1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update Angelo Cotta Ramusino
Transcript
Page 1: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

1GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

“off-detector” readout electronics for the Gigatracker: status update

Angelo Cotta Ramusino

Page 2: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

2

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

Page 3: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

3

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

The GTKRO high speed serial data receivers have been so far tested by generating 3.2Gbps serial streams on board and looping them back, as during the Nov 2013 dry run.

real GTKRO signals recorded via SignalTap, a.c.r., 2013-11-29

Page 4: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

4

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

The simulated data pattern matches the pattern (idle characters) published by Matt.

Stricter check could be done by testing the GTKRO against an up-to-date model of the TDCpix serializer.

a.c.r.2014-03-19

GTKRO simulation of 3.2Gbps signals

TDCpix 3.2Gbps output signals (from “The TDCPix Test System and First Results”,

Matt Noy, Feb 11 2014

Page 5: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

5

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

real GTKRO signals recorded via SignalTap, a.c.r., 2013-11-27

Acknowledgement of the ‘t’ character reception from the Ethernet port

‘t’ character received from the GTKRO slow link controller after the about 2.6us

turnaround time

The GTKRO serial configuration link has been so far tested by hosting in the GTKRO FPGA both the slow link controller and a simulated TDCpix-side endpoint.

The loopback through the installed fibers has been tested during the Nov 2013 dry run.

Page 6: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

6

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

The GTKRO controller has been checked against Matt’s up-to-date model of the TDCpix configuration link controller. The simulation results shows that the two system properly exchange data.

a.c.r. 2014-03-28

Page 7: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

7

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

The higher level of the TDCpix configuration protocol could be handled locally by the on board NIOS processor which has access to:

• on-board SRAM 1M x 18bit for local configuration variable storage (SRAM interface module developed by R.Malaguti, INFN-FE)

• FIFO based interface to the “hardware” layer of the TDCpix configuration protocol

• Stefano’s ethernet MAC

• I2C link (firmware developed by R. Malaguti, INFN-FE) to on board sensors (XCVR link input optical power; FPGA temperature)

Page 8: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

8

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

Following the meeting the preparation of the actual interconnection link will be discussed with the TDCpix designers

Page 9: 1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.

9

“off-detector” readout electronics for the Gigatracker (GTKRO): status update

preparing for the test of interconnection to the TDCpix: high speed serial data link

preparing for the test of interconnection to the TDCpix: configuration link

GTKRO motherboard production

GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE

All GTKRO motherboard PCBs have been manufactured and a first lot of 15 is being populated; delivery expected in a week.


Recommended