+ All Categories
Home > Documents > 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman...

1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman...

Date post: 19-Mar-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
27
HOW IO LINK IS REVOLUTIONIZING OEE, CHANGE OVER AND PREDICTIVE MAINTENANCE
Transcript
Page 1: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

HOW IO LINK IS REVOLUTIONIZING OEE, CHANGE OVER AND PREDICTIVE MAINTENANCE

Page 2: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Introduction

Greg Molinaro Industry Manager with Balluff USA 25 years in Manufacturing and Automation Electrical Engineer Controls Automation Vendor Machine Builder

Page 3: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is Overall Equipment Efficiency?

OEE: The percentage of manufacturing time that is truly productive.

Three Components of OEE1. Availability Loss

a. Unplanned Stops/Downtime – Machine Failureb. Planned Downtime – Set up and Adjustments

2. Performance Lossa. Small Stops – Idling and Minor Stopsb. Slow Cycles – Reduced Speed

3. Quality Lossa. Production Rejects – Process Defectsb. Start up Rejects – Reduced Yield

Page 4: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is IO-Link?

• IO Link is Universal• IO Link is Smart (Intelligent)• IO Link is Easy (Straight Forward)• Simplifies Controls Architecture• Provides Visibility Down to the Sensor and Device• Backbone of the Smart Factory

Page 5: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is IO-Link?IO-Link is a point-to-point or peer-to-peer communications between a master and a device utilizing the 4-wire unshielded sensor cable

Same cable used today for prox switches or photo-eyes.

Device can be up to 20m away from the master.

master

device

Page 6: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is IO-Link?

• Capable of building STAR topology

• Extend the Master Block

• Extend the Hub

• Use with existing infrastructure

• Simplifies Retro Fit Projects

Page 7: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is IO-Link?What does IO-Link communicate?

• Process data (Control) Cyclical communication of process status

• Parameter data (Configuration) Messaging data with configuration information

• Event data (Diagnostics) Communication from device to master

(diagnostics/errors )

Data communicated in engineering units (millimeters, psi/bars, degrees)

1101

1000

0110

0101

00011010

Page 8: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

@WillAutomate

Vendor Neutral & Open Standard (IEC 61131-9)

Similar to USB's "plug & play" feature

IO-Link is Universal

IO-Link is NOT a NetworkIO-Link is NOT a Network

For Computer Technology

=For Automation

Technology

IO-Link is NOT a Network

For Computer Technology

=For Automation

Technology

Page 9: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

@WillAutomate

Use Existing Infrastructure & Network ArchitectureDeviceNet & EtherNet/IPCC-Link & CC-LinkIE FieldProfinet & ProfibusEtherCAT & TCP/IP

Controller AgnosticSiemens or Allen BradleyMitsubishi or Omron

Robot AgnosticYaskawa or MotomanKuka or Fanuc

IO-Link is Universal

@WillAutomate

Page 10: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

@WillAutomate

Reduce Planned and Unplanned Downtime

Offers full Remote Configuration

Provides Enhanced Diagnostics

Reports Event Warnings

Store settings in the control or master and swap as needed on the fly

Swap smart sensors w/o programming (Fast Change out)

IO-Link is SMART

@WillAutomate

Page 11: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

@WillAutomate

Eliminates need for Manual Configuration

No errors on setup of new device

Find & Replaceo Sensor Parameters are

downloaded automaticallyo Saving precious time and

production

Enables Faster Troubleshooting

IO-Link is EASY

@WillAutomate

Page 12: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Reduce Analog costs by 15%-20%

Reduce risk of electrical noise disrupting the process

Reduce terminations and turn them into connections

Easily retrofit measurements & analog devices

Simplify Analog & Measurements

IO-Link is EASY – Eliminate Analog Headaches

Page 13: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

IO-Link Simplifies the Controls Architecture

One Standard Interface

Use the same standard sensor cable across the board for integrating Discrete I/O Analog I/O Smart Devices and sensors Specialty devices (RFID, Vision)

Page 14: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

IO-Link Simplifies the Controls Architecture

Page 15: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is Predictive Maintenance?

Predictive Maintenance helps determine the condition of in-service manufacturing equipment in order to predict when maintenance should be performed.

The desire is to prevent the occurrence of a failure by performing planned maintenance. Predict when a failure might occur Prevent unplanned downtime Increase OEE Reduce Equip Failure Reduce Small Stops Reduce Slow Cycles

Preventative Maintenance only captures 18% of the machine failures

Example: Car taken to the shop and put on computer

Page 16: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

IO-Link and Predictive MaintenanceIO Link Smart Sensors Makes Data Available

Process Data Counting/Sorting

Parameter Data (Device Configuration) Rate/Gain/Distance

Diagnostic/Event data (Condition Monitoring) Temp/Vibration/freq/resist/pressure/current/volts

Increase OEE Reduce Planned Stops Reduce Small Stops Reduce Slow Cycles Production Rejects

Page 17: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Example – CP PackagingEnhanced Diagnostics

• Standard sensors connected to IO Link Hubs

• Visibility by IO Link Master and Hub port

• Reduced Service Timeo HMI button – send configuration to

device

• Increased Available Run Time and Reduced Downtime

Page 18: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Example – CP Packaging

Simplifies Retro Fit of earlier model machine

• Able to keep existing standard sensors

• Reduced analog wiring

• IO Link Master Block provides short circuit protectiono 277 VAC Heaters

• Reduced PLC program changes

Page 19: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

What is Change Over?

Format Change – adjusting or changing out parts on a machine to run a new product(Bag Size, Carton Size, Case Size, Bottle Size)

Semi Automatic and Automatic Verifying Correct Position

Guided format change (Height, Length) Magazine Guide Rails Lug Adjustment Flap Plow Adjustment Glue Nozzle Adjustment

Change part detection Fixture Forming Tube Jaws Timing Wheels

Page 20: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Examples of Change/Swap out• Bag size• Carton Size• Case Size• Bottle Size• Bottle Color• Container Size

Verify Position• Consistent every time• Faster• No tweaking

Change Over – Guided Format ChangeLinear Positioning over IO Link

Page 21: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Examples of Change/Swap outo Bag sizeo Carton Sizeo Case Sizeo Bottle Sizeo Container Size

Identify correct change/swap out of equipmento Fixture Changeso Chocolate Moldso Forming Tubeso Jawso Spout

Change Over – Change Part DetectionRFID Over IO-Link

Page 22: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

Change Over Demonstration Video

Page 23: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

IO-Link and Change Over

Advantages of IO-Link and Linear Positioning for Change Over Reduced change over time More accurate positioning Much Less Tweaking after change over Reduced product waste from new production run Easier for operator Minimal cost to upgrade existing equipment Eliminates Analog wiring

Page 24: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

@WillAutomate

“With these technologies, customers are able to reduce their changeover time from over 30 minutes down to five while eliminating potential human errors.” Edson Packaging

Increase Machine Throughput: Faster Changeover – Tools & Guides

IO-Link and Change Over

Balluff Inc | Marketing Management Director, Will Healy III @WillAutomate

Page 25: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

IO-Link Equals Increased OEE

IO-Link Enables Smart Factory Concepts Today

Intelligent Devices More information Accurate information Enhanced Diagnostics Simplifies Retrofit Utilize existing devices

Page 26: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

How IO-Link is RevolutionizingOEE, Predictive Maintenance and Change OverAvailability Loss (Planned and Unplanned Downtime) Reduces unplanned downtime Helps pin point trouble areas and bottle necks Reduces machine tweaking and cleaning

Performance Loss (Stops and Slows) Reduces obstructed product flow Prevents incorrect settings Prevents misaligned or blocked sensors

Quality Loss (Bad and Reduced Product) Reduces incorrect settings

Page 27: 1 - How IO Link is Revolutionizing OEE, Change Over and … · 2019. 4. 15. · Yaskawa or Motoman Kukaor Fanuc IO-Link is Universal @WillAutomate Reduce Planned and Unplanned ...

THANK YOU FOR YOUR ATTENTION!

© All rights reserved: Balluff GmbH, Neuhausen. Transmission of this text in original or copy form as well as sharing with third parties is prohibited.

Phone:e-mail:

If there are any questions, please feel free to contact me.

Greg MolinaroIndustry Manager

[email protected]


Recommended