1 Development of countermeasures
Transcript
Page 1: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

1

Development of countermeasures

Page 2: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

2

Principles of countermeasure development

• The process of countermeasure development should aim to– Determine a Range of measures likely to influence the

dominant crash types and road features– Select countermeasures based on professional

judgment and experience that can expected to reduce the number or severity of dominant crashes

From Ogden, Chapter 7

Page 3: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

3

Principles of countermeasure development (continued)

– Check to see if adopted countermeasures have any undesirable consequences in

• Safety terms– e. g. lead to an increase in number or severity of another

crash type• Traffic efficiency• Environmental terms

– Be cost-effective• Maximize the benefits from HRL program

– Be efficient• Produce benefits which outweigh costs

Page 4: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

4

Principles of countermeasure development (continued)

• A safe road is one that recognizes the realities and limitations of human decision making

• The management of road safety must ensure the road environment not place demands upon the driver that are beyond the driver’s ability to manage, or which are outside normal road user expectations

• What are the characteristics of a safe road?

Page 5: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

5

Characteristics of a safe road

• A safe road is defined as one which is designed and managed so that it:– Warns the driver of unusual features– Informs the driver of conditions to be encountered– Guide the driver through unusual sections– Control the driver’s passage through conflict points and

road links– Forgives a driver’s inappropriate behavior

Page 6: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

6

Intersections • The main design principles for intersections are

– Minimize the number of conflict points and thus the opportunity for crashes

• T-intersections and roundabouts have fewer conflict points than 4-way intersections

– Give precedence to major movements through• Alignment• Delineation• Traffic control

– Separate conflicts in space or time

Page 7: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

7

Intersections (continued)– Control the angle of conflict

• Crossing streams of traffic should intersect at a right angle or close to it

• Merging streams should intersect at small angles to ensure low relative speed

– Define and minimize conflict areas– Define vehicle paths– Ensure adequate sight distances– Control approach speed using

• Alignment• Lane width• Traffic control• Speed limits

Page 8: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

8

Intersections (continued)– Provide clear indications of right-of-way requirements– Minimize roadside hazards– Provide access to use intersection for

• Vehicular traffic– Special provisions for heavy vehicle and public transportation

vehicles

• Non-vehicular traffic– Pedestrians and other vulnerable road users

– Simplify the driving task– Minimize road user delayRoundabouts usually include to some degree allof the above principles

Page 9: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

9

Mid-block locations• The principles for design and operation of non-

intersection locations include– Consistent standards of horizontal and vertical

alignments– Develop roadway cross sections to suit road function and

traffic volumes– Delineate roadway and vehicle paths– Standards of access control from abutting land use– Ensure that roadside environment is clear or forgiving

Page 10: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

10

Mid-block locations (continued)• Overlaying all of the above principles is a vital need to

consider particular needs of all road user groups• Careful consideration of these needs will ensure the

quality of final treatment– Pedestrians have special needs that should be separately

considered when investigating safety problems and developing countermeasures

– Special requirements of heavy vehicles• Negotiating low-radius turn• Traveling through horizontal curves with adverse super-elevation

– Other user groups needs

Page 11: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

11

Countermeasure selection

• Matching solutions to problems– The key to selection of countermeasures is to

concentrate on the particular crash types which identified in diagnosis phase

– The final choice will be based upon judgment and experience

– Utilizing countermeasures which have been successful in similar situations elsewhere

Page 12: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

12

Criteria for countermeasure development

• There are number of criteria for countermeasure selection– Technical feasibility

• Can countermeasure provide an answer? • Does it have technical basis for success?

– Economic efficiency• Is countermeasure likely to be cost effective?• Will it produce benefits to outweigh its costs?

– Affordability• Can it be accommodated through program budget?• Should a cheaper solution be adopted?

Page 13: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

13

Criteria for countermeasure development (continued)

– Acceptability • Does the countermeasure target the problem?• Will it easily understandable by community?

– Practicality• Is there likely to be a problem of non-compliance?• Can the measure work without unreasonable enforcement

effort?

– Political and institutional acceptability• Is the countermeasure likely to attract political support?• Will that be supported by the organization responsible for its

installation and on-going management?

Page 14: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

14

Criteria for countermeasure development (continued)

– Legal compatibility• Is the countermeasure a legal device?• Will users breaking any law by using it in the way intended?

– Compatibility• Is the countermeasures compatible with other strategies which

have been applied in similar situations?• It can be seen that adapting countermeasures to particular

problem is a complex process. • Development of countermeasures requires understandable

technical and institutional framework to provide the guideline principles and motivation for action

Page 15: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

From Garber …

15

Page 16: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

16

Page 17: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

From: Khisty

17

Page 18: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

18

Page 19: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

19

Page 20: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

20

Page 21: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

21

Page 22: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

1990 NHTSA/FHWA effective safety measures

What’s new since then that you know about?22

Page 23: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

23

Page 24: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

24

Page 25: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

25

Page 26: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

26

Page 27: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

27

Page 28: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

28

Page 29: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

29

Page 30: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

30

Page 31: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

31

Page 32: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

32

Page 33: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

33

Page 34: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

34

Page 35: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

35

Page 36: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

36

Page 37: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

37

Page 38: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

38

Page 39: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

39

Page 40: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Crash Reduction Factors

Aka Accident Modification Factors or Functions

40

Page 41: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

41

Page 42: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Do you know another way to do this?

See: combining crash reduction factors 42

Page 43: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Access Control

43

Page 44: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

44

Page 45: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Alignment

• Curved sections have 1.5-4.0 times the crash rate of tangent sections

45

Page 46: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Cross sections

46

Page 47: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

47

Page 48: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

48

Page 49: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

49

Page 50: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

50

Page 51: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

51

Page 52: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Intersections

52

Page 53: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Pedestrians

53

Page 54: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Crash Reduction Factors for Countermeasures

Issue Briefs and Desktop Reference

Maurice Masliah, Ph.D. Senior Researcher iTRANS Consulting

(905) 882-4100 ext 5295 [email protected]

Prepared by iTRANS Consulting

54

Page 55: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

55

April 2004

September 2007

Updated Issue BriefsTraffic Signals Intersections

Page 56: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

56

New Issue BriefsRoadway Departure Pedestrian

Page 57: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

57

New Product: Desktop Reference

Page 58: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

58

What is a CRF?

• CCrash RReduction FFactor

• Percentage crash reduction that might be expected after implementing a countermeasure– CRF of 25 means a 25% reduction in crashes

– CRF of -20 means a 20% increase in crashes

Page 59: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

59

Issue Briefs: Purpose

• One CRF for each countermeasure

• The “best” available CRF (accuracy and precision checks)

• Additional information relevant to the CRF(traffic control, area type, etc.)

Page 60: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

60

Desktop Reference: Purpose

• Multiple CRFs for the same countermeasure (where available)

• CRF functions

• Additional information such as study type, number of observations, CRF range (high - low)

Page 61: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

61

Product PurposeIowa DOT

Tom WelchState Transportation Safety Engineer

Iowa Dept of Transportation

Page 62: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

62

Roadway Departure Issue Brief

• Purpose

• CRFs

• How to Use

Page 63: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

63

Roadway Departure CRF Example

• CRF = 38(10)17

Page 64: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

64

CRF Example

Remove or relocate fixed objects outside the clear zone

38CRF

Expected crashes without treatment

Expected crashes with treatment

Page 65: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

65

CRF Example

• CRF = 38(10)17

Bold type means a rigorous methodology was used to estimate the CRF, and the standard error is relatively small

(10 ) is the standard error for this CRF

17 is the reference number* * details at the end of the Issue Brief

Page 66: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

66

CRF Confidence Interval

• Estimation of confidence interval [38(10)17]

2 standard errors from the CRF

18% (38 - 2 X 10) and 58% (38 + 2 X 10)

• Expected safety effect of the countermeasure: between 18% and 58%

Page 67: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

67

Example ApplicationDouglas County

Keary B. LordAssistant Director/

Traffic Operations Division Manager

Page 68: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

68

Accuracy

• Accuracy is the proximity of the estimate of the CRF to the true value

• Two types of bias affect accuracy:

1. Regression to the mean bias

2. Traffic volume bias

Page 69: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

69

Precision

• Precision is the degree to which repeated estimates of the CRF are similar to each other

• Measure of precision: standard error of CRF

Page 70: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

70

Reliability

• Reliability is defined here as the combination of precision and accuracy

• CRFs that pass the reliability test are shown in bold font

Page 71: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

71

Reliability Selection Criteria and Thresholds

Page 72: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

72

Number of CRFs and Bold CRFs

Total CRFs

Bold CRFs

% Bold CRFs

Intersection 452 63 14% Roadway Departure 504 28 6% Pedestrian 32 2 6%

** Very few published CRFs Very few published CRFs are considered reliable!are considered reliable!

Page 73: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

73

CRF Proper Use and Limitations Colorado DOT

TBD – Bryan Allery/Jake Kononov

Colorado Dept of Transportation

Page 74: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

74

Highway Safety Improvement Program (HSIP)

• Planning • Implementation • Evaluation

(3) A comparison of accident numbers, rates, and severity observed after the implementation of a highway safety improvement project with the accident numbers, rates, and severity expected if the improvement had not been made.

Page 75: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

75

HSIP & CRFs

• Evaluation legislation specifies the information needed to produce CRFs

• Our review of HSIPs has not found any states which tie their evaluation work with CRF generation

• Potential to link tasks currently being conducted with improving knowledge of effectiveness of countermeasures

Page 76: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

76

Strategic Highway Safety Plan (SHSP)

• CRFs should be part of the process of selecting countermeasures

• Intersections as an emphasis area within a SHSP

• Task team identifies left-turn crashes at intersections as an overrepresented crash type

• What are appropriate countermeasures?

Page 77: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

77

Strategic Highway Safety Plan (SHSP)

• Review of Intersection Issue Brief for left-turn crash CRFs– Provide protected left turn phase 16(2)19

– Install left-turn lane (physical channelization) 249

– Install cameras to detect red-light running 45(6)27

• Identify intersection locations and conduct a cost-benefit analysis

Page 78: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

78

Future Direction – What’s Next?

• Accident Modification Factors and Functions (rather than CRFs)

• Increase in number of studies that evaluate safety effects of countermeasures

• More stringent criteria in adoption of AMFs

• New tools

Page 79: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

79

What is an AMF?

• Multiplier representing the expected change in crashes

– CRF of 25 equals an AMF of 0.75

– CRF of -20 equals an AMF of 1.20

• Accident Modification Factor

Page 80: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

80

Accident Modification Functions

• Today, CRFs / AMFs for most countermeasures are noted as constants

• However, CRFs / AMFs are really functions of environmental variables:

– Traffic volume

– Traffic mix (trucks, pedestrians, bicyclists)

– Road geometry

– Operational conditions

Page 81: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

81

More Stringent Inclusion Criteria

• Highway Safety Manual inclusion process:

– Accuracy and precision of AMFs

– Standard error of 0.1 or less indicates AMF that is sufficiently accurate, precise, and stable

– Companion AMFs with standard errors of 0.2 - 0.3 are also included

• indicating the potential safety effects of the treatment on other facilities, or other crash types and severities

Page 82: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

82

Future Direction

• Periodical Update of Issue Briefs and Desktop Reference

• Search new information: – current research projects: http://rip.trb.org/– government-funded documents published:

http://www.ntis.gov/search/index.asp?– bibliographic database

http://ntlsearch.bts.gov/tris/index.do

Page 83: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

83

New Tools and New AMFs

• Low Cost Safety Improvements Pooled Funds Study

• Highway Safety Manual (HSM)

• SafetyAnalyst

• Interactive Highway Safety Design Model (IHSDM)

Page 84: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

84

CREDITS

The Technical Working Group (TWG)FHWAProject Manager

Clayton Chen

FHWA Marcee AllenNick ArtimovichMark DoctorKenneth EpsteinRay KrammesJim GrowneyDean Larsen

Matt LupesMary McDonoughDavid MorenaFred RanckTamara RedmonEd RiceGabe Rousseau

Iowa DOT Tom Welch

ITE Ed Stollof

iTRANS Geni BaharMaurice MasliahRhys WolffPeter ParkNesta Morris

Page 85: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

85

Page 86: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

86

Page 87: 1 Development of countermeasures. 2 Principles of countermeasure development The process of countermeasure development should aim to – Determine a Range.

Many more like this in the reference 87


Recommended