Evgenia Koeva Cohesion Policy for Environment Directorate Managing Authority of OPE Ministry of Environment and Water PREPARATION OF WATER INFRASTRUCTURE PROJ ENVIRONMENT OPERATIONAL PROGRAMME
Transcript
Page 1: 1-4_Presentation bav conference may 2012

Evgenia KoevaCohesion Policy for Environment Directorate

Managing Authority of OPEMinistry of Environment and Water

PREPARATION OF WATER INFRASTRUCTURE PROJECTS ENVIRONMENT OPERATIONAL PROGRAMME

Page 2: 1-4_Presentation bav conference may 2012

PROGRAMME OBJECTIVES

STRATEGIC OBJECTIVE: – Improvement, preservation and recovery of the

natural environment and development of environmental infrastructure

SPECIFIC OBJECTIVES: – Protection and improvement of water resources

– Improvement of waste management and soil protection

– Preservation of biodiversity and nature protection

Page 3: 1-4_Presentation bav conference may 2012

PRIORITY AXES

PRIORITY AXIS 1: Improvement and development of water and wastewater infrastructure in settlements with over 2000 PE and in settlements below 2000 PE within urban agglomeration areas

Budget: 1 284 000 000 EUR

Beneficiaries: municipal administrations and river basin management directorates

Page 4: 1-4_Presentation bav conference may 2012

PRIORITY AXES

PRIORITY AXIS 2: Improvement and development of waste treatment infrastructure

Budget: 367 million EUR

Beneficiaries: municipal administrations, associations of municipalities

Page 5: 1-4_Presentation bav conference may 2012

PRIORITY AXES

PRIORITY AXIS 3: Preservation and recovery of biodiversity

Budget: 103 million EUR

Beneficiaries: municipalities, NATURA 2000 management administrations, non-governmental organisations

Page 6: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: EUROPEAN LEGISLATION

Compliance with Directive 91/271/EEC concerning urban wastewater treatment

Page 7: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: ELIGIBLE ACTIVITIES

Construction/reconstruction of WWTPConstruction of collectors to WWTPConstruction of main collectors and pump

stations for wastewater collection Construction of sewerage networks Reconstruction/rehabilitation of sewerage

networks Construction/reconstruction of water supply

networks that are located in the routes of the sewers

Page 8: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: FINANCING

- Direct award procedures and beneficiaries

- Prioritisation of agglomerations with a focus on agglomerations above 10 000 PE in the 2007-2013 programming period

Page 9: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: STAGES OF PROJECT PREPARATION (1)

- Preparation of invitations for application that outline eligible beneficiaries and activities, required documentation, specific conditions for application

- Organisation of consultations with the direct project beneficiaries

- Review of feasibility studies by the MA and provision of comments

- Revision of project documentation by the project beneficiaries

Page 10: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: STAGES OF PROJECT PREPARATION (2)

- Review of complete project documentation (feasibility studies, preliminary designs for WWTP, preliminary and detailed designs for sewerage and water supply networks, cost benefit analyses) by the MA and provision of comments

- Revision of documentation and submission of project proposals for evaluation

- Evaluation of the submitted proposals - Contract award upon completion of the

evaluation

Page 11: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: MOST COMMON MISTAKES

- Incorrect estimation of the number of PE

- Incorrect estimation of water consumption per capita

- The feasibility study does not examine the entire collecting and treatment system

Page 12: 1-4_Presentation bav conference may 2012

PRIORITY AXIS 1: DIRECT AWARD PROCEDURES

- 2010: two direct award procedures for construction and technical assistance+construction (for agglomerations above 10 000 PE)

- 2011: one direct award procedure for construction (for agglomerations between 2 000 and 10 000 PE)

Page 13: 1-4_Presentation bav conference may 2012

OPE IN SUPPORT OF THE WATER SECTOR REFORM (1)

Recent amendments to the Water Act:

- Public ownership of water infrastructure assets

- Management of water infrastructure by water associations established for each of the 28 designated areas in the country

Page 14: 1-4_Presentation bav conference may 2012

OPE IN SUPPORT OF THE WATER SECTOR REFORM (2)

In 2012 the MA of OPE launched a direct grant award procedure aimed at supporting the water sector reform and the sustainable management of water infrastructure in the country.

Page 15: 1-4_Presentation bav conference may 2012

OPE IN SUPPORT OF THE WATER SECTOR REFORM (3)

Planned activities of the procedure:

- Development of a strategy for the water sector- Capacity building of water companies (operators)

and water associations- Development of a single information system for

water services - Development of legislative acts and other documents

that regulate water infrastructure management and performance of water associations

Page 16: 1-4_Presentation bav conference may 2012

OPE IN SUPPORT OF THE WATER SECTOR REFORM (4)

- Beneficiary: Water Infrastructure Directorate at the Ministry of Regional Development and Public Works

- Budget: 8 400 000 EUR

Page 17: 1-4_Presentation bav conference may 2012

Cohesion Policy for Environment Directorate MANAGING AUTHORITY OF OPE

www.ope.moew.government.bg