    MMS WorkshopUnlocking Technology and Geologic Challenges in the GoM

    January 2008

  • 8/8/2019 080123_BP

    2/11

    Future PaleogenePlay Area ?

    Current PaleogenePlay Area

    25,000

    35,000

    N S

    Paleogene

    Kaskida2006

    Jack2004

    Stones2005

    Cascade2002

    Tucker2006

    Chinook2003

    Mad Dog Deep2005

    St Malo2003

    Julia2007

    Most activity and discoveries are along the

    southern extent of the Paleogene Trend

    Moving to the North it will be potentially

    Deeper, hotter and higher pressure more

    difficult seismic imaging, more structurally

    complex

    MMS Questions: Is this Concept Warranted?Paleogene: A Challenging Opportunity

  • 8/8/2019 080123_BP

    3/11

    Kaskida2006

    Jack2004

    Stones2005

    Cascade2002

    Tucker2006

    Chinook2003

    Mad Dog Deep2005

    St Malo2003

    Julia2007

    Industry has invested in significant acreage positions

    Acreage is largely un-drilled but most of it likely to exceed currently challenged Pg conditions

    MMS Questions: Is this Concept Warranted?Paleogene: A Challenging Opportunity

  • 8/8/2019 080123_BP

    4/11

    TotalDepth

    PompanoPompano MarsMars UrsaUrsaEmpireEmpire

    State Bldg.State Bldg.DianaDiana

    HooverHoover NaNa KikaKikaHornHornMt nMt nHolsteinHolstein AtlantisAtlantis

    Ma dMa dDogDog

    ThunderThunderHorseHorse

    1,000

    2,000

    3,000

    4,000

    5,000

    6,000

    7,000

    8,000

    10,000

    15,000

    20,000

    25,000

    30,000

    Future developments are depicted as possible scenarios based on water depth.

    Subsea Technology /New Concepts

    Subsea Technology /Subsea Technology /

    New ConceptsNew Concepts

    Deeper Water /Deeper HorizonsDeeper Water /Deeper Water /Deeper HorizonsDeeper Horizons

    SubsurfaceVisualization &

    Complexity

    SubsurfaceSubsurfaceVisualization &Visualization &

    ComplexityComplexity

    The Future Portfolio: Technology Drivers

    New GenerationRigs

    New GenerationNew GenerationRigsRigs

    Higher Pressures /Higher Temperatures

    Higher Pressures /Higher Pressures /Higher TemperaturesHigher Temperatures

  • 8/8/2019 080123_BP

    5/11

    How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene

    Key Focus Appraisal Areas:

    Static - Wells & Advanced Seismic

    Dynamic Flow Testing - Rate/Recovery

    Appraisal & Development Technology

    Advanced seismic techniques,limited capabilities, timeliness

    SubsaltSeismic Imaging

    Concerns and GapsConditionTheme

    Existing Technology6,000 - 9000 ft.Water Depth

    Existing Technology20k psi @ reservoir

    15k psi @ seafloor

    >25-35k ft TVD

    Reservoir Depth &Pressure

    No ExistingProduction Analogs

    +

  • 8/8/2019 080123_BP

    6/11

    Lessee must demonstrate that project requirements are beyondtraditional appraisal /development.

    One or more of these 5 technical challenges creates the need forregulatory flexibility:

    Quantitative Beyond current industry capability

    o HP High Pressure > 15k psi @ seafloor or

    > 20k psi @ reservoir

    o HT High Temperature > 350 F

    o Extreme Depth >25,000 subsea

    Qualitative

    o Rate/Recovery Challenges Rock & Fluid Properties

    o Severe Seismic Imaging Challenges

    How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene

  • 8/8/2019 080123_BP

    7/11

    Viscosity v. Permeability

    0

    2

    4

    6

    8

    10

    12

    1 10 100 1000 10000

    Permeability (mD)

    Viscosity

    (cp)

    Paleogene

    Historical DW GoM

    Current Producing DW

    GoM has ~300x betterproductivity.

    There are no production analogs for these conditions!

    How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene

    Rate and Recovery

  • 8/8/2019 080123_BP

    8/11

    S

    S

    R

    R

    R

    R

    To address the challengingimaging issues, a Wide

    Azimuth Towed Streamer(WATS) survey takes ~ 4years to plan, acquire,process and interpret.

    WATS Imaged parts of the Fieldpreviously hidden!

    Narrow Azimuth WATS

    Salt Salt

    BP CONFIDENTIAL

    How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene

    Seismic Imaging

  • 8/8/2019 080123_BP

    9/11

    Response to Remaining MMS questions

    What other eligibility criteria should be considered?

    Discovery made prior to application

    Milestones:

    Advanced seismic acquisition or

    processing

    Appraisal wells, sidetracks,

    deepenings, whole cores

    Dynamic well testing

    Technology development

    Feasibility study

    Preliminary engineering design

    Detail engineering design

    Prototype testing

    Field trial

    Equipment commitments

    What would tangible/observable

    milestones be for technologydevelopment related to a lease?

    Detailed Activity Schedule of

    investment and activity commitmentsaddressing the technological

    challenges

    Approved by the MMS and updated

    regularly to demonstrate progress Schedule milestones could include,

    but not limited to, the planning and

    execution of:

  • 8/8/2019 080123_BP

    10/11

    Response to Remaining MMS questions

    How long should such a suspension last, and should it berenewable?

    On the project level, the length should be covered by the Activity

    Schedule

    Periodic reviews will address progress toward the technological

    challenges Suspension should be renewable/revisable based on results from

    activities

  • 8/8/2019 080123_BP

    11/11

    Purpose of White PaperConclusion:Challenges of Unlocking New Provinces in GoM

    The MMS and industry have a proven track record of collaboration in successfully

    meeting technology challenges in the Gulf of Mexico and can mutually benefit from

    a flexible regulatory framework as challenges arise

    An orderly appraisal program which considers dynamic testing and technology

    development is the key to delivering development.

    Decreased cycle time to first oil

    Enable technology development that will help unlock the next generation ofresource development for the country.

    Enable the pursuit of proper activities on a prioritized schedule without having to

    make inefficient drilling and/or premature exit decisions.

    Allow for the most efficient allocation of scarce resources in service of technologydevelopment to enable earlier delivery of oil and gas production.

    Ensure the activities undertaken are consistent with goals of natural resource

    conservation and fulfill the express purpose of the OCS Lands Act