Chapter 14
The Systems Development Process, Part II: System Selection, Detailed Design, and System Implementation
2
Objectives for Chapter 14 Factors to be considered in a detailed feasibility study The three major steps involved in a cost-benefit analysis of proposed
information systems Advantages and disadvantages of the commercial software option,
and the decision-making process used to select commercial software The sequence of events that constitute the detailed design phase of
the SDLC The design procedure for both hard-copy and electronic input and
output media The design of the process component of a system Principal features of a system implementation, including the use of
PERT and GANTT charts to create an implementation schedule The different types of system documentation and the purposes they
serve Procedures employed in database and system conversion
The Seven Stages of the SDLC
SystemsPlanning
SystemsAnalysis
ConceptualDesign
SystemSelection
DetailedDesign
SystemImplementation
Maintenance
New Systems Development
SYSTEMS DEVELOPMENT LIFE CYCLE
ProjectProposals &Schedules
SystemsAnalysisReport
MultipleConceptualDesigns
SystemSelectionReport
DetailedSystemDesign
FullyDocumentedSystem
Required Documentation
4
Stage 4: System Evaluation and Selection
This phase is an optimization process that seeks to identify the best system and make an informed decision under uncertain circumstances.
Two steps detailed feasibility study cost-benefit analysis
5
Detailed Feasibility StudyThis should be performed by an
informed, but independent group: the project manager user representatives systems professionals who are not a
part of the project
6
Feasibility Factors
Technical - well-established and understood technologies represent less risk and will receive a higher score
Legal - need to assess critical control, security, audit trail, and privacy issues
Operational - the availability of well-trained, motivated, and experienced users must be assessed
Schedule - need to assess available development tools, the technology platform, the systems design, and user training requirements
Economic - costs are becoming better defined and assessment becomes easier
7
Cost-Benefit Analysis
Cost-benefit analysis helps management determine whether the benefits received from a proposed system will outweigh its costs.
It is useful for comparing competing systems designs.
Intangible benefits make this process difficult.
8
Cost-Benefit AnalysisIdentify the costs.Identify the benefits.Compare the two.
Period1 2 3 4 5 6 7
$
500
400
300
200
100 0
Present Value of Total Costs
Present Value of T
otal Benefits
Pa
yba
ck P
oin
t
9
Identification of Costs and Benefits
Examples of One-Time Costs: hardware and software acquisition training personnel
Examples of Recurring Costs: hardware and software maintenance personnel
Examples of Tangible Benefits: increased sales within existing markets labor reduction
Examples of Intangible Benefits: increased customer satisfaction improved employee satisfaction
10
Systems Selection Report
This formal document consists of a: revised feasibility study cost-benefit analysis list and explanation of
intangible benefits for each alternative
On the basis of this report, the steering committee will select a single system.
11
The Purchase of Commercial Systems Packages
Four factors have stimulated the growth of commercial software: relatively low cost prevalence of industry-specific
vendors growing demand by small businesses trend toward downsizing and
distributed data processing
12
Types of Commercial Systems Packages
Turnkey systems are completely finished and tested systems that are ready for implementation.
Backbone systems provide a basic system structure on which to build.
Vendor-supported systems are custom-developed and maintained by a vendor for a customer.
ERP systems are difficult to classify since they have characteristics of all of the above.
13
Pros and Cons of Commercial Software
Advantages: decreased implementation time decreased cost reduced probability of program errors
Disadvantages: reduced independence - the customer is
dependent on the vendor for maintenance less flexibility in system greater difficulty in modifying the system as
needs change over time
14
Four Steps in Choosing a Commercial Package
Analyze needs and develop detailed specifications of the system requirements.
Send out the Request for Proposals to all prospective vendors to serve as a comparative basis for initial screening.
Gather the facts about each vendor’s system using multiple sources and techniques.
Analyze the findings and make a final selection.
15
The Role of Accountants in Evaluation and Selection
The accountant should ensure that: only escapable costs are used in
calculations of cost savings benefits reasonable interest rates are used in
measuring present values of cash flows one-time and recurring costs are
completely and accurately reported realistic useful lives are used in
comparing competing projects intangible benefits are assigned
reasonable financial values
16
Stage 5: Detailed Systems Design
This stage follows a logical sequence of events: data model the business process and
design conceptual views design the normalized database
tables design the physical user views (output
and input views) develop the process modules specify the system controls perform a system walkthrough
17
Data Modeling
Data Modeling is the task of formalizing the data requirements of the business process as a conceptual model.
The primary tool is the ER diagram which is used to depict the entities or data objects in the system.
Each entity in an ER diagram is a candidate for a conceptual user view that must be supported by the database.
18
The Normalization Process
A process which systematically splits unnormalized complex tables into smaller tables that meet two conditions: all nonkey (secondary) attributes in the
table are dependent on the primary key all nonkey attributes are independent of the
other nonkey attributesWhen unnormalized tables are split and
reduced to third normal form, they must then be linked together by foreign keys.
19
Designing Output ViewsOutput is the information produced by the
system to support user tasks and decisions.Output attributes:
relevant summarization except orientation timely accurate complete concise
20
Output Reporting Techniques
Different users prefer different styles of output (tables, matrices, charts, and graphs) and modes of output (hard copy vs. display screen).
Systems designers must identify these styles and provide output in the desired style.
21
Designing Input Views
Data input views are used to capture the relevant facts about the resources, events, and agents involved in business process transactions.
Input may be either hard copy input documents or electronic input.
22
Designing Hard Copy Input
Items to Consider: How will the document be handled?
What quality paper? How long will the form be stored and in
what type of environment? How many copies are required? What size form is necessary? Non-
standard form can cause printing and storage problems.
23
Hard Copy Form Design
The objective is to design the form so as to reduce clerical errors and omissions and allow the data to be collected as efficiently as possible.
Zones- areas that contain related data-use lines, captions, or boxes
Embedded instructions - should be on the form, not as a separate sheet, and should be written in an active voice
24
User’s View - Purchase Order
Purchase Order PO 39763
Vendor NameVendor Address
Telephone:OrderDate
DateRequired
VendorNumber
Terms
PartNo.
Description Qty Unit Price ExtendedPrice
Total Cost
1
2
3 4
56
7 8
9 10 11 12
13
9
9
9 10
10
10
11
11
11
12
12
12 Cal
cula
ted
Fie
ld
25
Designing Electronic Input
Input may be from either a source document or data found directly in the computer system.
SourceDocument
SourceDocument
ElectronicInput
ElectronicInput
DataCollection
EconomicEvent
EconomicEvent
TransactionFile
TransactionFile
File
Audit Trail
Input From SourceDocument
Direct Input
Audit Trail
26
Direct Input
This method can reduce the input errors that result from additional clerical steps involved in input from source documents.
Direct data collection uses intelligent forms for online editing that help the user complete the forms and make calculations automatically.
27
Data Entry Devices
point-of-sale terminalstouch screensmousemagnetic ink character
recognition devicesoptical character recognition devicesvoice and touch-tone recognition
devices
28
Designing the Process Component
This phase begins with the DFDs produced in the general design phase.
The first task is to decompose the existing DFDs to a degree of detail that will serve as the basis for creating structure diagrams.
The structure diagrams will provide the blueprints for writing the actual program modules.
Lower-Level DFD for an AP Process
1.1 1.31.2
1.4.1 1.4.3 1.4.41.4.2
AuthorizePurchase
1.4.6
1.4.71.4.5
1.5
OrderGoods
ReceiveGoods
Vendor
ReceiveP.R.
ReceiveP.O.
ReceiveRec. Rpt.
ReceiveInvoice
PRFile
Open POFile
RRFile
InvoiceFile
PreparePayment
Review &Compare Prepare
Voucher
Update AP & PrepareVoucher
AP Sub-Ledger
VoucherRegister General
LedgerDepartment
PurchaseReq
PurchaseOrder
ReceivingReport
Invoice
PaymentVoucher
ApprovedLiabilities
PostPostingData
Journal Voucher
Post
30
The Modular Approach
Each module performs a single task.
Correctly designed modules possess two attributes: loosely coupled (low amounts of
exchange of data between modules) strongly cohesive (small number of
tasks performed in each module)
31
Pseudocode
Allows the functional characteristics and logic of the modules to be expressed without having to code in any specific programming language
Allows end users to be actively involved in this step even though they may lack programming skills
32
Design System Controls
The last step in the detailed design phase. Need to consider: computer processing controls database controls manual controls over input to and output from
the system operational environment controls
This step allows the design team to review, modify, and evaluate controls with a system-wide perspective that did not exist when each module was being designed independently.
33
System Design Walkthrough
This step is performed by the development team to ensure the design is free from conceptual errors that could become programmed into the final system.
Some firms may use a quality assurance group to perform the task. This is an independent group of programmers, analysts, users, and internal auditors.
34
Stage 6: Systems Implementation
The steps that have the greatest impact on accountants and auditors are: managing the systems implementation developing system software documenting the system software converting the databases converting to the new system conducting the post-implementation review
35
Managing the Systems Implementation
An implementation schedule must be created. Project Evaluation and Review
Techniques (PERT) Charts - show the relationships among the many activities. The critical path shows which activities, if delayed, can cause the overall project to be delayed.
GANTT Charts - a horizontal bar chart which shows the project time frame at a glance and compares budget with actual implementation times.
36
Developing Application Software
If the organization intends to develop software in-house, then a programming language must be selected.
Programming Languages
Generation Language Example1GL Machine 010110000010000000010000001110
000110000110000000100000111000110101100000100011000100000011
2GL Assembly(symbolic)
L 2,AA 2,BST 2,C
3GL High-level(compiler)
ADD SALARY, COMMISSION,GIVING TOTAL PAY
4GL Natural COMPUTE TOTAL PAY OF ALLEMPLOYEES BY ADDING THEIRSALARY AND COMMISSION
38
3rd Generation LanguagesCOBOL, FORTRAN, C, BASIC, and PL1,
among others3GLs function efficiently because
they are compiled programs.The operational procedures are
specified in precise detail which allows greater control over process functionality.
The code is clearly visible to the programmers, which facilitates debugging and maintenance.
39
4th Generation Languages
Program generators, query languages, and screen and report generators
The designer may more easily experiment and design as they go.
These languages are easier for non-technical staff to use.
40
The Modular Approach to Programming
Promotes programming efficiency since modules can be both programmed and tested independently
Promotes maintenance efficiency since small modules are easier to analyze and change
Promotes greater control since they are less likely to contain material errors of fraudulent logic
41
Software Testing
Programs must be thoroughly tested before they are implemented.
Individual modules should be tested with test data containing both “good” and “bad” data. All logic procedures should be tested.
After the individual modules have been tested, the entire system should be tested as a whole.
42
Documenting the System
Documentation describes how the system works and should be made for: designers and programmers - comment
lines in programs, system flowcharts, and program flowcharts
operator documentation - run manuals user documentation - instructions on how
to use the system, tutorials, and help features
accountants and auditors - all of the above as well as document flowcharts
43
Converting the DatabasesThis is the transfer of data from its current form to
the format or medium required by the new system.Data conversion is risky and must be carefully
controlled by the following precautions: validation - old database must be inspected
before conversion reconciliation - after the conversion, the new
database must be reconciled against the original backup - copies of the original files must be
kept as backup against discrepancies in the converted data
44
Converting to the New System
Three approaches:Cold turkey cutover (plunge) - the firm
switches to the new system on a particular day and simultaneously terminates the old system. This is the riskiest approach.
Phased cutover - modules are implemented in a piecemeal fashion. The risk of a devastating failure can be reduced.
Parallel cutover - the old system and new system are run simultaneously. This is the safest, yet costliest, approach.
45
Post-Implementation Review
The objective is to measure the success of the system and of the process after the dust has settled. Want to assess: system design adequacy accuracy of time, cost, and benefit
estimatesThis information can provide
feedback to improve future systems development projects.
46
The Role of Accountants
Most system failures are due to poor designs and improper implementation. Accountants should provide their expertise to help avoid inadequate systems by: providing technical expertise for
financial reporting requirements specifying documentation standards for
auditing purposes verifying control adequacy in accordance
with SAS 78