Page 9) $__________ 10. Total for Equipment (Page 10) $__________ 11. Total for Containment Boom and Rope (Page 11) $__________ 12. Total for Rolloffs and Miscellaneous (Page 12) $__________ 13. Total for Rolloffs and Miscellaneous (Page 13) $__________ 14. Total for Portable Holding Tanks, and Sanitation Unit (Page 14) $__________ 15. Total for Separators, Washers and Carbon Units (Page 15) $__________ Subtotal, Page 26 $__________
27
Attachment #10 Emergency Response Services - Price Schedule
Contractor: ______________________________ Price Summary Sheet Totals Subtotal, from previous Page 26 $__________ 16. Total for Field Analytical Equipment (Page 16) $__________ 17 Total Air Drill, Bonding Equipment and Fans (Page 17) $__________ 18. Total for Drums (Page 18) $__________ 19. Total for Miscellaneous and Sorbents (not used in water) (Page 19) $__________ 20. Total for Sorbents used in Water (Page 20) $__________ 21. Total for Drum and Rolloff Storage (Page 21) $__________
22. Total for Non-RCRA and RCRA Waste Disposal (Page 22) $__________ 23. Total for D002, and Empty Drum Disposal (Page 23) $__________ 24. Total for Material Recycling (Page 24) $__________
25. Total Explosives Related Material (Page 25) $__________ Total Bid Price (Total Pages 26 and 27) $__________ Note: All totals are to be carried forward from the pages indicated.