1 HERSCHEL: PMT status report The order to replicate PCB for divider of R1828-01 has been launched...

Date post: 28-Dec-2015
Category:
Upload: camron-booker
View: 214 times
Download: 1 times
Share this document with a friend
Popular Tags:
9
1 HERSCHEL: PMT status report The order to replicate PCB for divider of R1828-01 has been launched on 11-02-2014 a) digital file for production (promised by 14-03-2014) b) production of PCB (not started, on critical path) Prototype base modifications a) old base like for BLS counters (ready, waiting for R1828 delivery 2pieces) b) new base for modified voltages sequence (waiting for ordered components - FARNELL) Stand for study of PMTs with LEDs a) pulsing LED with signal recording (in use, scope LeCroy WaveRunner 104MXi-A) b) permanent illuminating LED (scheduled for coming week- end) Cosmic stand with prototype counters and PMTs a) trigger counters (ready) b) prototype counters (to be assembled during next week - Raphael) c) oscilloscope “LeCroy WR 104MXi-A” (ready – 350CHF/month) Two LEDs to be embedded inside scintillator – transparency monitoring! RD 21/03/2014
Transcript

1

HERSCHEL: PMT status report

• The order to replicate PCB for divider of R1828-01 has been launched on 11-02-2014a) digital file for production (promised by 14-03-2014)b) production of PCB (not started, on critical path)

• Prototype base modifications a) old base like for BLS counters (ready, waiting for R1828 delivery

2pieces)b) new base for modified voltages sequence (waiting for ordered components -

FARNELL)

• Stand for study of PMTs with LEDsa) pulsing LED with signal recording (in use, scope LeCroy WaveRunner

104MXi-A)b) permanent illuminating LED (scheduled for coming week-end)

• Cosmic stand with prototype counters and PMTsa) trigger counters (ready) b) prototype counters (to be assembled during next

week - Raphael)c) oscilloscope “LeCroy WR 104MXi-A” (ready – 350CHF/month)

• Two LEDs to be embedded inside scintillator – transparency monitoring!(to be checked with prototype)

• 30 old PMTs “56AVP” available from UA1 thanks to Raphael and Heinrich!!!

• Extensively checked last few days (first results available)

RD 21/03/2014

2

HERSCHEL: PMT status report

RD 21/03/2014

STAND for PMT TESTS with LEDs

• base for test R1828

• old resistive base for 56AVP (UA1)

• scope LeCroy WR 104MXi-A (1GHz, 4 ch., WindowsXP )

• NIM crate with LED driver and trigger logic

•HV power supply and current monitoring

All 30 PMTs “56AVP” passed check :

• all are alive and working

• relative photocathode quantum efficiency measured

• Gain = A (HV) α measured to be ~12.2

3

HERSCHEL: PMT status report

RD 21/03/2014

STAND for COSMIC TESTS

Prototype scintillator counter

4

HERSCHEL: PMT status report

RD 21/03/2014

Two LEDs allow plastic transmittance monitoring

LED – 1 LED – 2

Aim – to monitor ratio LED1/ LED2 during shut-down

Vacuum pipe

5

HERSCHEL: PMT status report

RD 21/03/2014

OLD PMTs from UA1

For the same LED brightness and HV=1850V the response varies from

min - 35mVmax – 729mV

All 30 “56AVP” are alive – responding to LED pulse.

6

HERSCHEL: PMT status report

RD 21/03/2014

OLD divider from UA1

• Magnetic steel shielding with 2 LEDs on top

• Mu-metal screening

• Electro-static screening @photocathode HV

• Pure resistive divider

Average pulse height .vs. HV (two LED intensity settings)

56AVP #22544

7

HERSCHEL: PMT status report

RD 21/03/2014

Comparison of 30 PMTs “56AVP”

Pulse height spread for

fixed LED intensity and same HV=1850V

•no stability guarantee, •few minutes averaging

8

HERSCHEL: PMT status report

RD 21/03/2014

Single Photo-electron spectra PMT 56AVP # 49667

(~1M sweeps, @2500V)

0

100

200

300

400

500

-10 0 10 20 30 40 50 60 70 80 90 100

Q, pC

LED Pedestal

9

HERSCHEL: PMT status report

RD 21/03/2014

Outcome:

• Divider production under large concern

• Stand for prototype testing ready by next week

• 56AVP could be considered as a back-up solution (more study required)

• Dividers from UA1 to be investigated (if available)

• COMPASS group from Mainz asked to search spare parts for divider housing

• LEDs worth to embed in to scintillator to be able to monitor its transparency

• The coming weeks are crucial to finalize the baseline solution for counters.