3
Notice of Project Western University Facilities Management Client Services 519-661-3304 ([email protected]) Project Number: Project Name: Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other Shutdowns/Interruptions(Approximate Schedule): Electrical Power Domestic Water Steam Hot Water Heating Chilled Water Elevators Fire Alarms Roads / Lots ITS Other Issued By: Miniature Attached Date/Schedule: Contractor: Attached To Follow Special Conditions ( Noise, Odors, Asbestos, Etc.) Comments: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Areas/Rooms Affected, Alternate Route/Service: Description/Reason for Project: Service to be interrupted: Building(s) Affected: Information Sheet Sent To Client #1 #3 #2 #4 #1 #2 #3 #4 Phone # Cell # Client Contact: Phone # Designer Consultant: Emergency Phone List: (to CCPS Only) Project Manager/ Co-ordinator: Signature/ Stamp: Cell # Note: Signature/ Stamp: Time: 9M5127 New Dental Simulation Lab Print Form November 9th, 2015 - April 30th, 2016 K & L Construction - Shane Burch (PM) & Don Lebel (Super) Core-Drilling, Hammering. Above ceiling work on LLG and in basement requiring Type 2 enclosures - being done by W&H Smith & inspected by Pinchin. LOWER LOWER GROUND Floor - renovation of area as shown on attached for duration of time frame. Basement Library area as shown ( for brief periods) Renovation project to create a new Simulation Lab on LLG floor. Mechanical & Electrical connections outside this area, and drainage work in basement. Floor areas 88737 +1 (519) 808-7516 Kevin Inchley 84125 Nicholson Sheffield - Gerald Gallacher Mike DeJager +1 (519) 521-4623 Trade support will be needed & WO's issued accordingly. Certain work will be scheduled around exams and also during the X-mas break. Elevator is already protected. DENTAL SCIENCE BUILDING (DSB) Submit by E-mail
Transcript
Page 1: #1 DENTAL SCIENCE BUILDING (DSB) #2 Simulation Lab Connections Nov 9 201… · DENTAL SCIENCE BUILDING (DSB) Submit by E-mail. Area of Work\rNew Simulation Lab. Designated elevator

Notice of Project Western University

Facilities Management Client Services 519-661-3304 ([email protected])

Project Number:

Project Name:

Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other

Shutdowns/Interruptions(Approximate Schedule):Electrical Power Domestic Water Steam Hot Water Heating

Chilled Water

Elevators

Fire Alarms

Roads / Lots

ITS Other

Issued By:

Miniature Attached Date/Schedule:

Contractor:

Attached To Follow

Special Conditions ( Noise, Odors, Asbestos, Etc.)

Comments:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Areas/Rooms Affected, Alternate Route/Service:

Description/Reason for Project:

Service to be interrupted:

Building(s) Affected:

Information Sheet Sent To Client

#1

#3

#2

#4

#1 #2

#3 #4

Phone # Cell #

Client Contact: Phone #

Designer Consultant:

Emergency Phone List: (to CCPS Only)

Project Manager/ Co-ordinator:

Signature/ Stamp:

Cell #

Note:

Signature/ Stamp:

Time:

9M5127

New Dental Simulation Lab

Print Form

November 9th, 2015 - April 30th, 2016

K & L Construction - Shane Burch (PM) & Don Lebel (Super)

Core-Drilling, Hammering.

Above ceiling work on LLG and in basement requiring Type 2 enclosures - being done by W&H Smith & inspected by Pinchin.

LOWER LOWER GROUND Floor - renovation of area as shown on attached for duration of time frame. Basement Library area as shown ( for brief periods)

Renovation project to create a new Simulation Lab on LLG floor. Mechanical & Electrical connections outside this area, and drainage work in basement.

Floor areas

88737 +1 (519) 808-7516

Kevin Inchley 84125

Nicholson Sheffield - Gerald Gallacher

Mike DeJager

+1 (519) 521-4623

Trade support will be needed & WO's issued accordingly. Certain work will be scheduled around exams and also during the X-mas break. Elevator is already protected.

DENTAL SCIENCE BUILDING (DSB)

Submit by E-mail

dtrudgeo
Approved
Page 2: #1 DENTAL SCIENCE BUILDING (DSB) #2 Simulation Lab Connections Nov 9 201… · DENTAL SCIENCE BUILDING (DSB) Submit by E-mail. Area of Work\rNew Simulation Lab. Designated elevator
dtrudgeo
Polygon
dtrudgeo
Polygonal Line
dtrudgeo
Polygonal Line
dtrudgeo
Polygonal Line
dtrudgeo
Polygonal Line
dtrudgeo
Polygonal Line
dtrudgeo
Polygonal Line
dtrudgeo
Callout
Area of Work New Simulation Lab
dtrudgeo
Callout
Designated elevator for access.
dtrudgeo
Callout
Approximate locations of Sanitary Drainage work in ceiling space.
dtrudgeo
Callout
Approximate locations of work above ceilings for Mechanical Services from Room 0003.
dtrudgeo
Line
dtrudgeo
Polygon
dtrudgeo
Callout
Contractor lay-down area and entrance.
Page 3: #1 DENTAL SCIENCE BUILDING (DSB) #2 Simulation Lab Connections Nov 9 201… · DENTAL SCIENCE BUILDING (DSB) Submit by E-mail. Area of Work\rNew Simulation Lab. Designated elevator

General Contractor K & L Constr.   Project Manager  – Shane Burch – 519‐200‐2852 Superintendent – 24 hr. – Don Lebel – 519‐521‐4623  Mechanical Curney – Chris Dukeshire – 519‐636‐0372  Electrical Gordon – Clint Lukings – 519‐808‐6764  Sprinklers Western Fire Prot. ‐ TBA   Consultants Nicholson Sheffield – Megan Bachinski – 519‐673‐1190 Chorley & Bisset – Carlos De Oliveira – 519‐643‐8077  Client – Schulich Kevin Inchley – 519‐777‐6145 Shawn Wilson – x 86108  Facilities Management PM – Mike DeJager – 519‐808‐7516  

dtrudgeo
Text Box
Project Manager - 24 hr contact # 1 - Shane Burch - 519-200-2852 Superintendent - 24 hr contact # 2 . - Don Lebel - 519-521-4623