OWRB LOAN APPLICATION OKLAHOMA WATER RESOURCES BOARD LOAN APPLICATION NO. ____-____-________-____ (This number is assigned by OWRB) In order to complete the review of the above referenced application, it is necessary that the following additional information and material be furnished to the Board. Please note that this request for additional information does not constitute application approval, but is only a UUstage of the application submission and Board staff review process. Please provide a signed original or signed electronic copy. The following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial assistance applied for (as set out below) and must be paid to the Oklahoma Water Resources Board by the applicant at the time of filing this application. 0BULoan Application Amount Fee $ 249,999 or less $ 100.00 $ 250,000 - 999,999 $ 250.00 $1,000,000 or more $ 500.00 A. LOAN TYPE Loan Type 1BAmount Term 1 3BCollateral Pledged 2 FAP Bond Clean Water SRF Drinking Water SRF 1. Term of Loan in years – FAP Bond maximum 30 years; SRF maximum 30 years 2. Collateral proposed to be pledged to repayment of the loan – e.g. revenues from water, sewer, stormwater, and other utility 1 Updated 2/17
Transcript
Page 1: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

OKLAHOMA WATER RESOURCES BOARD

LOAN APPLICATION NO. ____-____-________-____ (This number is assigned by OWRB)

In order to complete the review of the above referenced application, it is necessary that the following additional information and material be furnished to the Board. Please note that this request for additional information does not constitute application approval, but is only a UUstage of the application submission and Board staff review process. Please provide a signed original or signed electronic copy.

The following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial assistance applied for (as set out below) and must be paid to the Oklahoma Water Resources Board by the applicant at the time of filing this application.

0BULoan Application Amount Fee $ 249,999 or less $ 100.00$ 250,000 - 999,999 $ 250.00$1,000,000 or more $ 500.00

A. LOAN TYPE

Loan Type 1BAmount Term 13BCollateral Pledged 2

FAP Bond

Clean Water SRF

Drinking Water SRF

1. Term of Loan in years – FAP Bond maximum 30 years; SRF maximum 30 years2. Collateral proposed to be pledged to repayment of the loan – e.g. revenues from

water, sewer, stormwater, and other utility systems, and any sales tax revenue

B. APPLICANT INFORMATION1. Applicant Name and Address

Name:

County:

Address: Phone: ( )Fax: ( )

Office Hours: E-mail:

Website: DUNS # (SRF Applicants Only):

1 Updated 2/17

Page 2: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

2. Applicant’s Chief Officer and/or person to whom all pre-application inquiries should be directed:

Name:Title: Phone: ( )Address: Fax: ( )

E-mail:

3. Applicant's Chair and Secretary:Name Office Held

ChairSecretary

4. Applicant's Financial Consultant:Firm Name:Contact: Phone: ( )Address: Fax: ( )

E-mail:

5. Applicant’s Legal Counsel:Firm Name:Contact: Phone: ( )Address: Fax: ( )

E-mail:

6. Applicant’s Bond Counsel: Firm Name:Contact: Phone: ( )Address: Fax: ( )

E-mail:

7. Applicant’s Consulting Engineer: Firm Name:Contact: Phone: ( )Address: Fax: ( )

E-mail:

8. Authorizing Resolution – Please enclose a certified copy of the resolution reflecting applicant’s authorization for making this loan application to the OWRB.

2 Updated 2/17

Page 3: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

2BC. FINANCIAL INFORMATION1. Applicant’s Existing Debt – Please complete the information on USCHEDULE ONEU for each outstanding debt obligation of the Applicant. Make copies of USCHEDULE ONEU if additional pages are needed. Also, please include copies of loan documentation on all outstanding debt obligations, including, as applicable, bond resolutions or indentures, trust agreements, promissory notes, loan agreements, mortgage and security agreements, etc.

2. Existing Sales Tax Revenue – List sales tax portion (if any) currently dedicated to retirement of the existing debt and/or portion available to retire proposed OWRB debt. Please include a copy of the applicable sales tax ordinance(s) if sales tax will be pledged to repayment of the proposed OWRB debt [AUTHORITIES ONLY; NOT APPLICABLE FOR DISTRICTS].Total Existing Sales Tax: %Amount Dedicated to Existing Debt: %Amount Available for Proposed Debt: %

3. Covenants and Restrictions:List legal covenants or restrictions for sales tax and utility revenue obligations, if pledged for this loan:

4. Financial Information – Unless previously provided or available on the state auditor and inspector’s website (www.sai.ok.gov), please include copies of financial audits for the previous five fiscal years.  Also provide the current fiscal year budget and year-to-date unaudited operating statements.

5. Pending Litigation – Include a statement from the Applicant’s Legal Counsel stating:

(a) the existence of any pending litigation and its potential impact on the Applicant, and

(b) the existence of pending administrative complaints that allege discrimination based on race, color, national origin, sex, age, or disability.  Do not include employment complaints not covered by 40 CFR Parts 5 and 7.

6. Capital Improvements Program – Please provide a description of the Applicant’s capital improvements program, if any, as relates to water, sewer, and stormwater infrastructure.

3 Updated 2/17

Page 4: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

D. ECONOMIC INFORMATION1. Ten Largest Taxpayers – Two (2) year historical trend of ad valorem assessed valuation [AUTHORITIES ONLY; NOT APPLICABLE FOR DISTRICTS].

YEAR: YEAR:

NameAd Valorem

Assessed Valuation NameAd Valorem

Assessed Valuation

Totals: Totals:

2. Sales Tax Collections (if pledged for this loan) – We will pull Sales Tax data from the Oklahoma Tax Commission website. If you believe any of that information to be incorrect, please submit up to the last ten (10) fiscal years of Sales Tax Collection data. [AUTHORITIES ONLY; NOT APPLICABLE FOR DISTRICTS]:

4 Updated 2/17

Page 5: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

3. Total Water and Sewer Connections – Ten (10) year historical trend of connections, coinciding with the Applicant's fiscal year end:

Water Connections Sewer ConnectionsYear Active* Inactive Total Active* Inactive Total

Note: An inactive sewer connection is a connection that is not believed to be in use (ex: because the property is vacant.)

Please provide the connection information below, coinciding with the Applicant’s fiscal year end:

Commercial Water Connections Industrial Water ConnectionsYear Active* Inactive Total Active* Inactive Total

*Note: Use maximum number of active meters/connections recorded during the year.

5 Updated 2/17

Page 6: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

E. PROJECT1. Project Description – Provide plans and specs, if completed, a copy of the construction permit, if available, and the site certificate.Description of Project/Project Purpose:

Project Location:

Anticipated Construction Period:Anticipated Completion Date:

2. Project Budget - List project construction cost (attach a detailed cost estimate) and engineering, inspection, legal, project contingency, land acquisition, financial consultant costs, etc:

Budget Item Cost Estimate

Total

3. Other Funding Sources – including Federal/State participation (loans, grants, etc.) and any other sources including Applicant’s local contribution, if any. Provide commitment letters if available.

Funding Source

Type of Request Amount Present Status Comment

F. EXISTING WATER AND/OR SANITARY SEWER SYSTEM

6 Updated 2/17

Page 7: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

1. Treatment capacity – in million gallons per day (mgd):

Facility Name CapacityWater:

Sewer:

2. Storage capacity – in thousand or million gallons:

Facility Name CapacityWater:

Sewer:

3. Applicant’s Current Water Supply SourceIf groundwater is a source for your water supply, list the legal description of each well down to a 10 acre tract (e.g. NW NW NW Section 3, T6N, R7W).

Well Site Legal Description

If surface water is a source for your water supply, list the legal description of each diversion point down to a 10 acre tract (e.g. NW NW NW Section 3, T6N, R7W).

Diversion Point Legal Description

If water is purchased from another entity, provide the name and phone number of the entity and include a copy of any water purchase contract.

Entity Name:

7 Updated 2/17

Page 8: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

Address: Phone: ( )Fax: ( )

4. Water Rights – List all water rights permits by which the applicant is authorized to take water (indicate if an application for water rights is currently being processed):

Water Right Number Holder

Number of Acre-Feet Per Year

If you have more permits than can be shown above, list on a separate sheet and attach using the above format.

5. Peak and Average Usage – four year historical and projected trends (in million gallons per day):

Historical Projected

Year Peak (mgd) Average (mgd) 6BYear Peak (mgd) Average (mgd)

6. Annual Operations and Maintenance CostsCurrent Annual O&M Costs:

Projected Annual O&M Costs upon Project Completion:

Increase/(Decrease) in Annual O&M Costs

7. Operating/Lease Agreements – Provide copies of any operating agreements or lease agreements relating to the water or sewer system (if applicable); for example, a lease agreement between a town and its public works authority.

8 Updated 2/17

Page 9: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

8. Water Consumption and Revenue – Please complete UATTACHMENT IU providing four year historical trends by usage (million gallons) and revenue (by residential, commercial and industrial class); four year historical trends for ten largest customers by usage (million gallons) and revenue; and four year historical for consumption and system water loss.

9. Water/Sewer/Stormwater Rate Structure – Please complete UATTACHMENT IIU

providing the current rate structure and make copies and complete for the previous three rate structures.

10. Inventory of Facilities – Please complete UATTACHMENT IIIU providing an inventory of existing water, sanitary sewer and stormwater facilities.

G. ADDITIONAL INFORMATION CHECKLISTDon’t forget to include the following information (application section reference):

Authorizing Resolution (B8)

Copies of loan documents on outstanding debt obligations (C1)

SCHEDULE ONE – Outstanding Debt (C1)

Sales Tax Ordinance [AUTHORITIES ONLY; NOT APPLICABLE FOR DISTRICTS] (C2)

Audited Financial Information unless previously provided or available at www.sai.ok.gov (C4)

Pending Litigation Statement (C5)

Description of capital improvements program, if any (C6)

Site Certificate, Plans and Specs, and Construction Permit (E1)

Water Purchase Agreements (F3)

Operating/Lease Agreements (F7)

ATTACHMENT I – Water Consumption and Revenue (F8)

ATTACHMENT II – Water/Sewer/Stormwater Rate Structure (F9)

ATTACHMENT III – Inventory of Existing Water, Sanitary Sewer and Stormwater Facilities (F10)

Also include the following if not previously submitted to the OWRB:

Trust Indenture; Orders of Incorporation, etc.

Engineer’s Report

Contract for Engineering Services

Copies of any Notice of Violation or Consent Order

9 Updated 2/17

Page 10: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

VERIFICATIONSTATE OF OKLAHOMA )

) ss.COUNTY OF )

I, , being first duly sworn and upon oath states: that I am the duly authorized representative for the Applicant herein; that I have read the contents of the within and foregoing LOAN APPLICATION and is familiar with the contents thereof; and that the matters and information therein set forth are, to the best of Applicant's knowledge and belief, true and correct.

(Applicant Name)

Signed By:

Printed Name:

Title:

(Applicant's Representative)

Subscribed and sworn to before me this day of , 20 .

(Notary Public)

My Commission Expires:

(SEAL)

ATTORNEY’S CERTIFICATION AS TO LEGALITY OF APPLICATION

I, the undersigned, certify that: I am an attorney representing the applicant herein with respect to the foregoing application attached hereto; the applicant is a [CHECK ONE]:

municipality public trust rural water/sewer district other public entity (identify):

duly organized and existing under the laws of Oklahoma; the applicant possesses full power and authority to acquire, complete and operate the project described in this application; and this application has been lawfully and effectively authorized and executed as the valid action of the applicant.

Attorney at Law

10 Updated 2/17

Page 11: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

Printed Name:

OBA No.:

11 Updated 2/17

Page 12: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

SCHEDULE ONE7BOutstanding Debt Obligations

Source of Funds:Original Amount: Date Obtained:

Current Balance: Maturity Date:

Annual Payment: Interest Rate: %

Reserve Balance:

Interest Rate Mode:

Pledged Collateral:Has the Applicant been over 30 days late on a payment?If yes, please explain:

( ) Yes( ) No

Has the Applicant been in default on this loan?If yes, please explain:

( ) Yes( ) No

Source of Funds:Original Amount: Date Obtained:

Current Balance: Maturity Date:

Annual Payment: Interest Rate: %

Reserve Balance:

Interest Rate Mode:

Pledged Collateral:Has the Applicant been over 30 days late on a payment?If yes, please explain:

( ) Yes( ) No

Has the Applicant been in default on this loan?If yes, please explain:

( ) Yes( ) No

Make copies of SCHEDULE ONE if additional pages are needed.

SCHEDULE ONE – 1 Updated 2/17

Page 13: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATIONATTACHMENT IWATER SALES

Four (4) Year Historical TrendRESIDENTIAL COMMERCIAL INDUSTRIAL TOTAL

YEAR VOLUME REVENUE VOLUME REVENUE VOLUME REVENUE VOLUME REVENUE

ANNUAL WATER INFORMATION (Most recent four (4) year historical)YEAR:

Purchased/Produced:Sold/Consumption:Unaccountable:

ATTACHMENT I – 1 Updated 2/17

Page 14: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

TEN LARGEST CUSTOMERS

Please provide the previous four (4) years of historical usage for each pledged revenue type (i.e. water, sewer, etc.) by using the tables below or by submitting your own data.

YEAR: Service: YEAR: Service:

NameUsage (mg) Revenue Name

Usage (mg) Revenue

Totals: Totals:

YEAR: Service: YEAR: Service:

NameUsage (mg) Revenue Name

Usage (mg) Revenue

Totals: Totals:

ATTACHMENT I – 2 Updated 2/17

Page 15: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

TEN LARGEST CUSTOMERS

In the space below, please indicate any anticipated major customers, if any, starting or discontinuing service in the future. Please include the year, if known, and impact on future usage and revenue.

Anticipated Major Customers Starting Service:

Anticipated Major Customers Discontinuing Service:

ATTACHMENT I – 3 Updated 2/17

Page 16: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

ATTACHMENT IIWater/Sewer/Stormwater Rate Structure

Applicant Name: a. Water Rates – Effective Date:

Residential:

Minimum bill $ for gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Commercial:

Minimum bill $ for gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

b. Sewer Rates – Effective Date: Residential:

Minimum bill $ for gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Commercial:

Minimum bill $ for gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Next gallons for $ per gallons

Make copies of ATTACHMENT II if additional pages are needed.

Page 17: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

c. Stormwater Rates – Effective Date: (Complete only if stormwater infrastructure is a component of the loan or if pledging stormwater revenues)

Stormwater fee structure: (Please describe or include ordinance as an attachment)

ATTACHMENT II – 2 Updated 2/17

Page 18: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

ATTACHMENT IIIINVENTORY OF EXISTING WATER, SANITARY SEWER AND STORMWATER

FACILITIES

Applicant Name: Date:

A. Water System1. Water Wells (if applicable)

a. Total number of active wells: b. Total pumping capacity (all wells on) (gpm): c. Do all wells have the following (Please answer Yes or No):

Flow Meters: Sample Taps: Side Discharge: All weather access road:

d. Please furnish a map showing the well locations or a list of the legal description for each well.

2. Water Treatment (Please furnish a PROCESS diagram)a. Type (check or describe):

Rapid Sand Slow Sand Lime-soda Softening Rapid Sand Pressure Filtration Reverse Osmosis Ion Exchange Other (describe):

b. Design Capacity (MGD): c. Treatment Process (check, list, or describe):

Pretreatment Other (list or describe):Rapid Mixing Flocculation Sedimentation Filtration

d. Clearwell Capacity (gallons):

3. Distribution Mainsa. Total length of all mains (feet): b. Size range (inches): c. Pipe materials (check all that exist in the system):

Asbestos Cement Cast Iron Concrete Ductile Iron PVC Steel Other (describe)

ATTACHMENT III – 1 Updated 2/17

Page 19: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

4. Booster Pump Stationsa. Total number in distribution system: b. Hydraulic Data:

Station Designation*

Capacity (GPM) (all pumps on)

Pump Type/Quantity (centrifugal, turbine, etc.)

* Indicate station name, or number, or nearest road intersection, or legal description

c. Emergency facilities:

Station Designation * Description

* Indicate station name, or number, or nearest road intersection, or legal description

5. Fire Hydrantsa. Total number in system: b. Estimate the percentage of hydrants that are:

Dry Barrel type Equipped w/safety flanges Equipped w/isolation valves

c. Estimate the percentage of occupied lots that are not located within 400 feet of a fire hydrant:

d. Frequency of flow measurement: e. Current Insurance Service Office (ISO) rating:

6. Distribution Main Valvesa. Are they exercised at regular intervals: (Yes or No)b. Is there a sufficient quantity of valves to isolate small areas during either

routine maintenance or emergency repairs: (Yes or No)c. How often are they checked for leaks:

ATTACHMENT III – 2 Updated 2/17

Page 20: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

7. Individual Service Metersa. Are all customers metered: (Yes or No)b. Are meters checked for accuracy at regular intervals:

(Yes or No)If yes, how often:

c. How often are they read: d. Describe meter replacement policy:

8. Master Metersa. Name of purchaser(s):

b. How often are meters read: c. How often are they tested for accuracy: d. Describe meter replacement policy:

9. Storage Tanks in the Distribution Systema. Capacity and Type:

Number or Name

Capacity (gallons)

Type (elevated, standpipe, underground, ground, etc.)

ATTACHMENT III – 3 Updated 2/17

Page 21: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

b. Construction Material and Total Height:

Number or Name Wall Material Roof Material Total Height (feet)

c. Appurtenances:

Number or Name

All-Weather Access Road

Security Fence

Overflow Pipe Per

DEQ Standards Roof Vent

Ladders Equipped w/Safety Devices

B. Sanitary Sewer System1. Collection Mains (exclude service lines)

a. Total length of collection mains (feet or miles): b. Pipe size range (inches): c. Pipe materials (check all that exist in the system):

Asbestos Cement Cast Iron Clay Concrete Ductile Iron PVC Steel Other (describe)

d. Maximum manhole spacing (feet): e. Manhole wall material (check all that exist in the system):

ATTACHMENT III – 4 Updated 2/17

Page 22: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

Clay Brick Concrete Brick Cast-in-place Concrete Precast Concrete Fiberglass Other (describe)

f. Average Manhole diameter (feet):

2. Lift Stationsa. Total number in collection system: b. Hydraulic Data:

Station Designation*

Capacity (GPM) (all pumps on)

Pump Type/Quantity (submersible, centrifugal,

suction lift, etc.)

* Indicate station name, or number, or nearest road intersection, or legal description

c. Emergency facilities to prevent bypassing (ponds, engine-drive pumps, etc.:

Station Designation * Description

* Indicate station name, or number, or nearest road intersection, or legal description

ATTACHMENT III – 5 Updated 2/17

Page 23: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

3. Treatment Plant(s) (Please furnish a PROCESS diagram)a. Design capacity:

Plant A (name): MGD: or Persons:

Plant B (name): MGD: or Persons:

b. Treatment units (check appropriate process):

Treatment Unit Plant A Plant BBar ScreensComminutorsGrit ChambersFlow EqualizationStormwater Holding PondPrimary ClarifierFinal ClarifierTrickling FiltersAeration TanksOxidation DitchRotating Biological ContractorSequencing Batch ReactorsLand ApplicationTotal Retention LagoonFlow Through LagoonSludge ThickenersAnaerobic DigestorsAerobic DigestorsSludge Drying BedsMechanical Dewatering UnitsChlorination/DechlorinationUltraviolet Disinfection

ATTACHMENT III – 6 Updated 2/17

Page 24: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

c. Lagoon Data:Plant A

Primary Cells:Total Number: Total Surface Area (acres):

Evaporation Cells:Total Number: Total Surface Area (acres):

Polishing Cells:Total Number: Total Surface Area (acres):

Plant BPrimary Cells:

Total Number: Total Surface Area (acres):

Evaporation Cells:Total Number: Total Surface Area (acres):

Polishing Cells:Total Number: Total Surface Area (acres):

d. Effluent Flow Measurement (describe):Plant A: Plant B:

e. Receiving Stream or Reservoir:Plant A: Plant B:

C. Stormwater System (Complete only if stormwater infrastructure is a component of the loan or if pledging stormwater revenues)1. Community information

a. Is the applicant a MS4 community? (Yes or No)

b. Does the community participate in theNational Floodplain Insurance Program? (Yes or No)

i. Is the community enrolled in the Community Rating System program? (Yes or No)

ATTACHMENT III – 7 Updated 2/17

Page 25: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

2. Watershed or catch basina. Total drainage area: b. List of rivers, tributaries, creeks and streams in watershed:

Water body Description

3. Stormwater linesa. Combined sewer system: (Yes or No)b. Piping characteristics:

Diameter range: Material of construction (check all that exist in the system):

Asbestos cement Cast iron Concrete Ductile iron PVC Steel Other (describe)

Total length: Average depth from soil surface:

c. Stormwater inlet characteristics:Number of inlets: Average inlet separation: Material of construction: Warning sign to avoid dumpingthrough inlets? (Yes or No)

4. Discharge channelsa. Channel configuration (check all that exist in the system):

i. Type:Open Closed

ii. Surface:Natural (i.e. ditch) Grassed Paved Rip-rap Other (describe)

ATTACHMENT III – 8 Updated 2/17

Page 26: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

iii. Geometry:Vertical channel Circular channel Trapezoidal channel Other (describe)

b. Dimensions:Range of depth (in feet): Average width (if trapezoidal,indicate bottom and top widths): Length:

c. Culverts characteristics:Number of public culverts (does not includeprivate driveways):

Culvert types (check all that exist in the system):Pipe Arch pipe Box Bridge Arch Other (describe)

d. Flow resistances:Are channels cleaned andmaintained regularly? (Yes or No) If yes, how often? Are there any structures whichobstruct water flow? (Yes or No)

Obstructing structure (i.e. bridges, dams) Location

ATTACHMENT III – 9 Updated 2/17

Page 27: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

5. Retention systems and temporary storagea. Type (check all that exist in the system and indicate if they are natural,

grassed or paved):Extended detention basins Retention/detention ponds Wetlands Tanks/vaults Equalization basins Other (describe)

b. Please indicate the approximate storage capacity of each system.

System Name Capacity

6. Volume reduction methodsa. Type (check all that exist in the system):

Infiltration/exfiltration trenches Infiltration/exfiltration basins Permeable/porous pavement Bioretention cells/rain gardens Dry swales Dry wells/cisterns Extended detention basins Other (describe)

7. Identify areas of interesta. List the locations with a record of flooding or considered likely to represent

a bottleneck in the stormwater management:

Location Description

Answer b and c below only if MS4 Community

ATTACHMENT III – 10 Updated 2/17

Page 28: 0BULoan Application AmountFee · Web viewThe following filing, reviewing and processing fee is required with all loan applications. Such fee shall be based on the amount of financial

OWRB LOAN APPLICATION

b. Are there any factories or construction sites discharging to the stormwater lines? (Yes or No)

c. If yes, do they have a valid OPDES/Stormwater discharge permit? (Yes or No)

ATTACHMENT III – 11 Updated 2/17