Site BinderTelkomsel Tinem Project
Site Region : JabodetabekSite ID / Name : SKB045/NAGRAK2MW
Site Location : Jl.Raya Cikidang, RT.01/02, Kel.Pamuruyan,Kec.Cibadak, Sukabumi.BTS Type : DBS 3900 Outdoor
Template confirm by:
TELKOMSEL :
HUAWEI:
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 2/22
SITE ACCEPTANCE DOCUMENT CHECKLIST
Hereby stated description and item below refer to the documents attached have been approved forconstruction:
No. Table of ContentsChecked
RemarksHUAWEI TELKOMSELBTS 2G
1 BOQ for BTS 2G N/A2 ATP for BTS 2G N/A
A. BSS N/AB. Microwave N/AC. Power Supply N/A
Node B 3 BOQ for NodeB4 ATP for NodeB
A. Node BB. MicrowaveC. Power Supply
AS BUILT DOCUMENTATION 5 A. Site Location
B. ShelterC. DDF BOX
D. EAC BoxE. FEP(For New TK site)F. Feeder and Jumper CableG. Grounding BarH. BTS CabinetI. DCPDBJ. Battery and RectifierK. AntennaL. Equipment Room layout(For New TKsite)VSWR Measurement
6 2G VSWR Test N/ANodeB VSWR Test
Submitted by Approved by
Region
Name
DATE
SIGNATURE
SITE ID / NAME : SKB045/NAGRAK2MWREGION : JabodetabekSITE TPYE : Outdoor
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 3/22
3 . BOQ FOR NodeBNo. Model Description
Quantity
Existing Add Total
1BTS3900 WCDMA S2/2/2 (Band 1 2100MHz,CE U: 768 D: 768, DC -48V) Version:V200R011/ H82
0 1 1
> Hardware
Main Equipment
QW-BBUU BBU3900, QWLM1BBU2 Distributed Base Station BaseBand Unit (-48 V, Without GPS) 0 1 1
SS-DL-8E1-120-10 Trunk Cable, 15m, 120ohm, 4E1, 0.4mm, D26(3ROW), 120CC8PO.4P430U (S) 0 1 1
QW-RRUD RRU3804C,QWEM1RRUD,Distributed Base StationRadio Remote Unit(-48V,40W,1.25G) 0 0 0
eSFP-850nm-1000Base-Sx/FC200 MMOptical Transceiver,ESFP,1310nm,STM1,-15~-8dBm,-31dBm,LC,SM,15km 0 6 6
No. Model DescriptionQuantity
Existing Add Total
1BTS3900A WCDMA S2/2/2 (Band 12100MHz, CE U: 1152 D: 1152, DC -48V)Version: V200R011/ H37
0 0 0
> Hardware
Main Equipment
QW-BBUU BBU3900, QWLM1BBU2 Distributed Base Station BaseBand Unit (-48 V, Without GPS) 0 0 0
SS-DL-8E1-120-10 Trunk Cable, 20m, 120ohm, 4E1, 0.4mm, D26(3ROW), 120CC8PO.4P430U (S) 0 0 0
QW-RRUD RRU3804C,QWEM1RRUD,Distributed Base StationRadio Remote Unit(-48V,40W,1.25G) 0 0 0
eSFP-850nm-1000Base-Sx/FC200 MM Optical Transceiver,eSFP,850nm,2.125Gb/s (Multi rate), -9.5~-2.5dBm,-17dBm,LC,MM,0.5Km 0 0 0
2 APM for WCDMA
S4020922 APM Support 0 0 0
* Site BOQ will base on the actual install material
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 4/22
ATP BTS 3G
SITE REGION : JabodetabekSITE ID : SKB045SITE LOCATION : Jl.Raya Cikidang, RT.01/02,
Kel.Pamuruyan, Kec.Cibadak,Sukabumi.
BTS TYPE : DBS 3900 Outdoor
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 5/22
4 .BTS 3G Acceptance Test Procedure4.1 Installation Checklist
4.1.1 Indoor Installation Checklist4.1.2 Outdoor Installation Checklist
4.2 Environment Monitoring Functional Test4.3 VSWR Test
4.3.1 Feeder System Test4.4 BTS Commissioning Record
4.4.1Network Parameter Checklist4.5 Stand Alone Test
4.5.1 DBS3800 Basic function Checklist4.6 Integration Test
4.6.1 Basic services Checklist4.6.2 Handover test4.6.3 24 Hours Stability Test4.6.4 Alarm query test
4.7 Punch List Summary
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 6/22
4.1 Installation Checklist
4.1.1 Indoor Installation Checklist
SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
Equipment overall conditionProcedure Pass Fail N/A Remark Audit
1 Visually inspect the cabinets for any damage.
2 Check that the cabinet doors and locks operatecorrectly. (applicable for outdoor Equipment)
RemarksSite Documentation
Procedure Pass Fail N/A Remark Audit
3Check that the equipment is installed according tothe as plan site design package.
4 Check that the indoor cable ladder is installedaccording to the as plan side design package(applicable for Indoor Equipment)
RemarksCivil Works Check
Procedure Pass Fail N/A Remark Audit
5 Check that the cabinets have been securelyfastened and are leveled correctly.
6Check that indoor cable ladder above the cabinethas been installed correctly (applicable for IndoorEquipment).
7 Check that the DDF are grounded to the maingrounding bus bar.
Remarks
Equipment Specific Checks
Procedure Pass Fail N/A Remark Audit
8 Check that all equipment internal cables arecorrectly installed and labeled.
9Check that the cabinet blanking panels have beeninstalled.
Remarks
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 7/22
Cabinet External Cabling Check
Procedure Pass Fail N/A Remark Audit
10Check each the equipment rack is grounded tothe main grounding bus bar and labeled.
11 Check that the A-Bis and A PCM cables areconnected to the correct position of DDF.
12Check that the alarm cabling has beenconnected from the BTS to the DDF
13 Check that the extension cabinet cables arecorrectly connected and labeled.
14 Check that the feeder jumper cables aretightened all the NodeB.
15 Check that the external cabinet cabling hasbeen cable tied to the cable ladder.
16 Check that the indoor feeder cable labeling iscorrect.
17 Check that the DC power cable is the correctsize and is terminated correctly.
18 Check the transmission cables, DC Cables andfeeder jumpers are be correctly labeled
19 Check that accessory equipment is installedcorrectly.
Remarks
Final Checks
Procedure Pass Fail N/A Remark Audit
20 Check that all installation and packing materialshave been removed from the site.
Remarks
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 8/22
4.1.2 Outdoor Installation Checklist
SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
Antennas
Procedure Pass Fail N/A Remark Audit
21 Visually inspect the antennas and feeders forany installation damage.
22 Check that the correct type of antenna hasbeen installed.
Remarks
Feeders
Procedure Pass Fail N/A Remark Audit
23 Check that the bending radius of all feedersis greater than 20 x Ǿ.
24 Check that outdoor feeder labeling is correctat the top and the bottom of the tower.
25 Check that the top feeder grounding iscorrectly terminated.
Remarks
Connectors
Procedure Pass Fail N/A Remark Audit
26 Check that all top feeder connectors are tight.
27 Check that all top feeders to jumperconnections are tight.
28Check that all top jumpers to antennaconnections are tight.
Remarks
Weather sealing
Procedure Pass Fail N/A Remark Audit
29 Check all top grounding kits are weather-sealed correctly.
30Check all feeders to jumper connections areweather-sealed correctly.
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 9/22
31 Check all jumpers to antenna connectionsare weather-sealed correctly.
Remarks
Antenna Steelwork
Procedure Pass Fail N/A Remark Audit
32 Check that the antenna supporting steelworkis correctly installed.
33 Check all antenna mounting clamps andbrackets have been tightened.
Remarks
Antenna Installation Check
Procedure Pass Fail N/A Remark Audit
34 Check that the antennas are mounted at thecorrect height.
35 Check that the direction of all antennas in allsectors is correct.
Remarks
Antenna Installation Date
Antenna Sector 1 Sector 2 Sector 3
Height IBC 50 M IBC 50 M IBC 50 M
Direction IBC 100 Deg IBC 210 Deg IBC 330 Deg
Down tiltM/E
IBC 2 Deg IBC 2 Deg IBC 2 Deg
Remarks
Outdoor Site Documentation
Procedure Pass Fail N/A Remark Audit
36Check that the antenna layout is according tothe site drawing.
37Check that the feeder cable ladder isinstalled as per the site drawing.
38Check that the feeder gland plate is installedas per the site drawing (applicable for IndoorE ui ment
Remarks
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 10/22
SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
Civil Works Inspection
Procedure Pass Fail N/A Remark Audit
39 Check that the feeder cable ladder iscorrectly installed
40Check that the feeder grand plate has beencorrectly installed (applicable for IndoorEquipment).
Remarks
Feeder Grounding
Procedure Pass Fail N/A Remark Audit
41 Check number/location of feeder groundingkits.
42 Check all bottom grounding are correctlyterminated
43 Check all bottom grounding kits are weathersealed correctly.
Remarks
Concluding Checks
Procedure Pass Fail N/A Remark Audit
44 Check that all installation and packingmaterials have been removed from the site.
Remark
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 11/22
4.2 Environment Monitoring Functional Test
4.2.1 Basic Shelter Environment Monitoring Functional Test For Indoor NodeB
SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
NO Test Description Pass Fail N/A Remark Audit
Basic Shelter alarm test( only for the indoor NodeB)
1 Temperature alarm
2 Door Open alarm
Notes :
1: These 2 alarm only provided for the new site;2: For swap, collocation sites , these two alarm refer to next page.
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 12/22
4.2.2 External Environment Monitoring Functional Test
SITE : NAGRAK2MW SITE CONFIG : 1/1 DATE:
Port
Number
External Alarmnumber
PortNumber
in NodeBSoftware
External Alarm
ID inM2000
External Alarm number
NameSeverity
Polarity ValidLevel
Pass Fail N/A Remark
1
1
0
65426 Mains Fail AL3 Open
19 65462 Mains Fail(Simpul 2G) AL3 Open
20 65464 Mains Fail(Simpul 3G) AL3 Open
21 65466 Mains Fail(Simpul2G&3G) AL3 Open
2 2 1 65428 Module Rectifier Fail AL3 Open
3 3 2 65430 Battery Fuse Fail AL3 Open
4 4 3 65432 Load Fuse Fail AL3 Open
5 5 4 65434 Battery Low Voltage AL3 Open
6 6 5 65436 Genset Running AL3 Open
7 7 6 65438 Genset Failed AL3 Open8 8 7 65440 High Temperature AL3 Open9 9 8 65442 Door open AL1 Open
10 10 9 65444 Battery Burglar AL3 Open11 11 10 65446 Grounding Burglar AL3 Open12 12 11 65448 Battery Charging AL1 Open
13 13 12 65450 AC Burglar AL3 Open
14 14 13 65452 Mains Rect Trans Fail AL3 Open
15 15 14 65454 Module Rect Trans Fail AL3 Open
16 16 15 65456 Battery Fuse Trans Fail AL3 Open
17 17 16 65458 Load Fuse Trans Fail AL3 Open
18 18 17 65460 Battery Trans LowVoltage AL3 Open
19 - 18 - - -
20 - 19 - - -
21 - 20 - - -
22 - 21 - - -
23 - 22 - - -
24 - 23 - - -
Notes :1:The alarm items from the 1th to 5th need be provided and tested,2:The 6 th and 7 th alarm will be test if there is Gunset and the alarm port is be provided and is available.3:The other actual Items of External alarms depend on the how many items that could be provided by
TELKOMSEL.4:The “N/A” will be filled if the signal of alarm is not be provided or i t is not be available in the current network.
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 13/22
4.3 NODE B VSWR Test
4.3.1 Feeder System List
SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
VSWR TEST
No. RRUBoard RRU Panel N port VSWR Feeder Length(m) Distance To Fault (DTF) Audit
1 RRU 0RRU _TXM 1.1 Optic - M CRO
RRU _TXD 1.1 Optic - M CRO
2 RRU 1RRU _TXM 1.1 Optic - M CRO
RRU _TXD 1.1 Optic - M CRO
3 RRU 2RRU _TXM 1.1 Optic - M CRO
RRU _TXD 1.1 Optic -M CRO
Notes :1. VSWR value shall be refer to the specification manual from the supplier2. Setting at site master for cable 7/8" (VF and cable loss shall refer to the specification manual from thesupplier).3. Setting at site master for cable 1-5/8" (VF and cable loss shall refer to the specification manual from thesupplier).4. VSWR ≤ 1. 25. DTF test will be carried out according to the test procedure and test result included in the testdocumentation.
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 14/22
4.4 BTS Commissioning Record
4.4.1. Network Parameter ChecklistSITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
Cell parameter Plan Actual Remark
Sector 1
CI - 60451
Antenna direction(Azimuth)
100 100 M CRO
Antenna Tilt (M+E)(Degree)
2” 2” M CRO
Sector 2
CI - 60452
Antenna
direction(Azimuth)
210 210 M CRO
Antenna Tilt (M+E)(Degree)
2” 2” M CRO
Sector 3
CI - 60453
Antennadirection(Azimuth)
330 330 M CRO
Antenna Tilt (M+E)(Degree)
2” 2” M CRO
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 15/22
4.5 Stand Alone Test
4.5.1 DBS3800 Basic function Checklist
Test category Test item Test sub-item Test result Audit
T01Hardware
T01-01
Power-on StatusCheck
T01-0101 Power-on check ofBBU3806 Pass Fail NA
T01-0102 Power-on check ofRRU Pass Fail NA
T01-02Hardware StatusCheck
T01-0201 Status check ofBoards Pass Fail NA
T01-03
Port StatusCheck
T01-0301 Status Check ofE1/T1 Ports of Iub Interface Pass Fail NA
T01-0302 Status Check of
Local Ethernet PortPass Fail NA
T02Operation andMaintenance
T02-01EquipmentManagement
T02-0101 System Restart Pass Fail NA
T02-0102 BBU/RRU Blockingand Unblocking Pass Fail NA
T02-0103 Online Local CellManagement Pass Fail NA
T02-0104 Online Local CellOperations Pass Fail NA
T02-0105 Online Logical CellData Query Pass Fail NA
T02-02MaintenanceChannelManagement
T02-0201 Local Maintenancethrough Local Ethernet Port Pass Fail NA
T02-03PerformanceManagement
T02-0301 RTWPMeasurement Monitoring Pass Fail NA
T02-0302 Cell ServiceResource Query Pass Fail NA
T02-0303 RRU Output PowerMonitering Pass Fail NA
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 16/22
4.6 Integration Test
4.6.1 Basic services checklist SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
Basic Service TestCell No. Test Item Pass Fail Remark
Cell 1
Incoming Call(3G-3G)
Incoming Call(2G-3G)
Incoming Call(PSTN-3G)
Outgoing Call(3G-3G)
Outgoing Call(3G-2G)
Outgoing Call(3G-PSTN)
SMS Incoming
SMS OutgoingHSDPA Browsing
HSDPA Downlink
Cell 2
Incoming Call(3G-3G)
Incoming Call(2G-3G)
Incoming Call(PSTN-3G)
Outgoing Call(3G-3G)
Outgoing Call(3G-2G)
Outgoing Call(3G-PSTN)
SMS IncomingSMS Outgoing
HSDPA Browsing
HSDPA Downlink
Cell 3
Incoming Call(3G-3G)
Incoming Call(2G-3G)
Incoming Call(PSTN-3G)
Outgoing Call(3G-3G)
Outgoing Call(3G-2G)
Outgoing Call(3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 17/22
4.6.2 Handover Test
SITE : NAGRAK2MW SITE CONFIG: 1/1 DATE:
Call Test
Origin
Cell
Target
Cell
Target CellPass Fail Remark Audit
ARFCN/BCCH S-code/BSIC
CELL1
CELL2 60452 224
CELL3 60453 232
CELL(2G)A
CELL2
CELL1 60451 216
CELL3 60453 232CELL(2G)B
CELL3
CELL1 60451 216
CELL2 60452 224
CELL(2G)C
CELL(2G)A CELL 1 60451 216
CELL(2G)B CELL 2 60452 224
CELL(2G)C CELL 3 60453 232
Notes: 1. In the Target cell column, the parameter ARFCN &S-code is for 3G cell, the parameter BCCH &BSIC is for 2G cell.2. Verify with the TOC if inter site neighbor relationship has been defined before test .3. GSM 2G cell mush add corresponding 3G neighbor cell.
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 18/22
4.6.3 24 Hours Stability Test
Site Name : NAGRAK2MWCheck Result:
OK
--This is to be confirmed that the BTS 3G has been running at least 24 hours without anyrelated self Fault
Remarks
Notes: The 24 hours is to be done in TOC/NOC, which will be passed if NODEB is normal operation and no alarm.
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 19/22
4.6.4 Alarm query test
Site Name : NAGRAK2MWCheck Result:
OK
1 This test will be done from OMC (Region TOC)
2 This is to be confirmed that the BTS alarm is visible and there are no active alarms
Remarks
Notes: if the site is no active alarms then write “OK, no active alarm”, otherwise record the alarm information in detail
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 20/22
4.7 Punch List Summary
Site Name :
No.
NAGRAK2MWCheck Result:
Note:Please record the items and detail description if there is any items that can not be complete the test or check.
Items DescriptionRectified By
RemarkHUAWEI TELKOMSEL
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 21/22
5. AS BUILT DOCUMENTATIONNo. 2G 3G Remark
A. Si te Locat ion1 Site Location
B. Shelter1 Shelter and Tower / Pondation2 Top Of Indoor Shelter3 Left Side of Indoor Shelter4 Right Side of Indoor Shelter
C. DDF Box1 DDF Box (Open)2 DDF Box (Closed)
D. EAC Box.
1 EAC BoxE. FEP1 FEP Indoor2 FEP Outdoor
F. Feeder and Jumper Cable1 Outdoor Feeder Label2 Indoor Feeder Label3 Feeder Route Bending from
Beside4 Feeder Under Tower5 Feeder Route Below Bending
radius through FEP6 Indoor Feeder Installation7 Jumper Indoor
G. Grounding1 Indoor Grounding Bar2 EGB at Top (Tower)3 EGB at Center (Tower)4 EGB at Bottom (Tower)5 EGB Outdoor Shelter6 Grounding Cabinet
7 Grounding of FeederH. BTS Cabinet
1 BTS Cabinet (Open)2 BTS Cabinet (Closed)
I. ACPDB1 ACPDB
J. Battery and Recti fier1 Rectifier (Open)2 Rectifier Cabinet (Closed)3 1 st Bank Of Battery4 2 nd Bank Of Battery
K. Antenna
7/17/2019 07052011200002
http://slidepdf.com/reader/full/07052011200002 22/22
1 Antenna Position2 Cell A Antenna Installation3 Cell A Antenna Direction4 Cell A Tilting Antenna5 Cell B Antenna Installation6 Cell B Antenna Direction7 Cell B Tilting Antenna8 Cell C Antenna Installation9 Cell C Antenna Direction
10 Cell C Antenna TiltingL. Equipment Room layout(For New TK site)
1 Equipment Room layout