+ All Categories
Home > Documents > 08a UTRAN Procedures Ws11

08a UTRAN Procedures Ws11

Date post: 03-Jun-2018
Category:
Upload: ahsan1234567
View: 218 times
Download: 0 times
Share this document with a friend

of 28

Transcript
  • 8/12/2019 08a UTRAN Procedures Ws11

    1/28

    UMTS Networks 1Oliver Waldhorst, Jens Mueckenheim Oct-11

    UTRAN Procedures

    Elementary procedures

    Paging RRC connection setup Transaction reasoning Authentication and security control Transaction setup with RAB allocation

    Transaction clearing and RAB release RRC connection releaseRRM procedures Radio link addition and deletion Intersystem handover from UMTS to GSM (CS/PS) UE state transitions/ bearer reconfiguration

    MM procedures -> see MM slidesCM procedures -> see CM slides

    References: Kaaranen ch. 10 (simple cases discussed here)

    3GPP TR 25.931 (more complicated cases)

  • 8/12/2019 08a UTRAN Procedures Ws11

    2/28

    UMTS Networks 2Oliver Waldhorst, Jens Mueckenheim Oct-11

    Basic Model of UMTS Network Transactions

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction

    (user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

    UE indicates the CNthe requested service

    A transaction comprises all the elementaryprocedures required to enable

    the transport of user data (PS or CSmode) or

    the exchange of higher-layer signalingmessages (e.g. MM or CM)

    Allocation of bearers to supportrequired UMTS bearer service

    Transfer of data

    Release of all bearers to supportUMTS bearer service

  • 8/12/2019 08a UTRAN Procedures Ws11

    3/28

    UMTS Networks 3Oliver Waldhorst, Jens Mueckenheim Oct-11

    UE RRC Connected States

    Cell_DCH

    Dedicated Traffic and Control carried over DCH

    Cell_FACH Dedicated Traffic and Control carried over RACH/ FACH

    URA_PCH

    No air interface resources required, dormant RB

    UE receives paging on UTRAN Routing Area (URA) basis rather than

    standard routing area (RA); URA usually in the order of 10 cells

    C e l l F A C H

    C e l l D C HU R A P C H

    N o d a t a

    N o d a t a

    D a t a ac t i v i ty

    D a t a

    ac t iv i t y

    L o w

    traf f ic

    H igh t r a f f ic

    o r C S c a l l

    D y n a m i c R B

    r e c o n f i g u r e

    C e l l F A C H

    C e l l D C HU R A P C H

    N o d a t a

    N o d a t a

    D a t a ac t i v i ty

    D a t a

    ac t iv i t y

    L o w

    traf f ic

    H igh t r a f f ic

    o r C S c a l l

    D y n a m i c R B

    r e c o n f i g u r e

    optional

  • 8/12/2019 08a UTRAN Procedures Ws11

    4/28

    UMTS Networks 4Oliver Waldhorst, Jens Mueckenheim Oct-11

    Paging

    Paging type 1:

    UE idle mode (no RRC connection) RRC connected modes cell_PCH or URA_PCH

    Example: paging for a UE in idle mode

    U E N od e B

    1 .1

    N od e B

    2 .1

    R N C

    1

    R N C

    2

    C N

    R A N A PR A N A P

    1 . P a g i n g

    2 . P C C H : P a g i n g T y p e 1

    R A N A P R A N A P1 . P a g i n g

    3 . P C C H: P a g i n g T y p e 1

    (Requesting CN domain,

    IMSI, ...)

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    5/28

    UMTS Networks 5Oliver Waldhorst, Jens Mueckenheim Oct-11

    Paging

    Paging type 2:

    UE is in RRC connected mode cell_DCH or cell_FACH

    Paging request from another CN domain

    Example: paging for a UE in RRC Connected Mode(CELL_DCH or CELL_FACH state)

    2 cases:

    UTRAN coordinates the paging request with the existing RRC connection (given example)

    UE coordinates the paging request with the existing RRC connection

    U E S e r v i n g

    R N C

    C N

    R R CR R C

    2 . D C C H: P a g i n g T y p e 2

    R A N A P R A N A P1 . Pa g i n g

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    6/28

    UMTS Networks 6Oliver Waldhorst, Jens Mueckenheim Oct-11

    RRC Connection Setup

    Establishment of a RRC connection in cell_DCH mode

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

    U E N o d e B R N C C N

    U E _ I d l e

    C E L L _ D C H

    In i t i a l R an d o m Acces s

    C C C H ( T M ) / R A C H : R R C C o n n e ct io n R e q u e s t

    R L S e t u p R e q u e s t

    R L S e t u p R e s p o n s e

    A L C A P I u b T r a n s p o r t b e a r e r S e tu p

    U L / D L S y n c h r o n i s a ti o n

    C C C H ( U M ) / F A C H : R R C C o n n e c t io n S e t up

    D C C H ( A M ) / D C H : R R C C o n n e c t i on S e tu p C o m p l e t e A d d r . : b y D C H

    D C C H e s t ab l is h e d

    UE cap ab i l i t ie s

    k n o w n

    Ad d r . : I n i ti a l UE ID

    R e q u e s t fo r D C C H

    In c l . E s t ab l i sh m en t

    c a u s e

    E s t ab l i s h m en t

    o f U T R A N

    D C H r e s o u r c e s

    i n c l. C A C

    Ad d r . : I n i t ia l UE ID

  • 8/12/2019 08a UTRAN Procedures Ws11

    7/28UMTS Networks 7Oliver Waldhorst, Jens Mueckenheim Oct-11

    Initial Random Access

    UE addressing

    CCCH: UE ID embedded in the RRC message

    DTCH/ DCCH: UE ID included in MAC header

    U E N o d e B Con t ro l l i ng

    R N C

    P r e a m b l e

    P r e a m b l e

    P r e a m b l e

    A c q u is iti o n In d ic a ti o n (A IC H )

    P R A C H M e s s a g e

    R e s o u r c i n g N o d e B

    H a r d w a r e

    R A C H F P

    R A C H M e s s ag e

    [ R R C C o n n e c t i o n R e q u e s t ]

    C R C C h e c k

    R A C H F P

    P e r s i s t e n c y

    c h e c k b e f o r e

  • 8/12/2019 08a UTRAN Procedures Ws11

    8/28UMTS Networks 8Oliver Waldhorst, Jens Mueckenheim Oct-11

    RRC Connection Setup

    Reasons for RRC connection setup:

    Call setup (mobile-originated and mobile-terminated calls)

    Conversational call Streaming call

    Interactive call

    Background call

    Emergency call

    Call re-establishment

    Exchange of signaling messages (low/high priority)

    RRC connection request message contains, e.g.

    IMSI, TMSI, IMEI Location area, routing area identity, etc.

    Other information: e.g. HSDPA/ E-DCH UE capability, standards release

  • 8/12/2019 08a UTRAN Procedures Ws11

    9/28UMTS Networks 9Oliver Waldhorst, Jens Mueckenheim Oct-11

    NAS Signaling Connection Establishment(Transaction Reasoning)

    U E S e r vin g

    R N C

    C N

    1 . R R C C o n n e c t io n E s t a b l is h m e n t

    R R CR R C

    2 . D C C H : In i t i a l Di re c t T r a n s fe r

    R A N A P R A N A P

    3 . I n i t ia l U E M e s s a g e

    Payload contains system network message:

    Information about the transaction initiated bythe UE (IMSI, TMSI, location area, kind of

    requested transaction)

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    10/28UMTS Networks 10Oliver Waldhorst, Jens Mueckenheim Oct-11

    Authentication and Security Control

    Authentication request/response: mutual authentication of UE and network

    Security mode command/complete: CN domain indicates to UTRAN and UE the encryptiondetails (method/algorithms and encryption keys)

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    11/28UMTS Networks 11Oliver Waldhorst, Jens Mueckenheim Oct-11

    Transition Setup and RAB Establishment(CS Mode)

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    12/28UMTS Networks 12Oliver Waldhorst, Jens Mueckenheim Oct-11

    Transition Setup and RAB Establishment(PS Mode)

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    13/28UMTS Networks 13Oliver Waldhorst, Jens Mueckenheim Oct-11

    RAB Establishment

    Example: Synchronised establishment of a RAB on DCH

    R A B A s s i g n m e n t R e s p o n s e

    R a d i o B e a r e r S e t u p C o m p l e te

    R a d i o B e a r e r S e t u p

    R a d i o L i n k R e c o n f i g u r a ti o n C o m m i t

    R ad i o L i n k R eco n f i g u ra t i o n R ead y

    R ad i o L i n k R eco n f i g u ra t i o n P rep a re

    R A B A s s i g n m e n t

    C NS R N CN o d e BU E

    A L C A P I u T r a n s p o r t B e a r e r E s ta b l is h m e n t

    A L C A P I u b T r a n s p o r t B e a r e r E s ta b l is h m e n t

    N o d e B R N C D a t a T r a n sp o r t B e a r e r S y n c

    C e l l _ D C H

    Act i v a t i o n T i m e ,

    TA cti va ti on

    C e l l _ D C H /

    C e l l _ F A C H W h e n C S C NW h e n C e l l_ F A C H :

    R L S e t u p

  • 8/12/2019 08a UTRAN Procedures Ws11

    14/28UMTS Networks 14Oliver Waldhorst, Jens Mueckenheim Oct-11

    Transaction Release and RAB Release(CS Mode)

    Note: signaling connection and RRC connection remains

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    15/28UMTS Networks 15Oliver Waldhorst, Jens Mueckenheim Oct-11

    Transaction Release and Iu Release(CS Mode)

    Note: signaling connection and RRC connection are released

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    16/28UMTS Networks 16Oliver Waldhorst, Jens Mueckenheim Oct-11

    Transaction Release and RAB Release(PS Mode)

    Note: signaling connection and RRC connection remain

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    17/28UMTS Networks 17Oliver Waldhorst, Jens Mueckenheim Oct-11

    Transaction Release and Iu Release(PS Mode)

    Note: signaling connection and RRC connection are released

    Paging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    18/28UMTS Networks 18Oliver Waldhorst, Jens Mueckenheim Oct-11

    RRC Connection ReleasePaging

    RRC Connection Establishment

    Transaction Reasoning(Signaling conn. establishment)

    Authentication andSecurity

    Transaction Setup andRAB Allocation

    Transaction(user or control plane)

    Transaction Release andRAB Release

    RRC Connection Release

  • 8/12/2019 08a UTRAN Procedures Ws11

    19/28UMTS Networks 19Oliver Waldhorst, Jens Mueckenheim Oct-11

    RRC Connection Release (involving DRNC)

    Example: RRC connection release of a dedicated channel in soft HO modewith DRNC

    1 0 . Rad io L in k D ele t io n Resp o n se

    8 . Rad io L in k D ele t io n

    9 . Rad io L in k D ele t io n Resp o n se

    6 . Rad io L in k D ele t io n

    5 . R R C C o n n e c t io n R e l e a s e C o m p l e t e

    4 . R R C C o n n e c t io n R e l e a s e

    1 1 . Rad io L in k D ele t io n Resp o n se

    7 . Rad io L in k D ele t io n

    U E N o de B D ri ft R N S

    N o d e B S e r v i n g R N S

    Drif tR N C

    S er v in gR N C

    C N

    R R C

    R R C R R C

    N B A P

    N B A P

    R N S A P

    N B A P N B A P

    N B A P

    R N S A P

    R A N A P

    R A N A P

    3 . A L C A P I u B e a r e r R e l e a s e

    A L C A P I u r B e a r e r

    Re lease

    1 3 . A L C A P I u b B e a r e r R e l e a s e

    1 2 . A L C A P I u b B e a r e r R e l e as e

    1 . I u R e l e a se C o m m a n d

    2 . I u Re lease Co mp le te

    R R C

    R A N A P

    N B A P

    R N S A P

    N B A P

    N B A P

    R N S A P

    R A N A P

  • 8/12/2019 08a UTRAN Procedures Ws11

    20/28UMTS Networks 20Oliver Waldhorst, Jens Mueckenheim Oct-11

    Soft Handover Radio Link Addition

    U E S R N CT a r g e t

    N o d e BD R N C

    A L C A P I u r b e a re r S e tu p

    A c t i v e S e t U p d a t e ( R a d i o L i n k A d d i t io n )

    A L C A P I u b D a t a T r a n s p o r t be a r e r S e tu p

    R N C D e c i d es t o

    a d d a n e w R a d i o

    L i n k

    T a r g e t N o d e B i s

    e a d y

    UE s t a r t s

    R x o n n e w

    a d io l i n k

    E . g . n e w

    e ig h b o u r c e l l l i s t

    R a d i o L i n k R e s t o r e I n d i c a t io nR a d i o L i n k R e s t o r e In d i c a t i o n

    A c t i v e S e t U p d a t e C o m p l e t e

    M e a s u re m e n t C o n t r o l

    s t ar t Rx

    s t a rt T x

    W h e n R L S e t up

    R a d i o L i n k A d d / S e t u p R e q u e s t

    R a d i o L i n k A d d / S e t u p R e s p o n s e

    R a d i o L i n k A d d / S e t u p R e q u e s t

    R a d i o L i n k A d d / S e t u p R e s p o n s e

    Unsynchronized addition

  • 8/12/2019 08a UTRAN Procedures Ws11

    21/28UMTS Networks 21Oliver Waldhorst, Jens Mueckenheim Oct-11

    Soft Handover Radio Link Deletion

    UE SRNCNode B DRNC

    Free-up resources of

    old NodeB

    Active Set Update (Radio Link Deletion)

    UE stopsRx on old

    radio link

    E.g. new

    neighbour cell list

    Active Set Update Complete

    Measurement Control

    Radio Link Deletion Request

    ALCAP Iur bearer ReleaseALCAP Iub Data Transport bearer Release

    RNC Decides todelete an existing

    Radio Link

    Radio Link Deletion Request

    Radio Link Deletion ResponseRadio Link Deletion Response

    stop Rx & Tx

    Unsynchronized deletion

  • 8/12/2019 08a UTRAN Procedures Ws11

    22/28UMTS Networks 22Oliver Waldhorst, Jens Mueckenheim Oct-11

    Inter-system Handover (UMTS to GSM)

    U E 2 G M S CS R N C 3 G M S C

    C h a n n e l a c t i v a ti o n

    r o c e d u r e i n B S S

    R e l o c a t io n R e q u i r e d

    U E s w i t ch e s

    o G S M B S S

    H O C o m p l e te

    M A P P r e p a r e H O R e s p o n s e

    R N C D e c i d e s to

    e r fo r m H O t o

    G S M

    H O f r o m U T R A N C o m m a n d

    B S C

    M A P P r e p ar e H O R e q .

    H O R e q u e s t

    H O R e q u e s t A C K

    R e l o c a t i o n C o m m a n d

    R a d i o L i n k F a i lu r e i n U T R A N a n d R a d i o L i n k E s ta b l is h m e n t i n G S M B S S

    Iu Re leas e P rocedure

    H O C o m p l e te

    M A P S e n d E n d S i g n a l R e q .

    F r e e u p o f

    R e s o u r c e s

    M A P S e n d E n d S i g n a l R e s p .

  • 8/12/2019 08a UTRAN Procedures Ws11

    23/28UMTS Networks 23Oliver Waldhorst, Jens Mueckenheim Oct-11

    UTRAN Initiated UMTS-GPRS Cell Reselection

    U E S G S NS erv ingR N C

    R A N A P R A N A P6 . I u R e le a s e C o m m a n d

    R A N A P R A N A P7 . I u R e l e as e C o m p l e t e

    R R C R R C

    2 . C e l l C h a n g e O r d e r f r o m

    U T R A N

    3 . T h e U E a c c e s s e s t h e G S M

    s ys tem and in i t ia t es rou t ing a r ea

    p d a te . T he p a c k e t c o n te x t is

    r a n s fe r r e d t o t h e n e w S G S N .

    R A N A P R A N A P4 . S R N S C o n t e x t R e q u e s t

    R A N A P R A N A P5 . S R N S C o n t e x t R e s p o n s e

    1 . U T R A N d e c i s i o n to p e r f o rm C e l l C h a n g e O r d e r fr o m U T R A N :

    Most signalling between 2G and 2G CN

  • 8/12/2019 08a UTRAN Procedures Ws11

    24/28

    UMTS Networks 24Oliver Waldhorst, Jens Mueckenheim Oct-11

    SRNS Relocation (CS)

  • 8/12/2019 08a UTRAN Procedures Ws11

    25/28

    UMTS Networks 25Oliver Waldhorst, Jens Mueckenheim Oct-11

    URA_PCH to CELL_DCH/ CELL_FACH Transition

    Unsynchronised procedure with CRNC = SRNC

    U E N o d e B S R N C

    C e l l_ D C H : R a d i o B e a r e r R e c o n f i g u ra t io n C o m p l e te ( D C C H A M , D C H )

    C e l l_ F A C H : U T R A N M o b i li ty C o n f ir m ( D C C H A M , R A C H )

    R a d i o L i n k S e t u p r e q u e s t

    UE T r a n s i t i o n s t o

    C e l l D C H / s t a y s i n

    C e l l _ F A C H

    U E S e n d s C o m p l e te

    M e s s a g e

    L 2 A C K ( D C C H )

    R a d i o L i n k S e t u p r e s p o n s e

    R a d i o L i n k R e s t o r e I n d i c a ti o nC e l l _ D C H /

    C e l l _ F A C H

    C e l l U p d a t e C o n f ir m ( C C C H , F A C H , U M )

    A L C A P I u b D a t a T r a n s p o r t b e a r e r S e tu p

    U R A _ P C H

    U E t e m p o r a r y in

    C e l l _ F A C HI f C e l l _ D C H

    I n c l . D B C c h e c k

    F o r e a c h D C H ,

    se p a r a t e ly

    I n c l. U L / D L S y n c h .

    C e l l U p d a t e ( C C C H , R A C H , T M , c a u s e p a g in g r e s p o n s e o r U p l i n k D a t a tr a n s m i s si o n )

    R R C S t a t e I n d ic a t o r

    C e l l _ D C H /

    U R A _ F A C H

    TA ct iv at io n

    = N O W

  • 8/12/2019 08a UTRAN Procedures Ws11

    26/28

    UMTS Networks 26Oliver Waldhorst, Jens Mueckenheim Oct-11

    CELL_FACH to CELL_DCH Transition

    U E N o d e B R N C C N

    R a d i o B e a r e r R e c o n fi g ur a ti o n C o m p l e te ( D C C H A M , D C H )

    R a d i o B e a r e r R e c o n fi g u ra ti o n ( D C C H , F A C H )

    R a d i o L i n k S e t u p r e q u e s t

    R a d i o L i n k S e t u p r e s p o n s e

    U E T r a n s i t io n s t o

    C e l l D C H

    U E S e n d s C o m p l e t e

    M e s s a ge o n D C H

    L 2 A C K ( D C H )

    R N C d e t e rm i n e s U E

    shou ld t rans i t ion to

    C e l l D C H

    R a d i o L i n k R e s t o r e I n d i c a t io n

    R N C S t o ps M A C - d

    T r a n s m i s s i o n t o U E

    C e l l F A C H

    C e l l D C H

    A L C A P f o r bo th D C H

    F P S y n c h

    Unsynchronised procedure with CRNC = SRNC

  • 8/12/2019 08a UTRAN Procedures Ws11

    27/28

    UMTS Networks 27Oliver Waldhorst, Jens Mueckenheim Oct-11

    CELL_DCH to URA_PCH/ CELL_FACH Transition

    Unsynchronised procedure with CRNC = SRNC

    U E N o d e B S R N C

    R a d i o L i n k D e l e t io n R e q u e s t

    R R C S t a t e I n d ic a t o r

    C e l l _ F A C H /

    U R A _ P C H

    L 2 A C K ( D C C H , F A C H )

    U E S e n d s C o m p l e te

    M e s sa g e o n R A C H

    R a d i o L i n k D e l e t i o n R e s p o n s e

    C e l l _ F A C H /

    U R A _ P C H

    A L C A P I u b D a t a T r a n s p o r t B e a r e r R e l e as e

    C e l l _ D C H

    UE t r a n s i t io n s t o

    C e l l_ F A C H a n d

    e a d s S I B

    Fr e e - u p n o n - u se d

    D C H R e s o u rc e s

    R a d i o B e a r e r R e c o n fi g u ra t io n ( D C C H , D C H , U M )

    R a d i o B e a r e r R e c o n fi g u ra t io n C o m p l e te ( D C C H , R A C H , A M )

    R N C l e a v e s ti m e

    o r L 2 A C K b e in ge r r o r e d

  • 8/12/2019 08a UTRAN Procedures Ws11

    28/28

    Dynamic Bearer Reconfiguration

    U E S R N C

    R a d i o L i n k R e c o n f i g

    P r e p a r e

    N o d e B

    (D r i f t

    R N S )

    N o d e B

    (S erv i n g

    R N S )

    D R N C

    R a d i o L i n k R e c o n f i g u r a t io n P r e p a r e

    R a d i o L i n k R e c o n f i g u r a ti o n P r e p a r e

    R a d i o L i n k R e c o n f i g u ra t io n R e a d yR a d i o L i n k R e c o n f i g R e a d y

    R a d i o L i n k R e c o n f i g u ra t io n R e a d y

    A L C A P I u r b e a re r S e tu p

    R a d i o L i n k R e c o n f i g

    c o m m i t (TA ct iv at io n )R a d i o L i n k R e c o n f i g u ra t io n C o m m i t (TA ct iv at io n )

    R a d i o L i n k R e c o n f i g u ra t io n c o m m i t (TA ct iv at io n )

    T r a n s p o r t C h a n n e l R e c o n f i g u r a ti o n ( D C C H , A M , TA ct iv at io n )

    T r a n s p o rt C h a n n e l R e c o n f ig u r a ti o n C o m p l e te ( D C C H , A M )

    A L C A P I u b D a t a T r a n sp o r t b e ar e r R e l ea s e

    A L C A P I u b D a t a T r a n s p o r t b e a re r R e l e a s e A L C A P I u r b e a r e r R e le a s e

    A L C A P I u b D a t a T r a n s p o r t b e a re r S e tu p

    A L C A P I u b D a t a T r a n sp o r t b e ar e r S e tu p

    C e l l D C H

    C e l l D C H

    R N C D e c id e s to

    c h a n g e t h e r a t e o f

    h e U E

    A l l N o d e B s a r e

    e a d y

    A c t i v a t i o n T i m e

    , TA ct iv at io n

    U E & N o d e - B

    e c o n f i g u r e d t o

    h e n e w r a t e s

    R e l e a s e t h e t r a n s p o r t

    N e tw o rk re so u rc es fo r

    h e p r e v i o u s

    c o n f i g u r a t i o n

    W h e n r a t e i n c r e as e

    Synchronised DCH modify w/o transport bearer reconfiguration


Recommended