1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design
Transcript
Page 1: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

1

Basic Tools for Business Process Design

Chapter 4

Business Process Modeling, Simulation and Design

Page 2: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

2

Overview

• Introduction Basic Tools for BPD• Graphical tools

– General Process Charts– Process Activity Charts– Process Flow Diagrams– Flow Charts– Service System Mapping

• Workflow Design Principles and Tools– Establish product orientation in the process– Eliminate buffers– One-at-a-time processing– Balancing bottleneck flows– Minimize sequential processing and handoffs– Scheduling based on job characteristics– Minimize multiple paths

Page 3: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

3

• Deterministic tools and modeling approaches to help designers analyze processes and check proposed designs for – Feasibility– Completeness– Efficiency

• Quantitative tools require data regarding important process characteristics– Steps required to complete the process– Processing and activity times are key

• Tagging is an important technique for gathering process data– Follow a job through the process– Data is collected on a document (a tag) accompanying the job– Particularly useful for gathering data on processing and activity

times

Basic Tools for Process Design

Page 4: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

4

• Summarizes the current process the redesigned process and the expected improvements

• Characterizes the process by– The number of activities per category

– The amount of time spent in each activity category

– The percentage of the total processing time spent on each category

• Clearly indicates – Major problems with the existing process

– How the redesigned process remedies these problems

• Problems measured in terms of the time and the percentage of time spent on non-value adding activities

General Process Charts

Page 5: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

5

Illustration of a General Process Chart

Activities Current Process Redesigned Process Difference

No. Time % No. Time % No. Time

Operations 5 30 10 5 30 37.5 0 0Inspections 3 60 20 1 20 25.0 -2 -40Transport. 10 120 40 2 20 25.0 -8 -100Storage 0 0 0 0 0 0 0 0Delays 7 90 30 1 10 12.5 -6 -80

Total 25 300 100 9 80 100 -16 -220

Page 6: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

6

• Complements the general process chart– Provides details regarding the sequence of activities

• Disadvantages– Only considers average activity times

– If the process includes several variants with different paths (i.e. multiple paths through the process) each variant needs its own activity chart

– Cannot depict parallel activities

Process Activity Charts

Page 7: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

7

Illustration of a Process Activity Chart

Process Activity Chart

Process: __________________________

Developed by: ____________________

Page: ____ of _____

Date: __________

Current ProcessProposed Process

Description TimeValue code

(V/N/C) SymbolNo.

For each activity, fill in the required information. Also, connectthe symbols to show the flow through the process.The value code indicates whether the activity adds value (V),does not add value (N), or controls (C).

Adoption

1 6

9/14/99

X

1 Find where to go 2-10 N

2 Walk through 10-45 V

3 What’s next? 1-5 N

Operation

Inspection

Storage

Delay

Transportation of a physical item

Symbols

Page 8: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

8

• Provide a picture of the spatial relationships between activities– Typical application is for production floor layout problems.

• The diagram is used for measuring process performance in units of time and distance– Including both horizontal and vertical movements.– Assumes that moving items requires a time proportional to the

distance.

• Can be used in conjunction with Process Activity Charts– By labeling areas in the process flow diagram and by adding a

column to the activity chart, indicating for each activity which area it belongs to.

– Alternatively, the flow diagram includes the activity numbers in the activity chart.

Process Flow Diagrams (I)

Page 9: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

9

Illustration of a Process Flow Diagram

C

B

AF

E

D

Finished requestIncoming request

Before Redesign

C

B

A

F

E

Incoming request

Finished request

D

After Redesign

Page 10: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

10

• Analysis geared towards reducing excessive and unnecessary transportation and movements of items/jobs– Long distances

– Crisscrossing paths

– Repeated movements between the same activities

– Other illogical flows

• Can be used as a basis for computing Load Distance (LD) scores– Useful for quantitatively comparing alternative designs/layouts

with regards to flow rates and distances

Process Flow Diagrams (II)

Page 11: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

11

• LD(i,j) = LD score between work centers i and j

• The LD score measures the attraction between two work centers (activities)– The larger the traffic volume the higher the score and the higher

the incentive to keep the work centers together

• The goal is to find a design that minimizes the total LD score (the sum of individual scores between work centers)

• The Load Matrix summarizes the load (flow rate = # of jobs) that needs to be shipped between each pair of work centers

Load Distance Analysis

LD(i,j) = Load(i,j)*Distance(i,j)

Page 12: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

12

A Sample Load Matrix

A B C D E FA 20 20 80B 10 75C 15 90D 70

• See also example exercise on LD Analysis

Page 13: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

13

• One of the fundamental graphical tools for process analysis and design– Typically depicts activities sequentially from left to right

– Can help to identify, loops, multiple alternative paths, decision points etc.

• Symbols often used in flow charting

Flow Charts

Transportation of aphysical item

Transportation ofinformation

Operation

Inspection

Storage

Delay

Page 14: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

14

Illustration of a Sample Flow Chart

Operator takes phoneorder.

Orders waitto be pickedup.

Supervisorinspectsorders.

Order isfulfilled.

Order waitsfor sales rep.

Is ordercomplete?

Yes

No

Orders aremoved tosupervisor’sin-box.

Orderswait forsupervisor.

Page 15: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

15

• Flowcharts may be used to estimate the total average process time from the estimated activity times

– Assumes that the standard processing time is known (estimated)

– Assumes that the standard setup time is known (estimated)

– The standard times assumes 100% worker efficiency. If the worker is less efficient the times must be adjusted as above.

Activity Times and Path Frequencies (I)

Average activity time

=

(Unit processing time)*(batch size)+setup time

Efficiency

Page 16: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

16

Example: Inspection activity• Inspection of one unit takes 3 minutes

• Each inspection batch includes 10 units

• It takes 15 minutes to prepare for the inspection of a batch

• The inspector is new on the job and it currently takes 25% longer time to inspect a batch than when she is fully trained

What is the estimated activity time for inspecting a batch?

The average activity time = ((3*10) + 15)/0.75 = 60 minutes

Activity Times and Path Frequencies (II)

Page 17: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

17

• An extension of traditional flowcharting– Illustrates how effectively a business process satisfies customers across all

encounters

– Documents the role played by the customer in the service delivery process

– A combination of service blue printing and traditional flowcharting

• Goals with SSM– Build consistent perceptions of customer’s experience with core processes

– Identify all points of contact between the process and its customers

– Provide a basis for developing an economic business model

– Identify opportunities within the process

– Provide a design framework

– Aid in pinpointing control points and strategic performance measures

Service System Mapping (I)

Page 18: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

18

• An extension of traditional flowcharting– Illustrates how effectively a business process satisfies customers across all

encounters– Documents the role played by the customer in the service delivery process

SSM Horizontal Bands• The purpose is to organize activities according to the people or “players

in the process. – Who does what?• A SSM typically consists of 5 bands

1. Customer band – end user2. Frontline or distribution channel band3. Back-room activity band4. Centralized support or information systems band5. Vendor or supplier band

SSM Process Segments• A process segment or sub process is a set of activities that produces a

well defined output given some input

Service System Mapping

Page 19: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

19

Sample SSM for an Order Fulfillment Process

CustomerBand

Front lineBand

Back-roomBand

ISBand

SupplierBand

Receiving Filling Shipping Billing

Page 20: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

20

• Software products for flowcharting and diagramming… Micrografx PaceStar RFFlow Visual Thought SmartDraw TeamFlow Tension Software Visio 2000

• A specialized approach for “enterprise modeling and analysis” is the so called IDEF methodology– A family of structured methods (functional, information and data

modeling)

– Based on an established graphical language SADT (Structured Analysis and Design Technique)

– Used by many consulting firms not least in design of information systems

Additional Diagramming Tools

Page 21: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

21

Organizing Activities• Two basic ways of organizing activities

1. By process (Process Orientation)

2. By product (Product Orientation)

• Process orientation (functional layout) groups activities or workstations according to function– Most common when the same activity is used for producing

different products or services or when serving many different customers

– Utilization of equipment and personnel tends to be high

Workflow Design Principles and Tools (I)

Page 22: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

22

• Product orientation groups all necessary activities to complete a finished product into an integrated sequence of work nodes or work stations

– A typical example is an assembly/production line for making a particular car model

– Activities are organized around the route (needs) of a particular product or service

– Advantages with product orientation include• Faster processing rate• Lower WIP• Less unproductive time due to setups• Less transportation time• Less handoffs

– A capital intensive way of organizing activities

Workflow Design Principles and Tools (II)

Page 23: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

23

Product v.s. Process Orientation

1 2

4 5

3

Customer B

Customer A

(a)

1 2 4 5 3

3 1 4 2 5

Customer B

Customer A

(b)

Process Orientation Product Orientation

Page 24: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

24

• To justify a product orientation from a resource utilization perspective the product/service volumes must be quite high.

• A popular hybrid between product and process orientation in manufacturing is known as Group Technology (or product clustering)– Groups products with similar characteristics into families and

organizes activities around these families instead of around the individual products

– “Product Family” orientation

• The equivalent in business processes would be to group jobs with similar characteristics into families.

• The hybrid orientation simplifies customer routings, reduces process time and can be justified even if the volumes of individual products/services are not that large

A Hybrid Orientation

Page 25: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

25

Illustration of a Hybrid Orientation

1

2 4 5

3

1

3

4 2 5

13

Customer C

Cell AC

Cell BD

Customer A

Customer B

Customer D

Page 26: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

26

Buffer Elimination• Buffers are put in place to protect against variability in demand,

processing times, etc.– Jobs stacked up at different parts of the process, waiting to be processed.

• WIP = Work In Process inventories.– All jobs currently in the process, i.e. in queues/buffers, under

transportation or under processing.

• Buffers tend to cause logistical and communication problems due to slower information feedback.– Implies the need for advanced tracking systems to identify what job is in

which buffer.

• Product orientation implies less WIP but needs to be well balanced in order to minimize buffers.

Workflow Design Principles and Tools (III)

Page 27: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

27

One-at-a-time Processing• Reduction of the batch size to the size of one unit• By reducing batch sizes (and setup times) the throughput

time and WIP can be minimized• Two types of batches

1. Process batch– All jobs being processed before the resource needs to be

changed to process jobs of a different kind2. Transfer batch

– Number of items/jobs transported together to the next resource for processing

– Usually the process batch– By reducing the transfer batch total processing time and WIP are also

reduced

Workflow Design Principles and Tools (IV)

Page 28: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

28

• Three activities in sequence 1, 2 & 3

• Processing times: 1 h/job in 1&3 and 0.5 h/job in activity 2

• Consider the total throughput time for a batch of 100 units when the transfer batch size is: A) 100 B) 20

Example – Effect of Reducing Batch Sizes

1

2

3

ProcessBatch

TransferBatch

100 100

100

100

100

100

100

50

100

250

100 20

20

20

20

100

20

130

1

2

3

ProcessBatch

TransferBatch

Page 29: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

29

Balancing bottleneck flows• Linked to the OM principle known as Theory of Constraints

(TOC) popularized by Eliyahu Goldrat in his book The Goal– Balance flow not capacity!

– Keep bottlenecks fed!

• Historically manufacturers had tried to balance capacity across processes to match market demands– Making all activity capacities the same makes sense only if

processing times are constant or display marginal variability

– Variation in processing times causes inventory build up and idleness at different parts of the process

• Only two ways of handling variation– Increase WIP to smooth variation

– Differentiate/balance capacity according to the job flows

Workflow Design Principles and Tools (V)

Page 30: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

30

Line Balancing• A useful approach when processing times are fairly constant

– Should not be used when processing times display high variability

• The goal is to balance the capacity of the different workstations constituting the production line (the process)

Procedure

1. Specify sequential (precedence) relationships among the activities using a precedence diagram

2. Use market demand to determine the line’s desired cycle time per work station (C)

Workflow Design Principles and Tools (VI)

C = Process time per day

Market demand per day (in # of jobs)

Page 31: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

31

Line Balancing Procedure (continued)

3. Determine the theoretical minimum # of workstations (TM)

4. Select a primary rule to assign activities to workstations and a secondary rule to break ties

5. Assign activities one at a time to workstation 1 as long as the sum of activity times C. Repeat this for workstations 2,3, …

– Must satisfy the activities’ precedence relationships

6. Evaluate the line efficiency = Total process time/(C*#stations)

7. Rebalance using a different priority rule in case the efficiency is unsatisfactory

Workflow Design Principles and Tools (VII)

TM = Sum of activity times

C

Page 32: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

32

Potential Line Balancing Complications

• Market demand may require a work station cycle time shorter than the longest activity time Need to change the process in some way!

• Approaches:– Split the activity

– Use parallel workstations

– Train the workers or upgrade machinery

for faster processing time

– Work overtime

– Redesign the entire process

Workflow Design Principles and Tools (VIII)

Page 33: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

33

Minimize Sequential Processing and Handoffs• Sequential processing implies longer process throughput time

– Operations are dependent constrained by the slowest activity

– No one person is responsible for the entire service encounter

Illustrative example (see figure on next slide)

• A process with 4 activities, throughput time 30 minutes and processing times 10, 7, 8 & 5 minutes in the 4 activities

• Sequential set up – each individual performs a different activity– The process output is 60/10=6 jobs per hour

– The efficiency = (10+7+8+5)/(10*4) = 75%

• Parallel set up – each individual performs all 4 activities– The process output is now 4*(60/30) = 8 jobs per hour

– The efficiency = 30/30 = 100%

Workflow Design Principles and Tools (IX)

Page 34: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

34

Illustrative Example – Sequential v.s. Parallel Processing

30min

30min

30min

30min

Sequential processing

10min

7min

8min

5min 6 jobs/hour

Parallel processing

8 jobs/hour

Page 35: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

35

Scheduling based on job characteristics (I)• Scheduling involves sequencing the order at which a number of

different jobs are to pass through a workstation or process with limited capacity– Becomes more important as the diversity of jobs increases

• Characteristics that are commonly used as a basis for scheduling– Arrival time

– Estimated processing time

– Due date

– Importance

Workflow Design Principles and Tools (X)

Page 36: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

36

• Finding the “right”objective function and the best scheduling characteristic to satisfy this objective is tricky

• Three common overall objectives– Maximize process output over a given time period– Satisfying customer desires for quality and promptness– Minimizing current out-of-pocket costs

• Common surrogate objectives that are easier to quantify– Minimize the makespan (the throughput time for a defined set of jobs)– Minimize total (or average weighted ) tardiness (the time by which the

completion time surpasses the due date)– Minimize the maximum tardiness– Minimize the number of tardy jobs

• The weighted tardiness is obtained as the product between the tardiness value and the importance weight of the job in question

Scheduling Based on Job Characteristics (II)

Page 37: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

37

• Commonly used priority rules are– First-In-First-Out (FIFO) – scheduling according to arrival times– Earliest-Due-Date first (EDD)– Shortest Processing Time first (SPT)

(See example illustrating the application and effect of the different rules)

• Observations for a single server situation– EDD render the optimal solution to the problem of minimizing the

maximum tardiness– SPT render the schedule that minimizes the average throughput time

per job for a given set of jobs

Scheduling Based on Job Characteristics (III)

Page 38: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

38

Moore’s Algorithm• A method for minimizing the number of tardy jobs, when all

jobs are considered equally important1. Order the jobs according to the EDD rule.

2. Stop if no jobs are tardy – the optimal solution is found!

Go to step 6.

3. Find the first tardy job in the sequence.

4. Assuming that this tardy job is the kth in the sequence. Find and remove job j (j=1, 2, 3, …, k) with the longest processing time.

5. Revise the completion times and return to step 2

6. Insert the removed jobs at the end of the sequence in the order they were removed

• See example illustrating the application of Moore’s algorithm

Scheduling Based on Job Characteristics (IV)

Page 39: 1 Basic Tools for Business Process Design Chapter 4 Business Process Modeling, Simulation and Design.

39

Minimize the number of multiple paths through the process• Reduces complexity and confusion

– Simplifies resource management and scheduling

– Fewer jobs are routed the wrong path and need to be rerouted or reworked

Workflow Design Principles and Tools (XI)

• One way of reducing the number of paths without compromising the efficiency and customization ability is to use case teams, i.e., horizontal compression of work flow