1 ASSEMBLY NOTES 1. Specifications Build according to IPC 6012 class 2 Standards 2. THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions During assembly, keep room relative humidity above 25% Monitor ESD events 3. The camera head may be used in UHV environments LBNL 1 CYCLOTRON RD BERKELEY, CA 94720 ASSEMBLYDRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER: Rev: A DRAWN: N.ANDRESEN J. JOSEPH CHECK: DATE:
Transcript
Page 1: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

1

ASSEMBLY NOTES

1. SpecificationsBuild according to IPC 6012 class 2 Standards

2. THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautionsDuring assembly, keep room relative humidity above 25%Monitor ESD events

3. The camera head may be used in UHV environments

LBNL1 CYCLOTRON RDBERKELEY, CA 94720

ASSEMBLYDRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DRAWN: N.ANDRESENJ. JOSEPH

CHECK:

DATE:

Page 2: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

2

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

1. Inspect Cu Block pads for flatness using a spare SiC Substrate

2. Attach to 2.75” CF Flange

3. UHV CLEAN

1

STEP 1: STEP 2:

1. Install Clock & Bias board by gently wrapping Flex Assy around Cu block – note lower mounting tabs for proper orientation.

2. Attach to the Cu block using 2 #6 Button head screws as shown. Do not tighten screw – C&B board should float in place.

2

AND OPPOSITE MNT HOLE

Bare 1K-FS Cu Cooling Block Clock & Bias Board Installation

UHV CLEANESD SENSITIVE

Page 3: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

3

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

STEP 3: Sensor/Top Board Installation1. SENSOR mounted on the TOP Board can be damaged by ESD –

Proper handling is extremely important from this point and in all following assembly steps..

2. NOTE: Wire bonds are exposed on the component side of the TOP board assembly.

3. Install TOP board – set assembly, component side down and couple connectors to the C&B board connectors

4. Place a Diamond Insulator on each of the 4 Cu block fingers, and align it with the TOP board assembly with an appropriate pin (can be a screw, do not tighten)

5. Insert a 2-56 x 1” screw with a wide washer and nut attached, in each of the mounting holes of the TOP board to C&B board connectors (4x) and twist them in until the screw bottoms out into the C&B board connector, Be sure that the nut and washer are loose on the SiC side of the TOP board assembly. The screws will put the connectors into alignment.

6. Gently tighten all 4 of the nuts against the TOP board assembly. Using an open end wrench, slowly tighten all 4 nuts, rotating from nut to nut after ~ ½ turn per point, until the connectors are fully seated.

7. Remove all of the insertion screws, and return to the assembly tool kit

4

4x

Diamond Insulator

5 4x

NOTE: The connectors will come together very easily with the insertion tool – DO NOT FORCE. If there is resistance to the insertion, stop the process, separate the connectors and inspect for issues

Measure the following:1. R between the SiC and Cu Block2. R between VSUB and VDDOUT

3. R between VSUB and GND4. NEDGE to GND (J3 & J4, pins 84 & 85)5. NEDGE to VDDOUT (J3 & J4, pins 84 & 83)6. J3 & J4 Shell to Cu block7. SiC to VDDOUT

UHV CLEANESD SENSITIVE

Page 4: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

4

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

STEP 4: fCRIC Digitizer Board Installation

1. NOTE: Wire bonds are exposed on the component side of the fCRIC Digitizer board assembly.

2. Install fCRIC Digitizer board – set assembly, component side facing the Cu block, and couple connectors to the TOP board connectors

3. Set the fCRIC insertion tool on TOP board, aligned with the connector holes, and insert the attachment screws through the TOP board and tighten into the fCRIC connector jackscrew holes

4. Starting by hand, tighten the larger, socket head screws, applying pull evenly, until the connectors start to mate (they will be aligned by the previous step)

5. Finish seating the connector contact using a hex wrench. The connector will come together very easily with the insertion tool – DO NOT FORCE. If there is resistance to the insertion, stop the process, separate the connectors and inspect for issues

6. Remove all of the insertion screws, and repeat for fCRIC Digitizer board on opposite side of the assembly. If both boards have been installed, return the tooling fixture to the assembly tool kit

3

UHV CLEANESD SENSITIVE

Page 5: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

5

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

Install TOP board screws (do not tighten), insulators, springs and spacers as shown. Successively snug each screw until all are lightly tightened. Then back-off each screw by one-quarter turn. Measurement the continuity between the SiC Top-Board and Copper cooling block which should be an open-circuit. The resistance from the SiC to the Heater bars should be open.

STEP 5: Secure TOP board to Cu block

Silicon-Carbide Top-Board

2x Belleville spring washers

Copper cooling block

Top-board Bus clamp

Top-board Bus clamp screw

Polyimide washers

PTFE shrink tubing

CVD Diamond spacer 0.5-mm

Top-Board heater Copper bus

UHV CLEANESD SENSITIVE

Page 6: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

6

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

STEP 6: STEP 7:

Install fCRIC and C&B board Fasteners Install RTD sensors and Frame-Store shield

1. Install fasteners that are used to secure the fCRIC Digitizer and C&B boards to the Cu block.

2. Install spacers, washers, and button head screws to all 8 mounting locations before securely tightening the boards to the Cu block

3. Tighten securely after all fasteners are in place,

NOTE: A spacer block is required between boards for the fCRIC Digitizer that mounts in parallel to the back face of the C&B board..

UHV CLEAN

Frame Store Shield

1. Set Frame Store Shield Assembly into the imaging widow area on the top of the Camera Head assembly.

2. Lightly secure using 2-56 x ½ inch button head screws

3. Attach Kapton PT100 RTD (Minco #...) to the TOP board as noted. Bend the leads over the edge of the camera head and secure with a small piece of ½ inch wide Kapton tape.

4. Secure Heater wires in the same way.

RTD Location

ESD SENSITIVE

Spacer 2x

Page 7: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

7

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

Page 8: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

8

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

Mount housing base

Mount housing sleeve

Mount housing cap and filter slide

Insert filter

Insert filter cover

STEP N: Application Specific, Light Housing Installation

Page 9: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

9

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE:

STEP N+1: Immersion Probe Installation Information

Immersion chiller probe

Copper cooling block

Lubricate probe and camera bore with a very thin film (~0.0005”) of Apiezon “N” cryogenic vacuum grease.

O-Ring, 2-027, Silicone

Immersion probe, Polyurethane retaining spring. Install onto camera after installing Immersion chiller probe and before making CF flange connection.

Fill this void to limit the build-up of ice.

Immersion probe installation. Install a lubricated (Apiezon “N”) Immersion probe into the camera bore to a point where the o-ring engages the probe body. Attached a hand operated vacuum pump to this port and apply vacuum until the probe is seated. No additional load should be applied to the probe for installation. To remove probe apply a minor gas pressure to this port. To remove a probe which has become jammed in the camera; fill the volume of this tube and the space between the probe and the copper cooling block with water, attach a hydraulic pump and apply pressure (if hydraulic fluid is used in the pump, a double acting hydraulic cylinder can be inserted between the pump and the camera to isolate the two fluids).

Page 10: 1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

10

ASSEMBLY DRAWING:

1kFSCCD STD CAMERA HEAD

DWG NUMBER:Rev: A

DATE: