INTEGRATED CONSTRUCTION SYSTEM Manuel technique
Transcript
Page 1: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

INTEGRATED CONSTRUCTION SYSTEM

Manuel technique

Page 2: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Stan

dard

hei

ght o

f 350

mm

20 m

m

FONDATIONS

Construction

Panel thk Hydro isolation

22 mm pipe for electrical

Utilitaires

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

MGO board

Wall panel

Screw nails according calculation

but no more than 150 mm

Bottom plate (wooden)

Screw nails according calculation

End panel connector thk 45 mm

. Panel SIP screws

Sealant

Tyvek

Floor panel

45 x195 mm pressured treated wood

D.P.C. membrane

Anchor bolt

Up lift element (tie down element)

UP LIFT ELEMENT ONLY ON THE CORNER OF THE BUILDING

NOTES:

1. The detail is to be used with Possetti Construction construction drawings and installation guide. Refer to Possetti Construction construction drawings for final nail and screw schedules. 2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ SIP FLOOR

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 01

Page 3: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Construction

FOUNDATIONS

Hydro insulation

20 m

m

FONDATIONS

Construction

Panel thk Hydro isolation

Gypsum board/ MGO board MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Wall panel

Screw nails according calculation

but no more than 150 mm

Bottom plate (wooden)

Screw nails according calculation

End panel connector thk 45 mm

Panel SIP screws

Sealant

Tyvek

Floor panel

45 x195 mm pressured

treated wood

D.P.C. membrane

Anchor bolt

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ SIP FLOOR

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 02

Page 4: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Stan

dard

hei

ght o

f 350

mm

20 m

m

FONDATIONS

Construction

Panel thk Hydro isolation

22 mm pipe for electrical

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

MGO board

Wall panel

Screw nails according calculation

but no more than 150 mm

Bottom plate (wooden)

Floor joist (perpendicular to wall)

Screw nails according calculation

Blocking connector thk 45 mm

Thermal insulation

Sealant

Tyvek

45 x195 mm pressured treated wood

D.P.C. membrane

Anchor bolt

Up lift element

(tie down element)

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ SIP FLOOR

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 03

Page 5: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Stan

dard

hei

ght o

f 350

mm

20 m

m

FONDATIONS

Panel thk

Construction

Acoustique

22 mm pipe for electrical MGO board

Gypsum board/ MGO board Tyvek

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Wall panel

. Panel SIP screws

Floor joist

Two rows attached or per local code

Bottom plate (wooden)

Sealant

Screw nails according calculation

45 x195 mm pressured treated wood

D.P.C. membrane

Min. 5 cm bearing

Anchor bolt

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP DROOP WALL/ SIP FLOOR

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 04

Page 6: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

MURS

Construction

Panel thk

Gypsum board/ MGO board

MGO board

Wall panel

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Screw nails according calculation

but no more than150 mm

Screw nails according calculation

Bottom plate (wooden)

Sealant

End panel connector thk 45 mm

. Panel S.I.P. screws

45 x 195 mm pressured

treated wood

Floor panel

Tyvek

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ SIP FLOOR/ STEEL BEAM

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 5

Page 7: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

MURS

Construction

Panel thk

20 mm pipe for electrical horizontal chase centered

Gypsum board/ MGO board

Wall panel

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Screw nails according calculation

Sealant

Bottom plate (wooden)

Top plate (wooden)

Floor Joist/ Posi-Joist/ I-Joist

(perpendicular to wall)

End panel connector

Header wrap (if

required)

Screws nails according calculation

Extension top plate (wooden)

Gypsum board/ MGO board

Screws nails according calculation

but not less than 50 mm

Sealant

NOTES:

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 6

MUR SIP/ SOL/ SOLIVE PARALLELE

Page 8: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Sta

ndar

d he

ight

of 3

50 m

m

20 m

m

MURS

Utilitiaires

Panel thk

20 mm pipe for electrical horizontal chase centered

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Wall panel

Panel approved sealant at locations shown

Screw nails according calculation

Bottom plate (wooden)

Floor Joist/ Posi Joist/ I-Joist (perpendicular to wall)

Top plate (wooden)

End panel connector

Header wrap (if required)

Screws nails according calculation

Extension top plate (wooden)

Gypsum board/ MGO board Screws nails according calculation but not less than 50 mm

Panel approved sealant at locations shown

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 7

MUR SIP / SOL / SOLIVE PARALLELE

Page 9: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

MURS

Construction

Panel thk

Gypsum board/ MGO board

. Panel S.I.P. screw according calculation

Bottom plate (wooden)

End panel connector (wooden)

. Panel screw nails

according calculation

. Panel S.I.P. screw according calculation

Alternative top plate (wooden)

. Panel screw nails according calculation

O.S.B. board

NOTES:

Gypsum board/ MGO board

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL CORNER

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 8

Page 10: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Panel thk

Gypsum board/ MGO board

. Panel S.I.P. systeml

End panel connector O.S.B.

Rockwool insulation P.I.R. foam

. Panel S.I.P. screw

Structural partition wall

Gypsum board/ MGO board

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 9

Page 11: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

75 m

m

(100

mm

)

MURS

Construction

Panel thk

Gypsum board/ MGO board

. Panel S.I.P. system

Gypsum board/ MGO board

Galvanized metal angle 37.5 x 0.4 mm

Galvanized metal plate 75 x 0.4 mm

Gypsum board/ MGO board 3,6,9 mm

P.I.R. foam

. Panel D.I.P. system non structural wall

NOTES:

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 10

Page 12: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

MURS

Construction

. Panel SIP screw Roof

panel

Screw nails according calculations

End panel connector 45 mm

Galvanized metallic angle 37.5 x 0.4 mm

Wall panel

Gypsum board/ MGO board

Top plate (wooden)

P.I.R. foam

O.S.B.

Screw nails according

calculations

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 11

Page 13: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

Panel th

k

MURS

Construction

2 cm

Joint wood plate

Screw nails according calculations

Panel edge sealant at roof panels only

Joint wood plate

Gypsum board/ MGO board

Screw nails according calculations

. Panel approved sealant at location shown

. Panel approved panel seal tape at roof panels only

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP JOINT/ SINGLE LUMBER SPLINE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 12

Page 14: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

Panel th

k

MURS

Construction

2 cm

SIP joint element

Screw nails according calculations

Panel edge sealant at roof panels only

Spline attached full round head smooth shank nails both sides

Gypsum board/ MGO board . Panel approved

Screw nails according calculations

sealant at location shown

. Panel galvanized metallic plate

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP JOINT/ SPLINE

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 13

Page 15: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

Panel th

k

MURS

Construction

Screw nails according calculations

SIP panel

Joint wood plate

Screw nails according calculations

Joint wood plate

Gypsum board/ MGO board

Panel edge sealant at roof panels only

. Panel approved sealant at location shown

. Panel approved panel seal tape at roof panels only

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP JOINT/ SINGLE 4 X LUMBER SPLINE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 14

Page 16: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Pa

ne

l th

k

A

MURS

Construction

Top plate (wooden)

. Panel screw nails according calculations

2 x blocking

B B

2 x lintel plate (wooden)

. Panel screw nails according calculations

Panel thk

A A

End panel top plate 45mm

NOTES:

. Panel approved sealant at location shown

B B

1. The detail is to be used with . Panel construction drawings and installation guide. Refer to . Panel construction drawings for final nail and screw schedules. 2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SMALL OPENING INSIDE PANEL

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 15

Page 17: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Top plate (wooden)

Screw nails according calculations

ΚΟΡΥΦΗΣ

O.S.B. board

P.I.R. foam

Screw nails according calculations

Bottom plate (wooden)

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

Bottom

plate (wooden)

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 16

Page 18: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

MURS

Construction

Gypsum board

O.S.B.

P.I.R. foam

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Screw nails according calculations

Solid Beam (for support and

connections see Detail no. 48 - Floors chapter)

Screw nails according calculations

S.I.P. system

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 17

Page 19: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Screw nails according calculations

P.I.R. foam

O.S.B.

. Panel S.I.P. system

Panel joint wood plate 45 x 90 mm

Bottom plate 45 x 90 mm

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 18

Page 20: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

WALLS

SCALE: DETAIL 19

LAST UPDATE: INTEGRATED CONSTRUCTION SYSTEM

Construction

Screw nails according calculations

. Panel S.I.P. system

Panel joint wood plate 90 x 90 mm

Bottom plate

45 x 90 mm

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

Page 21: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

WALLS

SCALE: DETAIL 20

LAST UPDATE: INTEGRATED CONSTRUCTION SYSTEM

Construction

Screw nails according calculations

Hangers 600 mm

. Panel S.I.P. system

Panel joint wood plate

4 x 7.5/ 200

DETAIL A

Bottom plate 45 x 90 mm

Hangers

NOTES:

DETAIL A

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

Page 22: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

WALLS

SCALE: DETAIL 21

LAST UPDATE: INTEGRATED CONSTRUCTION SYSTEM

Construction

Lintel wood plate 2 pieces of 45 x 90 mm

. Panel S.I.P

system

. Panel S.I.P. system

Bottom plate 45x90mm

45x90

Lintel structure for openings more than 2.80m according engineering calculations

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

Page 23: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

WALLS

SCALE: DETAIL 22

LAST UPDATE: INTEGRATED CONSTRUCTION SYSTEM

Construction

Continue lintel wood plate

2 pieces of 38 x 89 mm

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

Page 24: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 23

Page 25: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

20 m

m

20m

m

20m

m

20 m

m

20 m

m

MURS

Feu

S.I.P. system, roof panel S.I.P. system, roof panel

S.I.P. system, wall panel

Floor support material Aerated concrete (acoustic insulation)

D.P.C. membrane

Wood beam

Rockwool

Gypsum board/ MGO board

S.I.P. system, wall panel

LAST FLOOR, ap. 1 LAST FLOOR, ap. 2 Fire protection Gyproc 50 mm

Floor support material Aerated concrete

(acoustic insulation) D.P.C. membrane

O.S.B

Rockwool

I beam wood + O.S.B.

Fire protection Gyproc 50 mm

S.I.P. system, wall panel

Floor support material Aerated concrete (acoustic insulation)

D.P.C. membrane

Wood beam

ROCKWOOL

Gypsum board/ MGO board

FIRST FLOOR, ap. 1 FIRST FLOOR, ap. 2

Floor support material Aerated concrete

(acoustic insulation) D.P.C. membrane

Rockwool

O.S.B

I beam wood+O.S.B.

O.S.B S.I.P. system, wall panel

Gypsum board/ MGO board

Fire protection Gyproc 50 mm

GROUND FLOOR, ap. 1 GROUND FLOOR, ap. 2 S.I.P. system, wall panel

Floor support material Aerated concrete (acoustic insulation) D.P.C. membrane

Floor support material Aerated concrete

(acoustic insulation) D.P.C. membrane

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 24

Page 26: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

MURS

Construction

Feu

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 25

Page 27: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Feu

Sound absorption tape

Beam

O.S.B. 12 mm for insulation support

Beam

Rockwool 30 mm

Rockwool 30 mm

GAP, 12 mm

S.I.P. panel

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 26

Page 28: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction NOTES:

. Panel screw nail types

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

. PANEL SCREW NAIL TYPES

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 27

Page 29: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

2.8

0

0.8

0

0.6

0

1.4

0

1.6

0

0.6

0

0.6

0

2.2

0

0.6

0

2.8

0

MURS

Construction

0.35

0.70 0.80 0.55 0.60 1.25

0.30

1.25 0.80 1.25 1.05 1.25

B2 B6 B11

B1 B4 B5 B8 B9 B10 B12 B13 B14

B3

B7

CUTTING LIST

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

CUTTING LIST

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 28

Page 30: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Lintel plate 45 x 90 mm

Lateral plate 45 x 90 mm

Lateral plate 45x90mm

Base plate

45 x 90 mm

NOTES:

NOTE! If the window opening more then 60 x 60 cm, structural frame is needed.

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 29

Page 31: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Less than 6

0 c

m

MURS

Construction

Lintel plate 45 x 90 mm

Lateral plate 45 x 90 mm

Lateral plate 45x90mm

Base plate

45 x 90 mm

NOTES:

NOTE! If the window opening position has in top of the panel less then 60cm, it needs engineering calculations; for more than 60x60cm, it needs structural frame

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 30

Page 32: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

VIEW

280 c

m

MURS

Construction

Top plate 45 x 90 mm

End panel plate 45 x 90 x 2665

Bottom plate 45 x 90 mm

Joint panel plate 90 x 90 x 2665

End panel plate 45 x 90 x 2665

Joint panel plate 90 x 90 x 2665

NOTES:

PLAN

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 31

Page 33: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

22

5

20

0

MURS

Construction

Acoustique

Rafter

Rockwool

Tyvek

Wood slate

Roof tile

Purlin

Extension plate Top plate

300

Fascia board

S.I.P. system

Gypsum board/ MGO board

Wood eave board

Lintel

Brick

Rendering

Window

Top plate Lintel

Brick

13 112 50 100 20

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 32

Page 34: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Acoustique

Feu

Gypsum board/ MGO board

O.S.B.

Acoustic slide

concrete

O.S.B.

Rockwool

Plastic profile

S.I.P. panel

Brick/ concrete

Fire protection, Gyproc 50 mm

End panel plate (wooden)

Fire protection, Gyproc 50 mm

Screw nails according calculations

End panel plate (wooden)

Steam barrier

Rockwool

O.S.B.

Gypsum board/ MGO board

O.S.B.

Brick/ concrete

P.I.R. foam

S.I.P. system O.S.B.

TOP VIEW

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 33

Page 35: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Isolation thermique

O.S.B.

S.I.P. system

O.S.B.

P.I.R. foam

Slide concrete

Pressured treated wood

Bottom plate (wooden)

Slide concrete

Anchor bold

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 34

Page 36: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Feu

Isolation thermique

Brick/ concrete

Tyvek

O.S.B.

APARTMENT 1 Gypsum board/

MGO board

O.S.B.

P.I.R. foam

Fire protection, Gyproc 50 mm

Screw nails according calculations

Fire protection, Gyproc 50 mm

S.I.P. system

APARTMENT 2

Tyvek

Double gypsum board/ MGO board

Gypsum board/ MGO board

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 35

Page 37: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Feu

Isolation thermique

Finished brick

Tyvek

Brick fixing system

Wood beam

O.S.B.

Screw nails according

calculation

Fire protection, Gyproc 50 mm

Up lift element (wooden)

Rockwool

Gypsum board/ MGO board

O.S.B.

Extension plate (wooden)

Top plate (wooden)

Screw nails according calculation

P.I.R. foam O.S.B.

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 36

Page 38: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Feu

Hydro isolation

Chimney

Hydroinsulation

O.S.B.

Fire protection

Roof S.I.P. panel

Gypsum board/ MGO board

5 cm

5 cm

P.I.R. foam

O.S.B.

Gypsum board/ MGO board

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 37

Page 39: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Concrete box

Fire protection

Fire place - structure

Feu

Hydro isolation

S.I.P. system, wall panel

End panel connector (wooden)

Stone mask

FIRE PLACE TOP VIEW

S.I.P. system

Fire protection

Chimney

Fire place concrete structure

Fire protection

Fire place concrete structure

Gypsum board/ MGO board

S.I.P. system

Fire place concrete structure

Concrete base

NOTES: SECTION

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 38

Page 40: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Utilitaires

S.I.P. system

Utilities pipes

End panel connector

Screw nails according calculations

End panel connector

P.I.R. foam

O.S.B.

O.S.B.

Wood slate S.I.P. system

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 39

Page 41: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Acoustique

Utilitaires

Finishing material

Base concrete

O.S.B.

Top plate (wooden)

Utilities pipe

P.I.R. foam

O.S.B.

Gypsum board/

MGO board

Plinth

Screw nails according calculations

Floor tiles

Anchor bold

Concrete slab

Tyvek

Base concrete

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 40

Page 42: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

MURS

Construction

Utilitaires

M.G.O. board

O.S.B.

Top plate (wooden)

Utilities pipe

P.I.R. foam

Gypsum board/ MGO board

O.S.B.

Plinth

Screw nails according calculations

Floor tiles

Anchor bold

Concrete slab

Tyvek

Base concrete

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 41

Page 43: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

SOLS

Construction

Panel thk

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

MGO board

Wall panel

Bottom plate (wooden)

Screw nails according calculation

but no more than 150 mm

Screw nails according calculation

End panel connector thk 45 mm

. Panel S.I.P. screws

Floor panel

Tyvek

45 x 195 mm pressured treated wood

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ SIP FLOOR/ STEEL BEAM

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 41

Page 44: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

MURS

Construction

Panel thk Acoustique

20 mm pipe for electrical horizontal chase centered

Gypsum board/ MGO board

Hydro isolation

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Wall panel

. Panel approved sealant at locations shown

Bottom plate (wooden)

Floor Joist/ Posi-Joist/ I-joist (perpendicular to wall)

Screw nails according calculation

End panel connector

Header wrap (if required)

Extension top plate (wooden)

Gypsum board/ MGO board

Top plate (wooden)

Screws nails according calculation but not less than 50 mm

Screws nails according calculation

. Panel approved sealant at

locations shown

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ FLOOR/ JOIST PARALLEL SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 42

Page 45: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

20 m

m

MURS

Construction

Panel thk Utilitaires

Hydro isolation

20 mm pipe for electrical horizontal chase centered

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Wall panel

Bottom plate (wooden)

Screw nails according calculation

. Panel approved sealant at locations shown

End panel connector 45 mm

Wood and O.S.B. joist

Top plate (wooden)

Gypsum board/ MGO board

D.P.C. membrane

Height extension top plate

. Panel approved

sealant at locations shown

Screw nails according calculation

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/FLOOR/ JOIST PARALLEL

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 43

Page 46: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

100 mm

S.I.P. wall

D.I.P. system nonstructural wall

Gypsum board/ MGO board 3,6,9 mm

P.I.R. foam

S.I.P. wall Galvanized metal angle

37.5 x 0.4 mm

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Floor panel

Tyvek

45 x 195 mm pressured treated wood

D.P.C. membrane

Anchor bolt

NOTES:

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 44

Page 47: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

Acoustique

O.S.B. floor support

Screw nails according calculations

Acoustic absorption tape

Top plate 2 plies x 45mm x 90 mm

Hanger as per calculation

“I” type beam . Panel

S.I.P. system . Panel

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 45

Page 48: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

Acoustique

Screw nails according calculations

Acoustic absorption tape

O.S.B. floor support

Screw nails according calculations

Top plate 2 plies x 45mm x 90 mm

Beam

S.I.P. system

. Panel

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 46

Page 49: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

O.S.B. O.S.B.

Top plate 45 x 90 mm

P.I.R. foam

Wood beam

S.I.P. panel Hanger as per calculation

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 47

Page 50: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

Acoustique

Gypsum board/ MGO board

Feu

Aerated concrete (acoustic insulation)

O.S.B. 18 mm

Rockwool 50 mm

Plastic profile

Concrete

Fire protection Gyproc 50 mm

Bottom plate (wooden)

End panel connector

Gyproc 50 mm

Beam

Double gypsum board/ MGO board

Gypsum board/ MGO board

O.S.B.

Screw nails according calculations

S.I.P. system

P.I.R foam

Tyvek

O.S.B.

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 48

Page 51: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

Acoustique

Brick/ concrete

O.S.B.

P.I.R. foam

Bottom plate (wooden)

Gypsum board/ MGO board

O.S.B.

Screw nails according

calculations

Rockwool

Wood beam

O.S.B.

Up lift element

Screw nails according calculations

Extension plate(wooden)

Top plate (wooden)

Gypsum board/ MGO board

Screw nails according calculations

S.I.P. system

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 49

Page 52: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

SOLS

Construction

O.S.B.

Metallic profile

Utilities pipe

P.I.R. foam

O.S.B.

Gypsum board/ MGO board

Bottom plate (wooden)

Screw nails according calculations

End beam connector (wooden)

Aerated concrete

(acoustic insulation)

O.S.B.

Wood beam

Double gypsum board or other approved thermal barrier

P.I.R. foam

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE:

DETAIL 50

Page 53: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

. Panel screw nails according calculation

. Panel approved sealant at locations shown

S.I.P. roof panel

Beveled lumber attached, full round head smooth shank nails both sides

10d nails two rows

staggered or per local code

O.S.B. panel

P.I.R. foam

Gypsum board/ MGO board O.S.B. panel

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL ANGLED CORNER SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 51

Page 54: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

. Panel screw nail according calculation

. Panel approved sealant at locations shown

Beveled lumber attached, full

round head smooth shank nails both sides

Gypsum board/ MGO board

O.S.B. panel

P.I.R. foam

. Panel S.I.P. screw

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL ANGLED CORNER/ OVERLAY

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 52

Page 55: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

Roof panel S.I.P. system

P.I.R. foam

. Panel S.I.P. screw

O.S.B. panel

Gypsum board/ MGO board Screw nails according to

calculations

. Panel screw nails according calculation

. Panel approved galvanized metal angle

Top plate 45 mm

Wall panel S.I.P. system

Gypsum board/ MGO board

P.I.R. foam

End panel plate

. Panel approved sealant at locations shown

O.S.B. panel

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ ROOF/ SQUARECUT EAVE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 53

Page 56: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

O.S.B. panel

Roof panel S.I.P. system

. Panel screw

P.I.R. foam

Gypsum board/ MGO board

. Panel approved galvanized metal angle

SILI top plate

Screw nail according calculations

Screw nails according

calculations

End panel plate

Wall panel S.I.P. system

Gypsum board or other approved thermal barrier

. Panel approved

sealant at locations shown

O.S.B. panel

P.I.R. foam

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ ROOF/ BLOCKING/ SQUARE CUT EAVE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 54

Page 57: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

O.S.B. panel

Roof panel S.I.P. system

. Panel screw

P.I.R. foam

Gypsum board/ MGO board

. Panel approved galvanized metal angle

SILI top plate

Screw nails according calculations

Screw nail according calculations

Wall panel S.I.P. system

Gypsum board or other approved thermal barrier

P.I.R. foam

End panel plate

O.S.B. panel . Panel approved

sealant at locations shown

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ ROOF/ PLUMB CUT EAVE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 55

Page 58: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

O.S.B. panel

Roof panel S.I.P. system

P.I.R. foam

. Panel screw

Gypsum board/ MGO board

. Panel approved galvanized metal angle

Screw nails according calculations

SILI top plate

Screw nail according calculations

Wall panel S.I.P. system

Gypsum board or other approved thermal barrier

P.I.R. foam

O.S.B. panel

End panel plate

. Panel approved sealant at locations shown

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ ROOF/ BLOCKING/ PLUMB CUT EAVE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 56

Page 59: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

Pre-engineered wood trusses

Screw nails according calculations

Galvanized metallic plate for joint pieces with nails

Galvanized metallic plate for joint pieces with nails

Wood beam/ joist

Gypsum board / MGO board

Height extension top plate (wooden)

Top plate (wooden) 45 mm

. Panel screw nails according calculations

Wall panel S.I.P. system

Panel thk

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP WALL/ PRE-ENGINEERED WOOD TRUSSES

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 57

Page 60: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

Panel edge sealant End panel connector 45 mm

. Panel approved sealant at locations shown

O.S.B.

Galvanized metallic profile

Gypsum board or other approved thermal barrier

Min. 5 cm bearing

. Panel S.I.P. screw

Ridge beam

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP ROOF/ RIDGE BEAM/ RIDGE PLATES

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 58

Page 61: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

Screw nails according calculations

Panel edge sealant

. Panel approved sealant at locations shown

End panel connector

. Panel SIP screw

Gypsum board/ MGO board

Rafter

Galvanized metallic profile

Ridge beam

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP ROOF/ RAFTER/ RIDGE PLATES

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 59

Page 62: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

1 cm min.

Panel edge sealant

. Panel screw

Two part polyurethane foam sealant

O.S.B.

Galvanized metallic profile

Gypsum board/ MGO board

Min. 5 cm bearing

Ridge beam

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP ROOF/ RIDGE BEAM/ TWO PART FOAM

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 60

Page 63: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

End panel connector 45mm

Screw nails according calculation

Panel edge sealant

O.S.B.

. Panel S.I.P. screw

. Panel approved sealant at locations shown

Galvanized metallic profile

Gypsum board/ MGO board

Min. 5 cm bearing

Ridge beam

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP ROOF/ RIDGE BEAM/ OVERLAY

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 61

Page 64: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

. Panel S.I.P. screw

Panel edge sealant

Gypsum board / MGO board

O.S.B.

. Panel galvanized metallic angle

Engineered lumber valley plates attached

full round head smooth shank nails top side

. Panel approved sealant at locations shown

Screw nails according calculations

Valley beam (min. 5c m bearing each panel)

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP ROOF/ VALLEY BEAM PLATES

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 62

Page 65: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

TOIT

Construction

Panel edge sealant

O.S.B.

Gypsum Board/ MGO board

. Panel galvanized metallic angle

. Panel approved two part polyurethane foam sealant

. Panel S.I.P. screw

Valley beam (min. 5 cm bearing each panel)

NOTES:

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP ROOF/ VALLEY BEAM/ TWO PART FOAM

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 63

Page 66: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

Panel th

k

TOIT

Construction

. Panel approved two part polyurethane foam sealant

Screw nails according calculation

O.S.B. surface spline attached full round head smooth shank nails top side

Gypsum board/ MGO board

O.S.B.

Panel edge sealant

. Panel approved panel seal tape at roof panels only

Beam

. Panel S.I.P. screws

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP JOINT/ BEAM/ OSB SURFACE SPLINE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 64

Page 67: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

Panel th

k

TOIT

Construction

Screw nails according calculation

. Panel approved two part polyurethane foam sealant

Spline attached full round head smooth

shank nails top side

Gypsum board/ MGO board

O.S.B.

Beam

Panel edge sealant at roof panels only

. Panel S.I.P. screws

NOTES:

1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP JOINT/ BEAM/ INSULSPLINE

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 65

Page 68: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

Panel th

k

Panel th

k

TOIT

Construction

. Panel S.I.P. screws

Gypsum board/MGO board

O.S.B.

Beam

NOTES: 1. The detail is to be used with Possetti Construction construction drawings and installation guide.

Refer to Possetti Construction construction drawings for final nail and screw schedules.

2. All building components used in construction with this detail shall be in compliance with local code requirement.

DETAIL NAME:

SIP PANEL/ INTERMEDIATE BEAM

SCALE:

INTEGRATED CONSTRUCTION SYSTEM

LAST UPDATE: DETAIL 66

Page 69: 1. Foundations 5 pg - possetti-construction.compossetti-construction.com/wa_files/SIP-Technical-Manual-new.pdf · Screw nails according calculation End panel connector thk 45 mm ...

INTEGRATED CONSTRUCTION SYSTEM


Recommended