Date post: | 16-Dec-2015 |
Category: |
Documents |
Upload: | leo-harrison |
View: | 217 times |
Download: | 1 times |
1
IBL Stave & loading tools
University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber
The main goal for today…
Review and Validate the SPECS for the Staves (dim., tol., …and the related fabrication processes and tools) Review of the Assembly tools (Flex, Modules) and related SPECS Define the critical envelopes and the way to check them… Define the Services assembly at PP0 area (including Cable saver)
2
Proposed AgendaGeneral INTRO …15’ (Didier, Franck)
• Stave Fabrication and Assembly status… 30’ (Eric, Charlie)
B. Stave drawings + Assembly views onto Beam pipe… 30’
(Didier L, Christophe)
C. Stave Metrology @ CPPM and UNIGE …30’ (Eric, Didier?)
D. Flex on Stave …30’ (Francois-Xavier, Christophe)
……………………………Lunch Break……………………………
E. Overview on FEA applied to 14 Staves …20’ (Raphael)
F. Module loading on Stave …45’ (Coralie, Maarten, Didier F, Franck)
- Handling frame(s)
- Cradle(s) for loading
- Interfaces to Wire bonding and Pull tester machines
3
Central part (50x30mmx2mm)
1000mm
250mm
Extensions for PP0 + Cable savers
To be re machined afterassembly onto the CFRP profile
Mold to get the CFRP profile(thickness to be optimized)Outsourced…
Stave Tooling version #0 Stave Handling Frame (IBL_HF#0)
250mmFrom the U shape aluminum profile …to a CFRP rectangular shape T300 fiber, 25 units to be fabricated in 3 parts Max length is 1,5m
Flatness, parallelism, precisiongiven by the aluminum mold
4
Stave Tooling version #0 Handling Frame + Cradle #0
Version -1
Cradle#0
Positioning
Clamping
PP0 support
Cable saver PCB
Pipe length to be fixed TODAY
Cover(s) removed for clarity
5
Stave Tooling version #0 Handling Frame + Cradle #0
Bare Stave with Flex+Wings… Handling frame to be delivered to CERN for Flex assembly All the wings to be folded back for module loading Wing repositioned after modules are loaded and visual inspection done
Flex wings
NOT SHOWN HERE:Additional V support underneath the Stave Omega (x2)Used for Module loading and Wire bonding processes
AS received at UNIGE from CERN
6
Stave Tooling version #0 Handling Frame + Cradle #0
When Flex wings are re positioned (and glued to the module)
7
Stave Tooling version #0 Some details on PP0 + Cable Saver
PCB Saver
PP0 support
8
Stave Tooling version #0 Some details on PP0 + Cable Saver
OpenClose
Short flex saversPCB saver
9
Cradle + Spacer
Stave Tooling version #0 Wire bonding machine (Interfaces)
10
Stave Tooling version #0 Wire bonding machine (Interfaces)
Moved to 220mm(Same on the left side)
Due to the capacity of the Wire bonding machine (range of 290mm)
290mm
11
Stave Tooling version #0 Pull Tester Interfaces
Centering systemAnd clamping
+/- 150mm
12
Extensions up to 7m!Use of standard circular CFRP profile (pull winding?)
Stave Tooling version #0 Some details on PP0 + Cable Saver
13
Stave Tooling version #0 IBL_HF#0 for final Stave loading
Half pipe as a rotating cradle
Mechanism for stave “docking”
OLD VERSION
Delicate kinematic
Checking by Didier L with IBL_HF#0
CAD Interference check (Stave loading onto Beam pipe)
14
Stave Tooling version #0 IBL_HF#0 (Access from the top)
Cutting out thru the CFRP profile
Close up… as seen from the top
15
Stave Tooling version #0 IBL_HF#0 (Other Integration issues)
PP0 support to be worked out(for final integration purpose) Avoid interference / neighbor Allow easy removal when stave in position