1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non-commercial, educational purposes, provided that this copyright statement appears on the reproduced materials and notice is given that the copying is by permission of the author. To disseminate otherwise or to republish requires written permission from the author.
Transcript
Page 1: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

1

Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non-commercial, educational purposes, provided that this copyright statement appears on the reproduced materials and notice is given that the copying is by permission of the author. To disseminate otherwise or to republish requires written permission from the author.

Page 2: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

Using a Formal Lessons-Using a Formal Lessons-Learned Analysis to Improve Learned Analysis to Improve Future ERP ImplementationsFuture ERP Implementations

January 13, 2005

MARC 2005 Conference

Baltimore, Maryland

Page 3: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

This presentation will describe how The This presentation will describe how The College of New Jersey identified some of College of New Jersey identified some of the experiences that worked well (or did the experiences that worked well (or did not) during our Financials and Human not) during our Financials and Human Resources implementations, and how we Resources implementations, and how we plan to ensure each item is addressed in plan to ensure each item is addressed in our upcoming implementation of the our upcoming implementation of the PeopleSoft Student Administration PeopleSoft Student Administration system.system.

OverviewOverview

Page 4: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

4

• State College, located in Ewing, NJ• Primarily undergraduate liberal arts• Students - 5,600 FT, 330 PT, 850 graduate• Faculty - 325 full-time, 350 adjunct• Staff - 675 full-time, 125 part-time• Student Employees/GA’s - 1,300

4

The College of New Jersey

Page 5: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

• PS Financials 7.52 (live in 2001, currently upgrading to 8.3)

• PS HRMS, Payroll, Benefits 8.3 (live in 2003)

• PS Portal (partial go-live in 2003)

• PS Student Administration 8.9 (implementation began Fall 2004)

• Blackbaud Raiser’s Edge (estimated go-live = February 2005)

5

TCNJ Administrative SystemsTCNJ Administrative Systems

Page 6: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

6

Some thoughts…

• “A failure is a man who has blundered but is not able to cash in the experience” Elbert Hubbard

• “Life can be understood only backwards, but it must be lived forwards.” Soren Kierkegaard

Page 7: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

7

Financials Project

• First ERP project

• Team = 4 functional + 4 Technical

• Timeline = 21 months

• No backfill

• Consultants

• Part-time project management

• No formal lessons learned analysis

Page 8: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

8

HR Project

• Team = 2.5 functional + 4 technical

• Timeline = 2 years

• Backfill

• Consultants

• Part-time project management

• Formal lessons learned analysis

Page 9: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

9

HR Lessons Learned

• Purpose – analyze project & difficult post-go live shakedown period

• Goals– Identify & repeat project successes– Avoid future problems– Improve project management practices– Promote internal staff development through self

review and analysis

Page 10: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

10

HR Lessons Learned (cont’d)

• Participants– Project Team– System end users– Project Sponsors - CIO & Asst VP of Human

Resources

• Timeframe• Compilation of responses• Sharing results

Page 11: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

11

HR Survey Expectations

• Complete survey electronically

• Distribute results and recommendations to all survey participants

• Participants should consider what went well and what we can learn

• Feedback should be honest, but constructive

• Looking for positive outcomes

Page 12: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

12

HR Survey Instructions

• Consider all phases of project

• Provide at least one ‘success’ in each area

• Provide at least one item that could be improved upon

• Provide realistic recommendations

Page 13: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

13

HR Feedback Categories

• 6 areas of feedback– General staffing– Sponsorship– Communication– Project Management– Design/Development/Testing– User Readiness

Page 14: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

14

Question:How do we ensure that we address and benefit from both the informal and formal lessons learned exercises from previous projects?

Page 15: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

15

Strategy

• Identify items that did or did not work well

• Identify a set of guiding principles to consider on future projects

• Develop concrete action items in response to each item

Page 16: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

16

Process

• Reviewed & considered results of HR analysis

• Planning team brainstorm

• Combined and revised pertinent results

Page 17: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

17

Issue Resolution Process

• Issue: Full utilization of issue resolution process

• Response:– Develop formal strategy– Utilize steering committee to a greater extent– PM and Tech Lead to provide biweekly updates

to CIO

Page 18: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

18

Change of Business Processes

• Issue: Changing business processes where possible

• Response:– Identify a functional lead for each module

– Charge functional lead w/responsibility

– Steering Committee will review all recommendations for modifications & provide authorization

– Project manager & Steering will challenge existing business processes

Page 19: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

19

Campus Communication

• Issue: Continue to communicate with campus community throughout project

• Response:– Hire new position – Training & Communications

Coordinator

– T&C Coord will develop comprehensive communication plan

– Steering Committee will approve communications plan

– Steering Co & PM ensures plan is being followed

Page 20: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

20

Project Milestone Checkpoints

• Issue: Checking in throughout the project at key points

• Response:– Steering committee meetings at project

milestones on project plan– Steering committee to provide ‘sign-off’ before

moving forward

Page 21: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

21

Slippage in Early Stages

• Issue: Avoiding slippage in early stages of project

• Response:– Develop positive reinforcement strategies– Review project plan frequently, identify

slippages, address w/team leads, bring to Steering for senior management enforcement

Page 22: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

22

Social Gatherings

• Issue: Plan for social gatherings of project team

• Response:– Hold a kickoff party/meeting– At least 1 social gathering per quarter– Go-live celebrations for each module– Include events on project plan

Page 23: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

23

Functional vs. Technical

• Issue: Combating functional vs. technical mentality

• Response:– Internal communications directed to entire team

– Team building/communications workshop(s)

– Social gatherings

– Cross training

– PM role should be neutral

– CIO to assist

Page 24: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

24

Team Communication

• Issue: Timely communication between functional & technical teams

• Response:– Weekly team meetings– Respond to communications within 48 hours– Issues log– Distribute notes within 48 hours– Steering to address breakdowns

Page 25: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

25

Data Mapping

• Issue: Consultant participation during data mapping exercise

• Response:– Schedule data mapping sessions on project plan

and meeting calendar– Include consultants

Page 26: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

26

Reporting

• Issue: Required reports should be completed prior to go-live

• Response:– Identify all required reports early– Prioritize reports & identify required deadlines– PM & Steering to ensure reports are completed

by deadlines

Page 27: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

27

Testing

• Issue: Complete thorough testing on all processes• Response:

– Identify all populations & scenarios as early as possible

– Obtain input from team members when developing timeframes & deadlines

– Develop complete test plans

– Assign testing coordinator role

– Convert & test data as early as possible

Page 28: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

28

Consultant

• Issue: Retaining consultants throughout life of project

• Response:– Engage consultants part-time over a longer time

period– Retain consultants on-site through post go-live

activities

Page 29: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

29

End User Training

• Issue: Ensure adequate end user training• Response:

– Hire Training & Communications Coordinator– Survey users prior to go-live to assess readiness– Re-train where necessary– Involve end users during testing– Consider mandating supervised periods of time

for users to ‘play’ in system

Page 30: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

30

Load Testing

• Issue: Perform adequate load testing

• Response:– Purchase software– Perform load testing on all SA modules prior to

go-live– Perform load testing on all SA + other PS

modules prior to go-live

Page 31: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

31

Staffing Plans

• Issue: Ensure adequate backup & backup staffing plans

• Response:– Identify key staff back in admin offices

– Consider pending retirements

– Develop plans to replace both key staff or team members I special circumstances

– Continue to allow team to be 100%, with temporary backfill staff

Page 32: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

32

Scope Creep

• Issue: How to avoid scope creep• Response:

– Define initial scope as early as possible, and refine through fit/gap

– Steering to approve all modifications– Steering to approve all functional scope

changes– Manage expectations throughout the project

(sponsor, PM and T&C Coordinator)

Page 33: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

33

Where are we today?

• Early stages of SA project

• SA Team is reviewing this information

• Project plan is being built

• Training/Communications strategies are being developed

Page 34: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

34

Future Considerations

• Checkpoints against responses w/SA project

• Post SA project review

• Future projects

Page 35: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

35

‘Off the Record’

• Executive sponsor role

• People dynamics

• Risk assessment

• Consulting budget development

• Don’t always share

Page 36: 1 Copyright Dawn Willan 2005. This work is the intellectual property of the author. Permission is granted for this material to be shared for non- commercial,

Nadine SternNadine SternChief Information OfficerChief Information OfficerThe College of New JerseyThe College of New JerseyE-mail: E-mail: [email protected]

Dawn WillanDawn WillanData Resources AdministratorData Resources AdministratorThe College of New JerseyThe College of New JerseyE-mail: E-mail: [email protected]@tcnj.edu

ContactsContacts


Recommended