Project ManageMent
© ABLE Instruments & Controls Ltd. Est 1985.
Project Orders
Project Orders are generally high value, complex to execute and require a significant level of management, engineeringand documentation.The term is used for orders normally relating to constructionor expansion Projects within the major process industries,in particular Oil & Gas.Whilst volatile in their value and timing, they form a significant part of ABLEs business planning, turnover and staffing.During the early 1990s this area was actively targeted for growth resulting in the infrastructure and expertise present within the company today.
© ABLE Instruments & Controls Ltd. Est 1985.
Project Management
‣ Meeting Contractual Requirements‣ Performing to Milestones‣ Understanding Technical Specifications‣ Quality & HSE Planning & Control‣ Planning, Scheduling & Progression‣ Document Submission, Approval & Control‣ Expediting Sub-Suppliers‣ Value Added Manufacture‣ Inspection & Acceptance Processes‣ Consolidation, Packing, Storage & Shipment
© ABLE Instruments & Controls Ltd. Est 1985.
Project Team
‣ Dedicated Projects Manager‣ Specific Project Engineer assigned to life cycle of the order‣ In House Engineering & Design Capability, including PED
& ASME‣ Full CAD Facilities‣ Computer Managed Document Control
© ABLE Instruments & Controls Ltd. Est 1985.
Package Procurement
Package Procurement is the utilisation of ABLE as a supplier for a multitude of varied instrumentation products from a number of sub-suppliers, achieved via a single contract.An increasing area of ABLEs business, our first Package Procurement order was received in the mid 1990s.Subsequent orders include complete supply of entire Project instrumentation requirements, inclusion of equipment outside of the standard instrumentation scope and order values in excess of £1M.
© ABLE Instruments & Controls Ltd. Est 1985.
Why Package Procurement?
‣ Reduced resource costs associated to individual RFQs, evaluation, negotiation and multiple order placement
‣ Reduced costs associated to multiple order management, expediting, document control and equipment inspection
‣ Single point of contact and responsibility‣ Consolidation of equipment for inspection, bespoke
packing and shipment
© ABLE Instruments & Controls Ltd. Est 1985.
Why Able?
ABLEs comprehensive range of instrumentation, competitive management fees, and partnerships with other instrumentation suppliers provides end-users with substantial overall cost savings.Our experienced engineers offer technical assistance in instrument selection and our expertise in this arena is second to none.In addition, commissioning and maintenance packages can be provided for all instruments supplied.
As an independently owned company, ABLE is capable of supplying instrumentation in accordance with client or contractor Vendor Lists or offer the most commercially attractive, technically compliant equipment from any qualified source.
© ABLE Instruments & Controls Ltd. Est 1985.
Project Example
Gorgon LNGClient: ChevronContractor: MW KelloggLocation: Australia
Project Information: Gas Processing Plant and LNG TerminalEquipment: 295 x V-Cone FlowmetersInformation: Largest single order executed by ABLE. Significant logistical management and material control due to multiple delivery points and the fragile ecological nature ofthe final destination
© ABLE Instruments & Controls Ltd. Est 1985.
Project Example
Gorgon LNG
$13, 232, 430. 05
© ABLE Instruments & Controls Ltd. Est 1985.
Project Example
Clair RidgeClient: BPContractor: AMECLocation: UK North Sea
Project Information: Two Bridge Linked PlatformsEquipment: 2 x Flare Gas MetersDetails: BPs first platform construction since Deepwater Horizon incident. ABLE in receipt of multiple flowmeter orders including V-Cones, VA Meters, Orifice & Restriction Orifice Plates
© ABLE Instruments & Controls Ltd. Est 1985.
Project Example
Clair Ridge
© ABLE Instruments & Controls Ltd. Est 1985.
Package Procurement Example
SaqqaraClient: BPContractor:Kellogg Brown & RootLocation: Egypt
Project Information: Offshore Platform and Onshore Separation & Gas Processing PlantEquipment: MIV Package of all Instrument RequirementsDetails: Order quadrupled in value during supply cycle to more than £1.2M. High level of document control, consolidation and logistic involvement. Separate contract received for site commissioning
INSPECTION AND TEST PLANCUSTOMER : KBRREV. DATE ORIG'R CHECK'D APP'D INSPECTION REQUIREMENTS
CLIENT : BP Exploration (Delta) Ltd01 18/08/06 RMB RS
PROJECT : Saqqara02 08/01/07 RMB RS KEY TO INSPECTION CODES :
ORDER NO. : SAQQ-0001-PIC02A03
RS MPEQUIPMENT : FIELD INSTRUMENTS
04RS MP
R - Review H - Hold
ABLE REF : XPK003965705
W - Witness M - Monitor
ITEM NO. : ALL06
WD - Waived
CUSTOMER
1.0 DIFFERENTIAL PRESSURE INDICATING TRANSMITTER1.1 Performance Test Performance Test procedure Performance Test procedure Performance Test Results M
1.2 Calibration Manufacture Procedure Manufacture Procedure Test & Calibration Certificate M
1.3 Pressure Test Pressure Test Procedure Pressure Test Procedure Pressure Test Certificate R1.4 Hazardous Area Certification
Certificate R
1.5 Material Test Certification
Certificates R
1.6 Material Traceability RecordsCertificates R
1.7 Certificate of Conformance
C of CR
1.8 Concession Request
DDR NoR
1.9 Dimensional Check GA DrawingInsp. Release/Waiver Note M
NOTE: W* 10% Witness
2.0 FLOW INDICATING DP TRANSMITTERS
2.1 Performance Test Performance Test procedure Performance Test procedure Performance Test Results M
2.2 Calibration Manufacture Procedure Manufacture Procedure Test & Calibration Certificate M
2.3 Pressure Test Pressure Test Procedure Pressure Test Procedure Pressure Test Certificate R2.4 Hazardous Area Certification
Certificate R
2.5 Material Test Certification
Certificates R
2.6 Material Traceability RecordsCertificates R
2.7 Certificate of Compliance
C of CR
2.8 Certificate of Conformance
DDR NoR
2.9 Dimensional Check GA DrawingInsp. Release/Waiver Note M
NOTE: W* 10% Witness
3.0 PRESSURE INDICATING TRANSMITTERS
3.1 Performance Test
Performance Test Results M3.2 Calibration Manufacture Procedure Manufacture Procedure Test & Calibration Certificate M
3.3 Pressure Test Pressure Test Procedure Pressure Test Procedure Pressure Test Certificate R3.4 Hazardous Area Certification
Certificate R
3.5 Material Test Certification
Certificates R
3.6 Material Traceability RecordsCertificates R
3.7 Certificate of Conformance
C of CR
3.8 Concession Request
DDR NoR
3.9 Dimensional Check GA DrawingInsp. Release/Waiver Note M
NOTE: W* 10% Witness
4.0 TEMPERATURE INDICATING TRANSMITTER4.1 Performance Test Performance Test procedure Performance Test procedure Performance Test Results M
4.2 Calibration Manufacture Procedure Manufacture Procedure Test & Calibration Certificate M
4.3 Press Testing of Thermowells Pressure Test Procedure Pressure Test Procedure Pressure Test Certificate R
4.4 NDE of Thermowells NDE Procedure NDE Procedure NDE Record R4.5 Hazardous Area Certification
Certificate R
4.6 Material Test Certification
Certificates R
4.7 PMI of Thermowells PMI Procedure PMI Procedure PMI Report R
4.8 Material Traceability RecordsCertificates R
4.9 WPQ Certificates
Certificates R
4.10 NDE Operator QualificationsCertificates R
4.11 Certificate of Conformance
C of CR
4.12 Concession Request
DDR NoR
4.13 Painting Inspection Approved Docs & Dwgs Approved Docs & Dwgs Painting Inspection Report M
4.14 Dimensional Check GA DrawingInsp. Release/Waiver Note M
NOTE: W* 10% Witness
5.0 HAND HELD HART COMMUNICATOR
5.1 Hazardous Area CertificationCertificate R
5.2 Concession Request
DDR NoR
5.3 Dimensional Check GA DrawingInsp. Release/Waiver Note M
6.0 PIG DETECTOR
6.1
RRR
W
RRRRR
RRRRRR
W*
Performance Test procedure PIC02AH0303Instrument Datasheet PIC02AC0301
Performance Test procedure PIC02AH0303
VERIFYING DOCUMENT VENDOR SUB-VENDOR
ACTIVITY No ACTIVITY DESCRIPTION PROCEDURE / DRAWING /
SPECIFICATION ACCEPTANCE CRITERIA
KBR BP / GUPCO TPI/CAQC
CJT
CJT
RMB05/07/07
06/08/07 RMB
W
W
W*W
RRRRRR
R
R
WW*
RRR
RR
W
W*W
W
RRRRR
SDRL CAT.SEQUENCE
NUMBER
SUPPLIERS DOCUMENT No.
PLANNED SUBMISSION DATE
REVIEW REQUIREMENT
INCLUDE IN MANUALLIFE CYCLE
CODE
PRIME SDRL CODE
ELECTRONIC FORMAT
A 0001
SDR-39657 23 August 2006 RA01 Excel
A 0003
PR-39657 23 August 2006 FA03 Word
A 0004
BOIL-39657 23 August 2006 FA04 Excel
A 0005
CT-39657 04 October 2006 R ALL A05 Excel
C 0001
WDS-39657 04 October 2006 R R02 C05 Excel
C 0002
SHAC-39657 01 November 2006 R R02 C08 Excel
C 0003
DCT-39657 01 November 2006 RC99 Excel
G 0001
PPP-39657 13 December 2006 R R01 G02 Acrobat
H 0001
QP-39657 23 August 2006 R R05 H02 Excel
H 0004
ITP-39657 20 September 2006 R R05 H03 Excel
H 0002
WP-39657 01 November 2006 R R05 H07 Word
H 0003
HSEP-39657 23 August 2006 R R05 H08 Acrobat
J 0001
SUC-39657 27 December 2006 R R03 J02 Excel
J 0002
TYO-39657 27 December 2006 R R03 J03 Excel
J 0003
CIS-39657 27 December 2006 R R03 J04 Excel
K 0001
WRC-39657 21 February 2007 S R04 K05 Excel
N 0001
RN-39657 21 February 2007 S R01+ R04 N07 As supplied
N 0002
CR-39657 AS RAISED R R01+ R04 N09 Word
N 0003
CC-39657 21 February 2007 S R01+ R04 N11 Acrobat
P 0001 Surface Preparation, Painting and Internal Coating Procedures SPP-39657 06 September 2006 R R05 P04 Acrobat
R 0001
DD-39657 21 February 2007 SR01 Acrobat
R 0002
OM-39657 27 December 2006 RR02 Acrobat
R 0003
MM-39657 27 December 2006 RR03 Acrobat
R 0004
CDB-39657 21 March 2007 RR04 Acrobat
R 0005
MR-39657 21 March 2007 RR05 Acrobat
B 0101
GA-39657-01 10 May 2006 R R03 B01 Acrobat
B 0102
GA2-39657-01 06 September 2006 R R03 B01 Acrobat
C 0101
IDS-39657-01 10 May 2006 R R02 C15 Acrobat
C 0102
IDS2-39657-01 06 September 2006 R R02 C15 Acrobat
D 0101
CSV-39657-01 07 June 2006 R R02 + R03 D01 Acrobat
G 0101
EIP-39657-01 19 June 2006 R R01 G01 Acrobat
H 0101
QMSC-39657-01 26 April 2006 R R05 H01 Acrobat
H 0102
PTP-39657-01 17 July 2006 R R05 H04 Acrobat
H 0103
ATP-39657-01 17 July 2006 R R05 H05 Acrobat
K 0101
PTR-39657-01 28 August 2006 S R04 K01 Acrobat
K 0102
HAC-39657-01 14 August 2006 S R04 K08 Acrobat
K 0103
PTR2-39657-01 10 January 2007 S R04 K01 Acrobat
K 0104
HAC2-39657-01 27 December 2006 S R04 K08 Acrobat
L 0101
MTC-39657-01 14 August 2006 S R05 L01 Acrobat
L 0105
MTR-39657-01 28 August 2006 S R05 L07 Acrobat
L 0102
MTC2-39657-01 27 December 2006 S R05 L01 Acrobat
L 0103
MTR2-39657-01 10 January 2007 S R05 L07 Acrobat
N 0101
PTC-39657-01 28 August 2006 S R04 + R05 N01 Acrobat
N 0102
ITCC-39657-01 28 August 2006 S R01+ R04 N02 Acrobat
N 0103
CCOM-39657-01 28 August 2006 S R01+ R04 N06 Acrobat
N 0104
PTC2-39657-01 10 January 2007 S R04 + R05 N01 Acrobat
N 0105
ITCC2-39657-01 10 January 2007 S R01+ R04 N02 Acrobat
N 0106
CCOM2-39657-01 10 January 2007 S R01+ R04 N06 Acrobat
B 0201
GA-39657-02 10 May 2006 R R03 B01 Acrobat
C 0201
IDS-39657-02 10 May 2006 R R02 C15 Acrobat
D 0201
CSV-39657-02 07 June 2006 R R02 + R03 D01 Acrobat
G 0201
EIP-39657-02 19 June 2006 R R01 G01 Acrobat
H 0201
QMSC-39657-02 26 April 2006 R R05 H01 Acrobat
H 0202
PTP-39657-02 17 July 2006 R R05 H04 Acrobat
H 0203
ATP-39657-02 17 July 2006 R R05 H05 Acrobat
K 0201
PTR-39657-02 28 August 2006 S R04 K01 Acrobat
K 0202
HAC-39657-02 14 August 2006 S R04 K08 Acrobat
L 0201
MTC-39657-02 14 August 2006 S R05 L01 Acrobat
L 0205
MTR-39657-02 28 August 2006 S R05 L07 Acrobat
N 0201
PTC-39657-02 28 August 2006 S R04 + R05 N01 Acrobat
N 0202
ITCC-39657-02 28 August 2006 S R01+ R04 N02 Acrobat
N 0203
CCOM-39657-02 28 August 2006 S R01+ R04 N06 Acrobat
B 0301
GA-39657-03 10 May 2006 R R03 B01 Acrobat
B 0302
GA2-39657-03 29 June 2006 R R03 B01 Acrobat
B 0303
GA3-39657-03 06 September 2006 R R03 B01 Acrobat
C 0301
IDS-39657-03 10 May 2006 R R02 C15 Acrobat
C 0302
IDS2-39657-03 29 June 2006 R R02 C15 Acrobat
C 0303
IDS3-39657-03 06 September 2006 R R02 C15 Acrobat
D 0301
CSV-39657-03 07 June 2006 R R02 + R03 D01 Acrobat
G 0301
EIP-39657-03 19 June 2006 R R01 G01 Acrobat
H 0301
QMSC-39657-03 26 April 2006 R R05 H01 Acrobat
H 0302
PTP-39657-03 17 July 2006 R R05 H04 Acrobat
H 0303
ATP-39657-03 17 July 2006 R R05 H05 Acrobat
H 0304
PMIP-39657-03 13 July 2006 R R05 H11 Acrobat
K 0301
PTR-39657-03 28 August 2006 S R04 K01 Acrobat
K 0302
HAC-39657-03 14 August 2006 S R04 K08 Acrobat
K 0303
PTR2-39657-03 02 November 2006 S R04 K01 Acrobat
K 0304
PTR3-39657-03 10 January 2007 S R04 K01 Acrobat
L 0301
MTC-39657-03 14 August 2006 S R05 L01 Acrobat
L 0305
MTR-39657-03 28 August 2006 S R05 L07 Acrobat
L 0308
MTC2-39657-03 19 October 2006 S R05 L01 Acrobat
L 0312
MTR2-39657-03 02 November 2006 S R05 L07 Acrobat
L 0313
PMIR-39657-03 02 November 2006 S R05 L13 Acrobat
L 0309
MTC3-39657-03 27 December 2006 S R05 L01 Acrobat
L 0310
MTR3-39657-03 10 January 2007 S R05 L07 Acrobat
L 0314
PMIR2-39657-03 10 January 2007 S R05 L13 Acrobat
PTC-39657-03 28 August 2006 S R04 + R05 N01 Acrobat
ITCC-39657-03 28 August 2006 S R01+ R04 N02 Acrobat
R01+ R04 N06 AcrobatAcrobat
Material Test Certificates (CO2)
Material Traceability Records (CO2)
Pressure Test Certificates (CO2)
Instrument Test and Calibration Certificates (CO2)
Certificate of Compliance (CO2)
General Arrangement Drawings (CO2)
Instrument Data Sheets (CO2)
Performance Test Report / Results (CO2)
Material Test Certificates (CO2)
General Arrangement Drawings (CO2)
Instrument Data Sheets (CO2)
Performance Test Report / Results (CO2)
Equipment Hazardous Area Certificates (CO2)
Material Traceability Records (CO2)
General Arrangement Drawings (CO1)
Instrument Data Sheets (CO1)
Material Traceability Records (CO1)
est Certificates
Material Test Certificates (CO1)
Positive Material Identification Report (CO1)
Positive Material Identification Report (CO2)
Performance Test Report / Results
Equipment Hazardous Area Certificates
Material Test Certificates
Material Traceability Records
Performance Test Report / Results (CO1)
Quality Management System Certification
Pressure Test Procedures
Performance/Acceptance Test Procedure
Cross Sect/Expl View Dwg with Parts List
Erection and Installation Procedures
Instrument Test and Calibration Certificates
Certificate of Compliance
General Arrangement Drawings
Instrument Data Sheets
PRESSURE INDICATING TRANSMITTER
Pressure Test Procedures
Performance/Acceptance Test Procedure
Material Traceability Records
Pressure Test Certificates
Performance/Acceptance Test Procedure
GENERAL DOCUMENTS
Material Test Certificates
Despatch DossierOperating ManualMaintenance Manual
Equipment Hazardous Area Certificates
Material Traceability Records
Performance Test Report / Results
Certification Data Book
Manufacturing Records
Quality Management System Certification
Instrument Data Sheets
Quality Management System Certification
Pressure Test Certificates
Instrument Test and Calibration Certificates
Erection and Installation Procedures
Certificate of Compliance
Pressure Test Procedures
Erection and Installation Procedures
Instrument Data Sheets
Cross Sect/Expl View Dwg with Parts List
Equipment Hazardous Area Certificates
Material Test Certificates
Performance Test Report / Results
Data Collection Tool
Cross Sect/Expl View Dwg with Parts List
General Arrangement Drawings
FLOW INDICATING DP TRANSMITTER
Concession Records (Design Deviation Requests)
Certificate of Conformity
Recommended Start-Up Commissioning Spares List
Recommended Two Year Operating Spares
Recommended Capital Insurance Spares
Packing and Preservation Procedure
Table of Contents (All Manuals)
General Arrangement Drawings
Weight Data SheetsSchedule of Hazardous Area Certified Elec Equip
DIFFERENTIAL PRESSURE INDICATING TRANSMITTER
Quality Plan
Weighing ProcedureH, S & E Management System & Policy
Weighing Report and Certificate
Release Note
Supplier Document Register
Progress ReportsBought Out Items List
DOCUMENT TITLE
SAQQARA PROJECT ABLE INSTRUMENTS & CONTROLSPURCHASE ORDER NUMBER
SAQQ-0001-PIC02A
SUPPLIER DOCUMENT REGISTER (SDR)
Inspection and Test Plan
Positive Material Identification Procedure
© ABLE Instruments & Controls Ltd. Est 1985.
Package Procurement Example
Saqqara7 Pig Detectors8 V-Cone Flow Elements166 Pressure Gauges34 Temperature Gauges36 Digital Indicators2 HART Hand Held Communicators55 Temperature Transmitters59 DP Transmitters157 Pressure Transmitters11 Guided Wave Radar Level Transmitters33 Non-Contact Radar Level Gauges14 Magnetic Level gauges6 Sand Monitors1 Pressure Regulators9 Pressure Regulating Valves1 Thermal Relief Valve1 Solenoid Valve4 Variable Area Flow Meters23 Restriction Orifice Plates6 Test Thermowells1 Ultrasonic Flare Gas Flow Meter2 DP Gauges18 Orifice Plates120 Sun Shades
© ABLE Instruments & Controls Ltd. Est 1985.
Package Procurement Example
North Rankin BClient: WoodsideContractor: EOS JVLocation: Australia
Project Information: New Platform, Bridge Linked to North Rankin AEquipment: Fire & GasDetails: Circa £1M package of equipment outside of ABLEs core competency, awarded due to our expertise in order and sub-supplier management
© ABLE Instruments & Controls Ltd. Est 1985.
Package Procurement Example
North Rankin B107 Infra Red Flame Detectors40 Infra Red Point Gas Detectors6 Infra Red Gas Detectors62 IR Line of Sight Gas Detectors10 Acoustic Gas Detectors132 Manual Call Points44 Pushbuttons22 Status Indicator Lamps1 Sample System67 Pressure Gauges11 Temperature Gauges9 Thermowells
© ABLE Instruments & Controls Ltd. Est 1985.
Value Added Manufacture Examples
Metering Systems
© ABLE Instruments & Controls Ltd. Est 1985.
Cabinet Design & Build
Value Added Manufacture Examples
© ABLE Instruments & Controls Ltd. Est 1985.
Spool Design & Fabrication
Value Added Manufacture Examples
© ABLE Instruments & Controls Ltd. Est 1985.
Panel Design & Assembly
Value Added Manufacture Examples