30
Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila MEGAWORLD CORPORATION 1 | Page Chino Roces corner EDSA, Barangay Magallanes, Makati City, Metro Manila 1. BASIC PROJECT DESCRIPTION Project Information Project Name : VION TOWER Location : Chino Roces corner EDSA, Barangay Magallanes, Makati City, Metro Manila Nature of Project : Single Podium, Multi-Residential Tower with Medium Sized Commercial Component Lot Area : 2,672.50 square meters Building Footprint Area : 1,127.55 square meters Total Built Area : 79,004.86 square meters Total Development Area : 80,871.83 square meters No. of Floor Level : 1 Utility Level 2 Lower Ground Floor Parking (LGF1 to LGF2) 1 Level of Main Lobby/ Commercial floor 1 Level of Commercial (2/F) 1 Level of Office Floor (3/F to 3A/F) 6 Levels of Parking Floors (5/F to 10/F) 2 Levels of Residential Floors with Amenity (11/F to 12/F) 42 Levels of Residential Floors (15/F to 57/F w/o 13/F, 14/F and 44/F designated) 1 Level for Roof Deck Total No. of Retail Units : 20 units Total No. of Parking Slots : 258 slots Project Duration : 4 years and 3 months’ development period
Transcript
Page 1: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 1 | P a g e

Chino Roces corner EDSA, Barangay Magallanes, Makati City, Metro Manila

1. BASIC PROJECT DESCRIPTION Project Information

Project Name : VION TOWER

Location : Chino Roces corner EDSA, Barangay Magallanes, Makati City, Metro Manila

Nature of Project : Single Podium, Multi-Residential Tower with Medium

Sized Commercial Component

Lot Area : 2,672.50 square meters

Building Footprint Area : 1,127.55 square meters

Total Built Area : 79,004.86 square meters

Total Development Area : 80,871.83 square meters

No. of Floor Level : 1 Utility Level

2 Lower Ground Floor Parking (LGF1 to LGF2)

1 Level of Main Lobby/ Commercial floor

1 Level of Commercial (2/F)

1 Level of Office Floor (3/F to 3A/F)

6 Levels of Parking Floors (5/F to 10/F)

2 Levels of Residential Floors with Amenity

(11/F to 12/F)

42 Levels of Residential Floors

(15/F to 57/F w/o 13/F, 14/F and 44/F designated)

1 Level for Roof Deck • Total No. of Retail Units : 20 units

Total No. of Parking Slots : 258 slots

Project Duration : 4 years and 3 months’ development period

Page 2: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 2 | P a g e

The Project Proponent Guevent Investments Development Corporation (formerly known as “Guevara & Sons, Inc.) and Honeycomb Builders, Inc. has awarded in favor of Megaworld Corporation the right to develop the Property via joint development arrangement. Megaworld Corporation is engaged in the investment, acquisition, development, construction and marketing aspects of prime real estate properties. It was incorporated in August 1989 and is responsible for numerous residential and office condominium developments in the Metropolis. By June of 1994, the company listed its shares of stocks with the Philippine Stock Exchange, thereby opening its doors for the public to invest in one of the country’s most dynamic and fast-growing real estate companies. Megaworld’s venture into large-scale developments that combine residential, business and commercial components began with Eastwood City, a live-work-play centered on the Eastwood City Cyber Park. Megaworld was the first to launch a development of this caliber and scale in the local market. Megaworld’s aim to improve the quality of its products and services as a means of ensuring customer satisfaction earned it the ISO 9001:1994 certification in 1999 - a first for any property developer in the country. It has since upgraded its certification to the ISO 9001:2000 series. Today, Megaworld brand reflects the proud achievements of a property company whose various projects have enhanced the urban landscape-providing the living, working and leisure environments that allow families to enjoy life better and businesses to thrive and grow. As project proponent, Megaworld will be involved in the conceptualization, design documentation, construction, implementation, marketing, maintenance, and operation of the development. The proponent's expertise in handling the property management of its built projects attest to its commitment to continually update, upgrade and maintain the high quality of its products for the benefit and satisfaction of its customers. Developer : Megaworld Corporation

Office Address : 28/F Alliance Global Tower 36th Street corner 11th

Avenue, Uptown Bonifacio, Taguig City, Metro Manila

Contact Persons : Philipps C. Cando

Condesa D. de los Santos

Janine C. Villanueva

Mariano C. Cabo

Julius E. Lugo

Telephone No. : (02) 894-6365; (02) 894-6300 loc. 6365

Facsimile No. : (02) 894-6378

E-mail Address : [email protected]

[email protected]

[email protected]

[email protected]

Page 3: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 3 | P a g e

2. PROJECT LOCATION AND AREA The proposed development is located at Chino Roces cor. EDSA, Barangay Magallanes, Makati City, Metro Manila. Please see Figure 1 for Vicinity Map. The site can be reached by all types of land vehicle from any point in Metro Manila. Summarized below are the boundaries of the project area.

Table 1: PROJECT SITE BOUNDARIES

Direction Property/ Establishment Barangay/ Municipality

North SM Savemore, San Lorenzo

Place Condominium Barangay Bangkal, Barangay San

Lorenzo

East Alphaland Southgate Mall Barangay Dasmariñas

South Levi Strauss Philippines

Barangay Magallanes

West Magallanes Barangay Hall

Figure 1: VICINITY MAP

VION TOWER

Page 4: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 4 | P a g e

Project site are bounded by the following geographic coordinates please see Table 2 supported by Figure 2 for its lot plan.

Table 2: GEOGRAPHICAL COORDINATES

Perimeter/ boundary Points (based on OCT/ TCT/ etc)

Latitude (N) Longitude (E)

Corner 1 14°32'25.08" 121°1'4.69"

Corner 2 14°32'26.18" 121°1'4.10"

Corner 3 14°32'26.23" 121°1'4.15"

Corner 4 14°32'26.32" 121°1'4.24"

Corner 5 14°32'26.41" 121°1'4.34"

Corner 6 14°32'26.49" 121°1'4.44"

Corner 7 14 32'26.58" 121°1'4.54"

Corner 8 14°32'26.60" 121°1'4.58"

Corner 9 14°32'26.66" 121°1'4.65"

Corner 10 14°32'26.74" 121°1'4.75"

Corner 11 14°32'26.76" 121°1'5.13"

Corner 12 14°32'27.04" 121°1'5.59"

Corner 13 14°32'27.08" 121°1'5.69"

Corner 14 14°32'27.10" 121°1'5.78"

Corner 15 14 32'27.09" 121°1'5.89"

Corner 16 14 32'27.07" 121°1'5.98"

Corner 17 14°32'27.02" 121°1'6.07"

Corner 18 14 32'26.95" 121°1'6.15"

Corner 19 14 32'26.87" 121°1'6.20"

Corner 20 14 32'26.47" 121°1'6.42"

Corner 21 14°32'26.07" 121°1'6.63"

Page 5: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 5 | P a g e

Figure 2: LOT PLAN Impact Areas Delineation of areas are based on the degree/ nature of the potential environmental impacts brought about by the proposed project. Environmental impacts are generally classified as primary and secondary impacts. Primary impact areas are those that are affected directly by the proposed action (i.e. related to construction & operation of the facility) and areas directly affected in terms of traffic congestion, noise, air and drainage lines. Primary Impact Zone consists of the area within the property itself, areas directly vulnerable to potential geological phenomenon that may be caused by the project and areas along the main river system that will be the receiver of water discharges. Secondary impacts are indirect or induced changes brought by the project. Typically, these include the associated investments and change patterns in social and economic activities in the neighboring areas likely to be stimulated or induced by the proposed action. This impact zone consists of the areas which can be benefited by the employment opportunities, and tributaries of the river system which can be indirectly affected by pollution brought by the construction of the project. Significance and/ or extent and magnitude of the impact may not only be confined within the primary impact zone but may also extend to the secondary impact areas. This issue is considered in the analysis. The location of the primary and secondary impact areas for the proposed Vion Tower project is identified in Figure 3.

Page 6: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 6 | P a g e

Figure 3: VICINITY MAP WITH PRIMARY AND SECONDARY IMPACT AREAS Accessibility Project site is located at Chino Roces cor. EDSA, Barangay Magallanes, Makati City, Metro Manila. The project site is highly accessible from the major national roads bounding the EDSA-Magallanes flyover and the road network within Chino Roces. 3. PROJECT RATIONALE

The project will be a pioneering residential development intended to provide residential spaces to Makati City based executives and young professionals. It offers convenience in terms of easy accessibility to work and other key locations. The increase in demand for more affordable residential spaces in terms of proximity to the work place, shopping malls and school inspired the proponent to come up with project. The project will offer a variety of residential options with a choice of flexible unit sizes and types to building designs and facades. The project also offers attractive amenities and security. The new development will create a unique synergy and be a special place to live, work and play.

The project will enhance job opportunities and revenues for the local communities. As a consequence, it will induce economic growth of the area and ease the perennial residential shortages in Metro Manila.

The general objectives of the project, among others are to provide employment during the construction and operational phases and to contribute to the economic growth of the area. Megaworld aims to ensure your outmost satisfaction through high quality products conceived in the spirit

Page 7: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 7 | P a g e

of innovation and born-out of continuous research and development. It gives priority to the continuous upgrading of the skill and expertise of its key people so that they can provide service of the highest quality. 4. PROJECT COMPONENTS Major Components: Built for a conducive and sophisticated work environment, the residential development being proposed is located at Chino Roces cor. EDSA, Barangay Magallanes, Makati City, Metro Manila. The proposed VION TOWER project will be built on a land area of about two thousand six hundred seventy-two and 50/100 square meters (2,672.50 sq. m.). This will fifty-seven (57) storey Residential building with two lower ground floor set as parking area. While on Ground Floor and 2/F as commercial area. Office space will be located at 3/F to 3A/F. Additional parking space is located at 5/F to 10/F. Residential units with amenity starts to 11/F to 12/F, while 15/F to 57/F without designated 13/F, 14/F and 44/F is intended as residential spaces. Also, there is a provision of roof deck. Machine room and viewing deck. The building footprint area of the project is one thousand one hundred twenty-seven and 55/100 square meters (1,127.55 sq. m.). The total development area including parking and open/site development area will be eighty thousand eight hundred seventy-one and 83/100 square meters (80,871.83 sq. m.). Detailed project component is shown in Table 3.

Table 3: AREA BREAKDOWN

Designation Level No. of Floor

No. of Units / Floor

Leasable Area (sq. m.)

Total Built Area (sq.m.)

Underground Utilities

Utility Level - - - 615.44

Parking LG1/F 1 32 slots - 1,846.33

LG2/F 1 17 slots - 1,846.33

Main Lobby / Commercial

G/F 1 1 366.63 2,672.50

2/F 1 1 660.80 1,818.35

Office 3/F 1 1 - 1,884.75

3A/F 1 1 275.40 275.40

Parking

22 slots - 1,609.35

5/F – 9/F 5 31 slots - 9,423.75

10/F 1 32 slots - 1,884.75

Amenity with Residential

11/F 1 15 564.50 1,127.55

12/F 1 22 843.50 1,115.86

Residential 15/F – 57/F (no 13/F,

14/F and 44/F) 42 26 40,068.00 51,587.09

Roof Deck Utilities

1 1 - 1,228.67

Machine Room - 195.38

Page 8: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 8 | P a g e

Designation Level No. of Floor

No. of Units / Floor

Leasable Area (sq. m.)

Total Built Area (sq.m.)

Viewing Deck - 195.38

Total 43,454.55 79,326.88

Total Lot Area 2,672.50 sq. m.

Building Footprint Area 1,127.55 sq. m.

Total No. of Parking Slots 258.00 slots

BREAKDOWN OF AREAS

Parking Area 614.44 sq. m.

Parking 16,610.48 sq. m.

Main Lobby/ Commercial Area 4,490.85 sq. m.

Office Area 951.08 sq. m.

Residential Area 41,476.00 sq. m.

Amenity/ Common Area 13,563.60 sq. m.

Roof Deck/ Machine Room 1,619.43 sq. m.

Open Space/ Site Development Area 1,544.95 sq. m.

TOTAL DEVELOPMENT AREA 80,871.83 sq. m.

Support Services and Facilities As a developer of the proposed development, Megaworld shall be responsible for the conceptualization, design, construction and maintenance of the project. The proposed project is designed for a more private and comfortable living condition with landscaped area and other recreational amenities. The proposed development will have the required fire safety utilities in modern office building such as automatic fire sprinkler system, smoke and heat detector system, water supply and drainage system, electrical and lighting system, mechanical ventilation and elevator system, telecommunications and cable TV system among others. Some of the features and highlights of the project are as follows:

• Automatic heat/ smoke detection and fire sprinkler system for all floors

• Private and comfortable working condition with landscaped area and recreational amenities

• Cistern tank and underground cistern for ample water supply

• 100% standby power generator

• Fire command center

• Building administrators/ security officer

• Closed Circuit TV (CCTV) monitoring for selected areas

• Variable Refrigerant Flow (VRF) AC system

• Provision of own Sewage Treatment Plant

• Multi-level parking

There will be security guards on duty for 24 hours to secure peace and order and security of the materials in the construction site. The new development will further enhance the area with a promise of a home and lifestyle of modern

Page 9: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 9 | P a g e

convenience for the Metro Manila based executive and professionals.

Please see Figure 4 for the site development of the project while Figure 5 shows the perspective plan of the proposed project. General Layout of Facilities: Commissioned to undertake the design of the project are as shown in Table 4.

Table 4: LIST OF CONSULTANTS

TRADE CONSULTANTS

ARCHITECTURAL Design Alliance

STRUCTURAL

Design and built by General Contractor MECHANICAL

ELECTRICAL

PLUMBING AND SANITARY

FIRE PROTECTION

Figure 4 and Figure 5 shows the site development plan and perspective plan of the project.

Page 10: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 10 | P a g e

Maps:

Figure 4: SITE DEVELOPMENT PLAN

Figure 5: PERSPECTIVE PLAN

Page 11: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 11 | P a g e

5. PROCESS/ TECHNOLOGY Power Supply Estimated power requirement of about 4 MVA of the project will be taken from MERALCO source during full occupancy. There will also be a standby generator set as back-up designed to supply emergency powers during power outages. The proposed project is a Multilevel Residential Tower with Medium Size Commercial. As of now we don’t have yet the design specifications for the generator sets, it will be by supplier. Approximately, the estimated demand/ consumption using generator sets will be the same as estimated power requirement. Furthermore, in case there will be a generator sets on the actual operation we will file the Application for “Permit To Operate” Air Pollution Source Installations (APSI). Water Supply Water will be supplied by the Manila Water during the construction and operation phases. The estimated water consumption will be 934.80 m3 per day during the full occupancy of the proposed development. Wastewater Management Plan The proposed project will construct/ provide its own sewage treatment plant to accommodate its need as the new development progresses. The typical Sequencing Batch Reactor Process Flow will be intended for the project. Solid Waste Management Plan Practically almost all of the component of the current solid wastes management program being implemented by Mega for the existing building is already consistent with the applicable provisions of the RA 9003, also known as the “Ecological Solid Waste Management Act of 2000” It basically covers the collection, temporary storage and hauling/ disposal of the wastes under consideration which take into account the segregation/ sorting of wastes being handled for purposes of material recovery, recycling and re-use and most importantly reduction of the volume of wastes to be finally disposed. As the implementation of the program for the current operation of MC proved effective, it will also be adopted and implemented for the proposed project. 6. PROJECT DURATION Based on the proposed construction plan of the project, it is tentatively scheduled to commence by June 2019 and expected to be completed within four (4) years and three (3) months as its development period. All necessary regulatory requirements with respect to construction activities will be complied faithfully by the proponent.

Page 12: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 12 | P a g e

7. PROJECT PHASES, KEY ENVIRONMENTAL ASPECTS, WASTES, ISSUES, BUILT-IN MEASURES

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

I. PRE-CONSTRUCTION PHASE

Engineering Geological and Geohazard Assessment Report (EGGAR)

• Adopt EGGAR Recommendations and Conclusions

• Proponent Part of Design and Development Phase

Traffic Impact Assessment (TIA) and Traffic Management Plan

• Adopt TIA Recommendations and Conclusions

Occupational Health and Safety Program • Provision of Occupational Health and Safety Plan

• Contractor/ Project Man-ager Emergency Preparedness and Contingency Response Plan • Provision of Emergency Prepared-

ness and Contingency Plan

Solid Waste Management Plan • Implement RA 9003 (Ecological Solid Waste Management Act of 2000)

• PCO/ Con-tractor

Hazardous Waste Management Plan • Implement RA 6969 (Toxic Sub-stances and Hazardous and Nu-clear Wastes Control Act of 1990)

II. CONSTRUCTION PHASE

Environmental

Aspect #1

A. The Land Solid Waste

• Generation of solid construction wastes

• Strict implementation of Solid Waste Management Act which in-clude waste segregation, re-use and recycling and waste audit along construction waste streams

• Contractor/ Project Man-ager

• Php3,000.00 per month

• Included in construction contract

• Contractors shall remove and dis-pose properly all debris and ex-cess material

• If generation of too much solid wastes is inexorable, proper housekeeping or efficient/ fre-quent disposal of solid wastes should implement strictly

Page 13: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 13 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Accumulation of domestic solid waste in the form of used paper, cans, bottles, food refuse, plas-tics, etc.

• Provide Material Recovery Facility to utilize proper sanitation and good housekeeping

• Contractors shall formulate guide-lines on garbage disposal and im-pose penalty to any workers who dispose solid waste indiscrimi-nately

• Provision of proper storage for raw materials

• Proper coordination with the City garbage collection system from prompt removal of garbage from site

• Increase or provide additional gar-bage bins that will be scattered throughout the entire project site to prevent irresponsible waste dis-posal

Hazardous Waste

• Generation of special wastes or household haz-ardous wastes such as paints, thinners, house-hold batteries, lead-acid batter-ies, spray canis-ters and the like

• Generation of used oil and grease from the equipment and vehicles

• Provide hazardous waste storage room for proper handling and dis-posal of hazardous waste materi-als in accordance with RA 6969

• PCO • Php1,000.00 per month

• Included in construction contract

• Secure Haz-ardous Waste ID prior to con-struction

• Secure PCO Accredita-tion prior to Registration

• Hazardous materials should be stored under watertight conditions to prevent their discharge in storm water

• Hazardous wastes must be stored in sealed containers constructed of suitable material with label that clearly identifies the contents and accumulation date

Page 14: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 14 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Oil and grease spills from heavy equipment and vehicles

• All project personnel should be trained to recognized hazardous wastes on the project and to re-spond appropriately to ensure safety and protect the environ-ment

• Contractor/ Project Man-ager

as Hazard-ous Waste Generator

Sub-soil Condition

• Risk of caving in during excava-tions

• Usage of dump trucks and pay loader to remove any excavated soil from the site during earthwork should minimize erosion

• Contractor/ Project Man-ager

• Php10,000.00 per lot

• Included in construction contract

• Provision of shoring, bracing, and protection of excavations with due importation given to proper spac-ing of braces, shores, whenever necessary

• No added cost

• Monitoring and inspection of all possible movements cracks in ad-jacent structures

• Necessary slope protection measures and adaptation of best engineering practices will be im-plemented to prevent excavation-related hazard

Integrity of Structures

• Stability of build-ing foundation

• The building would be designed to conform to the National & Interna-tional Structural Code (i.e. NSCP, ASCE, ASTM and AISC) and would be capable of resisting ma-jor earthquake and stable enough to withstand external loads

• Implementation of plans and spec-ification will be strictly monitored

Page 15: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 15 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

during construction thus recom-mendations of the soil investiga-tion report will be considered

Environmental

Aspect #2

B. The Water Water Quantity

• Increased water consumption in the area

• Implement water conservation • Contractor/ Project Man-ager

• No added cost

• Included in construction contract

Water Quality

• Possible contami-nation of sub-stance spills/ leaks

• Provide/ build temporary toilet fa-cilities with septic tank for workers and disposed off-site to an STP with valid discharge Permit from EMB

• Contractor/ Project Man-ager

• Php10,000.00 per lot

• Included in construction contract

• Provide grease trap/ oil and water separator for food wastes

• Implement proper handling of liq-uid wastes

• Implement proper handling of liq-uid wastes

• Drivers and operators shall be in-structed on proper maintenance of vehicles and equipment. Mainte-nance activities should not be done on-site to avoid spillage of oil and grease

Flooding/ Siltation/ Effluent

• Siltation and tur-bidity of receiving drainage line and water body

• Drainage system will be provided with silt trap so that construction debris/ waste that will be gener-ated in the construction site will not clog up that might cause flooding in the area. Silt trap minimizes sil-tation

• Contractor/ Project Man-ager

• Php5,000.00 per month

• Included in construction contract

Page 16: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 16 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Liquid wastes or sewage dis-charged into a river or the sea

• Installation of perimeter fence to avoid surface run-off along the street

• To avoid scattering of mud there should be a designated wash bay area for vehicle

• Stockpile aggregates properly

• Regular cleaning of drainage ca-nals

• Earthwork activities would also be scheduled during low precipitation periods. Proper work scheduling to hasten excavation works

• Exposed surfaces will be ce-mented or landscaped to stabilize the soil

Environmental

Aspect #3

C. The Air Dust Generation

• Generation of dust/ debris

• Regular watering on-site construc-tion area are expected to limit fugi-tive dust levels to acceptable lev-els

• Contractor/ Project Man-ager

• Php10,000.00 per lot

• Included in construction contract

• Increased in TSP level

• Constructing perimeter fences around the construction site to serve as windbreakers or barriers

• Proper work scheduling of cut-and-fill of the ground to hasten this activity and lessen the exposure of the earth materials to wind and rainfall

• Use of canvass covers for delivery trucks

• Ensure that the transport vehicles moving around the construction site are regulated to minimum

Air Quality

Page 17: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 17 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Increase of TSP, NOX, SO2 levels at the construc-tion site

• The equipment that will be brought to and used in the construction site has to be in good working condi-tion

• Contractor/ Project Man-ager

• Php10,000.00 per lot

• Included in construction contract

• Proper maintenance of genset and other equipment should be imple-mented to help reduce the level of SO2 and NO2 emission and re-duce fuel consumption

• Limit the movement of vehicles in the area through the assistance of traffic enforcer

• Schedule delivery of construction materials during non-peak hours

• Assign unloading and loading area for deliveries

Noise Quality

• Possible exces-sive noise gener-ation

• Construct temporary fence to acts as barriers and to confine noise within the project area

• Contractor/ Project Man-ager

• Php10,000.00 per lot

• Included in construction contract

• Equipment should be properly maintained to minimize noise emissions

• Use of mufflers on equipment mounts to lessen the noise pro-duce

• Proper scheduling of works to avoid the elevated cumulative noise impact

• Noise generating activities shall be made during daytime hours to en-sure minimal noise disturbance to the community (7:00 AM to 6:00 PM)

D. The People Health and Safety

Page 18: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 18 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

Environmental

Aspect #4

• Safety of workers and passersby

• Strict implementation of construc-tion safety rules and regulations

• Contractor/ Project Man-ager

• Php40,000.00 per lot

• Included in construction contract • Appointment of safety engineers

and project nurse

• Provide first aid center, medical and emergency kits within the job site

• Provision of Personal Protective Equipment (PPE) to the workers

• Post warning and safety reminders signs at strategic areas

• Provide fire extinguishers and safety nets at job site

• Conduct seminars on environmen-tal management and monitoring

• Provision of construction fence with lighted canopy and safety net around the project sire for the fall-ing debris

• Ensure structural openings area covered/ protected adequately (e.g. sumps, shafts, floor open-ings, etc.)

Peace and Order

• Probable disturb-ance of peace

• Strict implementation of No gam-bling and drinking policy

• Contractor/ Project Man-ager

• Php2,000.00 per lot

• Included in construction contract • Assign roving guards at night

• Imposed disciplinary measures

• Coordination with barangay and police authorities

Traffic

• Increase in traffic volume

• A traffic management plan will be implemented to have a smooth flow of traffic

• Contractor/ Project Man-ager

• Php2,000.00 per lot

Page 19: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 19 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Delivery of construction materials will be schedule during off-peak hours to minimize impact

• Included in construction contract

• Hauling of cut soil and construc-tion waste by dump trucks would be scheduled to minimize impact on vehicular flow

• Coordination with local authorities on traffic management

• Traffic control devices such as barricades, cones, blinkers shall be used to guide or channel traffic

• The arrangement of traffic control devices used to stop or channel traffic (barricades, cones, blinkers) shall be periodically inspected to ensure that the devices are in good condition

• Caution, warning and construction information warning signs will be displayed as appropriate to warn or inform vehicle traffic passing along the roadways near the con-struction site

• Assign competent traffic assis-tance to motorists entering the property to act as traffic signal man most especially during haul-ing and deliveries of construction materials

Socio-economic

• Increase in Job and Business Op-portunities

• Manpower requirement preferably to come from the community or who are qualified skilled worker is to be given priority

• Contractor/ Project Man-ager

• Construction labor cost

• Included in construction contract

Page 20: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 20 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Purchased construction materials, which can be supplied by business enterprises in the city and adjacent cities

• Additional income and benefit to the local government

• Secure and pay necessary busi-ness permits and clearances local LGU shall directly benefit from the project due to the additional fees that would be collected from taxes and additional revenues from li-censes and permits from various commercial establishments within the project site

• Contractor/ Project Man-ager

• Construction labor cost

• Include in construction contract

• Attract new investors and ex-pected to create more new busi-nesses to be developed in the area resulting to increase in prop-erty value

III. OPERATION PHASE

Environmental

Aspect #1

A. The Land Solid Waste

• Solid waste gen-eration

• Waste minimization, segregation, and recycling

• PCO • Php3,000.00 per month

• Included as operational cost • Provision of a centralized garbage

room for the collection waste from the occupants

• Establish Material Recovery Facil-ity (MRF) to minimize residual wastes

• Coordination with the city govern-ment for regular collection of gar-bage

• There will be daily monitoring of the solid waste by the assigned maintenance personnel to check whether the segregated wastes

Page 21: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 21 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

are brought to their designated containers

Hazardous Waste

• Generation of special wastes or household wastes such as paints, thinners, household batter-ies, lead-acid bat-teries, spray can-isters and the like

• These include wastes from resi-dential and com-mercial sources that comprise of consumer elec-tronics, washing machines, air conditioners, etc.) batteries, oil and busted lamps

• Batteries/ generator set that are malfunctioning will be brought back to factories for checking or replacement

• PCO • Php1,000.00 per month

• Included as operational costs

• Permit to Transport will be se-cured prior to hauling

• Secure haz-ardous waste ID

• Segregated busted fluorescent lamps and used oil from regular waste

• Hazardous wastes will be col-lected in containers for protection from spillage during storage and transport while an open top metal drum will be used for other types of hazwastes

• Labeled containers/ drums will be brought to a qualified waste facility for proper disposal or recycling ac-credited by DENR

• Accumulation of used oil from gen-erator set

• Provide hazardous waste storage room for proper handling and dis-posal of hazardous waste materi-als until collected by DENR ac-credited hazardous waste collec-tor/ transporter

• Designation of specific space for containers/ bins/ facility for haz-ardous wastes at MRF area

• Spillage on fuel storage tanks

• Proper maintenance of storage tanks

Green Area

Page 22: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 22 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Wear and tear of landscape during operational pe-riod

• Continuing maintenance and de-velopment of green areas, play-grounds and landscaped areas

• PCO • Php1,000.00 per month

• Included as operational costs

Environmental

Aspect #2

B. The Water Water Quantity

• Increase demand for water supply

• Ample water supply for the tenants would be assured through the pro-vision of domestic water tank, fire water reserved and an under-ground water tank

• PCO • No added cost

• Included as operational costs

• The tenants shall be encouraged to conserve water by promoting water conservation practices and regulated water pressure through distribution of leaflets/ pamphlets

Water Quality

• Generation of do-mestic wastewater/ run-off

• Provide grease trap/ oil and water separator for food wastes

• PCO • Php4,000.00 per month

• Included as operational costs • Provision of holding tank then con-

nected to the sewage treatment plant facility of the project

Environmental

Aspect #3

C. The Air Air Quality

• Emission of car-bon monoxide, NO2 from use of genset

• Regular monitoring and mainte-nance of the generator set shall be implemented by the administration personnel

• PCO • Php20,000.00 per month

• Included as operational costs

• Secure Per-mit to Oper-ate upon op-eration of generator sets

• A Permit to Operate will be se-cured upon operation of generator set to comply with Clean Air Act

• The project will have landscaped gardens and different ornamental plants to minimize air pollution

• PCO • As needed

Page 23: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 23 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Increase in the volume of vehi-cles that cause excessive emis-sion of carbon monoxide

• Tenants would be provided enough parking spaces for their vehicles

• Included as operational costs

• To minimize air pollution inside the parking levels, adequate air venti-lation will be provided

• The tenants shall be advised to properly maintain their vehicles to minimize gaseous emissions

• Traffic enforcers shall be enjoined to enforce traffic regulations partic-ularly rules on street parking

Noise Quality

• Possible exces-sive noise gener-ation

• The use of generator will only be during power failure

• PCO • Php10,000.00 per lot

• Included in operation costs • The unit will be provided with an

exhaust silencer and will be lo-cated in an enclosed area with sound-absorbing materials

Environmental

Aspect #4

D. The People Health and Safety

• Natural hazards (fire, earthquake)

• All units and common areas are provided by fire and smoke detec-tor alarm system and an automatic fire sprinkler system. There is also a fire reserve tank for continues water supply in case of emergency

• PCO • Php40,000.00

• Included as operational costs

• Secure Fire Safety In-spection Certificate • The building is designed in con-

formance to the National & Inter-national Code (i.e. NSCP, ACI, ASCE, ASTM & AISC) and would be capable of resisting major earthquakes and stable enough to withstand external loads

Page 24: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 24 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Probable disturb-ance of peace and order

• The property management shall enforce strict monitoring/ checking of all common areas

• A logbook for all visitors will be sta-tioned at the reception area

• Information dissemination shall be provided to all tenants in case of bomb threat

• Imposed disciplinary measures

• Coordination with barangay and police authorities

• Possibility of bomb threats, robbery and any other criminal ac-tivities

• Provide competent security ser-vices/ regular security patrol throughout the property

Traffic

• Increase in traffic volume

• Strict enforcement of traffic rules and regulations around the project area

• PCO • No needed cost

• Operational policy

• There will be an assigned security officer who will act as traffic control in coordination with the LGU to en-sure smooth traffic flow and proper enforcement of traffic rules and regulations

• Possible parking problems

• Slower traffic flow due to increase in vehicle volume

• Provision for traffic signs and suffi-cient parking space for the tenants

• Intrinsic in site develop-ment plan • Adopt recommendations from

Traffic Impact Assessment Study for implementation

Socio-economic

• Priority hiring of local qualified res-idents

• Property Ad-ministration

• As needed

Page 25: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 25 | P a g e

Project Phase/ Environmental

Aspect

Environmental Component

Likely to be Af-fected

Potential Impact Options for Prevention or Mitiga-

tion or Enhancement Responsible

Entity Cost

Guarantee/ Fi-nancial Ar-rangements

• Increase in job and business op-portunities (in-crease in popula-tion)

• Indirectly provides social services to the City through payment of its taxes

• Included as operational costs

• Additional income and benefit to the local government

• LGU shall directly benefit from the project due to the additional fees that would be collected from taxes and additional revenues from li-censes and permits from various commercial establishments within the project site

• Attract new investors and ex-pected to create more businesses to be developed in the area result-ing to increase in property value

IV. ABANDONMENT PHASE

Concerns the lifespan of the project or the demolition of the building after a certain number of years. After the construction of the building, abandonment is not foreseen for this type of project except for the abandonment of the temporary facilities used during construction. The General Contractor will free the site from construction debris and temporary structures such as bunk houses, stockrooms, toilets, etc. Instead of assigning a perpetual service life, a 50-year life span of the buildings are being considered. This assumes that the future association will operate and redevelop the property after its full depreciation and deterioration of the building utilities. Shifting of trust in business may affect the future of the project. However, the facility may be able to adopt new focus of business agenda. Thus, the facility has many options to make it usable for any type of business opportunities.

Page 26: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 26 | P a g e

Project Site Photos:

D C

A B

Page 27: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 27 | P a g e

Due west viewing Metro Manila Skyway and Epifanio de los Santos Avenue

A

Page 28: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 28 | P a g e

Due northeast viewing SanLazaro Place Condominuim and EDSA – Magallanes Flyover

B

Page 29: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 29 | P a g e

Due southwest viewing Philippine Allied Enterprises Corporation and Metro Manila Skyway

C

Page 30: 1. BASIC PROJECT DESCRIPTIONncr.emb.gov.ph/wp-content/uploads/2019/02/Project-Description-for-Scoping-VTower.pdfProject Description for Public Scoping VION TOWER Chino Roces Corner

Project Description for Public Scoping VION TOWER Chino Roces Corner EDSA, Barangay Magallanes, Makati City, Metro Manila

MEGAWORLD CORPORATION 30 | P a g e

Due southeast viewing Alphaland Southgate Mall and Alphaland Balesin Island Club, Incorporated

D


Recommended