+ All Categories
Home > Documents > 1 Cascade School District Survey Results November 1, 2010 1.

1 Cascade School District Survey Results November 1, 2010 1.

Date post: 20-Dec-2015
Category:
View: 218 times
Download: 4 times
Share this document with a friend
Popular Tags:
19
1 Cascade School District Survey Results November 1, 2010 1
Transcript
Page 1: 1 Cascade School District Survey Results November 1, 2010 1.

1

Cascade School DistrictSurvey ResultsNovember 1, 2010

1

Page 2: 1 Cascade School District Survey Results November 1, 2010 1.

2

Goals of Survey

1) To gauge community’s knowledge of District facility needs

2) To determine support for improvements to District facilities including a possible tax increase to pay for those improvements

Page 3: 1 Cascade School District Survey Results November 1, 2010 1.

3

Who was surveyed?43.5% Male

56.5% Female

98%Registered Voters

91.5%Home Owners

Page 4: 1 Cascade School District Survey Results November 1, 2010 1.

4

More about respondents..• How many people were interviewed?

– 200 people were interviewed from a sample of 628• What was their age?

– 64% over age 55 (35% over 65)• Where do they live?

– 61% in Leavenworth– 16% in Peshastin– 13% in Plain– 5% in Dryden– 5% in other locations (Lake Wenatchee, Winton)

• Over 75% of all respondents do not have any direct connection to the District

Page 5: 1 Cascade School District Survey Results November 1, 2010 1.

5

Do you support the Facilities Committee’s recommendation to replace aging school facilities?

Yes55%

No24%

Unsure21%

Page 6: 1 Cascade School District Survey Results November 1, 2010 1.

6

What is the level of support for placing a bond proposal before voters in February, 2011?

Strongly Sup-

port

Somewhat Support

Neutral Somewhat Oppose

Strongly Oppose

Unsure0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0% 32.5%

23.5%

19.5%

7.5%

14.5%

1.5%

Page 7: 1 Cascade School District Survey Results November 1, 2010 1.

7

Are you likely to support a proposed tax increase to address the district’s facilities

deficiencies?

Refuse

Unsure

NO

YES

1.0%

12.0%

32.5%

54.5%

Page 8: 1 Cascade School District Survey Results November 1, 2010 1.

8

What is the largest tax increase you would be willing to support per month?

Less than $30 20.0%

About $30 19.0%

$40 or more 21.0%

None 31.5%

Unsure 5.5%

Refuse 3.0%

Page 9: 1 Cascade School District Survey Results November 1, 2010 1.

9

How does home value affect voters willingness to incur a tax increase?

Amount of Tax Increase $250,000 home $250,000-$350,000

home $350,000 + home

$30/month or less43.1% 45.2% 38.2%

$40-$90/month8% 23.8% 33.8%

Not Willing to support an

increase21% 31% 27.9%

Page 10: 1 Cascade School District Survey Results November 1, 2010 1.

10

Page 11: 1 Cascade School District Survey Results November 1, 2010 1.

11

If there was only elementary school in the District and was located on an existing site,

where should it be located?

• 53.5% in Leavenworth

• 22% in Peshastin• 22% Unsure• 2.5% Refuse

Leaven-worth53.5

%Pe-shastin22.0%

Unsure 22.0%

Refuse 2.5%

2

Page 12: 1 Cascade School District Survey Results November 1, 2010 1.

12

If we could only rebuild one school to control costs, which one would it be?

New K-5 El-ementary

New 9-12 High School

Unsure Refuse0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

44.5%

32.0%

19.5%

4.0%

Page 13: 1 Cascade School District Survey Results November 1, 2010 1.

13

What is your level of support for the construction of a Performing Arts Auditorium?

Strongly Support

Somewhat Support

Neutral Somewhat Oppose

Strongly Oppose

Unsure0.0%5.0%

10.0%15.0%20.0%25.0%30.0%35.0%

33.5%

25.5%

18.0%

7.0%12.5%

3.5%

Page 14: 1 Cascade School District Survey Results November 1, 2010 1.

14

What is your level of support for improving the athletic fields at Peshastin-Dryden?

Refuse

Unsure

Strongly Oppose

Somewhat Oppose

Neutral

Somewhat Support

Strongly Support

0.5%

7.0%

12.5%

8.0%

20.5%

27.0%

24.5%

Page 15: 1 Cascade School District Survey Results November 1, 2010 1.

15

“Levies are for Learning”Do you support the proposed levy that would

increase taxes $.12/year?

YES82.5%

NO11%

Unsure 6.5%

Page 16: 1 Cascade School District Survey Results November 1, 2010 1.

16

What is the best way for you to receive information about the school district’s plans?

District newsletters

News media Word of mouth

District website

Other Don't know Refuse0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%52.0%

31.5%

7.0%4.0% 4.5%

0.5% 0.5%

Page 17: 1 Cascade School District Survey Results November 1, 2010 1.

17

Respondent Feedback

• On a positive note-Community feels good about Cascade School District-Many understand the need for addressing building deficiencies-People recognize the importance of quality education and role of

good facilities

• Areas of concern– People still being affected by poor economy– Many respondents on a fixed income– Residents feeling uninformed regarding District’s plan

Page 18: 1 Cascade School District Survey Results November 1, 2010 1.

18

Overall impressions

• Great need for detailed information• Lots of “unsure” responses that could be swayed with additional

information

• High number of respondents with no direct connection to the schools

• There is a cost threshold for tax increase

• Current economic situation continues to have an effect on voters• Lots of good data for CFAC to use in determining costs and scope of

work

Page 19: 1 Cascade School District Survey Results November 1, 2010 1.

19

Where do we go from here?


Recommended