2nd WORKSHOP ON POWER SECTOR REFORMS
11 – 12 NOV 2010
3
INTRODUCTIONINTRODUCTION
4
AREA OF JURISDICTION AREA OF JURISDICTION
CHAGAI
KHARAN
PANJGUR
TURBAT
GWADAR
AWARAN
KHUZDAR
KALAT
MASTUNG
BOLAN
LASBELA
D- BUGTI
KOHLU
LORALAI
ZHOB
Q.SAIF ULLAH
SIBI
PISHIN
ZIARAT
J.MAGSI
N-ABAD
KESC
JAFERABAD
MUSA KHAIL
SOUTHERN CIRCLE
NORTHERNCIRCLE
CENTRALCIRCLE
ARABIAN SEA
IRAN
AFGHANISTAN
SIND
PUNJAB
Q. ABDULLAH
QUETTABARKHAN
CIRCLE OP DIVS DISTT
CENTRAL 3 1
NORTHERN 5 17
SOUTHERN
TOTAL
3
11
12
30
NOSHKI
AREA - 43% OF PAKISTANPOPULATION - 4.5% OF PAKISTANPOPULATION FACILITATED - 48%
5
PROFILE PROFILE MANPOWER
AUH - 9072 HELD - 7095 DEF - 1977
11 KV FEEDERS - 450
DISTRIBUTION TRANSFORMERS - 35510 LENGTH OF LINES (KMs) - 37563
11 KV (HT) - 26268 0.4 KV (LT) - 11295
GRID STATIONS - 61— 66 KV - 10— 132 KV - 51— 220 KV - 02 (800 MVA)— MVA CAPACITY (66 & 132 KV G/S) - 1774
TRANSMISSION LINES (KMs) - 6239— 33 KV - 945— 66 KV - 636— 132 KV - 3994— 220 KV - 664
6
KEY PERFORMANCE INDICATORS
KEY PERFORMANCE INDICATORS
7
KPI - PROGRESS 2009 - 10
KPI - PROGRESS 2009 - 10
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
LINE LOSSES (%AGE) 18 % 20.70 % 3.75
COLLECTION RATIO (%AGE) 99% 75.60 % 0
TRANSFORMER FAILURE RATIO (%AGE) 2% 1.50 % 1.5
LINE FAILURE RATIO (BELOW 20 MIN) 24000 5216 2
LINE FAILURE RATIO (ABOVE 20 MIN) 7000 2751 2
DEFECTIVE METERS
(7 – 12 M AS % AGE OF TOTAL)1 % 0.75 % 4
SUB TOTAL 13.25
A. OPERATIONAL & COMMERCIAL PERFORMANCE – 50%A. OPERATIONAL & COMMERCIAL PERFORMANCE – 50%
8
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
CASH IN TRANSIT (%AGE) 10 % 12 % 0.75
O&M EXPENSES (RS / KWH) 1.79 1.88 1.25
SUB TOTAL 2.00
B. FINANCIAL PERFORMANCE – 8%B. FINANCIAL PERFORMANCE – 8%
KPI - PROGRESS 2009 - 10
KPI - PROGRESS 2009 - 10
9
KPI - PROGRESS 2009 - 10
KPI - PROGRESS 2009 - 10
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
CAPITALIZATION
(COMPLETION OF A - 90 FORMS) NOS2000 105 0
STG (RS IN M) 500 499 2.5
DOP (RS IN M) 87 81.378 0.5
ELR (RS IN M) 230 280.550 2.0
RURAL ELECTRIFICATION (RS IN M) 130 129.642 0.5
SUB TOTAL 5.5
C. CAPITAL EXPENDITURE PROJECT IMPLEMENTATION – 15%C. CAPITAL EXPENDITURE PROJECT IMPLEMENTATION – 15%
10
KPI - PROGRESS 2009 - 10
KPI - PROGRESS 2009 - 10
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
NEW CONNECTIONS (NOS) 12000 13278 1
CUSTOMERS FACILITATIONS (NOS) 20000 13752 1
EFFICIENCY OF SUPPLY COMPLAINTS RESOLUTION (NOS)
2000 1936 1
EFFICIENCY OF BILLING COMPLAINTS RESOLUTION (NOS)
18000 2799 2
SUB TOTAL 5.00
D. CUSTOMER RELATION MANAGEMENT – 5%D. CUSTOMER RELATION MANAGEMENT – 5%
11
KPI - PROGRESS 2009 - 10
KPI - PROGRESS 2009 - 10
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
OFFICERS STRENGTH 85 % 76 % 0.5
STAFF STRENGTH 80 % 75 % 1
RESOLUTION OF DISCIPLINARY CASES 85 % 21 % 0
SETTLEMENT OF AP 85 % 9 % 0
OFFICERS TRAINED DURING THE YEAR (%AGE)
5 % 9 % 3
STAFF TRAINED DURING THE YEAR (%AGE) 15 % 7 % 0
SUB TOTAL 4.5
E. HUMAN RESOURCE MANAGEMENT – 12%E. HUMAN RESOURCE MANAGEMENT – 12%
12
KPI - PROGRESS 2009 - 10
KPI - PROGRESS 2009 - 10
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
NO OF ACCIDENTS (FATAL) 0 5 0
NO OF ACCIDENTS (NON-FATAL) 0 6 0
SUB TOTAL 0
TOTAL SCORE 30.25
F. EMPLOYEES SAFETY – 10%F. EMPLOYEES SAFETY – 10%
13
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
LINE LOSSES (%AGE) 18 % 19.30 % 2.5
COLLECTION RATIO (%AGE) 90% 22 % 0
TRANSFORMER FAILURE RATIO (%AGE) 02% 1.57 % 2
LINE FAILURE RATIO (BELOW 20 MIN) 240 52 2
LINE FAILURE RATIO (ABOVE 20 MIN) 49 10 2
DEFECTIVE METERS
(7 – 12 MONTHS) AS %AGE OF TOTAL1 % 0.75 % 4
SUB TOTAL 12.50
A. OPERATIONAL & COMMERCIAL PERFORMANCE – 40%A. OPERATIONAL & COMMERCIAL PERFORMANCE – 40%
14
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
CASH IN TRANSIT (%AGE) 10 % 6 % 8
O&M EXPENSES (RS / KWH) 1.35 0.80 12
SUB TOTAL 20
B. FINANCIAL PERFORMANCE – 20%B. FINANCIAL PERFORMANCE – 20%
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
15
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
CAPITALIZATION
(COMPLETION OF A - 90 FORMS) %AGE80% 0 0
STG (RS IN M) 800 120 0
DOP (RS IN M) 160 1.16 0
ELR (RS IN M) 240 5.58 0
RURAL ELECTRIFICATION (RS IN M) 200 27.64 0
SUB TOTAL 0
C. CAPITAL EXPENDITURE PROJECT IMPLEMENTATION – 15%C. CAPITAL EXPENDITURE PROJECT IMPLEMENTATION – 15%
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
NOTE: BUDGET ALLOCATION RECEIVED AT THE END OF SEP 2010 HENCE EXPENDITURE COULD NOT BE INCURRED AS PER TARGETS
NOTE: BUDGET ALLOCATION RECEIVED AT THE END OF SEP 2010 HENCE EXPENDITURE COULD NOT BE INCURRED AS PER TARGETS
16
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
NEW CONNECTIONS (NOS) 12000 3416 1
CUSTOMERS FACILITATIONS (%AGE) 96% 98% 1
EFFICIENCY OF SUPPLY COMPLAINTS RESOLUTION (%AGE)
100% 100% 1
EFFICIENCY OF BILLING COMPLAINTS RESOLUTION (%AGE)
90% 93% 2
SUB TOTAL 5.00
D. CUSTOMER RELATION MANAGEMENT – 5%D. CUSTOMER RELATION MANAGEMENT – 5%
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
17
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
OFFICERS STRENGTH (%AGE) 75% 79% 2
STAFF STRENGTH(%AGE) 75% 77% 2
RESOLUTION OF DISCIPLINARY CASES (%AGE) 85% 79% 0.5
SETTLEMENT OF AP(%AGE) 50% 48% 0.5
OFFICERS TRAINED (%AGE) 05% 05% 2
STAFF TRAINED (%AGE) 15% 15% 2
SUB TOTAL 9
E. HUMAN RESOURCE MANAGEMENT – 10%E. HUMAN RESOURCE MANAGEMENT – 10%
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
18
KEY PERFORMANCE INDICATORS TARGETS ACTUAL SCORE
NO OF ACCIDENTS (FATAL) 0 2 0
NO OF ACCIDENTS (NON-FATAL) 0 0 4
SUB TOTAL 4
TOTAL SCORE 50.5
F. EMPLOYEES SAFETY – 10%F. EMPLOYEES SAFETY – 10%
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
KPI – PROGRESS 1ST QUARTER (JULY – SEP 2010)
19
BOTTLE NECKSBOTTLE NECKS LINE LOSSES
– NEPRA DETERMINATION FOR 2010 – 11 IS 18% AND CAN NOT BE ACHIEVED DUE TO FOLLOWING REASONS: -• AVAILABILITY OF SINGLE 220 KV SOURCE
• LENGTHY NETWORK OF BOTH 132 & 11 KV SYSTEM
• INADEQUATE POWER GENERATION AT QUETTA
• LOW VOLTAGE PROFILE DUE TO SYSTEM CONSTRAINTS
– TRANSMISSION LOSSES ARE ANTICIPATED TO INCREASE FURTHER UNTIL COMPLETION OF 220 KV DADU – KHUZDAR & DG KHAN – LORALAI T/ LINES
– NON PROVISION OF FC FORCE TO UPROOT 5000 X ILLEGAL TUBEWELLS EXISTING ON THE SYSTEM.
20
BOTTLE NECKSBOTTLE NECKS BILLING & COLLECTION
– TARGET FOR 2010 – 11 IS 90% AND CAN NOT BE ACHIEVED DUE TO FOLLOWING REASONS: -• THE DETERIORATED LAW & ORDER SITUATION IN THE PROVINCE
• INCIDENTS OF EMPLOYEES MANHANDLING HAVE INCREASED HAMPERING QESCO’S COLLECTION ADVERSELY.
• NON-PAYMENT OF AGRI SUBSIDY BY GOB / GOP
• NON PAYMENT OF BILLS BY AGRI CONSUMERS W.E.F JULY 2010 DUE TO WITHDRAWAL OF SUBSIDY AND NON ISSUANCE OF NOTIFICATION FOR ITS RESTORATION DESPITE OF HONORABLE PRIME MINISTER’S ANNOUNCEMENT IN AUGUST 2010.
21
STATUS OF VARIOUS ACTIVITIES / PROJECTSSTATUS OF VARIOUS ACTIVITIES / PROJECTS
22
STATUS OF VILLAGE ELECTRIFICATION – BALOCHISTAN SEP 2010
STATUS OF VILLAGE ELECTRIFICATION – BALOCHISTAN SEP 2010
TOTAL VILLAGES - 17123
ELECTRIFIED • UPTO 1999 - 2544• DURING 2000-2006 - 3238• DURING 2006 – 09 - 3722• DURING 2009 – 10 - 2070• DURING 2010 – 11 UPTO SEP 2010 - 220
TOTAL - 11794
ACHIEVEMENTS 2009 – 10 KFP - 441 ON DEPOSIT BASIS - 1629
TOTAL - 2070
BALANCE VILLAGES - 5329 TO BE ELECTRIFIED
– FROM EXISTING NETWORK - 4498– THROUGH ALTERNATE ENERGY - 831
NOS
23
VILLAGE ELECTRIFICATIONVILLAGE ELECTRIFICATION
625
919762
510
8281008
18862070
220
0
500
1000
1500
2000
2500
2007-082006-072005-062004-052003-042002-03 2008 – 09 2010-11UPTO SEP 10
2009-10
TARGET FOR 2010 – 11TARGET FOR 2010 – 11 - 2000 NOS - 2000 NOS
24
PROGVILLAGE RECIVE
D
FUND RECIVED
( RS IN M)
COMP
2008- 09
COMP
2009-10
COMP
07/10 TO 9/10TOTAL COMP
OVER ALL EXP UPTO SEP 2010
(RS IN M)
EXP
7/10 TO 9/10
(RS IN M)
BAL
(WIP)
KPP 635 946.23 538 13 0 551 907.05 0 84
PWP 3771 2919.59 1154 1616 174 2944 2070.33 89.307 827
KFP 1139 849.65 194 441 46 681 537.10 39.641 458
TOTAL 5545 4715.47 1886 2070 220 4176 3514.48 128.948 1369
VILLAGE ELECTRIFICATION VILLAGE ELECTRIFICATION 2008 TO SEP 2010 2008 TO SEP 2010
VILLAGE ELECTRIFICATION VILLAGE ELECTRIFICATION 2008 TO SEP 2010 2008 TO SEP 2010
25
DESCRIPTIONDESCRIPTION1. KUWAIT FUND LOAN AGREEMENT – 448 FOR 5 MILLION KD’S WAS SIGNED
ON 03 APR 1994 BUT DURING 1998 THE FUND STOPPED DISBURSEMENT HOWEVER THE LOAN HAS BEEN REVIVED DURING OCT 07 AND IS EFFECTIVE SINCE 09 MAR 08 AND COMPLETION PERIOD IS 2 YEARS
2. PROJECT COST
• FCC – (5.0 M K.D) RS 1034.00 M
• LCC RS 651.115 M
TOTAL RS 1685.115 M
BREAKUP OF FUND
• VILLAGE ELECTRIFICATION RS 1046.43 MILLION
• CONSTRUCTION OF 3 X GRID STATIONS
RS 469.04 MILLION
• IDC ON MATERIAL RS 169.68 MILLION
3. PROJECT DIGEST
• NEW VILLAGES 700 NOS CRITERIA HT – 2 KM, LT 1 KM)• NEW GRID STATIONS 3 NOS (132 KV DARWAZA,
BASIMA & HURAMZAI)
26
3 X GRID STATIONS & ASSOCIATED T/ LINES UNDER KFP LOAN # 448
3 X GRID STATIONS & ASSOCIATED T/ LINES UNDER KFP LOAN # 448
ESTIMATED COST - 475
• DARWAZA - 130 (COMMISSIONED)
• BASIMA - 215 (COMPLETED)
• HURAMZAI - 130 (COMMISSIONED)
RS IN M
27
ADDITIONAL POWER SOURCESADDITIONAL POWER SOURCES
220 KV– DADU-KHUZDAR T/LINE - 35 % WORK DONE– DG KHAN – LORALAI - 30 % WORK DONE– 1000 MW IMPORT (IRAN) - FEASIBILITY
STUDIES IN PROGRESS
– 100 MW FROM IRAN FOR GWADAR - WIP– 220/ 132 KV GRID STATION AT DMJ - LAND ACQUIRED– UPGRADTION OF DMJ FROM - REMITTANCE OF
66 INTO 132 KV SYSTEM) ALLOCATED RS 150 M AWAITED
27
NOTE: -• TRANSMISSION LOSSES WILL BE REDUCED FROM 8 % TO 3%
WITH THE COMPLETION OF THESE PROJECTS.• VOLTAGE PROFILES WILL BE IMPROVED SIGNIFICANTLY• ADDITIONAL SOURCES WILL BE AVAILABLE WITH REDUCED LOAD SHEDDING QUANTUM.
28
NEW GRID STATIONS – STGNEW GRID STATIONS – STGNAME OF PROJECT
APPROVED COST (RS IN M)
REMARKS
132 KV DERA BUGTI 303 ALLOCATION OF RS 100 M FOR EACH STATION UNDER ADP (GOP FINANCING) 2009 – 10 EXSITS
REMITTANCE OF RS 40 MILLION EACH RECEIVED. WORK OF T/ LINE IS UNDER
PROGRESS 132 KV SUI 297.20
132 KV DALBANDIN 960.00
RS 457 M REMITTED BY GOP REST OF AMOUNT WORTH RS 533 M STILL AWAITED . TOWER
ERECTION WORK IS IN PROGRESS WHERE AS REST OF ACTIVITIES HELD UP. HOWEVER, RS
450 M STANDS ALLOCATED UNDER PSDP 2010 – 11 REMITTANCE AWAITED
132 KV KOHLU 313
RS 140 M OUT RS 330 M REMITTED BY GOB UNDER PRESIDENT PACKAGE. 40 – 45 % WORK DONE BUT WORK HELD UP DUE SHORTAGE OF
FUNDS
29
NEW GRID STATIONS – STG NEW GRID STATIONS – STG
NAME OF PROJECTAPPROVED
COST (RS IN M)REMARKS
132 KV ZIARAT 240.006TH STG APPROVED PROJECTS CONSTRUCTION
OF T/ LINE IS IN PROGRESS
132 KV CHAGHI 450 .00 - Do -
132 KV DEEP SEA PORT GWADAR
235.00ALLOCATED RS 130 M UNDER ADP 2009 – 10
REMITTANCE AWAITED
132 KV SINGAHR HOUSING SCHEME
371.00
ALLOCATED RS 200 M UNDER ADP 2009 – 10
RS 90 M REMITTED DURING MAR 2010
(132 KV POLES & CONDUCTOR HAVE BEEN PROCURED, PROBLEM OF ROW NOT YET
SETTLED BY GDA)
132 KV DOWN TOWN GWADAR
306.00ALLOCATED RS 170 M UNDER ADP 2009 – 10
RS 170 M REMITTED IN MAY 2010
132 KV DERA MURAD JAMALI FROM UCH POWER HOUSE
-RS 350 M STANDS ALLOCATED UNDER PSDP 2010-11. ACTIVITIES IS SUBJECT TO REMITTANCE
30
132 & 66 KV GRID STATIONS WORK IN PROGRESS (EXT/ AUG)132 & 66 KV GRID STATIONS
WORK IN PROGRESS (EXT/ AUG)
S.NO. NAMECAP
(MVA)
1. 132 KV SARIAB (26 TO 40 MVA) AUG 14
2. 132 KV MAND (6.3 TO 13 MVA) AUG 6.7
3. 132 KV GWAL HYDERZAI (6.3 MVA) EXT 6.3
4. 66 KV ROJHAN JAMALI (6.3 MVA) EXT 6.3
TOTAL 33.3
31
NEW 132KV T/LINES(WORK IN PROGRESS)
NEW 132KV T/LINES(WORK IN PROGRESS)
S.NO. NAME LENGTH (KM)
1. BARKHAN –KOHLU 32
2. NOSHKI –DALBANDIN 195
3. IN & OUT RAKHNI 4.5
4. DALBANDIN - CHAGHI 59
5. KHANOZAI - ZIARAT 45
6. KASHMORE - SUI 49
7. SUI – DERA BUGTI 51
TOTAL 435.5
32
ADB FINANCING PLAN TRANCHE – I ADB FINANCING PLAN TRANCHE – I
AUG/ EXT OF 7 x GRID STATIONS AUG – 2 NOS ( 132 KV KALAT & SARIAB) EXT – 5 NOS (132 KV MASTUNG, MUSAFIR PUR, NAL, BARKHAN & RAKHNI)
CONVERSION 66 TO 132 KV – 66 KV GRID STATIONS - 2 NOS (ALIZAI, KANAK)
SYSTEM IMPROVEMENT FOR ENERGY LOSS REDUCTION– ELR + DOP– 11 & 0.4 KV CAPACITORS
ACTIVITIES– PROCESS FOR PROCUREMENT OF MATERIAL FINALIZED. PHYSICAL
ACTIVITIES WILL BE COMMENCED SHORTLY.
NOTE: - PC – I COSTING RS 2283 M EQUIVALENT US$ 27.85 M STANDS APPROVED BY GOP
32
33
ADB FINANCING TRANCHE – IIADB FINANCING TRANCHE – II
AUG/ EXT OF 18 x GRID STATIONS AUG – 13 NOS ( 132 KV YARU, KHANOZAI, QILLA SAIFULLAH,
RAKHNI, KHAD KOOCHA, QTA IND, SIBI, KHARAN, TURBAT, SURAB, SOHBAT PUR, DUKKI & GWADAR)
EXT – 5 NOS (132 KV MUSLIM BAGH, WADH, QILLA SAIFULLAH, QUETTA IND & ZEHRI)
SYSTEM IMPROVEMENT FOR ENERGY LOSS REDUCTION– 132 & 11 KV CAPACITORS
NOTE: - PC – I PREPARED & HAS ROUTED TO MINISTRY OF W&P THROUGH PEPCO, ANTICIPATED COST RS 2270 M EQUIVALENT US$ 28.81 M. APPROVAL OF PC – I BY ECNEC AWAITED
34
ADB FINANCING TRANCHE – III(2011 – 12)
ADB FINANCING TRANCHE – III(2011 – 12)
UP GRADATION FROM 33 TO 132 KV – MARAO & SPLINJI, BARSHORE, MALL, MUSA KHAIL,
BULEDA
UP GRADATION FROM 66 TO 132 KV – SORRANGE, DM JAMALI, ROJHAN JAMALI, USTA
MOHAMMAD, JHAL MAGSI & MANJOSHORI, GANDAKHA
NEW 132 KV GRID STATIONS– GOWARGO, NOHSAR, ZARD GHULAM JAN, KANMEHTERZAI,
PRINGABAD, JEWA, PASANZAI, BALNIGOR, MASHKEY, DAB KHAN ZAI, SARWAR ABAD, AWARAN, MALL, BULEDA
34
35
REVIEW OF CRITICAL STOCK POSITIOIN IN THE LIGHT OF
RECENT FLOODS
36
FLOOD AFFECTED GRID STATIONS & DIST NETWORK DISTRICT NASEERABAD / JAFFARABAD/ JHAL MAGSIFLOOD AFFECTED GRID STATIONS & DIST NETWORK DISTRICT NASEERABAD / JAFFARABAD/ JHAL MAGSI
132 KV LINES & GRID STATIONS
66 KV LINES & GRID STATIONS
LEGEND
SOHBATPUR
THULLJACOBABAD
SINDH
SHIKARPUR
MIRO KHAN
SHADADKOTSINDH
GANDAKHA
GARHIKHARO
SINDH
USTA
MOHAMMAD
JHAL MAGSIROJHAN JAMALI
D.M. JAMALIMANJHOSHORI
BABAKOT
HUMAYUN
RATO DERO
FLOOD AFFECTED AREAS – QESCO(3 X GRID STATIONS AFFECTED)
HESCO JURISDICTION
37
DIRECT LOSS GRID STATIONSDIRECT LOSS GRID STATIONS
NAME OF GRID STATION
DATE OF
LOSS
(RS IN M)
CONSUMERS
REMARKSSHUT-DOWN
RESTORED AFFECTED RESTORED
66 KV ROJHAN JAMALI
15 AUG 10 01 SEP 10 0.25 6112 6112
132 KV SOHBAT PUR
16 AUG 10 18 SEP 2010 0.31 5200 5200
PROVISIONALLY RESTORED & REQUIRED RELOCATION OF GRID
STATION IN ADJACENT TO EXISTING ONE AT THE NET
COST OF RS 50 M
38
DIRECT LOSS GRID STATIONSDIRECT LOSS GRID STATIONS
NAME OF GRID STATION
DATE OF
LOSS
(RS IN M)
CONSUMERS
REMARKSSHUT-DOWN
RESTORED AFFECTED RESTORED
66 KV GANDAKHA
20 AUG 10 28 SEP 2010 0.27 47882897 (60%)
• HOUSES DEMOLISHED• AFFECTEES NOT
RETURNED• SYSTEM REHABILITATED
INFRASTRUCTURE
RESIDENTIAL COLONIES, BOUNDARY WALLS, WATER SUPPLY LINES INCLUDING UNDER
GROUND & OVER HEAD TANKS, SEWERAGE LINES, CONTROL ROOMS & APPROACH
ROADS ETC
10.00 - - REHABILITATION UNDER PROCESS
TOTAL 10.83 16100 14209 (88%)
39
DIRECT LOSS DISTRIBUTION SYSTEM(DISTRICT JAFFERABAD, NASEERABAD, JHAL MAGSI & SHERANI)
DIRECT LOSS DISTRIBUTION SYSTEM(DISTRICT JAFFERABAD, NASEERABAD, JHAL MAGSI & SHERANI)
DESCRIPTION
LOSS
REMARKSQTY
AMOUNT
(RS IN M)
TRANSFORMERS VARIOUS CAPACITIES 84 24.28 84 TRANSFORMERS HAVE
BEEN REPLACED
HT LINES 37 KM 24.20 70% REHABILITATION WORK COMPLETED, HOWEVER SUPPLY
RESTORED THROUGH ALTERNATE
ARRANGEMENTS
LT LINES 07 KM 3.29
CUSTOMER CONNECTIONS(METERS SINGLE PHASE & THREE PHASE & TOU)
16100 NOS
16.34MOSTLY RESTORED
EXCEPT THOSE WHO YET NOT RETURNED
TOTAL 68.11
40
INDIRECT LOSSINDIRECT LOSS
OPERATION SUB DIVISION
CATEGORY WISE REVENUE LOSS DUE TO IRRECOVERABLE ELECTRICITY DUES
(RS IN M)
DOM COMM IND TOTAL
a. REVENUE LOSS DUE TO IRRECOVERABLE ELECTRICITY DUES
• DERA MURAD JAMALI 8.74 3.72 3.94 16.4
• USTA MOHAMMAD 11.94 4.78 8.16 24.88
• JAFARABAD 8.4 3.34 6.32 18.06
TOTAL 29.08 11.84 18.42 59.34
b. REVENUE LOSS DUE TO DISTRIBUTION MARGIN 91.49
GRAND TOTAL 150.83
41
TRANSFORMER CAPACITY 25KVA 50KVA 100 KVA 200 KVA
ISSUED 03 07 27 17
STOCK AVAILABLE 308 52 102 22
NO CRITICAL DEFICIENCY OF MATERIAL DUE TO FLOOD
TRANSFORMERS CAPACITY WISE ISSUED TO MEET WITH TRANSFORMERS CAPACITY WISE ISSUED TO MEET WITH EMERGENCY DAMAGES DURING FLOOD EMERGENCY DAMAGES DURING FLOOD
TRANSFORMERS CAPACITY WISE ISSUED TO MEET WITH TRANSFORMERS CAPACITY WISE ISSUED TO MEET WITH EMERGENCY DAMAGES DURING FLOOD EMERGENCY DAMAGES DURING FLOOD
42
THANKSTHANKS
43
POWER SOURCES – BALOCHISTANPOWER SOURCES – BALOCHISTAN
CHAGAI
KHARAN
PANJGUR
TURBAT
AWARAN
KHUZDAR
KALAT
MASTUNG
BOLAN
LASBELA
D- BUGTI
KOHLU
LORALAI
ZHOB MUSA KHAIL
Q.SAIF ULLAH
SIBI
Q. ABDULLAH
PISHIN
QUETTA
ZIARAT
SOHBATPUR
KESC
JALAQ
MASHKAIL
JACKIGORMAND
MIR JAWA
RAKHNI
GWADAR
TAFTANNOKUNDI
DALBANDIN
WASHAK
MASHKAYBULEDA
ORMARAPASNI
JIWANI
QAMAR UD DIN KAREZ
UCH POWER
580/500 MW
ARABIAN SEA
IRAN
AFGHANISTAN
SIND
PUNJAB
U/MOHD
D.M.JAMALI
(2 MW)
(2 MW)
(35 MW)
PISHUKAN
KAPPAR
KALMAT
DUREJI
J-ABAD (30 MW)SHAHDADKOT
(25 MW)
THUL 10 MW
SAKHI SARWAR -(KOT ADDU) (60 MW)
GUDDU
LEGENDGUDDU & IPPPUNJABSINDIRAN
43
KASHMORE - D/BUGTI (06 MW)
TPS SHEIKHMANDA 35/25 MW
HABIB ULLAH COASTAL 140/120 MW
44
% AGE T & D LOSSES UPTO SEP 2010
% AGE T & D LOSSES UPTO SEP 2010
5.0
14.3
19.3
20.8
0.0
5.0
10.0
15.0
20.0
25.0
TRANSMISSION DISTRIBUTION T&D 2010 T&D 2009
NEPRA TARGETS AWAITED
45
132 KV VOLTAGE PROFILE132 KV VOLTAGE PROFILE
70
90 96
109 112 116 116112 110 105
115105
120 125
0
20
40
60
80
100
120
140K
HU
ZD
AR
SO
RA
B
KA
LA
T
MA
NG
OC
HE
R
MA
ST
UN
G
220/
13
2 K
V Q
TA
IND
SA
RIA
B
QT
A C
ITY
M. A
BA
D
S. M
AN
DA
PIS
HIN
Q. S
AIF
UL
LA
H
HA
RN
AI
220/
13
2 K
V S
IBI
220 KV VOLTAGES MAX/ MIN• SIBI - 208/ 200• QTA IND - 187/ 180
4646
CHAGAI
KHARAN
PANJGUR
TURBATAWARAN
KHUZDAR
KALAT
MASTUNG
BOLAN
LASBELA
D- BUGTI
KOHLU
LORALAI
ZHOBQ.SAIF ULLAH
SIBI
PISHIN
QUETTA
ZIARAT
J.MAGSI
N-ABAD
KESC
MASHKAIL
MAND
GUDDU
GWADAR
TAFTAN
ORMARA
ARABIAN SEA
IRAN
AFGHANISTAN
SIND
350 KMs
100 MW POWER HOUSE AT KHUZDAR
KHOST
300 KMS WORK STARTED AVAILABILITY
OF POWER 250 MW
260 KM
• DG KHAN – LORALAI WORK STARTED
• AVAILABILITY OF POWER 480 MW
DADU
FUTURE PLANS200 MW POWER HOUSE AT QUETTA
Q. ABDULLAH
100 MW POWER HOUSE EACH AT KHUZDAR, LORALAI & SIBI
47
STATUS OF ILLEGAL AGRI TUBEWELLS REPORTED
STATUS OF ILLEGAL AGRI TUBEWELLS REPORTED
ILLEGAL TUBE WELLS CONNECTION REPORTED. 4975 NOS
- ADDITIONAL BURDEN ON QESCO NETWORK 170 MW
- UPROOTING OF THESE TUBEWELLS IS NOT POSSIBLE DUE TO POOR LAW AND ORDER SITUATION IN THE PROVINCE.
- REGULARIZATION OF THE ILLEGAL TUBEWELLS ON SUBSIDY BASIS BE ALLOWED
ALTERNATIVELY- LEA HELP BE PROVIDED FOR UPROOTING OF
THESE TUBEWELL.
- FINANCIAL IMPACT FOR REGULARIZATION OF ILLEGAL TUBEWELL FOR ADDITIONAL SUBSIDY TO BE BORNE BY GOP PER YEAR.
RS 3.9 B
- ESTIMATED COST FOR SUB STANDARD MATERIAL REPLACEMENT & REGULARIZATION OF ILLEGAL CONNECTIONS
RS 2.7 B
48
DISTRICT WISE NO OF ILLEGALT/WELLSDISTRICT WISE NO OF ILLEGALT/WELLSNAME OF DISTRICT ILLEGAL TUBEWELLS (NOS)
QILLA ABDULLAH 637
BARKHAN 634
KOHLU 911
LORALAI 384
MUSA KHAIL 29
SIBI 7
JHAL MGSI 24
BOLAN 48
KILLA SAIFULLAH 150
PISHIN 487
MASTUNG 153
KALAT 213
KHUZDAR 1233
QUETTA 13
ZHOB 21
TURBAT 31
TOTAL 4975
49
(Units in Million)
CUSTOMERS PROFILE PROGRESSIVE SEP 10 CUSTOMERS PROFILE PROGRESSIVE SEP 10
CATEGORY
NO. OF CONS
% OF TOTAL CONS
CONSU-MPTION UNITS IN
(M)
% OF CONSUMPTION
ASSESS-MENT RS.
(M)
% OF TOTAL
ASSESS
PAY-MENT RS.(M)
%OF TOTAL
PAY
PAYMENT AS %OF AS-
SESS
RECEIV-ABLE
DOM 372366 75.38 111.18 10.42 787.22 9.41 541.55 29.54 68.79 2373.66
COM 90598 18.34 21.63 2.03 342.41 4.09 290.11 15.83 84.73 401.25
IND 2859 0.58 28.31 2.65 337.98 4.04 278.71 15.21 82.46 189.17
AGRI 19381 3.92 805.00 75.45 5814.05 69.51 302.59 16.51 5.20 18038.13
FED GOVT
1809 0.37 24.77 2.32 292.64 3.50 267.07 14.57 91.26 266.87
PROV GOVT
6984 1.41 76.01 7.13 790.31 9.45 152.88 8.34 19.34 3059.94
TOTAL 493997 - 1066.90 - 8364.61 - 1832.9 - 21.91 24329.02
50
RECEIVABLES – SEP 10RECEIVABLES – SEP 10
0.31, 0%, 0%
12.58%
1.10%
32.85%
12.38%
28.65%
12.18%
AGRI SUBSIDY FED GOVT
(266.87) MFED GOVT
AGRI CONS SHARE
PRIVATE OTHERS
AGRI SUBSIDY PROV GOVT
(2964.08 M)
(7993.15 M)
(6970.12M)
PM SUBSIDY 0. 31 %75.58 M
(3059.94 M)
(2999.28 M)
GoP Subsidy Rs 3074.86 M
GoB Subsidy Rs 6970.12 M
Total Rs 10044.98 M
PROV GOVT
TOTAL RECEIVABLES Rs 24329.02 M
51
Govt Pvt Total Govt Pvt Total Govt Pvt Total
7/06 to 06/07 1703.1 1665.8 3368.9 1544.2 1670.5 3214.7 90.7 100.3 95.4
7/07 to 06/08 2023.6 2065.3 4088.9 1861.7 2044.1 3905.7 92.0 99.0 95.5
7/08 to 06/09 2440.2 2333.2 4773.4 2072.0 4372.2 6444.2 84.9 187.4 135.0
7/09 to 06/10 2986.7 2643.7 5630.4 2406.5 2598.2 5004.7 80.6 98.3 88.9
7/06 to 06/07 4557.1 1023.8 5580.9 3977.4 859.5 4836.9 87.3 84.0 86.7
7/07 to 06/08 5879.4 1131.8 7011.3 4822.6 961.1 5783.7 82.0 84.9 82.5
7/08 to 06/09 7167.9 1263.9 8431.8 5400.5 1028.5 6429.1 75.3 81.4 76.2
7/09 to 06/10 8857.1 1539.7 10396.8 6239.1 1165.1 7404.2 70.4 75.7 71.2
7/06 to 06/07 3514.8 760.8 4275.5 2937.7 606.3 3544.0 83.6 79.7 82.9
7/07 to 06/08 4314.7 957.5 5272.2 3663.1 752.7 4415.8 84.9 78.6 83.8
7/08 to 06/09 5397.1 1228.8 6625.8 4143.2 887.3 5030.5 76.8 72.2 75.9
7/09 to 06/10 6656.6 1360.2 8016.8 4890.8 874.0 5764.8 73.5 64.3 71.9
7/06 to 06/07 9775.0 3450.3 13225.3 8459.2 3136.3 11595.5 86.5 90.9 87.7
7/07 to 06/08 12217.7 4154.7 16372.4 10347.3 3757.9 14105.2 84.7 90.4 86.2
7/08 to 06/09 15005.1 4825.9 19831.0 11615.8 6288.0 17903.8 77.4 130.3 90.3
7/09 to 06/10 18500.4 5543.6 24044.0 13536.4 4637.3 18173.7 73.2 83.7 75.6
Billing Collection% age Collection
of BillingCircle
QESCO
South
North
Central
Govt Pvt Total Govt Pvt Total Govt Pvt Total
7/06 to 06/07 1703.1 1665.8 3368.9 1544.2 1670.5 3214.7 90.7 100.3 95.4
7/07 to 06/08 2023.6 2065.3 4088.9 1861.7 2044.1 3905.7 92.0 99.0 95.5
7/08 to 06/09 2440.2 2333.2 4773.4 2072.0 4372.2 6444.2 84.9 187.4 135.0
7/09 to 06/10 2986.7 2643.7 5630.4 2406.5 2598.2 5004.7 80.6 98.3 88.9
7/06 to 06/07 4557.1 1023.8 5580.9 3977.4 859.5 4836.9 87.3 84.0 86.7
7/07 to 06/08 5879.4 1131.8 7011.3 4822.6 961.1 5783.7 82.0 84.9 82.5
7/08 to 06/09 7167.9 1263.9 8431.8 5400.5 1028.5 6429.1 75.3 81.4 76.2
7/09 to 06/10 8857.1 1539.7 10396.8 6239.1 1165.1 7404.2 70.4 75.7 71.2
7/06 to 06/07 3514.8 760.8 4275.5 2937.7 606.3 3544.0 83.6 79.7 82.9
7/07 to 06/08 4314.7 957.5 5272.2 3663.1 752.7 4415.8 84.9 78.6 83.8
7/08 to 06/09 5397.1 1228.8 6625.8 4143.2 887.3 5030.5 76.8 72.2 75.9
7/09 to 06/10 6656.6 1360.2 8016.8 4890.8 874.0 5764.8 73.5 64.3 71.9
7/06 to 06/07 9775.0 3450.3 13225.3 8459.2 3136.3 11595.5 86.5 90.9 87.7
7/07 to 06/08 12217.7 4154.7 16372.4 10347.3 3757.9 14105.2 84.7 90.4 86.2
7/08 to 06/09 15005.1 4825.9 19831.0 11615.8 6288.0 17903.8 77.4 130.3 90.3
7/09 to 06/10 18500.4 5543.6 24044.0 13536.4 4637.3 18173.7 73.2 83.7 75.6
Billing Collection% age Collection
of BillingCircle
QESCO
South
North
Central
PROGRESSIVE BILLING AND COLLECTION YEAR WISE 2006 – 10
PROGRESSIVE BILLING AND COLLECTION YEAR WISE 2006 – 10
(Rs in Million)
52
SUMMARY OF RECEIVABLES AGAINST AGRICULTURE CONSUMERS IN BALOCHISTAN AS ON JUN 2010
SUMMARY OF RECEIVABLES AGAINST AGRICULTURE CONSUMERS IN BALOCHISTAN AS ON JUN 2010
GOB SHARE
– 30% AGRI SUBSIDY SHARE AGAINST RS 6824 M
– 12.5% SUBSIDY SHARE METERED SUPPLY RS 146 M
CONSUMERS SHARE
– SUBSIDIZED RS 1849 M
– NON – SUBSIDIZED RS 635 M
– P-DISC RS 80 M
GOP SHARE
– 40% AGRI SUBSIDY SHARE AGAINST 15660 RS 3014 M
– 12.5% SUBSIDY SHARE METERED SUPPLY RS 61 M
SUB TOTAL RS 12609 M
FINANCIAL IMPACT PER ANNUM IF SUBSIDY ALLOWED
– 4975 ILLEGAL TUBE WELL RS 3900 M
– REPLACEMENT OF SUB STANDARD MATERIAL RS 2700 M
1749 P-DISC SUBSIDY PER YEAR RS 1497 M
1788 NON – SUBSIDIZED TUBE WELL RS 1466 M
SUB TOTAL RS 9563 M
GRAND TOTAL RS 22172 M
53
PROGRESS – VILLAGE ELECTRIFICATION (KPP) 2007-11
PROGRESS – VILLAGE ELECTRIFICATION (KPP) 2007-11
VILLAGE RECOMD BY
VILLAGES RECEIVED
(NOS)
FUNDS RECEIVED(RS IN M)
COMP 2008-09
COMP 2009-10
COMP
JULY-SEP 10
COMP UPTO
SEP 10 UNDER PROG
(NOS)NOS EXP NOS EXP
KPP-II
(PM DIRECTIVE)
267 635.1 229 05 00 00 234 618.25 33
KPP-I
(MNA GRANT)07 23.46 03 00 00 00 03 19.80 04
KPP-I
(SENATOR GRANT)
10 14.16 09 00 00 00 09 13.65 01
KPP ( CM ) 94 41.15 86 00 00 00 86 38.25 08
KPP
(MPA GRANT)131 115.6 107 02 00 00 109 107.30 22
KPP
(NAZIM GRANT)
126 117.2 104 06 00 00 110 109.80 16
TOTAL 635 946.7 538 13 00 00 551 907.05 84
54
PROGRESS OF VILLAGE ELECTRIFICATION ( PEOPLES WORK PROGRAM ) 2008-11
PROGRESS OF VILLAGE ELECTRIFICATION ( PEOPLES WORK PROGRAM ) 2008-11
VILLAGES RECOMD BY
VILLAGES
RECEIVED
01.04.08 TO
30.06.10
( NOS)
FUNDS RECEIV
ED 01.04.08
TO 30.06.10 (RS IN
M)
COMP 2008-09
EXP
2008-09COMP
2009-10EXP
2009-10
COMPLETED
JULY–AUG 10
COMP DURING
SEP 10
UNDER PROG
(NOS)NOS EXP NOS EXP
PWP-II
(PM DIRECTIVE)2634 1930.09 756 836.9 1274 717.295 55 26.39 72 48.42 477
PWP-I
( MNA GRANT )79 48.633 05 3.393 20 8.24 02 .751 0 00 52
PWP-I
(SENATOR GRANT)
118 85.912 40 23.97 45 21.455 0 00 0 00 33
PWP
(Governor )01 1.400 00 00 01 1.4000 0 00 0 00 0
PWP
(CM DIRECTIVE)99 69.178 30 10.758 42 25.640 0 00 0 00 27
PWP
( MPA GRANT)814 778.339 310 192.80 226 129.689 17 1.448 25 11.47 236
PWP
(NAZIM GRANT)18 6.047 13 5.19 03 0.894 0 00 0 00 02
PWP
(OTHERS)8 12.484 13 5.19 05 3.312 0 00 03 1.254 00
TOTAL 3771 2919.6 1154 1073.1 1616 907.93 74 28.6 100 60.7 827
55
PROGRESS REPORT WORKS COMPLETED2006 - 2010
PROGRESS REPORT WORKS COMPLETED2006 - 2010
NEW GRID STATIONS COMPLETED 08 NOS.
EXTENSION 21 NOS.
• 132 KV 15 NOS
• 66 KV 06 NOS
AUGMENTATION 17 NOS.
CAPACITORS ADDED (13X G/S) 69.6 MVAR
TRANSMISSION LINES (10 X T/L) 298.2KM
56
WORKS COMPLETED DURING 2006- 10 (132KV NEW GRID STATIONS)
WORKS COMPLETED DURING 2006- 10 (132KV NEW GRID STATIONS)
S.NO. NAME CAP (MVA) STATUS
1. 132KV WADH 13
CO
MM
ISS
ION
ED
2. 132KV NAL 26
3. 132KV ZEHRI 13
4. 132KV HURAMZAI 26
5. 132KV DARWAZA 26
6. 132KV GWADAR IND: 13
7. 132 KUCHLAK 26
8. 132 KV BASIMA 13COMPLETED
TOTAL CAPACITY INSTALLED 156 MVA
57
WORKS COMPLETED DURING 2006- 10 (EXTENSION OF 132KV GRID STATIONS)
WORKS COMPLETED DURING 2006- 10 (EXTENSION OF 132KV GRID STATIONS)
S.No. NAMECAPACITY
(MVA)STATUS
1. BAGHBANA 26 CO
MM
ISS
ION
ED
2. SURAB 13
3. GIDDER 13
4. KHARAN 6.3
5. MANGOCHAR 26
6. KHADKUCHA 13
7. MACH 6.3
8. SHIEKHMANDA (13 THEN 40) 40
9. PISHIN 6.3
58
WORKS COMPLETED DURING 2006- 10 (EXTENSION OF 132KV GRID STATIONS)
WORKS COMPLETED DURING 2006- 10 (EXTENSION OF 132KV GRID STATIONS)
S.No. NAMECAPACITY
(MVA)STATUS
10. PISHIN 26
CO
MM
ISS
ION
ED
11. QILLA ABDULLAH 26
12. GULISTAN 26
13. KHANOZAI 13
14. DUKKI 13
15. WADH 13
TOTAL CAPACITY ENHANCED 266.9 MVA
59
WORKS COMPLETED DURING 2006- 10 (EXTENSION OF 66KV GRID STATIONS)
WORKS COMPLETED DURING 2006- 10 (EXTENSION OF 66KV GRID STATIONS)
S.No. NAMECAPACITY
(MVA)STATUS
1. KANAK 6.3
CO
MM
ISS
ION
ED
2. ALIZAI 6.3
3. D.M. JAMALI 6.3
4. USTA MOHAMMAD 6.3
5. JHAL MAGSI 5
6. MANJOSHORI (6.3 TO 13) 6.7
TOTAL CAPACITY ENHANCED 36.9 MVA
60
WORKS COMPLETED DURING 2006- 10 (AUGMENTATION OF 132KV GRID STATIONS)
WORKS COMPLETED DURING 2006- 10 (AUGMENTATION OF 132KV GRID STATIONS)
S.No. NAMECAPACITY
(MVA)STATUS
1. KALAT (13 TO 26) 13
CO
MM
ISS
ION
ED
2. MASTUNG (13 TO 26) 13
3. QUETTA CITY (26 TO 40) 14
4. MARRIABAD (13 TO 26) 13
5. YARU (13 TO 26) 13
6. MUSLIMBAGH (13 TO 26) 13
7. CHAMMAN (13 TO 26) 13
8. G. HYDERZAI (6.3 TO 13) 6.7
9. ZHOB (6.3 TO 13) 6.7
61
WORKS COMPLETED DURING 2006- 10 (AUGMENTATION OF 132KV GRID STATIONS)
WORKS COMPLETED DURING 2006- 10 (AUGMENTATION OF 132KV GRID STATIONS)
S.No. NAMECAPACITY
(MVA)STATUS
10. LORALAI (13 TO 26) 13
CO
MM
ISS
ION
ED
11. RAKHNI (6.3 TO 13) 6.7
12. BARKHAN (13 TO 26) 13
13. TURBAT (6.3 TO 13) 6.7
14. KHUZDAR (13 TO 26) 13
15. BAGHBANA (6.3 TO 26) 16.7
16. QUETTA CITY (13 TO 40) 27
17. Q/SAIFULLAH (15 TO 26) 11
TOTAL CAPACITY ENHANCED 212.5 MVA
62
CONVERSION OF GRID STATIONS FROM 66 TO 132KV
CONVERSION OF GRID STATIONS FROM 66 TO 132KV
S.NO. NAMECAPACITY
(MVA)STATUS
1. 66KV GWADAR OLD 13COMMISSIONED
ON 21.11.2009
63
PROGRESS REPORT OF 11KV CAPCITOR BANKS AT VARIOUS GRID STATIONS
S.NO. 132KV GRID STATION Cap: of
P/TF
MVAR Installed /Added
REMARKS
1. HURAMZAI (NEW) 20/26 7.2 COMMISSIONED
2. DARWAZA (NEW) 20/26 7.2 COMMISSIONED
3. WADH (EXT) 10/13 4.8 COMMISSIONED
4. KHUZDAR (AUG) 20/26 4.8 COMMISSIONED
5. NAL (NEW) 20/26 2.4 COMMISSIONED
6. BAGHBANA (EXT) 20/26 7.2 COMMISSIONED
7. SURAB (EXT) 10/13 4.8 COMMISSIONED
8. GULISTAN (EXT) 20/26 7.2 COMMISSIONED
9. KHANOZAI (EXT) 10/13 4.8 COMMISSIONED
10. LORALAI (AUG) 20/26 2.4 COMMISSIONED
11. GIDDER (EXT) 10/13 4.8 COMMISSIONED
64
PROGRESS REPORT OF 11KV CAPCITOR BANKS AT VARIOUS GRID STATIONS
S.NO. 132KV GRID STATION Cap: of
P/TF
MVAR Installed /Added
REMARKS
12. KHUD KUCHA (EXT) 10/13 4.8 COMMISSIONED
13 YARU (AUG) 20/26 2.4 COMMISSIONED
14. KIRDGAB (EXT) 10/13 4.8 COMMISSIONED
15. PISHIN (EXT) 20/26 7.2 Installed and will be commissioned on availability of 11KV capacitor Panel
16. QILLA ABDULLAH (EXT)
20/26 7.2 Installed and will be commissioned on availability of 11KV capacitor Panel
17. MANJO SHORI (AUG) 10/13 4.8 Installed and will be commissioned on availability of 11KV capacitor Panel
65
NEW 132KV T/LINES – COMPLETED2006 -10
NEW 132KV T/LINES – COMPLETED2006 -10
S.No. NAMELENGTH
(KM)STATUS
1. KHUZDAR –WADH 65
CO
MM
ISS
ION
ED
2. KHUZDAR –NAL 42
3. SURAB –ZEHRI 75
4. YARU –HURAMZAI 30
5. HURAMZAI –Q.ABDULLAH 18
6. FEED FOR GWADAR IND: 01
7. FEED FOR DARWAZA 0.9
8. FEED FOR BASIMA 16.1
9. RAKHNI –KINGRI 45.7
66
NEW 132KV T/LINES – COMPLETED2006 -10
NEW 132KV T/LINES – COMPLETED2006 -10
S.No. NAMELENGTH
(KM)STATUS
10. KINGRI –MEKHTAR 46 CO
MM
ISS
ION
ED
11. MEKHTAR –LORALAI 84
12. TPS –PISHIN 43
13. HURMZAI –ALIZAI 13.5
TOTAL 480.2KM
67
CONSTRUCTION OF 132 KV DALBANDIN GRID STATION & 132 KV NOSHKI – DALBANDIN T/ LINE
ESTIMATED COST RS 990 M FUNDS REMITTED RS 457 M BALANCE RS 533 M PROGRESS
– GRID STATION– SCOPE OF WORK
• 1 X LINE BAY AT 132 KV NOSHKI GRID STATION• 1 X T/F BAY WITH 20/ 26 MVA POWER T/F• 1 X ISO BAY• PROGRESS
– CIVIL WORKS OF CONTROL HOUSE BUILDING & RESIDENTIAL COLONY COMPLETED DURING 1996 – 97
– PROCUREMENT OF GRID STATION MATERIAL NOT MADE DUE TO LACK OF FUNDS
68
CONSTRUCTION OF 132 KV DALBANDIN GRID STATION & 132 KV NOSHKI – DALBANDIN T/ LINE
– TRANSMISSION LINE• LENGTH OF T/ LINE 190 KM• TYPE SDT• PROGRESS
– 95 % TOWER FOUNDATIONS CONSTRUCTED– ERECTION 40% COMPLETED
NOTE: - THE PACE OF WORK HAS BEEN SLOWED DOWN DUE TO REMITTANCES IN PIECE MEAL