+ All Categories
Home > Documents > 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area...

1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area...

Date post: 01-May-2015
Category:
Upload: marino-proietti
View: 213 times
Download: 1 times
Share this document with a friend
6
1 GLAST GLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction A.Brez INFN - sez. Pisa
Transcript
Page 1: 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction.

1

GLASTGLAST GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa

GLAST:Gamma Ray Large Area Telescope

Plan for the Engineering Model Tower Construction

A.BrezINFN - sez. Pisa

Page 2: 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction.

2

GLASTGLAST GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa

Engineering Model Construction Schedule

18/2 Start of face sheet lamination

11/3 Definitive drawings of close-out

15/3 Assembly tools ready and measured

25/3 Start of tray assembly

2/4 Start of tungsten , kapton, top/bottom tools fabrication

2/4 Delivery of dummy ladders

6/5 Start of tungsten and kapton gluing

20/5 Start of ladder and MCM mounting on tray

31/5 End of tray delivery

14/6 End of ladder and MCM mounting on tray

17/6 Start of bonding and encapsulation MCM to ladders

24/6 Start of tray thermal and shake tests

1/8 Critical Design Review

Page 3: 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction.

3

GLASTGLAST GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa

18/2 1900 HPK wafer delivered, 400 tested

25/2 Order of storage system and tools for the second assembly line

4/3 Conclusion of the tender for 300 laddersStart of the tender for the second assembly line

15/3 Assembly tools storage system and ladder probe station ready for the first assembly chain

2/4 II Probe station - ladder version ready

2/4 Start of production of flight ladders in the first assembly line

6/5 Start of production of flight ladders in the second assembly line

Flight ladder schedule

Goal: start of the assembly of flight ladders in 2 assembly lines

Page 4: 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction.

4

GLASTGLAST GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa

ditta descrizione ordine costo note

Plyform Pelli fibra carbonio Si2001

46.735

G&A Dummy ladders Si2001

36.720

Totali 2001 93.455

Plyform Attrezzatura GLAST Si2002

10.000

Galli&Morelli Inserti Al 3.000 offerta

Plyform Assemblaggio trays 45.000 Stima budget

G&A Attrezzature di incollaggio ladder su tray

17.000 offerta

Tecnowepla Nuovo tool di assemblaggio torre

6.000 offerta

Centrotecnica 15gg di test 22.000 Costo ~1450 €/day

30 scatole porta-tray 15.000 stima

Totali 2002 118.000

Costi per l’Engineering Model (€, IVA inclusa)

Page 5: 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction.

5

GLASTGLAST GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa

ditta descrizione ordine costo note

G&A Sistema di storage per 1000 ladders

30.000

G&A Affitto clean room 25.000

G&A Set di tools per seconda linea di assemblaggio

25.000

Prima linea di assemblaggio

300 ladders Si 2001

100.000

Seconda linea di assemlaggio

N ladders N*300

Costi per assemblaggio ladders di volo (€, IVA inclusa)

Page 6: 1 GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Plan for the Engineering Model Tower Construction.

6

GLASTGLAST GLASTGLAST GLAST Italy meeting Pisa 18/02/2002 A.Brez – INFN Pisa

Costi per materiale inventariabile (€, IVA inclusa)

Non sono state fatte richieste di materiale inventariabile nel 2002Nei primi mesi di quest’anno sono in arrivo 2 probe-station Kark Suss Pa200 modificate per tests sui ladder e 1 probe-station Kark Suss Pa200 per i test sui waferPer attrezzarle completamente mancano ad oggi 2 source meters e un LCR meter

Per I test dinamici di accettazione workmanship in Plyform e’ necessario prevedere un sistema vibrazionale a bassa potenza con lettura di accelerometri o a interferometria laser. Il costo si aggira sui 30.000 €

Per I test termici estensivi che dovremo compiere l’anno prossimo va preventivato l’acquisto di 2 camere climatiche (costo 40.000 € l’una) o forse di una camera a termo-vuoto