1 Bloomingdale Special Bloomingdale Special Taxing District March 9, Taxing District March 9, 2015 2015 Property Management Report Property Management Report
Transcript
Page 1: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

1

Bloomingdale Special Bloomingdale Special Taxing District March 9, Taxing District March 9,

20152015Property Management Property Management

ReportReport

Page 2: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

2

Completed February Completed February LandscapingLandscaping

Spot Treatment Turf WeedsSpot Treatment Turf Weeds Fig Pruning ContinuedFig Pruning Continued Shrub Detail & Pruning, Including Round-Up Shrub Detail & Pruning, Including Round-Up

weed sprayingweed spraying Natural Area Cutbacks ContinueNatural Area Cutbacks Continue Ant Mounds TreatedAnt Mounds Treated Spot Treatment Bed WeedsSpot Treatment Bed Weeds

Page 3: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

3

Planned March Planned March LandscapingLandscaping

Fertilization of All District TurfFertilization of All District Turf Spot Treat for Turf Insect ControlSpot Treat for Turf Insect Control Spot Treatments for Turf WeedsSpot Treatments for Turf Weeds Spray Plant Beds for Weed ControlSpray Plant Beds for Weed Control Continue Shrub TrimmingContinue Shrub Trimming Additional Spot Chinch Bug ApplicationsAdditional Spot Chinch Bug Applications Annual Natural Area Cutbacks Annual Natural Area Cutbacks

ContinuedContinued Continue Fig PruningContinue Fig Pruning

Page 4: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

Fig Replacements – Fig Replacements –

2,187 plants at $5.50 each2,187 plants at $5.50 each $12,028.50 $12,028.50 Plant Replacements –Plant Replacements –

264 1 gallon plants at $6.00 each 1,584.00264 1 gallon plants at $6.00 each 1,584.00

2,195 3 gallon plants at $17.00 each 37,315.002,195 3 gallon plants at $17.00 each 37,315.00 Sod Replacements –Sod Replacements –

33,270 square feet at $.65 / sq ft 21,625.0033,270 square feet at $.65 / sq ft 21,625.00 Two Oak Tree Replacements – Remove/ Two Oak Tree Replacements – Remove/

Grind/Replace/Irrigate - $2,770.00ea Grind/Replace/Irrigate - $2,770.00ea 5,540.005,540.00 Total Estimated 2015 Replacement $78,092.50Total Estimated 2015 Replacement $78,092.50

4

2015 Estimated BSTD 2015 Estimated BSTD Replacement Plant Replacement Plant

Material CostsMaterial Costs

Page 5: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

Accident Wall Accident Wall Repaired/Painted/FiggedRepaired/Painted/Figged

5

Page 6: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

Springvale Painting at Springvale Painting at Pine GrovePine Grove

6

Page 7: 1 Bloomingdale Special Taxing District March 9, 2015 Property Management Report.

Verizon Painting ProjectsVerizon Painting Projects