• System Setup information: http://support.netapp.com/NOW/public/system_setup/
• Controller and con�guration examples; Universal SAS and ACP Cabling Guide: https://library.netapp.com/ecm/ecm_download_�le/ECMM1280392
• OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
• Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092
• Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
HELPFUL LINKSVisit the NetApp web site for more information.
Complete con�guration5
• Create an account.• Register your system.• Get your license keys.
Register at support.netapp.com1
• Provision more storage.• Con�gure other protocols, data protection, and AutoSupport.• Set up Service Processor and Remote Support Agent.
Download OnCommand System Manager From http://support.netapp.com/NOW/cgi-bin/software/
3
Download and run Con�g AdvisorFrom http://support.netapp.com/NOW/download/tools/con�g_advisor/
2
Complete System Setup4
Power on all external storage ONLY 3
Install System Setup* softwareon the Windows client
4
51 2 3 4
Cable Windows client to the same network as your controllers2
Complete con�guration worksheet Available in the box or at http://support.netapp.com/NOW/public/system_setup/
1
*If you cannot use System Setup, see the Data ONTAP Software Setup Guide
• the system.
• When directed, power on your system (or repower).
• Wait for discover to complete. Up to 8 minutes.
• Enter the values from the con�guration worksheet into System Setup.*
Start System Setup software5
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
MANAGEMENT SUBNET
SubnetFAS2520 SYSTEM WINDOWS CLIENT
1
2
AC AC
0a0b
41 2 3 5
1
2
Both power supplies MUST be powered on.
0a0b
A
B
1
20a0b
Net
Ap
p
sup
po
rt s
ite
Installation and Setup InstructionsFAS2520 Systems
Microsoft Windows clientRuns the software to con�gure
your storage system
ScrewdriverAdditional network cables
For connecting your storage to your network switch and Microsoft® Windows® client
Rack space - 2U
Download:
You provide:
• System Setup Software: http://support.netapp.com/NOW/public/system_setup/• OnCommand System Manager: http://support.netapp.com/NOW/cgi-bin/software/
Prepare for installation1 4 51 2 3
Power cablesCon�guration
worksheet
Serial cable not needed for this con�guration
Starter network and storage cables
In the box:
4 51 2 3
Cabling FAS2520 systems with NO external storage
Cabling FAS2520 systems WITH external storageDS4246 disk shelves
Cabling FAS2520 systems WITH external storageDS2246 disk shelves
STOP HERE. If you have NO external storage, skip to .
Cable storage (Choose option A, B, or C below) 3
A
B
C
For additional con�gurations, see HELPFUL LINKS.
Single controller model Double controller model
1
2
AC AC1
2
AC AC
No additional cabling required for a single controller.
Single controller model Double controller model
1
2
AC AC1
2
AC AC
Single controller model Double controller model
1
2
AC AC1
2
AC AC
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
Network cables
2
1
3
4
Daisy chain SAS ports
Connect �rst SAS ports
Connect last SAS ports
Connect ACP ports on controllers to the disk shelves
Storage cables
1 2 3
Network cables
2
1
3
4
Daisy chain SAS ports
Connect �rst SAS ports
Connect last SAS ports
Connect ACP ports on controllers to the disk shelves
Storage cables
1 2 3
Connect SAS ports
Network cables
Connect ACP ports
2
Storage cables
Install hardware2 4 51 2 3
LIFTING HAZARDCAUTION
25 kg (55 lbs.)
• Rack the system. Rail kit: follow instructions in rail kit. OR System cabinet: install in system cabinet.
• Place the bezel over the front of the system.
Install system1
Cable controller for 7-Mode Data ONTAP or for switchless clustered Data ONTAP
2
DO NOT power on system at this point.
3 Connect both power cords
Power cords
Both power cords MUST be used for all units.
1
2
Use retaining clipsUse retaining clips
See your network administrator for help connecting to your switch.
Attach cable management arms.
Connect port e0c to the data switch.NOTE: Port e0c is required; other ports are available if needed.
Connect the wrench port to the management or subnet switch.
For option B onlyConnect port e0d to port e0d and e0f to e0f
Strap the cables to the cable management arms.
Network cables
Network cables
B4
5
1
2
3
If you are converting from a switchless to a switched con�guration, see the appropriate migration manual in the Cluster Management and Interconnect Switches library on the NetApp Support Site.
0a0b 0a0b
A
B
1
2
FRONT VIEW OF SYSTEM
PCM Attention LED
Console port (Setting: 9600 N-8-1)
SAS ports (2)
BACK VIEW OF SYSTEM
ACP port(locked wrench icon)
Gigabit Ethernet ports (2)
e0c - e0f 10 GbE Ethernet ports
One or two controller modules
10GbE switchless cluster
B A
B
A
B
5
1
1
2
AC AC
4
32
TO DATANETWORK SWITCH
TO MANAGEMENT NETWORK SWITCH
7-ModeA
32
A
B
A
B
5
1
1
2
AC AC
TO DATANETWORK SWITCH
TO MANAGEMENT SUBNET
FAS2520FAS2520
Shelf ID display
Attention LEDPower LED
Bezel
Power supply LEDs
A
B
1
2
A
Remote/Node Management port(wrench icon)
NVMEMLED
Network cables
4 51 2 3
Cabling FAS2520 systems with NO external storage
Cabling FAS2520 systems WITH external storageDS4246 disk shelves
Cabling FAS2520 systems WITH external storageDS2246 disk shelves
STOP HERE. If you have NO external storage, skip to .
Cable storage (Choose option A, B, or C below) 3
A
B
C
For additional con�gurations, see HELPFUL LINKS.
Single controller model Double controller model
1
2
AC AC1
2
AC AC
No additional cabling required for a single controller.
Single controller model Double controller model
1
2
AC AC1
2
AC AC
Single controller model Double controller model
1
2
AC AC1
2
AC AC
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
1
2
AC AC
IOM6
IOM6
LINK
LINK IOM6
IOM6
LINK
LINK
Network cables
2
1
3
4
Daisy chain SAS ports
Connect �rst SAS ports
Connect last SAS ports
Connect ACP ports on controllers to the disk shelves
Storage cables
1 2 3
Network cables
2
1
3
4
Daisy chain SAS ports
Connect �rst SAS ports
Connect last SAS ports
Connect ACP ports on controllers to the disk shelves
Storage cables
1 2 3
Connect SAS ports
Network cables
Connect ACP ports
2
Storage cables
Install hardware2 4 51 2 3
LIFTING HAZARDCAUTION
25 kg (55 lbs.)
• Rack the system. Rail kit: follow instructions in rail kit. OR System cabinet: install in system cabinet.
• Place the bezel over the front of the system.
Install system1
Cable controller for 7-Mode Data ONTAP or for switchless clustered Data ONTAP
2
DO NOT power on system at this point.
3 Connect both power cords
Power cords
Both power cords MUST be used for all units.
1
2
Use retaining clipsUse retaining clips
See your network administrator for help connecting to your switch.
Attach cable management arms.
Connect port e0c to the data switch.NOTE: Port e0c is required; other ports are available if needed.
Connect the wrench port to the management or subnet switch.
For option B onlyConnect port e0d to port e0d and e0f to e0f
Strap the cables to the cable management arms.
Network cables
Network cables
B4
5
1
2
3
If you are converting from a switchless to a switched con�guration, see the appropriate migration manual in the Cluster Management and Interconnect Switches library on the NetApp Support Site.
0a0b 0a0b
A
B
1
2
FRONT VIEW OF SYSTEM
PCM Attention LED
Console port (Setting: 9600 N-8-1)
SAS ports (2)
BACK VIEW OF SYSTEM
ACP port(locked wrench icon)
Gigabit Ethernet ports (2)
e0c - e0f 10 GbE Ethernet ports
One or two controller modules
10GbE switchless cluster
B A
B
A
B
5
1
1
2
AC AC
4
32
TO DATANETWORK SWITCH
TO MANAGEMENT NETWORK SWITCH
7-ModeA
32
A
B
A
B
5
1
1
2
AC AC
TO DATANETWORK SWITCH
TO MANAGEMENT SUBNET
FAS2520FAS2520
Shelf ID display
Attention LEDPower LED
Bezel
Power supply LEDs
A
B
1
2
A
Remote/Node Management port(wrench icon)
NVMEMLED
Network cables
• System Setup information: http://support.netapp.com/NOW/public/system_setup/
• Controller and con�guration examples; Universal SAS and ACP Cabling Guide: https://library.netapp.com/ecm/ecm_download_�le/ECMM1280392
• OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
• Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092
• Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
HELPFUL LINKSVisit the NetApp web site for more information.
Complete con�guration5
• Create an account.• Register your system.• Get your license keys.
Register at support.netapp.com1
• Provision more storage.• Con�gure other protocols, data protection, and AutoSupport.• Set up Service Processor and Remote Support Agent.
Download OnCommand System Manager From http://support.netapp.com/NOW/cgi-bin/software/
3
Download and run Con�g AdvisorFrom http://support.netapp.com/NOW/download/tools/con�g_advisor/
2
Complete System Setup4
Power on all external storage ONLY 3
Install System Setup* softwareon the Windows client
4
51 2 3 4
Cable Windows client to the same network as your controllers2
Complete con�guration worksheet Available in the box or at http://support.netapp.com/NOW/public/system_setup/
1
*If you cannot use System Setup, see the Data ONTAP Software Setup Guide
• the system.
• When directed, power on your system (or repower).
• Wait for discover to complete. Up to 8 minutes.
• Enter the values from the con�guration worksheet into System Setup.*
Start System Setup software5
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
MANAGEMENT SUBNET
SubnetFAS2520 SYSTEM WINDOWS CLIENT
1
2
AC AC
0a0b
41 2 3 5
1
2
Both power supplies MUST be powered on.
0a0b
A
B
1
20a0b
Net
Ap
p
sup
po
rt s
ite
Installation and Setup InstructionsFAS2520 Systems
Microsoft Windows clientRuns the software to con�gure
your storage system
ScrewdriverAdditional network cables
For connecting your storage to your network switch and Microsoft® Windows® client
Rack space - 2U
Download:
You provide:
• System Setup Software: http://support.netapp.com/NOW/public/system_setup/• OnCommand System Manager: http://support.netapp.com/NOW/cgi-bin/software/
Prepare for installation1 4 51 2 3
Power cablesCon�guration
worksheet
Serial cable not needed for this con�guration
Starter network and storage cables
In the box: