1 Gates Center Faculty Meeting: Nov. 3, 2004
Transcript
Page 1: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

1

Gates CenterFaculty Meeting: Nov. 3, 2004

Page 2: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

2

OutlinePreliminary designsProcess/TimelineOther buildingsWhat we need to think about

Page 3: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

3

Preliminary DesignsAlmost nothing set in stone

Just to give you a sense of the range of possibilities

Bowlin Cywinsky and Jackson (BCJ) were the architects.

BCJ did Bill Gate’s house, UCSD CS building, UIUC CS building, Pixar HeadquartersNot necessarily final architect

Page 4: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

4

Design I

Page 5: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

5

Page 6: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

6

Design II

Page 7: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

7

Page 8: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

8

Design III

Page 9: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

9

Page 10: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

10

Proposed Costs ($50M total)$33M building construction

$220/sqft * 150,000sqft$3M underground parking (150 cars @20K)$3M architect$2M landscaping development$2M Project management$2M Furnishing$5M Other (demolition, …)

Page 11: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

11

Proposed Sources$20M Gates Foundation$8M Other gifts (fundaraising)Remaining : Financing (Public Bonds)

Page 12: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

12

ProcessWarner Hall picks construction management company (DONE, Oxford)University committee selects architect (representatives from SCS, FMS, (DRC) Design Review Committee., Warner Hall, trustees)Architects works with us on design (especially the interior). Also can bring in consultants on particular aspects (e.g. lighting, wireless).Many levels of design.

Page 13: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

13

Process IIDifferent parts are put out for bid (concrete, electricity, heating, Construction starts…we have to be diligent about quality…many decisions have to made on the fly.

Page 14: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

14

Timeline

Jan 05 Jan 06 Jan 07 Jan 08 Jan 09

architectselected

schematicdesign

constructiondocs

groundbreaking

completion

our input into the designfundraising

Page 15: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

15

Process within SCSSmall committee

Guy BlellochSharon BurksPeter LeeManuela Veloso???

Randy Bryant + Jim Skees (Ex.officio)Everyone is encouraged to give input.

Page 16: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

16

Other recent CS buildingsStata Center, MIT (2004)Allen Center, UW (2003)Seibel Center, UIUC (2004)EBU3B, UCSD (2004-2005)ACES building, UT Austin (2001)Klaus building, Georgia Tech (2006)Maxwell-Dworkin, Harvard (1999)

Page 17: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

17

Space: 420K sqft (+ 280K garage)Cost: $350 Million (approximately)Architect: Frank GehryMajor Donors: $25M Ray Stata, $15M

Alexander Dreyfoos, $20M William Gates

MITRay and Maria Stata Center

Page 18: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

18

Page 19: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

19

Page 20: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

20

Page 21: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

21

Page 22: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

22

Page 23: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

23

Page 24: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

24

Page 25: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

25

The Paul G. Allen Center forComputer Science & Engineering Space: 168K + 22K sqftCost: $72MArchitect: LMN Architects (local)Major donations: $7.2M Microsoft, $14M

Paul Allen, $6.5M Bill and Melinda Gates Foundation, 7 other $1M+ gifts

Page 26: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

26

Page 27: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

27

Page 28: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

28

Page 29: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

29

Page 30: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

30

Page 31: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

31

A great opportunity to rethink how we organize

ourselves

Need to open our mindsWhat would improve your quality of lifeWhat is most important to us

The devil is in the details

Page 32: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

32

IssuesHow to organize research groups

students mixed with faculty or separatestudents with their facultygroups are localized

How to organize labsindividual or group labspeople in labs, or just equipmentlabs next to faculty

Page 33: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

33

Issues IITypes of common spaces

informal sitting areasreading roomfood services/caféatrium

Connectivity and traffic flowbridge to NSH?bridge to cut?

Page 34: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

34

Issues IIIPrivacy vs. Openness

glass windows on labsglass windows on officesopen space desks (students, staff?)

Boldness of architecturevanilla functional buildingmake a statement about SCS

Page 35: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

35

Issues IVWhat space gets windows

offices, conference rooms, common spaces

Number and sizes of conference rooms7220 (500sqft)4623 (900sqft)

Classroom spaceAny special teaching labs?Any special classrooms?

Page 36: 1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

36

Issues VOffice space for undergraduatesOffice sizes for graduate students

3 students, 4, 5, ?NoiseIndividual heat/air controlOpening windows


Recommended