Project Summary:•4 new build terraced houses in Wandsworth, comprising of 4bed, 3bath, WC & open plan living/dining area with private gardens.•Superstructure installation totalling 10 days, with minimal disruption to residents.•Construction Programme - 11months. •Superstructure Subcontractor.•Achieved Code for Sustainable Homes Level 3.
Case Study1-4 Edison Mews,Wandsworth, London.
Building Performace Summary:•Air Permeability Rating: 2.0.•Dwelling Emission Rate (DER): 14.84.•CO2 Emissions: 1.15 (tons/year).•SAP Rating (1-100): 88.•Environmental Impact Rating (1-100): 87.•Ext Wall U-Value: 0.17(W/m2k).•Floor U-Value: 0.12(W/m2k).•Roof U-Value: 0.13(W/m2k).
Project Overview
This project was designed to utilize the a site previously occupied by dilapidated garages. Thescheme maximized the sites potential by excavating below ground to incorporate a basementstructure. The proposed brief was to utilize an off-site manufactured solution to install a timber framesuperstructure quickly to minimize the construction program and the impact on the surroundingcommunity. The timber frame superstructure was manufactured over a period of 3 months andrunning concurrently alongside the groundworks element on site. As the substructure was formed, theindividual units were delivered to site using a flat bed delivery vehicle an installed by a mobile crane.Each individual unit was installed in approximately 3days, allowing a very quick lead into to internal fitout. Traditional method of fit out is then implemented to a high level of finish and running over a periodof approximately 10weeks per unit.
Build Sequencing
The building had previously been designed as a traditional masonry structure of brick & block.Following clients request this was redesigned to a complete timber structure using entirely FSCsupplied products. The main components were primarily constructed as a ‘flat pack’ kit of parts anderected in a five day period on site. Modular components were delivered on a short bed rigid deliveryvehicle and installed by a 20t mobile crane during which time health & safety and traffic managementwere carried out to high standard. Within 10 working days the superstructure was water tight andinternal fit-out could commence.
Marcus TerraceProject:
Drawing title:
Drawing Number:
Status:
Revision:
Scale:
Date of origin:
For Planning
March 2014
Ground Floor Plan
1:100 @ A3
150_PLN_201
A
Notes:
The copyright of this drawing is held by Design ACB Ltd. Not to be used
for any purpose without consent.
Wandsworth
Proposed
A: Wolverton Court • 15 London Street
Basingstoke • Hampshire • RG21 7NT
W: www.designacb.com
T: 01256 411450
© design ACB
• Do not Scale. Used figured dimensions only.
• All dimensions to be checked on site.
• All drawings to be read in conjunction with engineer's
drawings. Any discrepancies between consultants drawings to
be reported to the Architect before any work commences.
• The Contractor's attention is drawn to the Health & Safety matters
identified in the Health & Safety plan as being potentially hazardous.
• These items should not be considered as a full and final list.
• The Work Package Contractor's normal Health & Safety
obligations still apply when undertaking constructional
operations both on and off site.
• Design ACB take no responsibility for the location of legal
boundaries indicated on this drawing and advise a separate
drawing be completed by a specialist surveyor in order to
establish exact boundaries.
• DWG files provided for information only. Refer to PDF record.
design ACBa r c h i t e c t s
Revision Date Notes
Activ
ity s
pace
4 P
ers
on+
Activ
ity s
pace
4 P
ers
on+
SB
1-3
SB
4
SB
4
S-1
S-1
PC
CFSH
PC
CFSH
PC
CFSH
Futu
re S
how
er
Futu
re S
how
er
Futu
re S
how
er
Activity
space
1-3 Person
DW
WM
RB
FF
BU
BU
DW
WM
FF
RB
BU
RB
DW
WM
FF
S-1
Activity
space
1-3 Person
DW
FF
WM
BU
RB
Future Shower
SB 1-3
0 1 2 3 M
B
B
A
A
Dining
Kitchen
WC
Garden
Garden
Garden
Garden
Dining
Dining
Dining
Kitchen
Kitchen
Kitchen
WC
WC
WC
Study
Study
Study
A XX/03/14 Issued for planning
Marcus TerraceProject:
Drawing title:
Drawing Number:
Status:
Revision:
Scale:
Date of origin:
For Planning
March 2014
First Floor Plan
1:100 @ A3
150_PLN_202
A
Notes:
The copyright of this drawing is held by Design ACB Ltd. Not to be used
for any purpose without consent.
Wandsworth
Proposed
A: Wolverton Court • 15 London Street
Basingstoke • Hampshire • RG21 7NT
W: www.designacb.com
T: 01256 411450
© design ACB
• Do not Scale. Used figured dimensions only.
• All dimensions to be checked on site.
• All drawings to be read in conjunction with engineer's
drawings. Any discrepancies between consultants drawings to
be reported to the Architect before any work commences.
• The Contractor's attention is drawn to the Health & Safety matters
identified in the Health & Safety plan as being potentially hazardous.
• These items should not be considered as a full and final list.
• The Work Package Contractor's normal Health & Safety
obligations still apply when undertaking constructional
operations both on and off site.
• Design ACB take no responsibility for the location of legal
boundaries indicated on this drawing and advise a separate
drawing be completed by a specialist surveyor in order to
establish exact boundaries.
• DWG files provided for information only. Refer to PDF record.
design ACBa r c h i t e c t s
Revision Date Notes
Future Shower
Future Shower
D/D
D/D
D/D
D/D
D/D
D/D
D/D
D/D
Future Shower
D
D/D
D/D
DT
DT
Future Shower
Future Shower
W
W
DT
DT
W
D
W
D
W
D
DT
D/D
D
DT
D
DT
W W
D
W
DT
2100mm
1800mm
D
D/D
D/D
CY
L
CY
L
CYL
CYL
0 1 2 3 M
B
B
A
A
Bedroom
Bathroom
Void todining
Void todining
Wardrobe
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bathroom
Bathroom
En-SuiteEn-Suite
Bathroom
Bedroom
A XX/03/14 Issued for planning