MMS WorkshopUnlocking Technology and Geologic Challenges in the GoM
January 2008
8/8/2019 080123_BP
2/11
Future PaleogenePlay Area ?
Current PaleogenePlay Area
25,000
35,000
N S
Paleogene
Kaskida2006
Jack2004
Stones2005
Cascade2002
Tucker2006
Chinook2003
Mad Dog Deep2005
St Malo2003
Julia2007
Most activity and discoveries are along the
southern extent of the Paleogene Trend
Moving to the North it will be potentially
Deeper, hotter and higher pressure more
difficult seismic imaging, more structurally
complex
MMS Questions: Is this Concept Warranted?Paleogene: A Challenging Opportunity
8/8/2019 080123_BP
3/11
Kaskida2006
Jack2004
Stones2005
Cascade2002
Tucker2006
Chinook2003
Mad Dog Deep2005
St Malo2003
Julia2007
Industry has invested in significant acreage positions
Acreage is largely un-drilled but most of it likely to exceed currently challenged Pg conditions
MMS Questions: Is this Concept Warranted?Paleogene: A Challenging Opportunity
8/8/2019 080123_BP
4/11
TotalDepth
PompanoPompano MarsMars UrsaUrsaEmpireEmpire
State Bldg.State Bldg.DianaDiana
HooverHoover NaNa KikaKikaHornHornMt nMt nHolsteinHolstein AtlantisAtlantis
Ma dMa dDogDog
ThunderThunderHorseHorse
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
10,000
15,000
20,000
25,000
30,000
Future developments are depicted as possible scenarios based on water depth.
Subsea Technology /New Concepts
Subsea Technology /Subsea Technology /
New ConceptsNew Concepts
Deeper Water /Deeper HorizonsDeeper Water /Deeper Water /Deeper HorizonsDeeper Horizons
SubsurfaceVisualization &
Complexity
SubsurfaceSubsurfaceVisualization &Visualization &
ComplexityComplexity
The Future Portfolio: Technology Drivers
New GenerationRigs
New GenerationNew GenerationRigsRigs
Higher Pressures /Higher Temperatures
Higher Pressures /Higher Pressures /Higher TemperaturesHigher Temperatures
8/8/2019 080123_BP
5/11
How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene
Key Focus Appraisal Areas:
Static - Wells & Advanced Seismic
Dynamic Flow Testing - Rate/Recovery
Appraisal & Development Technology
Advanced seismic techniques,limited capabilities, timeliness
SubsaltSeismic Imaging
Concerns and GapsConditionTheme
Existing Technology6,000 - 9000 ft.Water Depth
Existing Technology20k psi @ reservoir
15k psi @ seafloor
>25-35k ft TVD
Reservoir Depth &Pressure
No ExistingProduction Analogs
+
8/8/2019 080123_BP
6/11
Lessee must demonstrate that project requirements are beyondtraditional appraisal /development.
One or more of these 5 technical challenges creates the need forregulatory flexibility:
Quantitative Beyond current industry capability
o HP High Pressure > 15k psi @ seafloor or
> 20k psi @ reservoir
o HT High Temperature > 350 F
o Extreme Depth >25,000 subsea
Qualitative
o Rate/Recovery Challenges Rock & Fluid Properties
o Severe Seismic Imaging Challenges
How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene
8/8/2019 080123_BP
7/11
Viscosity v. Permeability
0
2
4
6
8
10
12
1 10 100 1000 10000
Permeability (mD)
Viscosity
(cp)
Paleogene
Historical DW GoM
Current Producing DW
GoM has ~300x betterproductivity.
There are no production analogs for these conditions!
How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene
Rate and Recovery
8/8/2019 080123_BP
8/11
S
S
R
R
R
R
To address the challengingimaging issues, a Wide
Azimuth Towed Streamer(WATS) survey takes ~ 4years to plan, acquire,process and interpret.
WATS Imaged parts of the Fieldpreviously hidden!
Narrow Azimuth WATS
Salt Salt
BP CONFIDENTIAL
How would MMS define Technological Challenge?Emerging Technology Themes for the Paleogene
Seismic Imaging
8/8/2019 080123_BP
9/11
Response to Remaining MMS questions
What other eligibility criteria should be considered?
Discovery made prior to application
Milestones:
Advanced seismic acquisition or
processing
Appraisal wells, sidetracks,
deepenings, whole cores
Dynamic well testing
Technology development
Feasibility study
Preliminary engineering design
Detail engineering design
Prototype testing
Field trial
Equipment commitments
What would tangible/observable
milestones be for technologydevelopment related to a lease?
Detailed Activity Schedule of
investment and activity commitmentsaddressing the technological
challenges
Approved by the MMS and updated
regularly to demonstrate progress Schedule milestones could include,
but not limited to, the planning and
execution of:
8/8/2019 080123_BP
10/11
Response to Remaining MMS questions
How long should such a suspension last, and should it berenewable?
On the project level, the length should be covered by the Activity
Schedule
Periodic reviews will address progress toward the technological
challenges Suspension should be renewable/revisable based on results from
activities
8/8/2019 080123_BP
11/11
Purpose of White PaperConclusion:Challenges of Unlocking New Provinces in GoM
The MMS and industry have a proven track record of collaboration in successfully
meeting technology challenges in the Gulf of Mexico and can mutually benefit from
a flexible regulatory framework as challenges arise
An orderly appraisal program which considers dynamic testing and technology
development is the key to delivering development.
Decreased cycle time to first oil
Enable technology development that will help unlock the next generation ofresource development for the country.
Enable the pursuit of proper activities on a prioritized schedule without having to
make inefficient drilling and/or premature exit decisions.
Allow for the most efficient allocation of scarce resources in service of technologydevelopment to enable earlier delivery of oil and gas production.
Ensure the activities undertaken are consistent with goals of natural resource
conservation and fulfill the express purpose of the OCS Lands Act