1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor InfoComm International
Transcript
Page 1: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

1© 2013 InfoComm International

AV Project Management Using InfoComm Standards

Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green AssociateSenior Staff Instructor

InfoComm International

Page 2: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

2© 2013 InfoComm International

Objectives

• To use a framework for AV project planning, execution and closure

• To be familiar with project planning tools and AV standard documentation

Page 3: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

3© 2013 InfoComm International

Obvious?

• Yes• It’s back to basics• It’s picking up tips• It’s getting in shape• Are you the player or

the coach?

Page 4: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

4© 2013 InfoComm International

On Time – On Budget

• Why don’t our projects end?

• Why do we keep going back?

• I’m losing money on this

Page 5: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

5© 2013 InfoComm International

The End Starts At The Beginning

• What are expectations?– What the stakeholder thinks they are getting

from the designer and integrator– What the designer thinks they told the

customer and integrator– What the integrator thinks the designer and

stakeholder wants and needs

Page 6: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

6© 2013 InfoComm International

PM Process Definitions (Lifecycle)

CloseExecution/ControlPreparationInitiation

Page 7: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

7© 2013 InfoComm International

So What Did You Agree To Do?

• Scope of Work• Quality of Work• Time Line• Price• Terms and Conditions

Page 8: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

8© 2013 InfoComm International

Project Elements / Constraints

Cost ≠ Price

Quality is impacted by all

elements

Optimize project outcome

by managing constraints

Page 9: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

9© 2013 InfoComm International

Improving Performance

• Requires a repeatable structure• Requires industry standard documents• Requires transparency• Requires a check list

Page 10: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

10© 2013 InfoComm International

Project Comparison

Page 11: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

11© 2013 InfoComm International

Standards Guide

Page 12: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

12© 2013 InfoComm International

Standards Guide for AV Systems Design and Coordination Processes

• Guide for documenting AV projects• Guide for coordinating with other trades• Method for setting expectations

Page 13: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

13© 2013 InfoComm International

Standards GuideI. Project Planning and Coordination MeetingsII. Program Phase (alternatively, Briefing Phase or Concept Design Phase)

A. Needs AnalysisB. Program Report

III. Design PhaseA. Architectural and Infrastructure Requirements

1. Architectural and Interior Design2. Electrical3. Workmanship and Technique4. Acoustical5. Information Technology (IT)

B. AV System Documents1. Bid Specifications

Part 1 – GeneralPart 2 – ProductsPart 3 – Execution

2. Design Drawings3. Facilities Drawings4. System Drawings

IV. Construction PhaseA. Construction DrawingsB. Facilities DrawingsC. System DrawingsD. Reference DocumentationE. Testing and AcceptanceF. Project Closeout

Page 14: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

14© 2013 InfoComm International

What are the Parts?

• Scope, Purpose, and Application• Referenced Publications• Definitions• Requirements• Verification• Appendix

Page 15: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

15© 2013 InfoComm International

Scope - Purpose – Application

• Provides a method for documentation

• Provides a recognition and method of coordinating with other disciplines and trades

• Provides a practical guideline for verifying cross trade responsibilities

Page 16: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

16© 2013 InfoComm International

Method For Documentation

• Project Planning & Coordination• Program Phase• Design Phase• Construction Phase• Verification

Page 17: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

17© 2013 InfoComm International

Exceptions

Page 18: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

18© 2013 InfoComm International

Guide Requirements Section

• The largest portion of the document

• Describes in detail all aspects of the design process from project planning to a verified completed project

Requirements

Planning and

Coordination

Program

Phase

Design Phase

Construction Phase

Page 19: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

19© 2013 InfoComm International

Planning & Coord Meetings

• Schedule of meetings– Dates and times– Length and location

• Meeting members– Who is on the list?– Who is not on the list?

• Agenda for meetings

Page 20: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

20© 2013 InfoComm International

Establishing a Governance Structure

• Who do you need to make happy? • Managing expectations• Stakeholder relationships• Conflict and Escalation• How are you doing?

Page 21: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

21© 2013 InfoComm International

Program Phase

• Needs analysis• Program report

Needs

Applications

Tasks

Functions and Features

Page 22: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

22© 2013 InfoComm International

Design Phase

• Architectural and interior design

• AV System Documents

Page 23: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

23© 2013 InfoComm International

Program and Design Phases

• Gather Information• Needs Analysis• Site Survey• Recommend Changes & Create Scope• Determine AV Solution Components• Design AV Solution

Page 24: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

24© 2013 InfoComm International

Construction Phase

• Construction drawings• Facilities drawings• System Drawings• Reference Documentation• Testing and acceptance• Project closeout

Page 25: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

25© 2013 InfoComm International

Verification

• All trades coordination and expectations

• Provides responsibility check list

• Avoids planning and delivery holes

• Creates better understanding amongst client, GC, and trade partners

Page 26: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

26© 2013 InfoComm International

Who Will Manage The Project

• Technician• Designer• Sales manager• Consultant• Customer• Project manager

Page 27: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

27© 2013 InfoComm International

Roles And Perspectives

• Technicians / Engineers– Seeks optimal

solutions– Strives for precision– Deals with things– Focuses on processes– Reactionary problem

solving– Works with immutable

laws– Succeeds individually

• Project Manager– Seeks pragmatic

decisions– Strives for accuracy– Deals with people– Focuses on outcomes– Proactive planning– Works with

situational rules– Succeeds through

others

Page 28: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

28© 2013 InfoComm International

Making A Timeline

• You have what needs to be done

• How long will it take?• Break it down• Create milestones• Assign people

Page 29: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

29© 2013 InfoComm International

Risk Response Planning Strategies

• Threats• Opportunities• Strategies– Avoidance– Transference– Mitigation– Acceptance

Page 30: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

30© 2013 InfoComm International

Page 31: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

31© 2013 InfoComm International

Work Breakdown Structure

What is the required result?Specific, measurable, verifiable, unambiguous

AV Production System

Lighting Video Display

P&D

Scaffold

Support

Microphones

Cabling

Loudspeakers

Stands

Dynamic Cabling

Mixer Amplifiers

Cabling

Condenser

ENG Cam BOH

Talent Mic BOH

Rigging General Session Intro

Audio

FOH

Power Power Monitors

Page 32: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

32© 2013 InfoComm International

Logic Network Diagram

Page 33: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

33© 2013 InfoComm International

Estimate – Effort & Duration

• Time to complete the task? • Aggregate time to complete the task?

Page 34: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

34© 2013 InfoComm International

Mature Display of a Project Schedule

5 days / 2 days5 days / 2 days

6 days / 2 days7 days shown

7 days shown8 days shown

Hiding or Padding

Mature Use of Uncertainty and Reserves5 days

5 days6 days5 days

shown 5 days shown 6 days

shown 4 days uncertainty

22 days planned

4 days reserve 26 days

planned

26 days actual

24 days actual

2 days mitigation

Page 35: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

35© 2013 InfoComm International

Work Schedule

Page 36: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

36© 2013 InfoComm International

Labor

• Jurisdiction• Work Rules• Scales within scales• Premium time• Penalties• Payroll

Page 37: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

37© 2013 InfoComm International

Preparation Phase

Executing & Controlling Phase

Closing Phase

Event Closure

• What did we do well?

What could we have done better?

What were the key events for each phase?

Take the time to Look Back and Learn

Page 38: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

38© 2013 InfoComm International

How Will This Affect Me?

• Project quality will be improved• Coordination with other trades will be

improved• Costs will be reduced• Expectations will be met• Stress will be reduced

Page 39: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

39© 2013 InfoComm International

Project Completion

When you finished doing all the things that you said you would do.

Page 40: 1 © 2013 InfoComm International AV Project Management Using InfoComm Standards Tom Kehr, CTS-D, CTS-I, ISF-C, LEED Green Associate Senior Staff Instructor.

40© 2013 InfoComm International