Transcript
Page 1: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

1

Assessment Process for new Mining Leases (SA Mining Act 1971)

May,2006

Page 2: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

2

Outline • Legislative requirements• Assessment process

– Mining and Rehabilitation Proposal Document submitted (completed) – Statutory Public consultation (completed)– PIRSA and whole of government assessment of proposal (current step)– Minister considers to offer or reject lease (still to come)– Mining and Rehabilitation Program and Environmental Bond

assessment (still to come)

Page 3: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

3

Legislative requirements-2 Stage Assessment Process

1. Mining Lease Application– Application details mining concept and risks to environment, public health and

amenity – Statutory consultation is required– PIRSA and whole of government assessment– If to be offered, set rigorous lease conditions to protect environment, public health,

safety and amenity

2. Mining and Rehabilitation Program (MARP)– Specification of constructing, operating, closing and rehabilitating mine site in

accordance with lease conditions– Details of how environmental risks will be managed in perpetuity– Regularly reviewed during mine life

(Approvals and licences are also required under other environmental and safety Acts before mine construction and throughout life of mine)

Page 4: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

4

Assessment processMining and Rehabilitation

Proposal Document

Public Consultation

PIRSA Assessment & Minister lease offer/rejection

MARP / Bond Assessment

Page 5: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

5

Mining and Rehabilitation Proposal Document

• Mine closure and rehabilitation plan (post mine land use)

• Submitted by Terramin in November, 2005

• Description of environment and landscape (detail)

• Description of proposed operations (conceptual)

• Environmental, public health and amenity risk assessment

• Environmental, public health and amenity outcomes to be achieved (control measures)

Page 6: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

6

Assessment process Mining and Rehabilitation

Proposal Document

Public Consultation

PIRSA Assessment & Minister lease offer/rejection

MARP / Bond Assessment

Page 7: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

7

Public consultation• Statutory consultation on mining proposal

– Landowner, council, public, other govt. agencies– 6 weeks (10 November 2005 - 23 December 2006)– Summary of all issues raised compiled by PIRSA (Issues

document released at CCC 18 May)– PIRSA recommended actions to be taken by applicant to

address all issues raised– Issues document publicly available on 19 May

(www.pir.sa.gov.au/minerals)

• Applicant directed by PIRSA to respond to issues raised in consultation (Terramin’s response document publicly available on 19 May (www.pir.sa.gov.au/minerals)

Page 8: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

8

Assessment processMining and Rehabilitation

Proposal Document

Public Consultation

PIRSA Assessment & Minister lease offer/rejection

MARP / Bond Assessment

Page 9: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

9

PIRSA Assessment

• PIRSA undertakes comprehensive review using independent technical experts

• PIRSA prepares assessment report in consultation with other government agencies (EPA, Health, DWLBC (groundwater, River Murray), Transport, Planning, Safework SA)

• PIRSA considers lease conditions that would be required to address all identified issues (draft currently being prepared)

• Reviewed by PIRSA’s Tenement Review Committee and recommendation made to Director of Mines and to Minister for Mineral Resources Development

Page 10: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

10

Review of assessment report

• Statutory referral for formal review of whole of proposal and lease conditions by Development Assessment Commission (DAC)

• DAC recommendation to Planning Minister

• Statutory referral to Minister for River Murray

• If Planning and River Murray Ministers agree with Mineral Resources Development Minister, Government proceeds with offer of lease

• If no agreement, lease application is referred to Cabinet for decision

Page 11: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

11

Assessment processMining and Rehabilitation

Proposal Document

Public Consultation

PIRSA Assessment & Minister lease offer/rejection

MARP / Bond Assessment

Page 12: 1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.

12

MARP assessment

If a lease offer is made and accepted by the applicant:

• Detailed MARP prepared by applicant

• MARP approved or modifications requested by PIRSA in consultation with other government agencies and CCC

• Environmental bond determined (to cover full liability of rehabilitation of land)

• EPA work approval and licence issued

• Other licences E.g water extraction, dangerous substances are required