50
OUR REF: 3IHI9tllt5Li YOUR REF : TEL NO : III:X:: ft !l{ FAX NO : E-MAIL : .tl.t (20) in Ax (1) to EP2/G/AJ146 Pt.9 2835 1105 2591 0558 [email protected] HOMEPAGE: http://Www.epd.gov.hk EnvironmentaJ Impact Assessment (EIA) Ordinance, Cap. 499 Application for Variation of an Env ironmental Permit Project Title: Hong Kong-Zhuhai-Macao Bridge- Hong Kong Boundary Crossin g Facilities (Application No. VEP-498/2016) I refer to yom above application received on 24 March 2016 for variation of an environmental permit w1der Section 13(1) of the EIA Ordinance. Pw·suant to Section 13(5) of the EIA Ordinance, we have amended the Environmental Permit (EP-353/2009/J). I attach the Environmental Permit as amended (No. EP-353/2009/K) for your use. Under Section 15 of the EIA Ordinance, the amended Environmental Permit will be placed on the EIA Ordinance Register. It will also be placed on the ETA Ordinance website (http://www. epd.gov.hk/eiW). Please note that if you are aggrieved by any of the conditions imposed in thjs Permit, you may appeal under Section 17 of the ElA Ordinance within 30 days of receipt ofthis permit. Should you have any queries on the above application, please contact my colleague Mr. Lawrence NGO at 2835 1751. v;:· CL (Louis P.L. CHAN) Principal Enviromnental Protection Officer for Director of Environmental Protection Encl. c. c. S(RS)5 - w/e Environmental Protection Department Branch Office 28th Floor, Southorn Centre, 130 Hennessy Road, Wan Chai, Hong Kong. rtg J\.1 11 April 2016 6614
Transcript
Page 1: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

ltfs~tli~ OUR REF 3IHI9tllt5Li YOUR REF ~ ~ TEL NO IIIXft l FAX NO ~T-~1yen1= E-MAIL ~ tlt

(20) in Ax (1) to EP2GAJ146 Pt9

2835 1105

2591 0558

lplcepdgovhk

HOMEPAGE httpWwwepdgovhk

EnvironmentaJ Impact Assessment (EIA) Ordinance Cap 499 Application for Variation of an Environmental Permit

Project Title Hong Kong-Zhuhai-Macao Bridge- Hong Kong Boundary Crossing Facilities (Application No VEP-4982016)

I refer to yom above application received on 24 March 2016 for variation of an environmental permit w1der Section 13(1) of the EIA Ordinance

Pwmiddotsuant to Section 13(5) of the EIA Ordinance we have amended the Environmental Permit (EP-3532009J) I attach the Environmental Permit as amended (No EP-3532009K) for your use

Under Section 15 of the EIA Ordinance the amended Environmental Permit will be placed on the EIA Ordinance Register It will also be placed on the ETA Ordinance website (httpwwwepdgovhkeiW)

Please note that if you are aggrieved by any of the conditions imposed in thjs Permit you may appeal under Section 17 of the ElA Ordinance within 30 days ofreceipt ofthis permit

Should you have any queries on the above application please contact my colleague Mr Lawrence NGO at 2835 1751

vmiddotCL (Louis PL CHAN)

Principal Enviromnental Protection Officer for Director ofEnvironmental Protection

Encl cc S(RS)5 - we

Environmental Protection Department Branch Office

28th Floor Southorn Centre

130 Hennessy Road

Wan Chai Hong Kong

iUfti~~~ rtg ~XtH fiE~~

-s=+~ ~iift$1t)itJ1

11 April 2016

6614

Enviro nmenta l Petmiddotmit No EP-35312009K

JfJitftiJM~5Vi EP-3532009K

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499) Section 10 and 13

~JJ31l~lyen fi5 I~sectU (jg499~)

~lOI~h131~

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE A DESIGNATED PROJECT

~-Et~mm~I~msect~~-~~m

PART A (MAIN PERM1T) A~m lt~f~mplusmn~gB7r)

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO) t11e Director of Envtronmental

Protection (the Director) granted the Environmental Pennit (No EP-3532009) to the Highwavs Department

(hereinafter referred to as the Penuit Holder) on 4 November 2009 Pursuant to Section 13 of the EIAO the Director

amends the Environmental Permit (No EP-3532009J) based on the Application No VEP-4982016 The amendments

described below are incorporated into this Environmental Permit (No EP-3532009K) This Environmental Pennit as

amended is for the constJuction and operation of the designated project described in Pa1t B of this Permit subject to the

conditions specified in and attached to Part C of this Pennit The issue of this environmental permit is based on the

documents approvals or permissions described below

fUUfOJHiHfHJ ici i ~J(~ iU) ~ 1o1ifft tyen1 1JUE middot ~ iJH1HI ~~~ ( ~~ ) ~ 2 009 ~ 11 Fl4 El ~~~m~ OJm ~~mEP-3532009 tli-fgt lmipound1~ (Ft~~OJ~~~A) bull ~~1~1~~~J~l3i~altJmg middot ~amp~~~-a~JiiYHf

OJ~il a]$~~~ ~VEP-4982016~-g~ iJHf OJm ~~ sdf EP -3532009J bull 1- ~~ il 8- 2(poundztni iJi~ OJ~il

~sm EP-3532009Kii9 bull $~~f~ilaltJli~EJ=OJm middot R~Jfl~~isect$~0JmBJs~pjj~B~a~1~1EI~yenJl[sect

~~~~~ormcg~~~ampmaaltJbull~middotbullbullbull~orbull~bull~~~~ middot m~bull~orffiBD

Application No VEP-4982016

$~iHF~

Docnment in the 1 Project Profile -

Register Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities (Register

~He fffitaltJ X No PP-3462008)

f~ I~JWsect fiiJI -middotmiddot~Ej()lffil~~~O~ ( ~~~fffi~m PP-3462008)

2 Hong Kong - Zhuhai - Macao B1idge Hong Kong Boundary Crossing Facilities -

Environmental Impact Assessment (EIA) Report Executive Summary Environmental

Monitoring and Audit Manual

(Register No AEIAR-1 452009)

Hereinafter referred to as the EIA Report

~bullbullbull~~o~-bullbull~~~~~~middot~middotft~bullbullmiddotbullbull~bullampbullbull~oo (1t~~fffi~5df AEIAR-1 452009)

TfiJJmiddotIi~i-~

- I shy

Environmental Permit No EP-3532009 K

fflfl~rurm~IJf EP-3s312009JK

Application No

$~Hi~

VEP-4982016

3 Application for Environmental Permit on 15 June 2009 (Application No AEP-3532009)

~OJmm~A~ 2oo9 ~ 6 Fl 15 am~~JtUJi~OJm$~x($~i~~=

AEP-3532009)

4 The Directors letter ofapproval of the El A Report dated 23 October 2009 referenced (6 1) in

Ax( l) to EP2N9Al46 II

W-I~Jj~ 2009 ~ 10 Fl 23 B~~~IY-J1tc~Jft~lJl~~~1all~fii~ (61) in Ax(J) to

EP2N9N l46 H

5 Application for Variation of an Environmental Pem1it No VEP-3 152010 and attached

documents submitted by the Pem1it Holder on 11 June 2010

~OJ~fH~~Ati~ 2010 ~ 6 Flll 8~3t~2)[liiJl~OJm$~~~ VEP-3152010 ~Dil11it

6 Environmental Permit Issued on 24 June 2010 (No EP-3532009A)

~ 2010 ~ 6 Fl 24 B~~~~mlJi~OJmcampHtt EP-3532009A)

7 Application for Variation ofan Environmental Pem1it on 27 October 20 I0 (Application No

VEP-327201 0)

~OJm1~~A~ 2010 ~ 10 FJ 21 a~~~t2)[JitJWFOJm$~xc$~~~~

VEP-327201 0)

8 Environmental Penuit Issued on 16 November 20 I 0 (No EP-3532009B)

n~ 2010 ~ 11 Fl 16 B~~~a9JiiJ~OJm(Mi5Jt EP-3532009B)

9 Application for Variation of an Environmental Permit on 21 November 2011 (Application

No VEP-3432011)

~OJmj~~Afj~ 2011 ~ 11 Fl 21 B~~a9)2QJRiJl~OJm$~)lt14($~~~~

VEP-3432011)

I 0 Environmental Permit Issued on 25 November 201 1 (No EP-3532009C)

~ 2011 ~ 11 FJ 25 8 ~~~a9$1Ji~f0Jal(~f~~ EP-3532009C)

11 Application for Variation of an Environmental Permit on 27 February 2012 (Application

No VEP-3552012)

~OJm~~A~ 2012 ~ 2 Fl 21 am~~t~sol tJi~OJm$~xilt$~1H~IliX

VEP-35520 12)

12 Environmental Pennit Issued on 7 March 2012 (No EP-35320090)

~ 2012 ~ 3 FJ 1 a~H~a9miJi~fOJmc~~ EP-353noo9D)

13 Application for Variation of an Environmental Permit on 8 October 2012 (Application No

VEP-38020 12)

~OJm~~Ati~ 2012 ~ 10 Fl s B~~~~2~J~l1i~fOJg~$~x1tt=c$~1HMi~m VEP-38020 I 2)

- 2 shy

Envi ronmenta l Pe rmit No EP-3532009K

Jamamptt=UJm~M EP-3s3noo91K

Application No

$~~~SlHm

VEP-4982016

14 Environmental Permit Issued on 16 October 2012 (No EP-35312009E)

n~ 2012 ~ 10 Fl16 B~H~Bltlli~~OJm(~~ EP-3532009E)

15 Application for Variation of an Environmental Pennit on 18 April 2013 (Application No

VEP-40220 13)

~or~~t~~AJ~ 2o13 ~ 4 Fl 1s amxaJ~~~Jii~~OJm$~xi4cEf3~~~~

VEP-40220 13)

16 Environmental Pennit Issued on 24 April 2013 (No EP-3532009F)

~ 2013 ~ 4 Fl 24 B~~BltlJiJi~OJ~li(~Jj~ EP-3532009F)

17 Application for Variation of an Environmental Permit on 29 July 2013 (Application No

VEP-4102013)

~rorm1~~A~ 2o13 ~ 1 Fl 29 amxaJ~c1llitl~DJm$~x14($~~H~~m

VEP-41 020 13)

18 Environmental Pennit Issued on 6 August 2013 (No EP-3532009G)

~ 2013 ~ 8 ~ 6 B~~~Bltliii~~tOJm(~5m EP-3532009G)

19 Application for Variation ofan Enviroruuental Pem1it on 16 January 2015 (Application No

VEP-4632015)

gtOJ~fey~A~ 2o15 ~ 1 Fl 16 am~BltJ~~~rttplusmn~~OJmEI3~xi4ltEI3~~~~ VEP-4632015)

20 Environmental Permit Issued on 19 January 2015 (No EP-3532009H)

~ 2015 il= 1 Fl19 BjH~Bltllii~g)=OJ~(~~m EP-3532009H)

21 Application for Variation of an Environmental Permit oo 30 June 2015 (Application No

YEP-4772015)

~OJ~~H~~An~ 2015 ~ 6 ~ 30 BmxBltJ~~~JiiJi~OJ~~$~~x($~~~5m

VEP-4772015)

22 Environmental Permit Issued on 17 July 2015 (No EP-35320091)

n~ 2015 $ 7 Fl 17 B~~~BJli~gtOJm(~~ EP-3532009I)

23 Application for Variation of an Environmental Permit on 18 February 2016 (Application

No VEP-4972016)

~tOJm1~~An~ 2o16 il= 2 Fl 1s am~BltJ~2~iitl~OJ~~$~xi4ltEf3~H~

VEP-4972016)

24 Environmental Permit Issued on 25 Febmary 20 16 (No EP-3532009J)

~~ 2o16 ~ 2 Fl 25 B~~~aJfimg~OJ~~lt~~m EP-3532oo9J)

- 3 shy

Environmental Permi t o EP-3532009K

fiJIjttllfUJmga~ EP-353120091K

Application No VEP-49820 16

$~--Si~ 25 Application fo r Var iation for an Environmental Permit on 24 March 2016 (Application No

VEP-4982016)

~CiJ~i~~A~ 2016 ~ 3 Fl 24 B~j(f~tltf~2)lJiiJUfOJm$~~3Zi4($~tA1~

VEP-49820 16)

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

ef3aar~ Environmental Permit fHB l~

8 sectatE7ls lRJUfCiJ ~ iJ BltJ 11~UJW 13 VEP-3 152010

Efl~i~5Li

11 June 2010 ( I) Add Conditions 212 37 A and 3 17 A to 24 June 2010

2010 ~ 6 Fl ll 8 317L to Part C of the Environmental Permit 20 1 0~6Fl24 8 (No EP-3532009)

(-) tEJtiJsqCiJm(~sm EP-35312009) C $1JDA ~21237A amp3l7A ~ 317L Jii~

(2) Vary Conditions 17 31 33 318 319

32 1 and 322 in Part C of the Environmental

Pennit (No EP-3532009)

lt=) ]2)lliiJ~OJm(~setEP-3532009) C SBBJ ~ 173 1333 18319 321 amp 322JJi

f~f4

(3) Add Figures 11 to 29 to the Environmental

Permit (No EP-3532009)

(=) tEJiUJl~fCiJ~ft(~Mi~ EP-3532009) JDA~

11 ~ 29

VEP-3272010 27 October 20 I 0 (1) Delete Conditions 212 37A to 3 17 317 A 16 November 20 I 0

2010 1f 10 Fl 27 8 and 320 to Part C of tJ1e Environmental 20 I 0 if 11 ~ 16 B Permit (No EP-3532009A)

(- ) IBU~Jlii~~OJm(~~ EP-3532009A) C gu BltJ~ 212 37A to 317 317A amp 320 J1i1~

i4

(2) Vary Conditions 31 317B 317F 317J

318 319 and 322 to Part C of tJ1e

Environmental Pemut (No EP-3532009A)

(= ) 12)llyenUJUf0Jm(~~ EP-3532009A) C g8 119m 3 1 3 17B 317F 317J 318 319 amp

322 llit~

(3) Delete Figure 2 to 7 9 to 10 of the

Environmental Pennit

(No EP-3532009A)

( - ) IBUlJ-tiJi~CiJ~(~~ EP-3532009 A) lliiD 2 ~~ L~ lw

~d EIA~ - 4 - ~EPV~

~

Environmental Permit No EP-3532009K ffjlilfliJ~~~If EP-3532009K

Application No

EJ3~~~sm

Date of Application

$ij 8~11

List of Amendments Incorporated into tllis

Environmental Permit

83rrbullbull~~-~~bullnmsect ~7 amp9~ 10

Date of Amendment

~il811

(4) Vary Figure 22 2325 to 27 and 29 ofthe

Environmental Permit (No EP-3532009A)

(lm) ~c5HH~~q~~ft(~Kii5m EP-3532009A)I

22 23 25 ~ 27 amp 29

VEP-343201 1 2J November 2011

2011 $ 11 F3 21 8

(5) Add Figure 21 a and 27a to Environmental

Pernlit (EP-3532009 A)

Cligt 1Emi~~~J=CiJm(filli~ EP-3532009A) JO A~ 21a amp27a

(1) Vary Conditions 17 and 317B to Part C of

the Environmental Permit (No

EP-3532009B)

(-) ]ic)Ofii~~CiJ~Cii5~ EP-3532009B) C llB ~~ 11 amp 3ns m1~1~

25 November 2011

201 1 1f- 11 ~ 25 B

VEP-3552012 27 Februaty 2012

2012 $2 F3 27 8

(2) Vary Figure 24 ofthe Environmental Pennil

(No EP-3532009B)

(= ) ]ic)lmm~~middot(~~ EP-3532009B)iJ 24

( 1) Vary Conditions 17 317B 3 18 319 and

322 to Part C of the Environmental Permit

(No EP-3532009C)

(- ) ~c)ll~i~~~-(~5m EP-3532009C) C ~

~~ 11 317B 318 319 amp 322 mi~f

7 March 2012

20 12 1f- 3 ~ 7 B

(2) Add Conditions 322A to 322 F to Part C of

the Enviromnental Permit

(NoEP-3532009C)

(=) 1Emplusmn~~CiJm(~~ EP-3532009C) C sectBJO A~ 322A ~ 322F JJ[ f~1t=-

(3) Vary Figure 1 of the Environmental Permit

(No EP-3532009C)

(-) ~c)lmplusmn~~OJllilt-~~ EP-3532oo9tC)~ 1

VEP-3802012 8 October 2012

2012 $ l 0 Fl 8 8

(4) Add Figures 30 amp 31 to Environmental

Permit (No EP-J532009C)

(lm) ttJfil~~CiJlli(~sect5poundi EP-3532009C) JOA ~ 30 amp 31

1) Vary Conditions 17 and 31 7C to Part C of

the Environmental Permit (No

EP-3532009D)

16 October 2012

2012 ~ 10 ~ 16 B

r~E1Ao EPO - 5 - ~~ill~

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 2: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Enviro nmenta l Petmiddotmit No EP-35312009K

JfJitftiJM~5Vi EP-3532009K

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499) Section 10 and 13

~JJ31l~lyen fi5 I~sectU (jg499~)

~lOI~h131~

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE A DESIGNATED PROJECT

~-Et~mm~I~msect~~-~~m

PART A (MAIN PERM1T) A~m lt~f~mplusmn~gB7r)

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO) t11e Director of Envtronmental

Protection (the Director) granted the Environmental Pennit (No EP-3532009) to the Highwavs Department

(hereinafter referred to as the Penuit Holder) on 4 November 2009 Pursuant to Section 13 of the EIAO the Director

amends the Environmental Permit (No EP-3532009J) based on the Application No VEP-4982016 The amendments

described below are incorporated into this Environmental Permit (No EP-3532009K) This Environmental Pennit as

amended is for the constJuction and operation of the designated project described in Pa1t B of this Permit subject to the

conditions specified in and attached to Part C of this Pennit The issue of this environmental permit is based on the

documents approvals or permissions described below

fUUfOJHiHfHJ ici i ~J(~ iU) ~ 1o1ifft tyen1 1JUE middot ~ iJH1HI ~~~ ( ~~ ) ~ 2 009 ~ 11 Fl4 El ~~~m~ OJm ~~mEP-3532009 tli-fgt lmipound1~ (Ft~~OJ~~~A) bull ~~1~1~~~J~l3i~altJmg middot ~amp~~~-a~JiiYHf

OJ~il a]$~~~ ~VEP-4982016~-g~ iJHf OJm ~~ sdf EP -3532009J bull 1- ~~ il 8- 2(poundztni iJi~ OJ~il

~sm EP-3532009Kii9 bull $~~f~ilaltJli~EJ=OJm middot R~Jfl~~isect$~0JmBJs~pjj~B~a~1~1EI~yenJl[sect

~~~~~ormcg~~~ampmaaltJbull~middotbullbullbull~orbull~bull~~~~ middot m~bull~orffiBD

Application No VEP-4982016

$~iHF~

Docnment in the 1 Project Profile -

Register Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities (Register

~He fffitaltJ X No PP-3462008)

f~ I~JWsect fiiJI -middotmiddot~Ej()lffil~~~O~ ( ~~~fffi~m PP-3462008)

2 Hong Kong - Zhuhai - Macao B1idge Hong Kong Boundary Crossing Facilities -

Environmental Impact Assessment (EIA) Report Executive Summary Environmental

Monitoring and Audit Manual

(Register No AEIAR-1 452009)

Hereinafter referred to as the EIA Report

~bullbullbull~~o~-bullbull~~~~~~middot~middotft~bullbullmiddotbullbull~bullampbullbull~oo (1t~~fffi~5df AEIAR-1 452009)

TfiJJmiddotIi~i-~

- I shy

Environmental Permit No EP-3532009 K

fflfl~rurm~IJf EP-3s312009JK

Application No

$~Hi~

VEP-4982016

3 Application for Environmental Permit on 15 June 2009 (Application No AEP-3532009)

~OJmm~A~ 2oo9 ~ 6 Fl 15 am~~JtUJi~OJm$~x($~i~~=

AEP-3532009)

4 The Directors letter ofapproval of the El A Report dated 23 October 2009 referenced (6 1) in

Ax( l) to EP2N9Al46 II

W-I~Jj~ 2009 ~ 10 Fl 23 B~~~IY-J1tc~Jft~lJl~~~1all~fii~ (61) in Ax(J) to

EP2N9N l46 H

5 Application for Variation of an Environmental Pem1it No VEP-3 152010 and attached

documents submitted by the Pem1it Holder on 11 June 2010

~OJ~fH~~Ati~ 2010 ~ 6 Flll 8~3t~2)[liiJl~OJm$~~~ VEP-3152010 ~Dil11it

6 Environmental Permit Issued on 24 June 2010 (No EP-3532009A)

~ 2010 ~ 6 Fl 24 B~~~~mlJi~OJmcampHtt EP-3532009A)

7 Application for Variation ofan Environmental Pem1it on 27 October 20 I0 (Application No

VEP-327201 0)

~OJm1~~A~ 2010 ~ 10 FJ 21 a~~~t2)[JitJWFOJm$~xc$~~~~

VEP-327201 0)

8 Environmental Penuit Issued on 16 November 20 I 0 (No EP-3532009B)

n~ 2010 ~ 11 Fl 16 B~~~a9JiiJ~OJm(Mi5Jt EP-3532009B)

9 Application for Variation of an Environmental Permit on 21 November 2011 (Application

No VEP-3432011)

~OJmj~~Afj~ 2011 ~ 11 Fl 21 B~~a9)2QJRiJl~OJm$~)lt14($~~~~

VEP-3432011)

I 0 Environmental Permit Issued on 25 November 201 1 (No EP-3532009C)

~ 2011 ~ 11 FJ 25 8 ~~~a9$1Ji~f0Jal(~f~~ EP-3532009C)

11 Application for Variation of an Environmental Permit on 27 February 2012 (Application

No VEP-3552012)

~OJm~~A~ 2012 ~ 2 Fl 21 am~~t~sol tJi~OJm$~xilt$~1H~IliX

VEP-35520 12)

12 Environmental Pennit Issued on 7 March 2012 (No EP-35320090)

~ 2012 ~ 3 FJ 1 a~H~a9miJi~fOJmc~~ EP-353noo9D)

13 Application for Variation of an Environmental Permit on 8 October 2012 (Application No

VEP-38020 12)

~OJm~~Ati~ 2012 ~ 10 Fl s B~~~~2~J~l1i~fOJg~$~x1tt=c$~1HMi~m VEP-38020 I 2)

- 2 shy

Envi ronmenta l Pe rmit No EP-3532009K

Jamamptt=UJm~M EP-3s3noo91K

Application No

$~~~SlHm

VEP-4982016

14 Environmental Permit Issued on 16 October 2012 (No EP-35312009E)

n~ 2012 ~ 10 Fl16 B~H~Bltlli~~OJm(~~ EP-3532009E)

15 Application for Variation of an Environmental Pennit on 18 April 2013 (Application No

VEP-40220 13)

~or~~t~~AJ~ 2o13 ~ 4 Fl 1s amxaJ~~~Jii~~OJm$~xi4cEf3~~~~

VEP-40220 13)

16 Environmental Pennit Issued on 24 April 2013 (No EP-3532009F)

~ 2013 ~ 4 Fl 24 B~~BltlJiJi~OJ~li(~Jj~ EP-3532009F)

17 Application for Variation of an Environmental Permit on 29 July 2013 (Application No

VEP-4102013)

~rorm1~~A~ 2o13 ~ 1 Fl 29 amxaJ~c1llitl~DJm$~x14($~~H~~m

VEP-41 020 13)

18 Environmental Pennit Issued on 6 August 2013 (No EP-3532009G)

~ 2013 ~ 8 ~ 6 B~~~Bltliii~~tOJm(~5m EP-3532009G)

19 Application for Variation ofan Enviroruuental Pem1it on 16 January 2015 (Application No

VEP-4632015)

gtOJ~fey~A~ 2o15 ~ 1 Fl 16 am~BltJ~~~rttplusmn~~OJmEI3~xi4ltEI3~~~~ VEP-4632015)

20 Environmental Permit Issued on 19 January 2015 (No EP-3532009H)

~ 2015 il= 1 Fl19 BjH~Bltllii~g)=OJ~(~~m EP-3532009H)

21 Application for Variation of an Environmental Permit oo 30 June 2015 (Application No

YEP-4772015)

~OJ~~H~~An~ 2015 ~ 6 ~ 30 BmxBltJ~~~JiiJi~OJ~~$~~x($~~~5m

VEP-4772015)

22 Environmental Permit Issued on 17 July 2015 (No EP-35320091)

n~ 2015 $ 7 Fl 17 B~~~BJli~gtOJm(~~ EP-3532009I)

23 Application for Variation of an Environmental Permit on 18 February 2016 (Application

No VEP-4972016)

~tOJm1~~An~ 2o16 il= 2 Fl 1s am~BltJ~2~iitl~OJ~~$~xi4ltEf3~H~

VEP-4972016)

24 Environmental Permit Issued on 25 Febmary 20 16 (No EP-3532009J)

~~ 2o16 ~ 2 Fl 25 B~~~aJfimg~OJ~~lt~~m EP-3532oo9J)

- 3 shy

Environmental Permi t o EP-3532009K

fiJIjttllfUJmga~ EP-353120091K

Application No VEP-49820 16

$~--Si~ 25 Application fo r Var iation for an Environmental Permit on 24 March 2016 (Application No

VEP-4982016)

~CiJ~i~~A~ 2016 ~ 3 Fl 24 B~j(f~tltf~2)lJiiJUfOJm$~~3Zi4($~tA1~

VEP-49820 16)

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

ef3aar~ Environmental Permit fHB l~

8 sectatE7ls lRJUfCiJ ~ iJ BltJ 11~UJW 13 VEP-3 152010

Efl~i~5Li

11 June 2010 ( I) Add Conditions 212 37 A and 3 17 A to 24 June 2010

2010 ~ 6 Fl ll 8 317L to Part C of the Environmental Permit 20 1 0~6Fl24 8 (No EP-3532009)

(-) tEJtiJsqCiJm(~sm EP-35312009) C $1JDA ~21237A amp3l7A ~ 317L Jii~

(2) Vary Conditions 17 31 33 318 319

32 1 and 322 in Part C of the Environmental

Pennit (No EP-3532009)

lt=) ]2)lliiJ~OJm(~setEP-3532009) C SBBJ ~ 173 1333 18319 321 amp 322JJi

f~f4

(3) Add Figures 11 to 29 to the Environmental

Permit (No EP-3532009)

(=) tEJiUJl~fCiJ~ft(~Mi~ EP-3532009) JDA~

11 ~ 29

VEP-3272010 27 October 20 I 0 (1) Delete Conditions 212 37A to 3 17 317 A 16 November 20 I 0

2010 1f 10 Fl 27 8 and 320 to Part C of tJ1e Environmental 20 I 0 if 11 ~ 16 B Permit (No EP-3532009A)

(- ) IBU~Jlii~~OJm(~~ EP-3532009A) C gu BltJ~ 212 37A to 317 317A amp 320 J1i1~

i4

(2) Vary Conditions 31 317B 317F 317J

318 319 and 322 to Part C of tJ1e

Environmental Pemut (No EP-3532009A)

(= ) 12)llyenUJUf0Jm(~~ EP-3532009A) C g8 119m 3 1 3 17B 317F 317J 318 319 amp

322 llit~

(3) Delete Figure 2 to 7 9 to 10 of the

Environmental Pennit

(No EP-3532009A)

( - ) IBUlJ-tiJi~CiJ~(~~ EP-3532009 A) lliiD 2 ~~ L~ lw

~d EIA~ - 4 - ~EPV~

~

Environmental Permit No EP-3532009K ffjlilfliJ~~~If EP-3532009K

Application No

EJ3~~~sm

Date of Application

$ij 8~11

List of Amendments Incorporated into tllis

Environmental Permit

83rrbullbull~~-~~bullnmsect ~7 amp9~ 10

Date of Amendment

~il811

(4) Vary Figure 22 2325 to 27 and 29 ofthe

Environmental Permit (No EP-3532009A)

(lm) ~c5HH~~q~~ft(~Kii5m EP-3532009A)I

22 23 25 ~ 27 amp 29

VEP-343201 1 2J November 2011

2011 $ 11 F3 21 8

(5) Add Figure 21 a and 27a to Environmental

Pernlit (EP-3532009 A)

Cligt 1Emi~~~J=CiJm(filli~ EP-3532009A) JO A~ 21a amp27a

(1) Vary Conditions 17 and 317B to Part C of

the Environmental Permit (No

EP-3532009B)

(-) ]ic)Ofii~~CiJ~Cii5~ EP-3532009B) C llB ~~ 11 amp 3ns m1~1~

25 November 2011

201 1 1f- 11 ~ 25 B

VEP-3552012 27 Februaty 2012

2012 $2 F3 27 8

(2) Vary Figure 24 ofthe Environmental Pennil

(No EP-3532009B)

(= ) ]ic)lmm~~middot(~~ EP-3532009B)iJ 24

( 1) Vary Conditions 17 317B 3 18 319 and

322 to Part C of the Environmental Permit

(No EP-3532009C)

(- ) ~c)ll~i~~~-(~5m EP-3532009C) C ~

~~ 11 317B 318 319 amp 322 mi~f

7 March 2012

20 12 1f- 3 ~ 7 B

(2) Add Conditions 322A to 322 F to Part C of

the Enviromnental Permit

(NoEP-3532009C)

(=) 1Emplusmn~~CiJm(~~ EP-3532009C) C sectBJO A~ 322A ~ 322F JJ[ f~1t=-

(3) Vary Figure 1 of the Environmental Permit

(No EP-3532009C)

(-) ~c)lmplusmn~~OJllilt-~~ EP-3532oo9tC)~ 1

VEP-3802012 8 October 2012

2012 $ l 0 Fl 8 8

(4) Add Figures 30 amp 31 to Environmental

Permit (No EP-J532009C)

(lm) ttJfil~~CiJlli(~sect5poundi EP-3532009C) JOA ~ 30 amp 31

1) Vary Conditions 17 and 31 7C to Part C of

the Environmental Permit (No

EP-3532009D)

16 October 2012

2012 ~ 10 ~ 16 B

r~E1Ao EPO - 5 - ~~ill~

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 3: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009 K

fflfl~rurm~IJf EP-3s312009JK

Application No

$~Hi~

VEP-4982016

3 Application for Environmental Permit on 15 June 2009 (Application No AEP-3532009)

~OJmm~A~ 2oo9 ~ 6 Fl 15 am~~JtUJi~OJm$~x($~i~~=

AEP-3532009)

4 The Directors letter ofapproval of the El A Report dated 23 October 2009 referenced (6 1) in

Ax( l) to EP2N9Al46 II

W-I~Jj~ 2009 ~ 10 Fl 23 B~~~IY-J1tc~Jft~lJl~~~1all~fii~ (61) in Ax(J) to

EP2N9N l46 H

5 Application for Variation of an Environmental Pem1it No VEP-3 152010 and attached

documents submitted by the Pem1it Holder on 11 June 2010

~OJ~fH~~Ati~ 2010 ~ 6 Flll 8~3t~2)[liiJl~OJm$~~~ VEP-3152010 ~Dil11it

6 Environmental Permit Issued on 24 June 2010 (No EP-3532009A)

~ 2010 ~ 6 Fl 24 B~~~~mlJi~OJmcampHtt EP-3532009A)

7 Application for Variation ofan Environmental Pem1it on 27 October 20 I0 (Application No

VEP-327201 0)

~OJm1~~A~ 2010 ~ 10 FJ 21 a~~~t2)[JitJWFOJm$~xc$~~~~

VEP-327201 0)

8 Environmental Penuit Issued on 16 November 20 I 0 (No EP-3532009B)

n~ 2010 ~ 11 Fl 16 B~~~a9JiiJ~OJm(Mi5Jt EP-3532009B)

9 Application for Variation of an Environmental Permit on 21 November 2011 (Application

No VEP-3432011)

~OJmj~~Afj~ 2011 ~ 11 Fl 21 B~~a9)2QJRiJl~OJm$~)lt14($~~~~

VEP-3432011)

I 0 Environmental Permit Issued on 25 November 201 1 (No EP-3532009C)

~ 2011 ~ 11 FJ 25 8 ~~~a9$1Ji~f0Jal(~f~~ EP-3532009C)

11 Application for Variation of an Environmental Permit on 27 February 2012 (Application

No VEP-3552012)

~OJm~~A~ 2012 ~ 2 Fl 21 am~~t~sol tJi~OJm$~xilt$~1H~IliX

VEP-35520 12)

12 Environmental Pennit Issued on 7 March 2012 (No EP-35320090)

~ 2012 ~ 3 FJ 1 a~H~a9miJi~fOJmc~~ EP-353noo9D)

13 Application for Variation of an Environmental Permit on 8 October 2012 (Application No

VEP-38020 12)

~OJm~~Ati~ 2012 ~ 10 Fl s B~~~~2~J~l1i~fOJg~$~x1tt=c$~1HMi~m VEP-38020 I 2)

- 2 shy

Envi ronmenta l Pe rmit No EP-3532009K

Jamamptt=UJm~M EP-3s3noo91K

Application No

$~~~SlHm

VEP-4982016

14 Environmental Permit Issued on 16 October 2012 (No EP-35312009E)

n~ 2012 ~ 10 Fl16 B~H~Bltlli~~OJm(~~ EP-3532009E)

15 Application for Variation of an Environmental Pennit on 18 April 2013 (Application No

VEP-40220 13)

~or~~t~~AJ~ 2o13 ~ 4 Fl 1s amxaJ~~~Jii~~OJm$~xi4cEf3~~~~

VEP-40220 13)

16 Environmental Pennit Issued on 24 April 2013 (No EP-3532009F)

~ 2013 ~ 4 Fl 24 B~~BltlJiJi~OJ~li(~Jj~ EP-3532009F)

17 Application for Variation of an Environmental Permit on 29 July 2013 (Application No

VEP-4102013)

~rorm1~~A~ 2o13 ~ 1 Fl 29 amxaJ~c1llitl~DJm$~x14($~~H~~m

VEP-41 020 13)

18 Environmental Pennit Issued on 6 August 2013 (No EP-3532009G)

~ 2013 ~ 8 ~ 6 B~~~Bltliii~~tOJm(~5m EP-3532009G)

19 Application for Variation ofan Enviroruuental Pem1it on 16 January 2015 (Application No

VEP-4632015)

gtOJ~fey~A~ 2o15 ~ 1 Fl 16 am~BltJ~~~rttplusmn~~OJmEI3~xi4ltEI3~~~~ VEP-4632015)

20 Environmental Permit Issued on 19 January 2015 (No EP-3532009H)

~ 2015 il= 1 Fl19 BjH~Bltllii~g)=OJ~(~~m EP-3532009H)

21 Application for Variation of an Environmental Permit oo 30 June 2015 (Application No

YEP-4772015)

~OJ~~H~~An~ 2015 ~ 6 ~ 30 BmxBltJ~~~JiiJi~OJ~~$~~x($~~~5m

VEP-4772015)

22 Environmental Permit Issued on 17 July 2015 (No EP-35320091)

n~ 2015 $ 7 Fl 17 B~~~BJli~gtOJm(~~ EP-3532009I)

23 Application for Variation of an Environmental Permit on 18 February 2016 (Application

No VEP-4972016)

~tOJm1~~An~ 2o16 il= 2 Fl 1s am~BltJ~2~iitl~OJ~~$~xi4ltEf3~H~

VEP-4972016)

24 Environmental Permit Issued on 25 Febmary 20 16 (No EP-3532009J)

~~ 2o16 ~ 2 Fl 25 B~~~aJfimg~OJ~~lt~~m EP-3532oo9J)

- 3 shy

Environmental Permi t o EP-3532009K

fiJIjttllfUJmga~ EP-353120091K

Application No VEP-49820 16

$~--Si~ 25 Application fo r Var iation for an Environmental Permit on 24 March 2016 (Application No

VEP-4982016)

~CiJ~i~~A~ 2016 ~ 3 Fl 24 B~j(f~tltf~2)lJiiJUfOJm$~~3Zi4($~tA1~

VEP-49820 16)

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

ef3aar~ Environmental Permit fHB l~

8 sectatE7ls lRJUfCiJ ~ iJ BltJ 11~UJW 13 VEP-3 152010

Efl~i~5Li

11 June 2010 ( I) Add Conditions 212 37 A and 3 17 A to 24 June 2010

2010 ~ 6 Fl ll 8 317L to Part C of the Environmental Permit 20 1 0~6Fl24 8 (No EP-3532009)

(-) tEJtiJsqCiJm(~sm EP-35312009) C $1JDA ~21237A amp3l7A ~ 317L Jii~

(2) Vary Conditions 17 31 33 318 319

32 1 and 322 in Part C of the Environmental

Pennit (No EP-3532009)

lt=) ]2)lliiJ~OJm(~setEP-3532009) C SBBJ ~ 173 1333 18319 321 amp 322JJi

f~f4

(3) Add Figures 11 to 29 to the Environmental

Permit (No EP-3532009)

(=) tEJiUJl~fCiJ~ft(~Mi~ EP-3532009) JDA~

11 ~ 29

VEP-3272010 27 October 20 I 0 (1) Delete Conditions 212 37A to 3 17 317 A 16 November 20 I 0

2010 1f 10 Fl 27 8 and 320 to Part C of tJ1e Environmental 20 I 0 if 11 ~ 16 B Permit (No EP-3532009A)

(- ) IBU~Jlii~~OJm(~~ EP-3532009A) C gu BltJ~ 212 37A to 317 317A amp 320 J1i1~

i4

(2) Vary Conditions 31 317B 317F 317J

318 319 and 322 to Part C of tJ1e

Environmental Pemut (No EP-3532009A)

(= ) 12)llyenUJUf0Jm(~~ EP-3532009A) C g8 119m 3 1 3 17B 317F 317J 318 319 amp

322 llit~

(3) Delete Figure 2 to 7 9 to 10 of the

Environmental Pennit

(No EP-3532009A)

( - ) IBUlJ-tiJi~CiJ~(~~ EP-3532009 A) lliiD 2 ~~ L~ lw

~d EIA~ - 4 - ~EPV~

~

Environmental Permit No EP-3532009K ffjlilfliJ~~~If EP-3532009K

Application No

EJ3~~~sm

Date of Application

$ij 8~11

List of Amendments Incorporated into tllis

Environmental Permit

83rrbullbull~~-~~bullnmsect ~7 amp9~ 10

Date of Amendment

~il811

(4) Vary Figure 22 2325 to 27 and 29 ofthe

Environmental Permit (No EP-3532009A)

(lm) ~c5HH~~q~~ft(~Kii5m EP-3532009A)I

22 23 25 ~ 27 amp 29

VEP-343201 1 2J November 2011

2011 $ 11 F3 21 8

(5) Add Figure 21 a and 27a to Environmental

Pernlit (EP-3532009 A)

Cligt 1Emi~~~J=CiJm(filli~ EP-3532009A) JO A~ 21a amp27a

(1) Vary Conditions 17 and 317B to Part C of

the Environmental Permit (No

EP-3532009B)

(-) ]ic)Ofii~~CiJ~Cii5~ EP-3532009B) C llB ~~ 11 amp 3ns m1~1~

25 November 2011

201 1 1f- 11 ~ 25 B

VEP-3552012 27 Februaty 2012

2012 $2 F3 27 8

(2) Vary Figure 24 ofthe Environmental Pennil

(No EP-3532009B)

(= ) ]ic)lmm~~middot(~~ EP-3532009B)iJ 24

( 1) Vary Conditions 17 317B 3 18 319 and

322 to Part C of the Environmental Permit

(No EP-3532009C)

(- ) ~c)ll~i~~~-(~5m EP-3532009C) C ~

~~ 11 317B 318 319 amp 322 mi~f

7 March 2012

20 12 1f- 3 ~ 7 B

(2) Add Conditions 322A to 322 F to Part C of

the Enviromnental Permit

(NoEP-3532009C)

(=) 1Emplusmn~~CiJm(~~ EP-3532009C) C sectBJO A~ 322A ~ 322F JJ[ f~1t=-

(3) Vary Figure 1 of the Environmental Permit

(No EP-3532009C)

(-) ~c)lmplusmn~~OJllilt-~~ EP-3532oo9tC)~ 1

VEP-3802012 8 October 2012

2012 $ l 0 Fl 8 8

(4) Add Figures 30 amp 31 to Environmental

Permit (No EP-J532009C)

(lm) ttJfil~~CiJlli(~sect5poundi EP-3532009C) JOA ~ 30 amp 31

1) Vary Conditions 17 and 31 7C to Part C of

the Environmental Permit (No

EP-3532009D)

16 October 2012

2012 ~ 10 ~ 16 B

r~E1Ao EPO - 5 - ~~ill~

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 4: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Envi ronmenta l Pe rmit No EP-3532009K

Jamamptt=UJm~M EP-3s3noo91K

Application No

$~~~SlHm

VEP-4982016

14 Environmental Permit Issued on 16 October 2012 (No EP-35312009E)

n~ 2012 ~ 10 Fl16 B~H~Bltlli~~OJm(~~ EP-3532009E)

15 Application for Variation of an Environmental Pennit on 18 April 2013 (Application No

VEP-40220 13)

~or~~t~~AJ~ 2o13 ~ 4 Fl 1s amxaJ~~~Jii~~OJm$~xi4cEf3~~~~

VEP-40220 13)

16 Environmental Pennit Issued on 24 April 2013 (No EP-3532009F)

~ 2013 ~ 4 Fl 24 B~~BltlJiJi~OJ~li(~Jj~ EP-3532009F)

17 Application for Variation of an Environmental Permit on 29 July 2013 (Application No

VEP-4102013)

~rorm1~~A~ 2o13 ~ 1 Fl 29 amxaJ~c1llitl~DJm$~x14($~~H~~m

VEP-41 020 13)

18 Environmental Pennit Issued on 6 August 2013 (No EP-3532009G)

~ 2013 ~ 8 ~ 6 B~~~Bltliii~~tOJm(~5m EP-3532009G)

19 Application for Variation ofan Enviroruuental Pem1it on 16 January 2015 (Application No

VEP-4632015)

gtOJ~fey~A~ 2o15 ~ 1 Fl 16 am~BltJ~~~rttplusmn~~OJmEI3~xi4ltEI3~~~~ VEP-4632015)

20 Environmental Permit Issued on 19 January 2015 (No EP-3532009H)

~ 2015 il= 1 Fl19 BjH~Bltllii~g)=OJ~(~~m EP-3532009H)

21 Application for Variation of an Environmental Permit oo 30 June 2015 (Application No

YEP-4772015)

~OJ~~H~~An~ 2015 ~ 6 ~ 30 BmxBltJ~~~JiiJi~OJ~~$~~x($~~~5m

VEP-4772015)

22 Environmental Permit Issued on 17 July 2015 (No EP-35320091)

n~ 2015 $ 7 Fl 17 B~~~BJli~gtOJm(~~ EP-3532009I)

23 Application for Variation of an Environmental Permit on 18 February 2016 (Application

No VEP-4972016)

~tOJm1~~An~ 2o16 il= 2 Fl 1s am~BltJ~2~iitl~OJ~~$~xi4ltEf3~H~

VEP-4972016)

24 Environmental Permit Issued on 25 Febmary 20 16 (No EP-3532009J)

~~ 2o16 ~ 2 Fl 25 B~~~aJfimg~OJ~~lt~~m EP-3532oo9J)

- 3 shy

Environmental Permi t o EP-3532009K

fiJIjttllfUJmga~ EP-353120091K

Application No VEP-49820 16

$~--Si~ 25 Application fo r Var iation for an Environmental Permit on 24 March 2016 (Application No

VEP-4982016)

~CiJ~i~~A~ 2016 ~ 3 Fl 24 B~j(f~tltf~2)lJiiJUfOJm$~~3Zi4($~tA1~

VEP-49820 16)

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

ef3aar~ Environmental Permit fHB l~

8 sectatE7ls lRJUfCiJ ~ iJ BltJ 11~UJW 13 VEP-3 152010

Efl~i~5Li

11 June 2010 ( I) Add Conditions 212 37 A and 3 17 A to 24 June 2010

2010 ~ 6 Fl ll 8 317L to Part C of the Environmental Permit 20 1 0~6Fl24 8 (No EP-3532009)

(-) tEJtiJsqCiJm(~sm EP-35312009) C $1JDA ~21237A amp3l7A ~ 317L Jii~

(2) Vary Conditions 17 31 33 318 319

32 1 and 322 in Part C of the Environmental

Pennit (No EP-3532009)

lt=) ]2)lliiJ~OJm(~setEP-3532009) C SBBJ ~ 173 1333 18319 321 amp 322JJi

f~f4

(3) Add Figures 11 to 29 to the Environmental

Permit (No EP-3532009)

(=) tEJiUJl~fCiJ~ft(~Mi~ EP-3532009) JDA~

11 ~ 29

VEP-3272010 27 October 20 I 0 (1) Delete Conditions 212 37A to 3 17 317 A 16 November 20 I 0

2010 1f 10 Fl 27 8 and 320 to Part C of tJ1e Environmental 20 I 0 if 11 ~ 16 B Permit (No EP-3532009A)

(- ) IBU~Jlii~~OJm(~~ EP-3532009A) C gu BltJ~ 212 37A to 317 317A amp 320 J1i1~

i4

(2) Vary Conditions 31 317B 317F 317J

318 319 and 322 to Part C of tJ1e

Environmental Pemut (No EP-3532009A)

(= ) 12)llyenUJUf0Jm(~~ EP-3532009A) C g8 119m 3 1 3 17B 317F 317J 318 319 amp

322 llit~

(3) Delete Figure 2 to 7 9 to 10 of the

Environmental Pennit

(No EP-3532009A)

( - ) IBUlJ-tiJi~CiJ~(~~ EP-3532009 A) lliiD 2 ~~ L~ lw

~d EIA~ - 4 - ~EPV~

~

Environmental Permit No EP-3532009K ffjlilfliJ~~~If EP-3532009K

Application No

EJ3~~~sm

Date of Application

$ij 8~11

List of Amendments Incorporated into tllis

Environmental Permit

83rrbullbull~~-~~bullnmsect ~7 amp9~ 10

Date of Amendment

~il811

(4) Vary Figure 22 2325 to 27 and 29 ofthe

Environmental Permit (No EP-3532009A)

(lm) ~c5HH~~q~~ft(~Kii5m EP-3532009A)I

22 23 25 ~ 27 amp 29

VEP-343201 1 2J November 2011

2011 $ 11 F3 21 8

(5) Add Figure 21 a and 27a to Environmental

Pernlit (EP-3532009 A)

Cligt 1Emi~~~J=CiJm(filli~ EP-3532009A) JO A~ 21a amp27a

(1) Vary Conditions 17 and 317B to Part C of

the Environmental Permit (No

EP-3532009B)

(-) ]ic)Ofii~~CiJ~Cii5~ EP-3532009B) C llB ~~ 11 amp 3ns m1~1~

25 November 2011

201 1 1f- 11 ~ 25 B

VEP-3552012 27 Februaty 2012

2012 $2 F3 27 8

(2) Vary Figure 24 ofthe Environmental Pennil

(No EP-3532009B)

(= ) ]ic)lmm~~middot(~~ EP-3532009B)iJ 24

( 1) Vary Conditions 17 317B 3 18 319 and

322 to Part C of the Environmental Permit

(No EP-3532009C)

(- ) ~c)ll~i~~~-(~5m EP-3532009C) C ~

~~ 11 317B 318 319 amp 322 mi~f

7 March 2012

20 12 1f- 3 ~ 7 B

(2) Add Conditions 322A to 322 F to Part C of

the Enviromnental Permit

(NoEP-3532009C)

(=) 1Emplusmn~~CiJm(~~ EP-3532009C) C sectBJO A~ 322A ~ 322F JJ[ f~1t=-

(3) Vary Figure 1 of the Environmental Permit

(No EP-3532009C)

(-) ~c)lmplusmn~~OJllilt-~~ EP-3532oo9tC)~ 1

VEP-3802012 8 October 2012

2012 $ l 0 Fl 8 8

(4) Add Figures 30 amp 31 to Environmental

Permit (No EP-J532009C)

(lm) ttJfil~~CiJlli(~sect5poundi EP-3532009C) JOA ~ 30 amp 31

1) Vary Conditions 17 and 31 7C to Part C of

the Environmental Permit (No

EP-3532009D)

16 October 2012

2012 ~ 10 ~ 16 B

r~E1Ao EPO - 5 - ~~ill~

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 5: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permi t o EP-3532009K

fiJIjttllfUJmga~ EP-353120091K

Application No VEP-49820 16

$~--Si~ 25 Application fo r Var iation for an Environmental Permit on 24 March 2016 (Application No

VEP-4982016)

~CiJ~i~~A~ 2016 ~ 3 Fl 24 B~j(f~tltf~2)lJiiJUfOJm$~~3Zi4($~tA1~

VEP-49820 16)

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

ef3aar~ Environmental Permit fHB l~

8 sectatE7ls lRJUfCiJ ~ iJ BltJ 11~UJW 13 VEP-3 152010

Efl~i~5Li

11 June 2010 ( I) Add Conditions 212 37 A and 3 17 A to 24 June 2010

2010 ~ 6 Fl ll 8 317L to Part C of the Environmental Permit 20 1 0~6Fl24 8 (No EP-3532009)

(-) tEJtiJsqCiJm(~sm EP-35312009) C $1JDA ~21237A amp3l7A ~ 317L Jii~

(2) Vary Conditions 17 31 33 318 319

32 1 and 322 in Part C of the Environmental

Pennit (No EP-3532009)

lt=) ]2)lliiJ~OJm(~setEP-3532009) C SBBJ ~ 173 1333 18319 321 amp 322JJi

f~f4

(3) Add Figures 11 to 29 to the Environmental

Permit (No EP-3532009)

(=) tEJiUJl~fCiJ~ft(~Mi~ EP-3532009) JDA~

11 ~ 29

VEP-3272010 27 October 20 I 0 (1) Delete Conditions 212 37A to 3 17 317 A 16 November 20 I 0

2010 1f 10 Fl 27 8 and 320 to Part C of tJ1e Environmental 20 I 0 if 11 ~ 16 B Permit (No EP-3532009A)

(- ) IBU~Jlii~~OJm(~~ EP-3532009A) C gu BltJ~ 212 37A to 317 317A amp 320 J1i1~

i4

(2) Vary Conditions 31 317B 317F 317J

318 319 and 322 to Part C of tJ1e

Environmental Pemut (No EP-3532009A)

(= ) 12)llyenUJUf0Jm(~~ EP-3532009A) C g8 119m 3 1 3 17B 317F 317J 318 319 amp

322 llit~

(3) Delete Figure 2 to 7 9 to 10 of the

Environmental Pennit

(No EP-3532009A)

( - ) IBUlJ-tiJi~CiJ~(~~ EP-3532009 A) lliiD 2 ~~ L~ lw

~d EIA~ - 4 - ~EPV~

~

Environmental Permit No EP-3532009K ffjlilfliJ~~~If EP-3532009K

Application No

EJ3~~~sm

Date of Application

$ij 8~11

List of Amendments Incorporated into tllis

Environmental Permit

83rrbullbull~~-~~bullnmsect ~7 amp9~ 10

Date of Amendment

~il811

(4) Vary Figure 22 2325 to 27 and 29 ofthe

Environmental Permit (No EP-3532009A)

(lm) ~c5HH~~q~~ft(~Kii5m EP-3532009A)I

22 23 25 ~ 27 amp 29

VEP-343201 1 2J November 2011

2011 $ 11 F3 21 8

(5) Add Figure 21 a and 27a to Environmental

Pernlit (EP-3532009 A)

Cligt 1Emi~~~J=CiJm(filli~ EP-3532009A) JO A~ 21a amp27a

(1) Vary Conditions 17 and 317B to Part C of

the Environmental Permit (No

EP-3532009B)

(-) ]ic)Ofii~~CiJ~Cii5~ EP-3532009B) C llB ~~ 11 amp 3ns m1~1~

25 November 2011

201 1 1f- 11 ~ 25 B

VEP-3552012 27 Februaty 2012

2012 $2 F3 27 8

(2) Vary Figure 24 ofthe Environmental Pennil

(No EP-3532009B)

(= ) ]ic)lmm~~middot(~~ EP-3532009B)iJ 24

( 1) Vary Conditions 17 317B 3 18 319 and

322 to Part C of the Environmental Permit

(No EP-3532009C)

(- ) ~c)ll~i~~~-(~5m EP-3532009C) C ~

~~ 11 317B 318 319 amp 322 mi~f

7 March 2012

20 12 1f- 3 ~ 7 B

(2) Add Conditions 322A to 322 F to Part C of

the Enviromnental Permit

(NoEP-3532009C)

(=) 1Emplusmn~~CiJm(~~ EP-3532009C) C sectBJO A~ 322A ~ 322F JJ[ f~1t=-

(3) Vary Figure 1 of the Environmental Permit

(No EP-3532009C)

(-) ~c)lmplusmn~~OJllilt-~~ EP-3532oo9tC)~ 1

VEP-3802012 8 October 2012

2012 $ l 0 Fl 8 8

(4) Add Figures 30 amp 31 to Environmental

Permit (No EP-J532009C)

(lm) ttJfil~~CiJlli(~sect5poundi EP-3532009C) JOA ~ 30 amp 31

1) Vary Conditions 17 and 31 7C to Part C of

the Environmental Permit (No

EP-3532009D)

16 October 2012

2012 ~ 10 ~ 16 B

r~E1Ao EPO - 5 - ~~ill~

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 6: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K ffjlilfliJ~~~If EP-3532009K

Application No

EJ3~~~sm

Date of Application

$ij 8~11

List of Amendments Incorporated into tllis

Environmental Permit

83rrbullbull~~-~~bullnmsect ~7 amp9~ 10

Date of Amendment

~il811

(4) Vary Figure 22 2325 to 27 and 29 ofthe

Environmental Permit (No EP-3532009A)

(lm) ~c5HH~~q~~ft(~Kii5m EP-3532009A)I

22 23 25 ~ 27 amp 29

VEP-343201 1 2J November 2011

2011 $ 11 F3 21 8

(5) Add Figure 21 a and 27a to Environmental

Pernlit (EP-3532009 A)

Cligt 1Emi~~~J=CiJm(filli~ EP-3532009A) JO A~ 21a amp27a

(1) Vary Conditions 17 and 317B to Part C of

the Environmental Permit (No

EP-3532009B)

(-) ]ic)Ofii~~CiJ~Cii5~ EP-3532009B) C llB ~~ 11 amp 3ns m1~1~

25 November 2011

201 1 1f- 11 ~ 25 B

VEP-3552012 27 Februaty 2012

2012 $2 F3 27 8

(2) Vary Figure 24 ofthe Environmental Pennil

(No EP-3532009B)

(= ) ]ic)lmm~~middot(~~ EP-3532009B)iJ 24

( 1) Vary Conditions 17 317B 3 18 319 and

322 to Part C of the Environmental Permit

(No EP-3532009C)

(- ) ~c)ll~i~~~-(~5m EP-3532009C) C ~

~~ 11 317B 318 319 amp 322 mi~f

7 March 2012

20 12 1f- 3 ~ 7 B

(2) Add Conditions 322A to 322 F to Part C of

the Enviromnental Permit

(NoEP-3532009C)

(=) 1Emplusmn~~CiJm(~~ EP-3532009C) C sectBJO A~ 322A ~ 322F JJ[ f~1t=-

(3) Vary Figure 1 of the Environmental Permit

(No EP-3532009C)

(-) ~c)lmplusmn~~OJllilt-~~ EP-3532oo9tC)~ 1

VEP-3802012 8 October 2012

2012 $ l 0 Fl 8 8

(4) Add Figures 30 amp 31 to Environmental

Permit (No EP-J532009C)

(lm) ttJfil~~CiJlli(~sect5poundi EP-3532009C) JOA ~ 30 amp 31

1) Vary Conditions 17 and 31 7C to Part C of

the Environmental Permit (No

EP-3532009D)

16 October 2012

2012 ~ 10 ~ 16 B

r~E1Ao EPO - 5 - ~~ill~

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 7: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-35312009K

lii~atUJm~5t~ EP-3532009K

Application No

$~~Hi~

Date ofApplication

$~~BJJJ

List of Amendments Incorporated into this

Environmental Permit

BEl-atpound~~Ji~OJmpg~yenJft~iliJisect

Date of Amendment

fi~HBM

(-) ~c)(~iji~J=DJm(fHi EP-3532009D) C

sect3a9~ u amp 317C rmNi1

(2) Add Figures 32 amp 33 to Environmental

Pemlit (No EP-3532009D)

lt=) tt~i~~OJmc~~m EP-3532009D) 1JDA 132 amp 33

VEP-4022013 18 April2013

20 13$4 FJ 18 B (I) Vary Conditions 17 and 3 17C to Part C of

the Environmental Permit (No

EP-3532009E)

(-) ~2)(~Ji~DJmcism EP-353120091E) c sect38]~ 17 amp 317C IJi1~1

(2) Replace Figure 32 and Figure 33 to

Environmental Permit (No EP-3532009E)

with the amended Figure 32

c=gt J~H~c)lL~ 32 Jmft~t~~OJ~~c~~m

EP-3532009E)i 32 75z 33

24 April 20 13

2013 if 4 Fl 24 8

VEP-41 012013 29 July 20 13

20 13$7 ~ 29 B (1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3 532009F)

(-) ~2)l~il~lf0Jm(~~ EP-3532009F) B

sect3amp c sect38]~ 17 ~i~f-t

(2) Add Conditions 43 to 46 to Part C of the

Environmental Permit (NoEP-3532009F)

c=) tt~jji~OJM(~~m EP-3532009F) C sect3 1JDA~ 43 ~ 46 ~iNi1tf

6 August 20 13

20l31f 8 F3 6 8

VEP-46320 15 16 January 20 15

20 15 $ 1 FJ 16 B ( 1) Vary Part Band Condition 17 to Part C of

the Environmental Permit (No

EP-3532009G)

(-) ~2$(ffiiJi~DJm(~~ EP-3532009G) B

gBamp c sectBSJ~ 17 IJifNif-t

(2) Add Conditions 324 to 326 to Part C of tbe

Environmental Pennit (NoEP-3532009G)

lt=gt 1EJ~il~OJmc~~~m EP-353t2oo9G) c gn 1JOA~ 324 ~ 326 IrHI~i4

19 January 20 15

2015 1f- I F3 19 8

VEP-4772015 30 hme 2015

2015$6 FJ 30 B ( I) Vary Condition l7 to Part C of the

Environmental Permit (No EP-3532009H)

(-) ~c)(~tl~OJmcMi~m EP-3532009H) c S3a9~ 11 ~iNi1tt=

17 July 2015

2015 1f7 FJ 17 B

- 6 -(~EIAO~

EP~ ~

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 8: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009 K

poundFWlirfDJ~~~i EP-35312009K

Application No Date of Application List of Amendments Incorporated into this Date of Amendment

$~~H~~m $~B~~ Environmental Permit I~U B ~~

8~~middotmiddot~~-~~-ll~sect (2) Add Conditions 327 and 328 to Part C of

the Environmental Permit

(NoEP-3532009H)

c=) ~-Ugf~m(~~m EP-3532009H) C ~~

IJOJg 327 ~ 328 ~11~Ht

VEP-49720 16 18 February 2016 (J) Vary Conditions 17 324 to 326 to Part C 25 February 2016

2016 iF 2 F3 18 B of the Environmental Permit (No 20 16 4- 2 ~ 25 a EP-3532009I)

(- ) ~~~J~l~HfOJmc~~m EP-353noo9fl) c sectB

yen]~ 17 324 ~ 326 J~1~1

(2) Add Condition 326A to Part C of the

Environmental Permit (NoEP-3532009I)

c=) ~~UHfOJ~i(~~m EP-3532009l) C g~

IJOA~ 326A JjHI~i

VEP-49820 16 24 March 2016 (1) Vary Condition 17 to Part Coftbe 11 April 2016

2016 iF 3 F3 24 B Environmental Permit (No EP-3532009J) 2016 4- 4 ~ 11 B (-) ~~~Jii~~~~i(~~~m EP-3532009J) C g~

yen]~ 17 J~1~1

(2) Vary Figure 27 to Environmental Permit

(No EP-3532009J)

lt=) 1~[~~1~~~middot (~~ EP-3532009J)~

27

11 April20 16

Date (Louis PL CHAN)

Bt~ Principal Environmental Protection Officer

for Director ofEnvironmental Protection

- 7 shy

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 9: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

faJl81fTIJii~ii~ EP-3532009K

PART B (DESCRIPTION OF DESIGNATED PROJECT) Bg~ (t~iEI~l~ 13 a~~~BJ3)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter

referred to as the Permit)

T~U~t~plusmn~~ormcrm~tOJ~~)Ag~J51Tmmt~yenJji~I~~~sect aJmsFJ

Title of Designated Project Hong Kong-Zhuhai-Macao Bridge (HZMB) Hong Kong Boundary Crossing

1sect~Ifpoundljlsect A98fiil Facilities (HKBCF)

(This designated project is hereafter referred to as the Project)

~~)~m~~Dryen

lt1sectIfpoundJ~sect -r~IfyenJj[sect)

Nahtn of Designated Project

1sect~fpound1Jlsect A9ttit I Reclamation works (including associated dredging works) more than 5 ha

in size

2

3

A dredging operation exceeding 500000m3

A road bridge more than 1OOm in length between abutments

4 A railway and its associated stations

5 A railway tunnel more than 800m in length between portals and

6 An activity for the reuse of treated sewage effluent from a treatment plant

(- ) iiDfJf~~sH~iyenJJi~~Ifpound(EHtfffi i~H27JEI~pound) lt=) t271Eil~JsectsoooooIT1JiyenJi27JE1F (-) mgzrs~yen1~M~~looakJ1Y$mt~Epoundnt1~~H~~ (IL9) mllsect5HHElampP~ lUi (n) Ao ZFs~yen1~M~~sooa-Jrr~lllm2Uttllsectlllmamp

lt~~wbull~bull~~a-J~~fiM~ffliyen1~bullmiddot

Location of Designated Project Northeast of Chek Lap Kok

1~~IfpoundljlsectAIJitlUi The location of the Project is shown in figure 1 of this Permit

~illaquotEJ2icrm

IfpoundJ~sect akJlth~m7F~w-Form~II7)

Scale and Scope of Designated

Project

1sect~Ilyen1Jlsect iyenJ~fH~~Dielll

The project mainly comprises the fo llowings

(i) Dredging and reclamation at the no ttheast waters off the Airport lsland to

provide a land platform for the development of the HKBCF and the

southern landfatl of the Tuen Mun Cbek Lap Kok Link

(ii) cargo processing fac ilities including kiosks for clearance of goods

vehicles customs inspection platform X-ray buildings and related

supporting facilities

(iii) passenger related facilities including processing kiosks and examination

facilities for private cars and coaches passengers clearance building and

halls and related supporting facilities

- 8 shy

= )

tJ middot-~~ ~~lA~~~ ~

=

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 10: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

JSJii~iJ~~~ EP-35312009K

(iv) acconuuodatiou for and facilities of the Government departments

providing services in connection with the HKBCF

(v) provision of transport and miscellaneous faci lities inside the HKBCF

including public transport interchange transport drop-off and pick-up

areas vehicle holding areas passenger queuing areas road networks

footbridges fencing sewage system including reclaimed water

treatment facility drainage systems water supply system utilities

electronic system traffic control and surveillance system and related

supporting facilities

(vi) provision of road access for cmmection of the HKBCF to the Hong Kong

Link Road the Tu en Mun-Chek Lap Kok Link and the Airport

(vii) reprovisioning ofthe affected Airports facil ities such as the existing Fire

Services Departments East Sea Rescue Berth and

(viii) provision of other facilities for connection with the Airport such as an

Automated People Mover system (ie a railway system) to connect the

Airport Tenninal with the HKBCF

I ~----~-~ff~~RfflIWmiddot~00~plusmn~~-middot-0~amp~ F~~~~lli3~tlRsectiyen-J~OOJtri~~

2 bull~bull~mnmmiddotregMwbull~~-middot~ middot bull~~bullg middot xbullbullbullampffi rm~~mnm

J wbullB~rmiyen-lmnffimiddotsectM~bullmiddot~~~~plusmnbull~~~bullbullmnmmiddotbullbull bull~bullbullwAm~ampffirm~~mnm

4 mf~wbullbullo~~~~~~~iyen-lregmrs~r~~yen-JWJyen~plusmnthtJ~mnm s ~bull~o~mmbull~~bull~mbullmiddot ~m~middot~~~bullmiddotbull~k~B

~-middot~~-~middotbullbullbullbullbull middot bullmbullmmiddotffA~bull middot~bull-~~bull~ M~mbullbullm~middotmiddot~bull-~~bullmiddot~mmbullmiddotbull~~middot middot ~~ ~ffitlamp~m~~7c6Hsect~~~gmnm

6 bullbullbullm~bullbullbull~o~~~~bullbullbull~bullbull middot~M~~~~~mmampbullbull 1 bullm~Iw~bull~~~bullbullmnmmiddot~~m~iyen-l~M=bull~ftmbull~m

R s m~~~mbull~bull~bullbullmiddotm~m~m~~yen-JbullBbullbull~bull(MmRsect~amp)

~-~~bullmbullbull~bull~nobullfo~ middot

- 9 shy

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 11: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

iftJli3ftiJ~~llt EP-3532009K

PART C (PERMIT CONDITIONS)

l General Conditions

11 The Permit Holder and any person working on the Project shall comply with all conditions set out in

this Pem1it Any non-compliance by any person may constitute a contravention of the Environmental

Impact Assessment Ordinance (Cap499) and may become the subject of appropriate action being

taken under the Ordinance

12 The Permit Holder shall ensure full compliance with all legislation from time to time in force

including without linlltation to the Noise Control Ordinance (Cap 400) Air Pollution Control

Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) Dumping at Sea Ordinance

(Cap 466) and Waste Disposal Ordinance (Cap 354) This Permit does not of itself constitute any

ground of defence against any proceedings instituted under any legislation or imply any approval

under any legislation

13 The Permit Holder shall make copies of tbis Permit together with all documents refenmiddoted to in this

Permit and the documents referred to in Part A of the Peinlit readily available at all times for

inspection by the Director or his authorised officers at all sitesoffices covered by this Permit Any

reference to the Permit shall include all documents referred to in the Permit and also the relevant

documents in the Register

14 The Permit Holder shall give a copy of this Permit to the person(s) in cl1arge of the site(s) and enswmiddote

that such person(s) fully understands all conditions and all requirements incorporated in the Permit

The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Pennit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all

vehicular site entrancesexits or at a convenient location for publics information at a ll times The

Permit Holder shall ensure that the most updated information about the Permit including any

amended Pennit is displayed at such locations If the Pennit Holder sunmiddotenders a part or the whole of

the Permit the notice he sends to the Director shall also be displayed at the same locations as the

otiginal Pennit The suspended varied or cancelled Pennit shall be removed from display at the

Project site(s)

16 The Pem1it Holder shall constiUct and operate the Project in accordance with the project descriptions

in Part B of this Permit

17 The Pennit Holder shall ensure that the Project is designed constructed and operated in accordance

with the infonnation and recommendations described in the ElA Report the application documents

including all attachments (Application No AEP-3532009 Application No VEP-315201 0

Application No VEP-3272010 Application No VEP-3432011 Application No VEP-3552012

Application No VEP-3802012 Application No VEP-402 2013 Appl ication No VEP-4102013

Application No VEP-4632015 Appl ication No VEP-4772015 Application No VEP-4972016

and Application No VEP-49820 16) other relevant documents in the Register and the information

or mitigation measures desc1ibed in this Pem1it and mitigation measures to be recommended in

submissions that shall be deposited with or approved by the Director as a result of penn it conditions

- I 0 -

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 12: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

lsJlWUJ~~~ EP-35312009K

and monitoring activities during all stages of the Project Where recommendations referred to in the

documents of the Register are not expressly referred to in this Permit such recommendations are

nevertheless to be implemented unless expressly excluded or amended in this Permit

18 All deposited submissions as required under this Permit shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the

Directors comments or otherwise as specified by the Director

19 All submissions approved by the Director all submissions deposited without comments by the

Director and all submissions rectified in accordance with comments by the Director under this

Permit sha ll be construed as part of the permit conditions described in Part C of this Permit Any

variation of the submissions shall be approved by the Director in writing or as prescribed in the

relevant permit conditions Any non-compliance with the submissions may constitute a

contravention of the Environmental Impact Assessment Ordinance (Cap 499) All submissions or

any variation of the submissions shall be certified by the Environmental Team (ET) Leader and

verified by the Independent Environmental Checker (IEC) referred to in Conditions 21 and 22

below before submitting to the Director under this Permit

110 The Permit Holder shall release all finalized submissions as required under this Permit to the public

by depositing copies in the Environmental Impact Assessment Ordinance Register Office or in any

other places or any intemet websites as specified by the Director or by any other means as specified

by the Director for public inspection For this purpose the Pennit Holder shall provide sufficient

copies of the submissions

lJ 1 The Permit Holder shall notify the Director in writing the commencement date of construction of the

Project no later than one month prior to the commencement of construction of the Project The

Permit Holder shall notify the Director in writing immediately if there is any change of the

commencement date of the construction

112 All submissions to the Director required under this Permit shall be delivered either in person or by

registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at

27F Southorn Cenhmiddote 130 Henoessy Road Wanchai Hong Kong) Electronic copies ofall finalized

submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML)

(version 40 or later) and in Portable Document Format (PDf version 13 or later) unless otherwise

agreed by the Director and shall be submitted at the same time as the hard copies

113 For the purpose of this Permit commencement of construction does not include works related to

site clearance and preparations or other works as agreed by the Director

Specific Conditions

2 Measures and Submissions before Commencement of Construction

- 11 bull

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 13: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Envitmiddotonmental Permit No EP-3532009K

lj)lWfUJ~~~~ EP-35312009K

21 An Environmental Team (ET) shall be established by the Permit Holder no later than 6 weeks before

the commencement of constt11ction of the Project The ET sball not be in any way an associated

body of the Contractor or the Independent Environmental Checker (IEC) for the Project The ET

shall be headed by an ET Leader The ET leader shall be a person who has at least 7 years of

experience in environmental monitoring and auditing (EMampA) or environmental management The

ET and the ET Leader shall be responsible for the implementation of the EMampA programme in

accordance with the EMampA requirements as contained in the EMampA Manual of the Project The ET

Leader shall keep a contemporaneous log-book ofeach and every instance or circtunstance or change

of circumstances which may affect the compliance with the recommendations of the EIA Report and

this Pennit The ET Leader shall notify the IEC withjn one working day of the occurrence of any

such instance or circumstance or change of circumstances The ET Leaders log-book shall be kept

readily available for inspection by all persons assisting in supervision of the implementation of the

recommendations of the EIA Report and this Permjt or by the Director or his authorized officers

Failure to maintain records in the log-book failure to discharge the duties of the ET Leader as

defined in the EMampA Manual or failure to comply with this Condition would entitle the Director to

require the Permit Ho lder by notice in writing to replace the ET Leader Failure by the Pem1it Holder

to make replacement or further failure to keep contemporaneous records in the log-book despite the

employment of a new ET Leader may render the Pennit liable to suspension cancellation or

variation

12 An IEC shall be employed by the Permit Holder no later than 6 weeks before cormuencement of

construction of the Project The IEC shall not be in any way an associated body of the Contractor or

the ET for the Project The IEC shall be a person who has at least 7 years of experience in EMampA or

environmental management The IEC shall be responsible for duties defined in the EMampA Manual

and shall audit the overall EMampA performance including the implementation of all environmental

mitigation measures submissions required in the EMampA Manual and any other submissions

required under this Petmit In addition the IEC shall be responsible for verifying the enviromnental

acceptability of perrnanent and temporary works relevant design plans and submissions under this

Permit The 1EC shall verify the log-book(s) mentioned in Condition 21 of this Permit The IEC

shall notify the Director by fax within one working day of receipt of notification from the ET

Leader of each and every occurrence change of circumstances or non-compliance with the EIA

Report and this Pennit which might affect the monitoring ot control of adverse environmental

impacts from the Ptbulloj~ct In the case where the IEC fails to so notify the Director of the same fails

to discharge the duties of the 1BC as defmed in the EMampA Manual or fails to comply with tills

Condition the Director may require the Permit Holder by notice in writing to replace the IEC

Failure to replace the 1EC as directed or further failure to so notify the Director despite employment

of a new 1EC may render the Pennit liable to suspension cancellation or vatiation Notification by

the Pennit Holder is the same as 11oti fication by the IEC for the purpose of this Condition

Management organization ofmain construction companies

23 The Permit Holder shall at least 2 weeks before the commencement of cm1struction of each relevant

contract under the Project infonn the Director in writing the management organization ofthe main

construction companies andor any fonn of joint ventures associated with the construction of the

corresponding prut of the Project The submitted information shall include at least an organization

- 12 shy

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 14: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

JaJliifUJ~~IM EP-35312009K

S ubmissions of specification and plan 011 mari11e ecoltJgical mitigation m easures

24 The Pennit Holder shall advance the preparation works for the designation of the marine park in the

Brothers Islands including a study on the details of the designation and consultation with

stakeholders on the understanding that designation of the marine park would immediately follow the

completion of the Project

25 The Pennit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a proposal including the

proposed size and management plan of the proposed marine park in the Brothers Islands in

consultation with the Director ofAgriculture Fisheries and Conservation

26 The Pennit Holder shall deposit with the Director prior to the commencement ofmarine works of the

Project three hard copies and one electronic copy of a Dolphin Watching Plan The plan sbaJl

include regular inspection of the silt curtains visual inspection of the waters surrounded by the

curtains and an action plan shall be devised to cope with any unpredicted incidents such as the case

that Chinese White Dolphin is found within the water surrounded by the silt curtains

27 The Permit Holder shall deposit with the Director at least 1 month before the commencement of

construction of the Project three hard copies and one electronic copy of a Spill Response Plan

detailing the actions to be taken in the event of accidental spillage of oil or other hazardous

chemicals from construction activities including vessels operating for the Project with specific

provisions for protecting marine ecology and the Chinese White Dolphins

28 To minimize tbe chance of vessel colJision and the disturbance to the Chinese White Dolphins the

Permit Holder shall deposit with the Director at least 2 weeks before the commencement of the

construction of the Project three hard copies and one electronic copy of a plan showing the regular

marine travel routes of vessels moving to ru1d from the Pr~ject work sites Any subsequent changes

to the regular routes shall be verified by the IEC as conforming to the requirements in the EIA

Report and deposited with the Director

La11tlscape am Visual Pla11

29 The Pennil Holder shall deposit with the Director at least L month before the commencement of

construction of relevant part of the Project three hard copies and one electronic copy of a lru1dscape

and visual plan incorporating aesthetic architectural design on buildings structures and related

infrastructure of the Project streetscape elements planting proposals and other measures including

night-time lighting control

Waste managementplan

210 The Permit Holder shall deposit with the Director at least 1 month before the commencement of the

construction of the project three hard copies and one electronk copy of a waste management plan

(WMP) for the construction stage of the Project The WMP shall describe the arrangements for

avoidance reuse recovery and recycling storage collection treatment and disposal of different

categories of

recommended mitigation measures on waste management in

- 13 shy

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 15: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

PtiJlirfiTJfamp~~ EP-3532009K

indicate the disposal location(s) of all surplus excavated spoil and other waste A trip ticket system shall be included in the WMP Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director All measmes

recommended in the WMP shall be fu lly and properly implemented by the Pennit Holder and any person working on the Project throughout the construction period

Environmental Proj ect Office

2 11 To oversee the cumulative environmental impacts arising from the Project and other concurrent projects in the adjoining area and to liaise closely with the mainland project teams for the HZMB

Main Bridge the Permit Holder shall set up an independent Environmental Project Office (ENPO) before the commencement of construction of the Project No later than two months before the

commencement of construction of the Project the Permit Holder shall submit for the Directors approval a proposal on the setting up of the ENPO which should include the main objectives of the ENPO its organizational structure and Lines of communication and the personnel involved The Permit Holder shall set up the ENPO in accordance with the approved proposal

2 12 Not used

3 Submissions or Measu res during Construction of the P ro ject

Measures to mitigate disturbance to Chinese White Dolplzins

3 1 A dolphin exclusion zone of 250m shall be implemented around the Project during the installation of the perimeter silt curtains around the HKBCF site and any re-deployment of the perimeter silt curtains P1ior to the sta1t of the works dolphin observer(s) shall scan the exclusion zone for at least 30 mim1tes If dolphins are observed in the exclusion zone the installationre-deployment works shall be delayed until they have left the area If dolphins are observed within the exclusion zone

during installationre-deployment works the relevant part of the works shall cease unti l the dolphins have left the area Tbe dolphin observer(s) shall have relevant hmiddotaining on dolphin monitoring and shall be independent of the construction contractor The dolphin observer(s) shall form pa1i of the

Environn1ental Team Passive Acoustic Monitoring using hydrophones or cetacean detectors shall be used for the detection ofdolphin outside the day ight hours

32 Once the perimeter silt curtains as mentioned in Condition 31 above are installed or re-deployed the

Dolphin Watching Plan as deposited under Condition 26 of this Pennit shall be implemented as part

of the EMampA programme

33 To minimize the acoustic disturbance to Chinese White Dolphins silence piling equipment such as vibratory piler shall be used for installation of sheet pile structure into the sea bed

34 No underwater percussive piling shall be used for the Project

35 AJl vessels within the work areas shall not travel at a speed higher than 10 knots

- 14 shy

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 16: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Envi ronmental Permi t No EP-3532009K

Jfift~lfUJm~5rJ EP-3532009K

36 Air compressors and other noisy equipment mounted on construction vessels shall be acousticallyshy

decoupled

37A Not used

37 Not used

38 Not used

39 Not used

310 Not used

311 Notused

312 Notused

313 Not used

314 Notused

315 Not used

316 Notused

317 Not used

Measures to mitigate water quality impacts

317A Not used

317B The Permit Holder shall construct the Project in accordance with Figures 11 to 28 of this Permit

The perimeter silt curtains as described in Figure 12 shall be installed around the HKBCF site before

the commencement of marine works No dredging works of marine sediment shall be carried out

for the Project except for the construction of box culverts and seawalls at Portion D the Fire

Services Department (FSD) Rescue Berth and APM Tunnel FSD Rescue Berth and APM shall not

commence construction before the completion of reclamation of the HKBCF and TMCLKL southern

landfall unless with prior approval by the Director The Permit Holder shaiJ notify the Director in writing any proposed changes in the construction sequences andor arrangements before

implementation of such changes The proposed changes shall be certified by the ET Leader and

verified by the IEC as conforming to the information and requirements contained in the EIA Report

317C Reclamation fi lling for the Project shall not proceed until at least 200m of leading seawall at the

reclamation are formed above +22mPD except for the sand blanket unless othe1wise agreed with

the Director The maximum daily filling rate of sand blanket sha ll be 24000m3 During the sand

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 17: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K I_fltJlSlfUJ~~SUf EP-3532009K

3170 A layer of geotextile shall be placed on top of the seabed before any filling activities take place

inside the cellular structures to fonn the seawall To prevent spillage of the filling materials onto

the surrounding water the conveyor belts shall be fitted with windboards and conveyor release

points shall be covered w ith curtain

317E Except fm the filling of the cellular structures not more than 15 public fill shall be used for

reclamation filling below +25mPD during construction of the seawall After the seawall is

completed except for the 300m marine access as indicated in Figure 15 of this Permit not more than

30 public ftl l shall be used for recJamation filling below +25mPD unless otherwise agreed by the

Director

317F No more than l grab dredger with a maximum daily dredging rate of 7200m3 shall be employed for

the dredging operation at the FSD Rescue Berth

317G No more than 2 grab dredgers with a maximum daily dredging rate of 12000m3 shall be employed

for the dredging operation at Portion D ofthe Project

317H Only grab dredgers shaJI be used for dredging works in this Project Each grab dredger shall be

enclosed by a cage type silt curtain with steel enclosure as illustrated in Figure 8 of this Permit to

reduce sediment loss to the suTounding environment during dredging operation

317f No more than 5 filling barge trips per day shal l be made wirh a maximum daily rate of 5000m3 for the filling operation at the FSD Rescue Berth

3 17 J Upon completion of 200m leading seawall no more than a total of 60 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 60000m3 for HKBCF and TM-CLKL southern landfall reclamation during the filling operation Upon completion of the whole section of seawall except for the 300m marine access as indicated in Figure 15 of this Pennit no more than a total of190 filling barge trips per day shall be made with a cumulative maximum daily filling rate of 190000m3 for the remaining ftlling operations for HKBCF and TM-CLCKL southem landfall reclamation To ensure that the cu mulative maximum filling rate assumed in the EIA report shall not be exceeded the Permit Holder shall submit at least one week prior to the end of each calendar month the anticipated daily filli ng rate for the coming month to the Environmental Project Office (ENPO) fm approval The actuaJ maximum daily filli ng rate shall not exceed the approved filli ng tbullate by ENPO

317K During the stone column installation silt curtain shall be installed near the active stone colwnn

installation points as indicated in Figure 29 of this Pennit A layer of geolextile with stone blanket

on top shall be placed on the seabed prior to stone coltunn instal lation works

3l7L To prevent grout leakage at the interfacing section between the stone column and the Tuen Mun

Cbek Lap Kok Link tunnel portion as indicated in Figure 23 of this Pennit grouting shall be applied

in grout p ipe by gravity method

Measures to mitigate Vater quality impacts from re-deposition ofDredged Sediment in Sheet Pile

Cellular Stmctures

318

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 18: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K mmatUJm~lJfJE EP-3s3n oo91K

319 Before re-deposition the dredged sediment a layer of geotextile shall be placed at the bottom of the sheet pile cellular structures to avoid the direct contact of the re-deposited sediment and the bottom

sediment

320 Not used

321 A minimum of 2m thick sand fill or public fill shall be placed on the top of the contaminated sediment to protect and cover the sediment after re-deposition

322 The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation

which may disturb the dredged sediment is allowed within the cellular structures as described in Condition 318 of this Permit

Measures to mitigate water quality impacts from re-deposition of Dredged Sediment within Designated Re-deposition Area

322A The dredged sediment from Portion D shall be re-deposited at the re-deposition area as indicated in Figure 30 and Figure 31 of this Permit within the Project boundary

322B Prior to the erection of the steel sheet piles and re-deposition of sediment silt curtain shaiJ be installed around the area of the re-deposition subarea

322C A layer of geotextile shall be placed on the seabed within the re-deposition subarea Sand bund shall be placed around the boundary of the re-deposition subarea

322D After the re-deposition of sediment within the re-deposition subarea a layer of geotextile and a minimum 2m thick sand blanket shall be placed on top of the re-deposited sediment as indicated in

Figure 31

322pound Field trial(s) shall be carried out to demonstrate that the removal of the temporary steel sheet piles

walls would not cause adverse water quality impacts A Trial Report shall be endorsed by the IEC and deposited to the Director No removal of the steel sheet piles except those involved in the field

trial(s) shall be carried out before the Trial Report is endorsed by the IEC and is deposited to the

Director

322F The dredged sediment shall not be disturbed after re-deposition No piling works or deep foundation which may disturb the dredged sediment is allowed within the re-deposition area as described in

Condition 322A of this Permit

Measures to mitigate air quality impacts during construction phase

323 The Permit Holder shall undettake watering at least 8 times per day on all exposed soil within the Project site and associated work areas throughout the construction phase

rom Floating Grout Production Facilities ami

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 19: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K ffttJ~DJ~~~ EP-35312009K

324 The entire grouting I concrete hatching processes and materials unloading loading and transfer shall be perfonned within an enclosed system The material storage tanks shall be fu lly covered I enclosed

325 The Permit Holder shall not discharge any wastewater from the grouting production I concrete batching processes or domestic sewage to the sea

326 Apart from the air intakes for the ventilation fans noisy equipment on the floating grout production facilities I concrete hatching plants shall be housed below the ship deck I inside ship body or provided with enclosures The air intakes for the ventilation fans and concrete pumps shall also be provided with acoustic decoupling measures

326A At any time only 2 numbers of any combination of floaUng concrete hatching plants and f1oating grout production facilities are allowed in operation

Measures to mitigate water quality impacts during loading and unloading of ecavated marine

mud

327 If off-site disposal is reqnired the excavated marine mud from the land-based works shall be disposed of at the designated disposal sites within Hong Kong as allocated by the Marine Fill Committee or other locations as agreed by the Director

328 No spilling and overflowing ofmaterials during loading I unloading I transportation shall be allowed

4 Measures or Submissions for Operation of the Pro ject

E mergency Response P lan for Spillage ofOil ami Chemicals

41 The Pennit Holder shall no later than 2 months before the commencement of operation of the

Project depo1gtit with the Director three sets of a detailed Emergency Response Plan (ERP) on how to

prevent oi l and chemical spillages caused by Lnffic incidents on the carriageway from entering into

[he waterbody The ERP shall be verified by the IEC as conforming to the recommendations

contained in the ElA Report

Artificial Reej(s)

42 The Permit Holder shall in consultatioD with the Director of Agriculture Fisheries and Conservation

deploy artificial reef(s) with a total vohJme of not less Lhan 10800m3

Treated Effluent Reuse for Tnilet Flushing

43 The Permit Holder shall ensure the distribution system for the reclaimed water is only connected for

the purpose of toilet flushing for the Hong Kong Boundary Crossing Facilities The system shall

not be connected to the Water Supplies Departments po11able water distribution system

44

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 20: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3531009 K

ff1Jjl~fiiJ~~I1f EP-35312009K

with warning signs and notices colour-coded and of different pipes sizes to the potable water pipes

so that physical colUlection of the two distribution systems would not be possible

45 The Permit Holder shall ensure the quality of the reclaimed water shall meet the standards set out in

Table I of this Permit

46 There shal l be no discharge of surplus reclaimed water into the sea In the event of emergency

the surplus reclaimed water shall be divetted back to the in let of the on-site sewage treatment plant

5 Environmental Monitoring and Audit (EMampA) Requirements

5 1 The EMampA programme of the Project shall be implemented in accordance with the procedures and

requirements as set out in the EMampA Manual of the approved EtA Report Any proposed change to

the EMampA requirements or programme shall be justified by the ET leader and verified by the IEC as

conforming to the information and requirements contained in the EMampA Manual and shall seek the

prior approval from the Director before implementation

52 Samples measurements and necessary remedial actions shall be taken in accordance with the

requirements of the EMampA Manual by

(a) conducting baseline environmental monitoring

(b) conducting impact monitoring

(c) ca rrying out remedial actions described in the EventAction Plans of the EMampA Manual in

accordance with the time frames set out in the Even t Action Plans or as agreed by the

Director in case where specified criteria in the EMampA Manual are exceeded and

(d) logging and keeping records of details of (a) to (c) above for all parameters within 3 working

days of the collection of data or completion of remedial action(s) for the pw-pose of

preparing and submitting the monthly EMampA Reports and to make available for inspection

on site

53 Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to

the Director at least 2 weeks before commencement of construction of the Project The submission

shall be verified by the IEC Additional copies of the submission shall be made available to the

Director upon his request

54 Three hard copies and one electronic copy of monthly EMampA Report shall be submitted to the

Director within 10 working days after the end of the reporting month The EMampA Reports shall

include a summary of all non-compliance (exceedances) of the environmental quality perfonnance

limits (Action and Limit Levels) The submissions shalJ be verifi ed by the 1EC Additional copies of

- ) I shy

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 21: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmentnl Permit No EP-3532009 K ~ljl~1fEITmfi~ EP-3532009K

55 All environmental monitoring and audit data submitted under this Permit shall be tme valid and

COJTect

56 To ensure a high degree of transparency regarding the monitoring data and results in view of the

public concem about the Project all environmental monitoring and audit data and results and all

submissions and perfonnance test data and results required by this Permit shall be made available by

the Permit Holder to the public through a dedicated web site to be set up by the Permit Holder under

Condition 62 below in the shortest practicable time and in no event later than 2 weeks after such

information is available

6 Electronic Reporting ofEMampA Information

61 To facilitate public inspection of the Baseline Monitoring Report and monthly EMampA Reports via

the EIAO Intemet Website and at the EIAO Register Office electronic copies of these Reports shall

be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable

Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be

submitted at the same time as the hardcopies as described in Condition 5 of this Pennit For the

HTML version a content page capable of providing hyperlink to each section and sub-section of

these RepOJts shall be included in the begitming of the document Hyperlinks to all figures drawings

and tables in these Reports shall be provided in the main text from where the respective references

are made All graphics in these Reports shall be in interlaced GIP JPEG or PDF format unless

otherwise agreed by the Director The content of the electronic copies of these Reports must be the

same as the hardcopies

62 The Permit Holder shall within six weeks to the commencement of construction of the Project set

up a dedicated web site and notify the Director in writing the Internet address where the project

information all environmental monitoring and audit data and reports described in Condition 61

above and all finalized submissions and plans required under this Permit are to be placed All

environmental monitoriJJg and audit data and reports described in Condition 61 above shall be made

available to the public via this dedicated web site to be set up by the Permit Holder in the sh01test

possible time and in no event later than 2 weeks after the relevant environ1nental monitoring data

and reports isare collected or become available unless otherwise agreed with the Director All

finalized submissions and plans shall be made available to the public via this dedicated web site to

be set up by the Pennit Holder in the shortest possible time and in no event later than 2 weeks after

they are deposited with or approved by the Director as required under this Pennit Lulless otherwise

agreed with the Director

63 The Intemet website as described in Condition 62 above shall enable user-friendly public access to

the monitoring and project information including the project profile of the Project the ETA report

the environmental pennit(s) all environmental monitoring and audit data and report and all finalized

submissions and plans required tmder tills Pem1it Unless otherwise agreed with the Director the

internet website shall bave features capable of

(a)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 22: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K

l~f)iglfilJ~~~ EP-3532009K

(b) searching by date

(c) searching by types of monit01ing data (eg noise water and air quality) and

(d) providing hyperlinks to relevant n1onitoting data after searching

Notes

U

1 This Permit consists of three parts namely Part A (Main Permit) Part B (Description of Designated

Project) and Part C (Permit Conditions) Any person relying on tills permit should obtain

independent legal advice on the legal implications under the Ordinance and the following notes are

for general infonnation only

~qOJm~~Jti~ ~PA~~ ( ~DJ~~plusmn~ti~~ ) Bti~ c113I~JJisect altJmag ) ampc fl~ c~DJm 1~14=) bull1f10Jti51ijqDJmaltJAplusmn~~8~Jiijfiil~i1U~~~a~1~~sectJ~n$~~~ middot~~UMRf~ -~~~m middot

2 If there is a breach of any conditions of this Permit the Director or his authorized officer may with

the consent of the Secretary for the Environment order the cessation of associated work until the

remedial action is taken in respect of the resultant environmental damage and in that case the Pennit

Holder shall not cruTy out any associated works without the permission of the Director or his

authorized officer

~~amp~DJ-~ff~middotmiddotmiddot~~-~-AampDJ~--~~~~~-~~~~ftffi~I~middot I~~DJmiddot~~AaMm~~limmbullbull~Mftfi~middotftmiddottt~~~Tmiddot~DJE~~A~middot ~~msectmAmiddot~~ ~~BfiffWffi~I~middot

3_ The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance

(the Ordinance) to the Director for a variation of the conditions of this Permit The Permit Holder

shall replace the original pennit displayed on the Project site by the an1ended permit

ijqOJmt~~ADJtHir~asyen11~i1ll~l311JiliaJtJtiEioJbull~$~~amp~DJmaJ11~1 ~qDJ~~1~~A~~

rebullwamp~~~mbullbull~bullbullI~~-~~~~~~mmiddot

4 A person who assumes the responsibility for the whole or a part of the Project may before he

assumes responsibility of the Project apply under Section 12 of the Ordiuru1ce to the Director for a

further environmental permit

~-lli~I~msectgm~~~lli~Imiddot~-ff~Amiddot~~-lliI~msect~middotff~ middot OJ~middotshyayen1~19U~l211JiliY9~~~1oJ~~$~yenTIY9J~~~qDJ~ 0

5 Under Section 14 of the Ordinance the Director may with the consent of the Secretaty for the

Enviromnent suspend vary or cancel this Pem1it The suspended varied or cancelled Permit shall be

removed front display at the Project site

ttH~r~~1~i1U~l41l~SJt~~ middot ~~OJ~l~mfcJ~~~~~~~B~ff5~ ~2)(~1f~ )jj~fDJ~i[ o

31tgB~ff5~ ~2Q~U~5SJ~~fDJ~amp~W1tpound~Iili~~ middot ~1ij~~ bull

6 If tl1is Permit is cancelled or surrendered during construction or operation of the Project another

environmental permit must be obtained under the Ordinance before the Project could be continued It ~ Cl~ V-

~ EIAO ~~ EPD

- 21 shy

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 23: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmental Permit No EP-3532009K W~iffOJ~~~ EP-3532009K

is an offence under Section 26 (1) of the Ordinance to construct or operate a designated project listed

in Schedule 2 of the Ordinance without a valid environmental pe1mit

~t~OJmttilyen~sect~3sect~~yenh$~ijr~Jamp5SJ~~J middot~UtEtUI~isect~~~IlyenJJsectLWJ middot~ ~~$CttHliaiyen1~~JmmH~sect5-17Jliplusmnl~OJm middot tiH~Jaiyen1~01JM26(1 )i~a9m~ fffoJA 1plusmn5~ ~~~mm~OJma9~mTbull3sect~~~bull~bullm~~2M~~~mItyenmsectmiddotM~m~middot

7 Any person who constructs or operates the Project contrary to the conditions in the Permit and is

convicted of an offence under the Ordinance is liable

~ff~AttWampt~OJm~-~Tmiddot~~~Migmsectmiddotm~middot~middotMmiddotW~ID~-

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

-bullbull~~~~-~~~middotOJbullmbullwo~~~EM6~ (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to

imprisonment for 2 years

---~~~~~=~~~--~~~OJ~~-500~~~~middot2~ (iii) on a first summary conviction to a fme at level 6 and to imprisonment for 6 months

---~-~~-~~middotOJa~6Mmiddotmiddot~~M6~ (iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment

for l year and

--middot~8~~~=~~---~~~middot0Jmiddot~middotlOOM~~~=l~amp (v) in any case where the offence is of a continuing nature the court or magistrate may impose a

fine of $10000 for each day on which he is satisfied the offence continued

ttffiOJ~5~T~~regHriii~~Ji l1~ middot~~Jt~~yenUsectDJ~vtJt-ra~~~rr~~8]amp-~sect5~ ~S shyaufJ I 0000 ~ bull

8 The Permit Holder may appeal against any condition of this Pennit under Section I 7 of the

Ordinance within 30 days of receipt of this Permit

~~OJ~JH~~AOJ1Et~f~$~~DJm1~ 30 ~IJ middot~IHfiJ~~Si11~W~~ 17 1~~t$~qDJmaltJfffOJii~HH~tplusmnlJ[ffmiddot

9 The Notes are for general reference only and that tbe Permit Holder should refer to the EtA Ordinance for details and seek independent legal advice

J~nbull~m-bullbull~mmiddot~~~~~-middot~OJmM~Abullbull~~~bullm~bull~~ti$~bull

E nvironmental Permit No EP-3532009K

J~m~qCJnHi~ipound EP-3532009K

- 22 shy

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 24: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Environmenta l Permi t No EP-35312009K

fflt)lgtfUJ~~~ EP-3532009K

Table 1 The Standards of Reclaimed Water for Reuse for Toilet Flushing

Water Quality Parameter Unit Reclaimed Water Quality

pH - 6-8 Turbidity NTU lt 2 Total Suspended Solids (TSS) mgL lt 10

5-Day Biochemical Oxygen Demand mgL lt 10 (BODs) Ecoli NolOOmL Not Detectable

Total Residual Chlorine (TRC) mgL gt 1 k=

(~middotlaquobull ~ ~ o~ a~~ EIAO ~

EPD~

~

Environmental Permit No EP-3532009K J~iji~j=CiJ~JHJiism EP-3532009K

- 23

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 25: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

cshy-J

sect r3

Q

~ ~

+

Reprovision ing of FSDs Rescue Berth

Existing FSDs Rescue Berth

Extension of Automated People Mover

nO~t0(3

tL o(9 (tef(3 + 0(9

HZMB Main Section

l ~v~ ~~~

(1

Sham Wat

San Shek wan

Sha Lo Wan

Lantau

AirpOrt Cl)

lttnne1 Tung Chung

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Ko ng Bo un dary Crossing Facil ities L fyenJ~ sect ~~if s~ Jf i~ A~~ s~ o tf Proj ect Location

(Pio n originulcd rlom F igure I ordocumen1s rece ived on 27220 I 2 wi lh Applicu1ion ror Vuriulion or m Envr ionrnc nlal Pe rm it no VEI-35520 I 2)r fl11 El 11 jt (Ill JIbullJ ilf (J ~20121f-2~27 8 ~UHt ~~VU~ ltmiddot Of Slt bullf ~~middot l(lo)ltVEP-35520 I2~1 ~ it- Ill I)

Environmental Protection Department E nviron menta l Permit No EP-3532009K Figure 1 Js ~P- Jq_ ~~ yen1 J f)t ~t Of~ ~fia ~fft EP-3532009K f-lt- YL IT o_i ashy ~1

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 26: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Full depth of water column

Grab dredger

~ ~ -~~

Chain to maintain the position of cage type silt curtain

Steel plate fixed to steel frame

Steel plate

Additional Cage Type Silt Curtain (with Steel

~ ~

middot

SILT CURTAIN FIXED TO THE BOTTOM OF SHEETPILE

SLACK FOR THE Silt curtain fixed to the I EXTENSION OF bottom of steel plate SILT CURTAIN DUE TO WAVE

Se abed AND TIDAL EFFECT

40mm DIA STEEL Enclosure) for Grab Dredgers BAR TO REST ON SEABED

DETAIL A

Seawater level

Ptmiddotoject Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossing Facilities Lfpoundt~ El~ tff ~~li~A~ ~ ~~ o ]f Single layer of C age Type silt curtai n (wit h steel e nclosure)

( lltn originnlcd f1middotom Figure 2530X041 308t ofA ppend ix 9 F ofApJgtrobulltl El A Rcpor i iCfcrcncc no A I IAR- 145 2009)Jf- lft -ai s(it 11H~ Yr ffl ) F7 ~)middot ~ ( J11 PbullJ if (j ( ~1~ jt 6Jl11 J~f$ f 11 ~1dlt 4t 1- litA El A R- 14 52009 IIHI-9F IJJ 2530 804 1308a)

Environm ental Permit No EP-3532 009K Figure 8 r la 11l ~r 31

Environm ental Protec tion Department [18Ji i11f- Of ~jt -~~ ~t EP-3532009K flt gtL iT it --ashy

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 27: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

APM underground landfall of TMCLKLstation transit hall

Reprovisioning of FSD Rescue Berth

~~ lt

PortionC1

------middott----

== ==~-r ----

No change to the marine tunnel and northern

I Portion C2

-middot-middot ------middotmiddotmiddot -middot J

tbullmiddotmiddotmiddot--~middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot middotmiddot middotmiddotmiddotmiddotmiddotmiddotmiddotmiddotmiddot

PortionS

TMCLKL Southern Landfall

No change to the viaduct section to north

Lantau forTMCLKL

Project T itle Hong Kong - Z huhai- Macao Bridge Hong Kong Boundary C ross ing Facilities L fpound rJi El ~ ~il ~~ Jfd~ A t- ~ ~~ o f Prop osed La yout of HKBC F amp TM-CLKL Sou t he rn La ndfall Reclamation4Jk ~gt- ary 4lt ~ [J ft it ~ rJJi_ -- all (-t b 4- ~~ tJ JrR Jt flli Jo1i kL ~ 41~ (Piun ori gimucd fro m Figure I I ofbull11bmiucd documents dntcd l l6120 I 0 with Applicati on for Variat ion ofun Envi ronm cntal lcrmit no VEI -3 15 20 I 0) ~ -a- 1 f 11 bull- ll -1 1lt 1 t a t I+ITF ~ (IIJM~ilf iJ ~20 1 0Jf-61l i1 B j~~~ll iltt J~ JtgtPf Sllbull~ l~AIoftV t imiddot3 1 520 1 06J itlmiddot 111 11 )

E nvironm ental P ermit No EP-3532009K F igure 11Environmental Protection Depar tment i] llJi if 0J ~i Mh ~Jt EP-353 2009KJi ift1jf- ~[ ~

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 28: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

------ ---------- --------- -----------

lOOOH i i i ~ I ~ I~ ~ ~ ~

regbull

- middot-middot-middot- ------- -)1

-middot-middot-middot- 1 middot -middot- 1 II -- j Imiddot-~

- 1 ~-1APM 1 i_=- --- I Portion C2 I Ir

~ -====- - I I

_ I I A I1_~ Portion 1 1

I i ~ I I bull bull - I -Imiddot

lt () 1 I middot I i Portion C1 r ~ r I

4 I i bull bull Early2011Portion deg~ _ i I 1900H --- middot middot --- -middot- I

Legends

~~-- P_j) middot- middot-middot-middot-middot-middot- _ oion B Stone column insUtlllllion ~ - middot ------- middot I I

- -- t -- bull - I Seaw~ll eonsuuction -- -- -- including stone columns ampmiddot-- - --- -- berm construclion I ____ -- -H I Stone Silt Cunun 7 -------shy

~~~-~~middot Geotextile sand frill 54o1d ~~i-~~ blanker amp band drains

Silt curuin 1111111111111111 Box culn

Public Foil

Surcharge

bull columns

~middot Perimeter Silt Curlai n

Project Title Hong Kon g- Z huhai- Macao Bridge Hong Kong Bound a r y C ross in g Facili ties r fi ~=~ El ~ f~ ~~ Jjd~ A~ t ~~ o 1f Outlin e of Construction Sequ ence (S heet I of 1 0)

( Plan originn tcd fronl Pigure 22 of uhm i u cd documcn l~ doted ll 6 20 l O wnh Appl ica rion for Vu ri1tion ofnn Envilonmcn tnl Perm i t no Vb P-3 1 5 2C) I 0))t L ~ If A Wl ( - l o~ l ) (Ill QbullJ llt poundJ ~~20 IOlf-6 Jl 11 B 1~ x Jll tU Jt iPfti middot~ lk lto ttV I I-3 1 5 20 I Ob~f 11122)

E nvironm ental Permit No EP-3532009KEnvi ronm enta l Protection Department Figure 12 J iJt tf 0[ ~jt ~ ~Jt EP-353 2009K li J2Jf ~t1K- ~i i shy

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 29: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

OOO N ~I h i i I ~ II Envistged ~

Nsvigttion Envissged

Route N~vigstion regRoute bull

~---K -~ ~ 11

- I -middot- II

middot-middot- I I Portion c2 --~ I

Portion A

middot ~

I I

I I I bull I I I

1 I I I

Portion D Portion C1

middot---middot-- middot

------4- - --

I I

IJ10000N Ibull

I I I

j j ~ I

i I bull I

I I( ~ I I

d f ( I

j ~i I 19SOO N I I

I I I

I I I I

I

I I I

I

I Silt Curt~ in I

H Construction of _____I box culverts

Silt Curt~ in

Note ~H Ust stnd fill (with up to 15o public fill) below +25mPO

Mid 2011

Legends

Stone column instollalon~

Seowoll consumiddotuction including stone columns amp- benn construction

gt-gtgt~gt Geotextilel sand fill sand ~_ blanket amp band droons

llllllllll llllll Box culvert

~ PublicFill

Surcharge

Perimeter Sih Curtoin

Project T itle Hong Kong- Z huha i - Macao Bridge Hong Kong Boundary C ross ing Facilities c fpound J~ sect ~ fP ~~ tfd~ k m- ~ ~~ 0 if Outline of Co nstruction S eq uence (S heet 2 of 10)

( Pla n o rig in ated from Figure 22 ofsubmiu cd doc uments dated 11620 I0 w ith Appli cati on fo r Va ria t io n ofm Envi ronmental Permi t no VE I middot3 15 20 I0)~16 I- tt If JYl (iflt I 0-t2) (Ill U1 ilfll ~20 1 0if6Jl ll 8 lJUOl ~it 11lt1~$TifSl I 111HtVEP-3 1520 1OtrrJ )( i- 11122)

Environmenta l Permit No EP-3532009KE nvironmental Protection Department Figure 13 Ji i5t 1 ti ~ J i jt tf- 0[ ~sect[ f~ ~Jt EP-3 53 2009K nru 13

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 30: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

i ~ i ~ ~

sect i isect

Envis~g~d N3vig3tion

Envisaged Route N3vlg~tion

Rout~

lOIOON ~ ~~ ------- ---

~r ----- 1

I ---- - I I --- Ji---- I I-------- c-_ I I-~--- middot -~ I I- ~ t middot - I I nr onn -

JlOOOOH Ilaquo I

I I I~ I

middot~ I

~~ I I I

I I

I I I

I19500~

I I

I

I ------

I

I _1--__ ---- I

I

I

_____ I I

I H SiltCun~lnConstruction ol box _____

culvens and n~w~ll

Portion B

Not~

Use stnd fill (with up to 15 public fill) below +25mPO

Earl 2012

Legends

Stone columnlnstollltion ~

Seawall construction including srone columns amp- berm construction

~middot~~middot--middot Geotextilel s~nd filii 5ltnd -t~~-laquo blanketamp lumd drains

1111111111111111 Box culven

ffif~lt Public Fill

Suocharge

Perimeter Silt Cunain

Prmiddotoject T it le Hong Kong- Z huhai- Macao Bridge H ong Kong Boundary C r oss ing Faci li t ies L [ ljt El ~ f~ ~~ Ji i- A ~ ~ ~~ a if Ou tline of Co nstr uction Sequ ence (S heet 3 of I 0)

(Plan originu tcd from Figure 2 ofsubmo ucd document~ doted 111620 I 0 with Allrlica ti on for Va riation ofon lnvirononcntal Permit no VE P-3 15 20 I0 _r_ ~If drJ(-tt I 0~3) Cill Abull)ijf e ~20 IOJl-6Jl ll 8 j( xtll ~ lt Jl JQ ll T 11 4 1i NO 1VEI -3 1520 I 06~J lt If- 11122)

E nvir onm enta l Permit No~ EP-3532 009K Figure 14 E nvironme ntal Protection Department J ijt 1t 0J t]t f~ ~Jt EP-3532009K li 14Jf iJt 17t- ~i f

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 31: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

3lt0000bull ~

~

~~

I~N

I

I I I I I

319000H Sift Curtun I ----shy

Portion 8

I ~

lampSOOH 1 Un S3nd fill (with up to JOY publie filii below +25mPO

2 Us~ publ ic fill 3bove +25mPO for 311 3rt3S

H i i ~ 1 i i ~ i

sect 1 i~ ~Envis3gtd

N~vig~tion Envis~g~d

Rout~ N~v ig3tion dDbullRout~

--- ----- I middot~ t I I ~~- lm I~

middot

)1 -===

I- p I

I Jbullbullmiddotbullmiddotla _

I ----

I

f ortion A _

I I

I I I

I I I

I I I

I I I

I

I I I I I I I I I I I

I I I I I I I I

I

Mid 2012

Legends

Stone column lnstollotion~

- Seawall construction induding stone columns amp berm construction

~~~middotgt~ Geotextilel sand fill sand lt~laquolt~~(ltbulllt~ blanket ampband droins

1111111111111111 Box culvert

~m PublicFill

Surcharge

Perimeter Silt Curtain

Project Title Hong Kong- Zhuh a i - Macao Bridge Hong Kong Boundary C ross ing Facilities _c rJi El ~ ~ ~t J$ i~ ~~ ~ ~t a If-Outline of Constru ction Sequence (Sheet 4 of 10)

(I Ian origina~cn from Figure 22 ofsubrniucd ltlocurncnls dalcd 11 6 20 I0 wi lh A r plicnion for Varialion ofan hnvironmcntallcnnituo VEI -315 20 10)~(Er tpoundJf IU~( I Ot4) (Ill MJilt i1 ht-2010-611118 -l- 30fl lltJitJk 1~~f1i~ 1AICLVEImiddot 315 20 10rl) ltff 11122)

E nvironmenta l Permit No EP-3532009KE nvironmental Protection Department tlt ~iL 1tz ~middotr W J Jt -tt Of 1i f~ ~Jt EP-3532009K-flt 1-Jt iT at ashy

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 32: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

lOOOH

~

2000()N

ai9SCO H

-H

N

~ I- IEnvisged Nvigt ion Route

----- ~ --- I

I I IJlmiddot

-

l ~f Portion A

-- ~

~-

-

I

middot _ Sih Cunin -

~ sect

~ ~

Envis3ged Nvig3tion Route

--shy

middotlf I tltt~ ~

I I I I I I I I I I I

I I I I I I

I I

I I

I I I

I I I

~ ~

regbull

Late 2012

I I

I I

Legends

I I I I

I I

I I

I

~

-Stone column instftllotion

Seawall consfuctlon Including stone columns amp berm conslfUctionI

I ~ _____

_ _ Geotextilel sond filii sond ~4t~~~ blanket ampband draint

Portion B 1111111111111111 Box culven

-----=--= Public Fill

Notts

1 Use snd fill (with up to 30 public fill) be low +25mPO Surchorge

2 Ust public fill 3bove +25mPD for 311 3ft 3S Perimeter Silt Cunoin

i~

P roj ect T itle Hong K ong- Z huh a i - Macao Bridge Hong Kon g Bound ar y C rossing Facili t ies rpound)~ El ~ ~iJ ~~ J ~~ A -m- if ~~ o tf Outline of C on struction Sequ ence (Sheet 5 of JO) ~~ x ~ Jf c~JmiddotKlt J0~5) ( Plan originated from F igure 22 ofsubm ill cd document~ dated 1116 2010 with Applicat ion lo r Va ria ti on ofnn f n v ironmcn t~ l lcrmil n o VE P-J 1520 1 0 )

( 11 M If lJ l-2010 $t-6l l l B lC ~Ill~ oIJIUt ~t i]11f bullIbull t1111 rtVE P-3 1520 10bltl 11 i1- 1122)

Environm enta l Protection Depa r t ment ~-Jf t 1f- tlf ~

E nvironmenta l Permit No EP-3532009K J t_t -tt t1f ti fo$ ~et EP-3532009K

F igure 16 ~ 16

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 33: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

~ ~ i I - ~ Envisaged

i i ~ sect i i

N3vigu ion Envisaged Route Navig3tion dDbullRoute

_- I I -

19100 N

)l

- I I------

~--=--=-- I

~ Surcharge

removed

I I

I I

I I I

I I

I I

I

I middot

I I I

I I

I I IIH Silt Cun1in _____ 1

I ---

Notes

tilOO H 1 Use S3nd fill (w ith up to 30~ public fill) below +25mPD

2 Use public fill ~bove +25mPD for ~11 lt1relt1s

--shy I

------- 1 ~- I ______ I laquo I

I

I I I I I I I I

I I I

1 I I~ I_( I

Earl 2013

Legends

Stone column ins tolllgttion~

- Seawall construction including stone columns amp bem1conslfllction

~-~~y Geotextilel sa nd filii sand ~~~~ blanket amp band drains

1111111111111111 Box culven

~= Public Fill

Surcharge

Perimeter Silt Cunoln

Proj ect T itle Hong Kong- Z huha i - Macao Bridge Ho ng Kong Boundary C rossing Facilities _L~poundt~ sect ~ ~ ~~~i~At~~ ~~ 0 If Outline of Co nstruction Sequ ence (S heet 6 of 10)

(Pla n orig inated from Figure 22 ofs ubmi tt ed docum ents dn tcd 11 6 20 10 with Appli ca ti on for Va riat io n ofm Envi ronm enwl Permit no VEP-3 15 20 I0 )~er flf A-~C I Oz6) (Ill NbullJ)If il ~~20 1 01f6Jl ll El J1 ~ ~l ~ tt Jlt J~ttfli bull11 tkn ltV IS11-3 1520 101orJ$t f lmiddot 11122)

E nvironm enta l Permit No EP-3532009KEnvironmental Protection Department ~tL 1Q_ _ it Jf iJt ~ liT ti f~ ~Jt EP-3532009KJ J-t ai ~

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 34: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

~ H sect i ~ i Envis3ged

i I ~ i lli I~

Nsvig3tion Envis3ged Route N3vig3tion

Route

H middotn --

regbull

middot ~ I I ~~ I I _ ___ I

I I I I I I I I I I

I I

N I I I I I

I

Project T itle Hong Kong - Z huh ai - Macao Bridge Hong Kong Boundary C ross ing Facilities I fpound JJi sect ~ ~it ~ Jjd~ k ~ ~ ~~ 0 f Outline of Construction Sequ ence (S heet 7 of 10)

( llan originated frltnn F igure 22 ofsubm itt ed document s dated 111620 10 with Applicat ion fo r Varin ti on ofan Environmcnwllcrm itn o VE I-3 1520 I 0 ) ~E c n q Id~(~ 1o~7) ( Ill Wlift 11 ~20 10lf-6Jl 11 B tit ~Ull ~ 7l Jlt lk 1~ TtJHbull t4middot1A ftVlll middot 3 1 S20 I OIIJ ltii- 11122)

E nvironm ental Permit No EP-3532009K Environm ental Protection Department Ji ijt tf- Of ~i r~ ~et EP-3532009K Ji i jt 17yen- ~i J

I I

I I I

I I I

I I I

I I

I I

middot I I

------ I

II I ~ II

H Silt Curtain I -----shyI

I

Surcharge removed

Notes

H 1 Use smd f ill (with up to 30 public fill) below +25mPO

1 2 Use public fill 3bove +25mPO for 311 3re3s

Mid 2013

Legends

Stone column inst~llation~

Seaw~ll constmction including stone columns amp - berm con5truction

~_ ~ G-eotextilet sand fill sond blanket amp band dratns

llllllllllllllll Box wlven

s~-= Public Fill ~~~~

Surch~rg~

P~rimeter Silt Cunain

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 35: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

i i I i ~ I~ ~Envis3gfd ~ ~ ~ middot N3vig3tion Envis3gfd

Route N3vigation Route $

~

)1 ~ ---- t I - I I I

I I

- - = _--~--

I I

1 I - I

I I 1 I 11u

I I I

-~

I

~

I

I

I I

I I I

I I I

I I I

I I

I I

I

Silt Cunoin I~

I~

~N

I-N _____ I

Surcharge removed

~lamplCOH

()-

- II I I I I I I I I I I I

alOOOO N I I

I I ~

Late 2013

Legends

Ston~ column instolilltion~

Seawall construction including stone columns amp- berm construction

yen~middot~~ Geotutiltl sand fili i sand ~~-~ blanket amp b~nd drains

1111111111111111 ao culvtn

~~ Public Fill

Surcharge

Perimrer Slit Cunaln

Project Title Hong Kon g- Zhuhai - Macao Bridge Hong Kong Bounda ry Crossin g Facilities L fpound )~ sect ~ $] 5~ Jt j~ ~ ~ 5~ 0 Jf-Outlin e of Constru ction Seq ucncc (Sheet 8 of I 0)

(P lan originated from Figure 22 ofs ubm itted dtgtCumcnts datecl 1116 20 I 0 wi th 1pplication for Variation ofan bnvirorHllCnta l lc omiddotmit no VIW-315201 0)~(EL tiJf - ~(amp l0~8 ) ( Jtl RbullJ ilf tt ~20 IOif-61111 8 -IX~ Jl ~ 1 liJk~Pftlt ~~ lA Ulo lliV I 1middot31 5 201 OI(JStffgt 11122)

E nvironmental Permit No EP-3532009KEnvironm ental Protection Department Jf Jt1f- tl g J Jt1f Of ti r~ ~t EP-3 532009K

shy

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 36: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

OOOH i ~ i i i i ~ i~ m ~ ~

Envis01ged Navigation dD

bullRoute

K

11

1~I

~~

Late 2014 19SOON

Stone column inst~llation

SeaWllll constmctionI including s1one columns amp benn constntctJon

I H

I bullmiddotbullmiddot~~-~~ Geo1extilel sand fili i sand ~~~ bh1nket ampbltnd dr3ins

1111111111111111 Box culven

I ~-~ Public fill

Surcharge WOOH

Perimeter Sill Cunaln

)1 ~--=======shy

l-l~

TverticOl l

~0111

~

-

Project Title Hong Kon g- Z huhai - Macao Bridge Hong Kong Boundary C tmiddotoss in g Facilities ~fIr~ El~ ffl ~~J5~A~~ ~~ a Outline of Co nstructio n Seq uencc (S heet 9 of J 0)

(Plan origin~ted from Figure 22 ofsubmiuc~ documen ts tinted 11 6 20 I 0 wi th Applica ti on for VnrialiOn ofu1 hnvironmcnwl Permit no VEI-3 15 20 I0) ~~ r UR- - WJ( iflt_ I Ot9) Ill AbullJ If B ~20 IOJj-6q I I 8 4t lUft ~ lt lll iQ- Of l ~middot SA10 ~Vtl -3 15 20 I0~~ $t fi- 11122)

Figure 20 0020

E nvironm enta l Permit No EP-3532009KEnvironmental P rotection Department Ji jt tt t7J ti- f$s ~t EP-353 2009K Jf Jt1m tt~ ~

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 37: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

i ~ I lsect ~

g I ~ ~ ~ ~

Envis3ged N3vig3tion dDRoute

tiOOOON

~

middot_~-

Mid 2015 19SOON

Stone column insullotion

Seowoll constluction I including stone columns amp berm construction

19000N I 1gt=raquoraquogt Geotextilel sond fil sand

~middot ~ blanketamp band droms

1111111111111111 Box culven

I ~~~ Public Fill

SurchorgeIampIOI)N

Perimeter Silt Cunain

J1 ~---

~

Legends

~

-

Project Title Hong Kong- Z huha i- Macao Bridge Hong Kong Bou nd ary C ross in g Facilities I ~pound r~ sect ~ $ ~~ Ji 5~ k ft- ~ ~~ 0 Jf Outline of Construction Seq uence (Sheet I 0 of 10) (Plan origina ted from Figure 22 ofsub miucd documents dated 11 6 20 I 0 with Appl ication for VniH ion ofan l)nviiOnmcntallcrmi t no V 1 1-3 15 20 I0) ~tL Uff- k ~(~I 0~1 0) (Ill A) ifll ~20 IOlf-6Jl I I a JUUit it d 1ltlt tt- fit bullIbull lgt 10 ftV F l-3 I 5 20 I O~J t ~f lll22)

E nvironmenta l Permit No EP-3532009K Figure 21E nvironmental Protection Department Ji _ltt Of ft ~ ~t EP-3532009K Ji_~i1R- t~ i 2 1

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 38: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

C~STRUCT SEAWALL AT FSD RESCUE BERTk

middot--- I

~

DREDGING FOil SEAWALL AND RECLWATDN lCOIIPLETpound0)

Stage 1

FILLI NG FOil INSTALLATION or APiol

OREOCINC FCJI TRENCH(TO INSTALL APII BY lilT IElHOO

Stage 4

Remarks

SEAWALL ~STllUCTl~ AT FSO RESCUE BERlli CcaflEltO) --

11 0u aJ0 ~aJ c~

c

Stage 2

u 110

aJ 0 ~ aJ c ~

c

Stage 5

1 Reclamation works for HKBCF and TM-CLKL Southern Landfall shall be completed prior to the commencement of the construction of APM Tunnel and re-provisloning of FSD Rescue Berth unless with the approval by the Director

2 The Future APM underground station I transit hall shall be construction on land basis

~-

11 0 aJ ~ c

~middot-

DREOCIHC FCJI TRENCH r~- TO IliS TAU APII BY lilT IEniOO

Stage 3

LEGEND

SIIQl SILT UIAUIH

CAEOlaquoO UU

___ A[C~~~IIOIIFilliNG IRU

--laquo FILLING IICAIS UlMLElEO

Proj ect T itle Hong Kong- Z huh ai- Macao Bridge Hong Kong Bo undary Crossin g Facilities L pound 1Ji sect _pound ~1 ~~Ji i~ k ~ ~~ 0 f O utline of Constru ction Sequ e nce (for APM Tunn el a nd FS O Rescue Ber th ) ~t r f1 Jf A_ $1il4t i M fit i1t amp )jlj F$ ~ fJ jt 4t ~B 1iZ) ( llon orlgi nnted from Figure 21a ofsubonillecl documents doted 7 1 ()10 I 0 with Application for Vtrintion ofan Environmen tnllc m it no VE I-32720 Itl )

l Ill Rl ~ld1 ~NlHOJt- 1 liH7 a lt lUll t 1t Jl Jl j-~fti If NO ltVEI-327201 Ob~ lt If- 1112 1 t)

E nvironmental Protection Department E nvironm ental P ermit No E P-3532009K Jg JiL JQ_ ~tpound W_ J jtlff- Of ~sectI~ ~Jt EP-3532009K of-lt x_ 171 iix_ a

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 39: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Plan View A Stone columns with -shy

base grout plugs ~

bull

TM-CLKL South Ventilation Building

bull bull

I

i I

i

i middot bull I

1 -l I

- i bullbull l i

~

bullbull i i i I

~ ___---- Stone columns behind ~ seawall cellular structure

i i I i

I i

Ibull middot l i i I

i middot bull middot i - bull I bull I I I middot I i I middot i I i

i I

I i bull

I I bull I

I j bull le

I I ~

i Note s The extent of stone columns is

I f approximate and indicative only ~middot ir

~

middot- Imiddot~

I

Project Ti tl e Hong Kong- Z huha i - Macao Bddge Hong Kon g Boundary Crossing Facilities L fI Jji El ~ ~$ ~~ ~- 51J k ~ -t ~~ 0 tf In terface between Seawa ll and TMmiddotCLKLTunn el S heet I of2) (Plan origino1cd fbullmiddotom Figure 22 ofsubmi tted documcn1s doled 27 I 020 I 0 with A pplicntion 1()1 Va riation ofnn ll nvironmental Permi t no VE P-32720 I 0)it Y1 pound W ~ f1l i4fc~ Fii1tll3-flt ~ )IJ Jff~ M(JIJ 4fc o (ft2~ 1) (Ill JJ Jlf 11 ~20 10~middot 10 l27 a~ SUit t ft Jl lQ1t bullnlt f1 ~lr 411VIll-32720 IOlh $t f- 11122)

Enviro nmental Permit No EP-3532009K F igure 22Environmental Protection Department J i tf- ay tt ~ha ~Jt EP-3532009K ~22Ji Jt 1f- -ti ~

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 40: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Section A-A

TM-CLKL South Ventilation Building

Vertical drains in Cope Line

Marine Deposits I Steel Sheet Pile Cellular Structure

~ Min 20m 1 Public Fill ~1 21

I J Rockflll~ bull ~xis~g Seabed -----r---t+-~-a--middot~trlta--o---rl~~- - w e a a ~

Minimum 3m below seabed Toe level t 11 raquol -21 5mPD

to 10m above Base grout plugs

1 1

5m clearance tunnel cr_own 1-1

I I I I

t C I i I I PO 1 1 1 1 bull 1 1l l 1 ] Approx -335m --- - -- ~ middot ~middot -middot-=middot- middot~tc -- shy

---~ Tunnel Bottom Level ___________ Approx -408mPD

TM-CLKL Tunnel Sections

Stone columns for overall wall stability with base

grout plugs

Project Title Hong Kon g - Z huh ai- Macao Bridge Hong Kong Boundary C rossin g Facilities L I )~ El ~ ~~ ~~ Jf- i~ k~ i ~~ 0 1f Inte rface between Seawa ll a n d TM -CL KL Tunn el (Sc he matic Seawall Sectio n A-A) Sh eet 2 of 2 it P9 f Ji Jl fl if~~ ri1 ift~ flt4 ~ J( t 1) fJ ~~ 0 (P lan originated from Figure 23 ofsubmillcd docu nocn tgt dnted 27 10 20 I 0 with App lication for Variation o f an Environme nwl l1ellnit no VIPJ27120 I 0) ( ~ JJ(A - Aeurot r ~ Isect] )~2t2 Ufl Nbulll ~- Q A~ZO IOIf-10Jl27 El it lOll~ ~t ~~ llttPf1ll ~middot tk lfo LVEI middot32720 I OOJ t ff Jil23)

E nvironmental Protection Department E nvironmen ta l Permit No E P-3532009K J Jitt Of lfi -~~ ~t EP-3532009K Jt iJt 1 ~~ I

shy

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 41: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

l

~

I I I I

I I 1 r

I I middot r

I I ~--lj shy t-

HlllltC JbullTtbullnobullbulll A(l9(1tl

1 - WJ

~~

--~~ ~ middot

~ ~ ~ ~ - ~- ~~

I

Vertical seawall supported by stone

columns or p1les

middot ~ __~ tobull Cl~fm shy bullbull3laquo1 U t ICOIH

~--middot~o eobull cubullr~4raquo4C)Ct I t t40CCIH

~pound0 llJIfJCl Etll~gtllt~ 801 CttIU1 hfCO)( t hftc)(11

r~Tr

oltrbullJt lttrv ro ooc WJ4 ~~l)tijl~t -

~ILIO ~ [lt --------------------~~~2___________ - 1 mm ~~11

-- ----shy

lLWD

j_gJ tbulll tlaquo WJrltbullf ltcon_bull -shy121 ltUt( Imiddot~ IANCOt

~jttlt(CIIIIf- IIIC tnDrgt

IJLU I CJ t t4-tJ)-) Ul )bull iti iJh(ll)t) Cftllt ~CWVIUfJU

~ 1(41(~ bull iC ll~Q -UItl_ lllolbull

) lIU1 S bull ntbullOt ~tllt b ~~ bull bullttbullL ~dbulll (tn~ OoiO LfG

bullmiddot rJIIITI bull~ ta -un~ llbulltrc1 ( -JJIItH~

OCfObullQ UtU r-~-middot -middot middot- ~ middot middot-- __ --shyw bullbull_ _ - __ bull bull - -middot - -shy _ ~ - shy ~~tccgtx __ lt 191$~ltmiddot--ltlt _t bull _bullbull _ + -~ bull

Nmt- W ~JmiddotmiddotMtfo~ 10 U LJ1 middot~TJgt 10 6T Cnd ----------~~~____ -- ---------shy

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C rossin g Facilities LfpoundJ~ sect ~ft ~~~i~ k~ ~~~ o 4shySeawall Fo rma t ion in Portion 0

(l lan originalcd from Figure 24 of~ubmi llcd documcou s doled 2 11 120 I I wilh Applicalion fo r VariHi on ofan En v ir(HgtIIlCnl~ l lcrmil no Vl P-3 43120 11)oe11 11- iiii JJt ~~ it (M Wl ilf Q ~20 II If I IA21 a~ SUil ~ ltt Jl Jt ~fgtTtst bull11 SA No 1VEP-343 2011 11~ Jt jf M24 )

Environm enta l Permit No E P-3532009KE nvironmental Protection Department Ji if tf- Of ~i it4 ~Jt EP-3532009KJfil1 ~i~

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 42: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Setbng outline

+55 mPD

Fill Rockfill

Box culverts

Sea water level

Marine Deposit

Project Title Hong Kong- Z huhai- Macao Bridge Hong Kong Boundary C ross in g Facilities L~pound~~ El ~~1 ~~~i~k~i~~ o if Typical Section a long Box C ulverts in Portion 0 Dl~ ~ ~ij ~ ~ )~ NR~1 ~-tJJ liJ (Plan originlled from Figure 25 ofsubrniued documents da ted 2710120 I 0 w ith App licatio n for Vtriat ion ofa n Environmentnl lcnn it no VEI-327 20 I0)

CIll ~middotI~pound M-20 I0~101127 8 4HUlt li JilU_ --T ~ middot~ 11 uatV J P-32720 IOltJ Jt f 11125)

Environmenta l Protection Department Ji iJt 1Jyen- tl shy

Environmental Permit No EP-3532009K Ji iJt -tt 0[ t1r ~Jij ~fv EP-3 53 2009K

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 43: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

+55 mPD

Fill Vertical drains

Marine Deposit

SettJng out line

Rockfifl

Project Title Hong Ko ng- Z huhai - Macao Bridge Hong Kong Boundary C ross ing Facilities _rpound~ 3 ~ ~1 5tJ-5~A~t 5t o tf Ty pical Section Across Area betwee n Box C ulve rts in Portion D

Sea water level

DJt~ -71shy~ $1i 1f~ a~ ~ ~ a0 Ill ~ ~~ iJJ RID (Plan originated from Figure 2fl ofs ubmitted documents dated 27 I0120 I0 with Appl icat ion for Vtrin t ion ofnn Environmcntt l lcrmit no VIJP-327120 I 0) i V a (lllWlilfll~20 1 01f-10Jl27a~UOUrtJitJt t1-TtlltftlAAItVEImiddot327120101hl if 11126)

E nvironmental Protection Department Ji if1$ t[ ~

E nvironm ental Permit No EP-3532009K J it tf- 0J ti fo~ ~Jt EP-3532009K

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 44: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

-----------------------

_~ng

M V~

Approx~35m - 65mI J l

1Imiddot I ADIfCbull 3 -mssmPo 1 - middot ~ Rock armour or Accropode

p middot~ below mean-low-low sea level

bull2l~I~ 1 middot Mean-low-low Sea Level

Fill I

l Vert1cal drains

J

Marine Deposit i

~ ~~ ~ rlsect ~~~ U 11 111 I Alt ~ R ~ ~ D ~ m

Sheet Pile

1middot1 I 1J I I ivanes2_ r 1 P W PZ M W Et bull Pi M bull f

M I

Alluvium

Stone Columns

L

Note All dirncnseons shovAI are approXlmate and ind1cat1Ye only

P roj ect Title H on g Kong- Z huh ai - Macao Br idge Hong Kong Bound a r y C ross in g Facili t ies LgtfI~ El~ ~j~~Jt~~Am-~ ~~ o ~

Ty p icaLSea wall C ross-sectio n (S lop ing Seaw a ii)(S heet I of 2) (l lan originaled from Figure 27 ofsubmined documcnls dtued 243 2016 wilh Applica ti on fo r Varintion ofnn Envi middotonmcntallcrmi l no V llPmiddot498120 16)

~~ i$ Jt tHJJ WiJ ( PJi 11+ iiJ- Jt) ( 412~ I ) ( Ill Jl~ ilf ll ~~20 163Jl24 a 41( lHit ~ lt 1IJt WT$ll 111 it141tYEPmiddot49820 166J t-11- lll27)

Environmental Protection Department Environmenta l Permit No E P-3532009K F igure 27 J tjt 1yen ti t Jf tJt tt Cf -~ ~Jt EP-3532009K IE27

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 45: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Sen~ng out ltnamp

Approx 35 m - SOm

____-- Vertical drains

Approx 312 m

Sea water level 1

Fill

Marine Deposit

Note All dimensions shown are approximate and indicative only

Proj ect Title Hong Kong- Zhuhai - Macao Bridge Hon g Kong Boundar-y Cross ing Facilities L tt 1Jt El ~ ~lt ~t- Ji i~ ~w~t- 0 If Typica l Seawall Cross-section (Vertical Seawaii)(Sheet 2 of2)

(Pla n originated from F igure 27a ofsubmilled documents dated 271020 I 0 with Application for Variati on o f an Environmenta l Perm it no VEP-3272 0 I 0) ~ 1 ifj Jt ctJJ liD C~ it ifj Jt) C-2z2) (Ill Jl If fl 120 10-t-10 Jl27 8 middotlUOIU itJt Jt11-T llH llf 1(1 ~VEP-32720 IOfiJ $t 14- 00270)

Environmental Permit No EP-3532009KEnvironmental Protection Department Ji ift-tt 0[ ti Mh ~Jt EP-3532009K Jf ift1 till

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 46: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

~

cvshyshyi

~

Vert1cal seawall

REPROVIS ION ING OF FSO SEA RESCUE BERTH

Portion A

middotmiddotmiddotmiddot -

Portion C1

PROPOSED HONG KONG LINK ROAD

Portion C2

middotmiddotmiddotmiddot~ middot-middot middotmiddot

_

Po rtion B

1

I

I

l bull bull J t7middotmiddotmiddot c

117 J

s i

c8 ~ (j

i ~_

shy Vert1cal seawall

Slop1n9 seawall

PROPOSED TUEN MUN -SOUTHERN ~

Project Title Hon g Kon g - Z huhai- Macao Brid ge Hong Kong Boundary C r oss in g Faciliti es r ~ )~ sect ~ ~lj ~~~ i~ ) m i ~~ 0 4shyLocation Plan fo1middot Ver tical Seawa lls a nd S lopin g Seawa lls Yf B i1t JJt amp Jt i$i 1Jt 1il jj_ ~

(Plan ori gina1ed from Figure 28 ofsubmi ucd documcrlls da1cd 111620 I 0 wilh Applicalion for Vnrialion ofan Environmcnlnl Pcrrnil no VEP-315 20 10) (Ill AHfll ~20 IO$f-6Jl ll a 4t SUit~ it l(t JUt- ~11 I tft to lltVEP-3 1 5120 lOft st 11shy III2S)

Environm ental P~ote~on Department le~~l ~ix1m al~ ~

E nvironmental Permit No E P-3532009 K Ji ijt ~Of ti ~ ~JL EP-35320 09K

Figure 28 ~28

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 47: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

Stone column cnstallalion pomt

Schematic Plan ~

Installed stone columns and barges not shown for clarity

Remarks

cl

~middot8 = I

oo I

bull

Alluvium

l e I ~ a middot== middotmiddotshym Aggregate blanket I

Schematic Section ~

---shy mud ~---- ~

1 The installation method of stone columns (approx 1m dia And 25m long) is shown for illustration purpose

2 A perimeter silt curtain will be installed for the whole reclamation area

Project Ti t le Hong Kong - Zhuhai - Macao Bridge Hon g Kong Boundary Crossing Facili t ies I~poundx~ sect t ~it ~~Jii~k~~ ~~a If Mitigation Meas ures for Ston e C olumn Installa t ion 4 G 4t 4i- ilt aJ ~ f4f 411middot ~e

Environmental Protection Department Ji it 1- ~i ishy

(Plan ori ginnlcd from Figure 29 ofsubmiucd documcnls dnccd 27 1020 I 0 wich Atgtpl ica ti on for Valiacio n ofan Envi ronmcntallcrmit no VEP-32720 I 0) (Ill NbullJ ilf IJ $20 I Olfmiddot l 01127 a l~ SOl ~ ft J- JtWT Ill bullIbull ltNI ftVE P-32720 IOM x f lll29)

E nvironmental Permit No EP-3532009K J it -tt Of~ fl~ ~t EP-353 2009K

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 48: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

~ _

lS

Cl sect ~

_ ~ ~

~ All COIJIOINA 1H ARE RHHEO iO ~ON~ ltO~G

19amp0 -~ iO

l Till~ Okn Jo IS RACED f~DII lOll~ I~~ ORr l10l61SL I 00l Spound~1NG OUT()~ POITONS ~wbull~ bull ftErE~W middoto -~r bullc~r fN OA awlltr~

lfWiQ

- bull shy -shy snbullt~ OJ- u bull~ na 1

IT T T I lO)

I -1

PCbull~i(liS 9ltPJ~O~ ll~pound

P~fJgtOStO CEllUI AO PIUCT~Rpound

SLIP J~~ ~ gttiLl t ~ERbull

CbullltgtlCE ) OoE TRES 11~middot~ Spound TT Jl( rur t ttE

middot~JliC~bulll ~pound-llEPOS tt iG Ot~bullCSALbull=ltbulls c~ bulllL OT[WlipoundS U CPEDGpound0 s~tOf ~i)ll ~amJ o

Project Title Hon g Kon g - Zhuhai- Macao Brid ge Hon g Kong Boundary Cross in g Facil ities L ~ Jfi El ~ ~~ ~~ Ji i~ k~ ~ i~ 0 tf-Location Plan for Ad di t io ntl R e-d e pos ition A bullmiddoteas fo r All C atego ries of Dred ged Sedime nt

SEAWALL PORTIOII Etshy

HONG KONG Q

INTERNATIONAL ~middot AIRPORT

t middot

-L

S( ~ltllll ~R1 10~ 0 -

- _Stf-laquo~ll iO~i OH 0

- IOFfiUPI H ULL gtbull ( a

PORTION Clo

Sf~_ ~~ 4

~gtlo~ 8

POR TIOtl 8

1~ ~~ JN JfL sect( W ift a~ ill~ J)fl jlj gtJl ~t (amp 1tt Ji fiE (Plan origina1cd from Figure 30 ofdocumen1s middotcceivcd on 27122 012 wilh Applicalion for Vnrin1ion ofan Environmenla l Permi1 no V JW-35520 I 2) Ull ~middotJ ilf li ~~20 12$f-2Jl27 a ~t tJ rtt t ~tJ~ JQ11 bullT i q lk14 tfVEI-355120 J21J lt 11 11130)

E nvironmental Permit No EP-3532009K E nvironmental Protection Department -rt ltL jQ_ ~middot lL JJt1t-Of~jpound~ EP-3532009K J-f-lt Jyt Jr- cl_ ashy

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 49: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

J)middotpil~ll Pl111 io bullr llcmiddotdcfgttilion of All Catcguribull ullhctl11cd ictlimcnt in 111 IICI

I

I

ltcobulldCJOSilion sulmrfll for receiving all Callt)Oriclt or dred~cJ sedirufnt 1 v

steel sheet pile wall

silt curtain

lntri114 014IC~- tu tbullJ(tUHiun or 11

li Jrcd~J gtltdloncnl

71

Floating Steel Sheet Pile buoy Sealevel

~~--------1 I -- Silt Curtain I geotextile I 2m thick sand blanket ~7 k I

weght y Csand bund

~

sea bed

rcmiddotdcpegtslllon ur l)m thick all Section 1-1 calqorio or drW~c-d ~rdln1fnl

Project Title Hong Kong- Z huhai- Macao Brmiddotidge Hong Kong Boundary Cross ing Facili t ies tfpound~ EJ --t f1~~Ji~~A~w ~~off Detai ls of Silt C urta in s ant Steel Sh eet Pile Wall Arou n d t he Re- d ergtos it ion S u b-area fll ~ Ji- m fit IJt ~ ~ fll ~ ift ~ f~ amp ~ ~amp ~t M~ euro1-J iuJ llfi (Pion origina ted from Figure 31 ofdocuments received on 27220 12 with Appl ication for Variation ofon Environmental Permit no VEP-35520 12)

( ~ 111if (J ~20 12~2)l27 a ~HbullI yen~ t ~t J~Jt1l-f~ l tt IIIo $tVEI-355 20 12ff Jt 11- 1131)

Environmental Protection Department E nvironmental Permit No EP-3532009K ~~ ~b jq_ ~~ W_ gtflt X- 171 o a J ijt -yenfay~ f~ ~Jt EP-3532 009K

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot
Page 50: .1 ~iift$1t)i:t - Environmental Protection Department · 3. Application for Environmental Permit on 15 June 2009 (Application No.: AEP-353/2009)

iymiddotmiddotmiddotmiddot~~ ~ ~

pound _ bull

Derrick Barge with enclosed grab system

-V bloQO

11 Oonlt Uyot Sill C-

Option A- Derrick Barge with enclosed grab system

~

middot

~L EndoSodolde-

11~~~~-- - middot ~

9 bii90 -16gt-lOml_

- ~- Ibull~- obullmiddotwltw middot middotbullmiddot ~~~~middot~

Pelican Barge

I I

J

I OouNe uylaquo sow

7shy ~

Opt ion B- Pelican Barge

Project Title Hon g Kong- Z h uhai - Macao Btmiddotidge Hong Kong Boundary C ross ing Facilities x ~ )~ El _pound 1f ~~ Ji ~~ A ~ i ~~ o JyenshyCage Type Double La yer Silt C urt a in for Sa nd Blanke t Filling Jfl ~ il- ~ fl J~ plusmn fJ ~ fl ~ i( F~ rY ~t (Plan orig inaoed from Appendix 0 ofdocumcno s received on 180420 13 with Appl ication for Variation o f an Environmennlle nnit no VEI-40220 13)

( ~ A1 ilf tJ raquo~20 13f-04 J 18 a ~UHl ~tJ~ Jt1tmiddot iif li bull11 1)tl 1VEP-40220 136~ )t flmiddot Nlft-D)

E nvironm ental Permit No EP-3532009KEnviro nm enta l Protection Department Je HL 112_ ~middotfi ji_ Ji ~t- Of ~i f~ ~t EP-3532009Kf-lt J) iT l_ ashy

shy

  • 结构书签
    • Annot
    • Annot

Recommended